CN218595857U - Hoisting system is changed to track roof beam stock - Google Patents
Hoisting system is changed to track roof beam stock Download PDFInfo
- Publication number
- CN218595857U CN218595857U CN202222364208.4U CN202222364208U CN218595857U CN 218595857 U CN218595857 U CN 218595857U CN 202222364208 U CN202222364208 U CN 202222364208U CN 218595857 U CN218595857 U CN 218595857U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- track beam
- motor
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/12—Trolleys or crabs, e.g. operating above runways having hoisting gear adapted to special load-engaging elements and not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C5/00—Base supporting structures with legs
- B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/14—Trolley or crane travel drives
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本实用新型涉及轨道梁施工时设备领域,具体来说是一种轨道梁锚杆更换吊装系统,包括吊装机构;所述吊装机构布置在龙门架上;所述吊装机构包括拖杆,所述拖杆通过吊绳与吊装电机相连接;本实用新型公开了一种轨道梁锚杆更换吊装系统,本实用新型公开的吊装系统可以实现轨道梁的架高和横移,方便后续实现轨道梁的移位,继而方便了轨道梁锚杆的后续更换操作。
The utility model relates to the field of equipment for track beam construction, in particular to a track beam bolt replacement hoisting system, including a hoisting mechanism; the hoisting mechanism is arranged on a gantry; The rod is connected with the hoisting motor through the sling; the utility model discloses a hoisting system for replacing the anchor rod of the track beam. position, which in turn facilitates the subsequent replacement of the track beam anchor.
Description
技术领域technical field
本实用新型涉及轨道梁施工时设备领域,具体来说是一种轨道梁锚杆更换吊装系统。The utility model relates to the field of equipment during track beam construction, in particular to a track beam bolt replacement and hoisting system.
背景技术Background technique
传统轨道梁锚杆更换时需要用到吊装设备。Lifting equipment is required for traditional track beam bolt replacement.
传统吊装设备一般就是通过绑带绑在轨道梁上,再配合吊具实现轨道梁的吊装,传统吊装设备虽然可以实现轨道梁的吊装,但是因为吊装设备结构单一,使得轨道梁吊装不稳定性。The traditional hoisting equipment is generally tied to the track beam by straps, and then cooperates with the spreader to realize the hoisting of the track beam. Although the traditional hoisting equipment can realize the hoisting of the track beam, the single structure of the hoisting equipment makes the hoisting of the track beam unstable.
所以为了实现轨道梁的稳定吊装,就需要对现有吊装设备进行优化设计。Therefore, in order to realize the stable hoisting of the track beam, it is necessary to optimize the design of the existing hoisting equipment.
实用新型内容Utility model content
本实用新型的目的是提供一种能够稳定实现轨道梁吊装的吊装系统。The purpose of the utility model is to provide a hoisting system capable of stably hoisting rail beams.
为了实现上述目的,本实用新型采用的技术方案为:In order to achieve the above object, the technical solution adopted by the utility model is:
一种轨道梁锚杆更换吊装系统,包括吊装机构;所述吊装机构布置在龙门架上;所述吊装机构包括拖杆,所述拖杆通过吊绳与吊装电机相连接。A track beam bolt replacement hoisting system includes a hoisting mechanism; the hoisting mechanism is arranged on a gantry frame; the hoisting mechanism includes a tow bar, and the tow bar is connected to a hoisting motor through a sling.
所述拖杆两端设有限位挡块。Both ends of the tow bar are provided with limit stops.
所述拖杆两端分别通过楔形吊架与吊绳相连接。The two ends of the tow bar are respectively connected with the suspension ropes through wedge-shaped hangers.
所述拖杆以及楔形吊架与轨道梁贴合处均设有橡胶垫。Rubber pads are provided at the junctions between the tow bar and the wedge-shaped hanger and the track beam.
所述吊装电机连接有支架机构;所述支架机构包括设置在龙门架上的支撑架,所述支撑架上设有电机底座,所述吊装电机布置在电机底座上;所述电机底座能够在支撑架上横向移动。The hoisting motor is connected with a support mechanism; the support mechanism includes a support frame arranged on the gantry frame, the support frame is provided with a motor base, and the hoisting motor is arranged on the motor base; the motor base can support Shelves move laterally.
所述吊装电机的输出端连接有吊装辊,所述吊装辊布置在电机底座上;所述吊装电机通过吊装辊与吊绳相连接。The output end of the hoisting motor is connected with a hoisting roller, and the hoisting roller is arranged on the base of the motor; the hoisting motor is connected with the hoisting rope through the hoisting roller.
所述电机底座下端设有滚动辊轴。The lower end of the motor base is provided with a rolling roller shaft.
所述电机底座与水平推动机构相连接;所述水平推动机构包括水平液压杆;所述水平液压杆通过电机底座与吊装电机相连接。The motor base is connected with the horizontal pushing mechanism; the horizontal pushing mechanism includes a horizontal hydraulic rod; the horizontal hydraulic rod is connected with the hoisting motor through the motor base.
本实用新型的优点在于:The utility model has the advantages of:
本实用新型公开了一种轨道梁锚杆更换吊装系统,本实用新型公开的吊装系统可以实现轨道梁的架高和横移,方便后续实现轨道梁的移位,继而方便了轨道梁锚杆的后续更换操作。The utility model discloses a system for replacing and hoisting rail beam anchor rods. The hoisting system disclosed in the utility model can realize the elevation and lateral movement of rail beams, facilitate subsequent realization of the displacement of rail beams, and then facilitate the installation of rail beam anchor rods. Subsequent replacement operations.
附图说明Description of drawings
下面对本实用新型说明书各幅附图表达的内容及图中的标记作简要说明:The following is a brief description of the contents expressed in the accompanying drawings of the utility model specification and the marks in the figures:
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型使用时的主视图。Fig. 2 is the front view when the utility model is in use.
图3为图1中的局部放大图。FIG. 3 is a partially enlarged view of FIG. 1 .
上述图中的标记均为:The symbols in the above figures are:
1、拖杆,2、吊绳,3、吊装电机,4、电机机座,5、滚动辊轴,6、吊装辊,7、楔形吊架,8、限位挡块,9、橡胶垫,10、支撑架,11、龙门架,12、水液液压杆,13、轨道梁。1. Towbar, 2. Lifting rope, 3. Hoisting motor, 4. Motor frame, 5. Rolling roller shaft, 6. Hoisting roller, 7. Wedge hanger, 8. Limit block, 9. Rubber pad, 10. Support frame, 11. Gantry frame, 12. Water-liquid hydraulic rod, 13. Track beam.
具体实施方式Detailed ways
下面对照附图,通过对最优实施例的描述,对本实用新型的具体实施方式作进一步详细的说明。The specific implementation of the present utility model will be described in further detail below through the description of the best embodiment with reference to the accompanying drawings.
一种轨道梁13锚杆更换吊装系统,包括吊装机构;所述吊装机构布置在龙门架11上;所述吊装机构包括拖杆1,所述拖杆1通过吊绳2与吊装电机3相连接;本实用新型公开了一种轨道梁13锚杆更换吊装系统,本实用新型公开的吊装系统可以实现轨道梁13的架高和横移,方便后续实现轨道梁13的移位,继而方便了轨道梁13锚杆的后续更换操作。A
本实用新型公开了一种轨道梁13锚杆更换吊装系统;本实用新型公开的吊装系统可以用于轨道梁13的吊装操作,具体实施时,可以实现轨道梁13的架高和横移,从而实现锚杆的后续更换操作,另外,本实用新型通过吊装机构与水平推动机构的配合,可以小范围内移动对应的轨道梁13,可以在小空间内实现轨道梁13的稳定抬升,方便后续的锚杆更换操作。The utility model discloses a hoisting system for replacing anchor rods of
具体,本实用新型公开的吊装系统主要是用于对轨道梁13进行抬升和移位,改变轨道梁13在锚杆正上方的布置,继而方便后续的锚杆更换操作。Specifically, the hoisting system disclosed in the utility model is mainly used for lifting and shifting the
另外,在本实用新型中吊装系统包括设置在龙门架11上的吊装电机3,本实用新型吊装电机3的设置,为一个吊装驱动部,吊装机构起到很好的连接作用,方便了吊装系统与轨道梁13之间的连接;具体,本实用新型中所述吊装机构包括拖杆1,所述拖杆1通过吊绳2与吊装电机3相连接;拖杆1在使用时放置在轨道梁13下方,两端分别通过吊绳2与吊装电机3相连接,吊装电机3连接有吊装辊6,吊装电机3带动吊装辊6进行转动,吊绳2在吊装辊6上进行缠绕收卷,从而方便实现轨道梁13的吊装上升;在轨道梁13吊装上升到设定位置后,通过水平推动机构实现实现对轨道梁13的横移,实现锚杆的暴露,方便实际更换操作;另外,在本实用新型中水平推动机构设置在龙门架11上,水平推动机构推动吊装机构横向移动,最终实现轨道梁13的横向偏移。In addition, in the utility model, the hoisting system includes the hoisting
进一步的,在本实用新型中所述拖杆1两端设有限位挡块8;限位挡块8的设置,起到很好的限位作用,方便拖杆1与轨道梁13连接的稳定性。Further, in the utility model, the two ends of the tow bar 1 are provided with limit stoppers 8; the setting of the limit stoppers 8 plays a very good position-limiting effect, and facilitates the stability of the connection between the tow bar 1 and the
进一步的,在本实用新型中所述拖杆1两端分别通过楔形吊架7与吊绳2相连接;楔形吊架7的设置,起到很好的桥接作用,方便了吊绳2与拖杆1之间的连接,另外,楔形吊架7上端大下端小;楔形吊架7上端挤压在轨道梁13侧面,起到很好的限位作用,保证轨道梁13放置的稳定性。Further, in the utility model, the two ends of the towing rod 1 are respectively connected to the
进一步的,在本实用新型中所述拖杆1与轨道梁13贴合处设有橡胶垫9;橡胶垫9起到很好的隔离;避免拖杆1损伤轨道梁13;同时在楔形吊架7上也设有橡胶垫9,也起到很好的防护作用。Further, in the utility model, a rubber pad 9 is provided at the joint between the tow bar 1 and the
进一步的,在本实用新型中所述水平推动机构包括水平液压杆12,所述水平液压杆12一端与龙门架11相连接;另一端与吊装电机3相连接;所述水平液压杆12通过电机底座4与吊装电机3相连接;水平液压杆12的设置,在实际使用时,水平液压杆12的启动,可以推动吊装电机3横向移动,继而实现轨道梁13的横向移动;另外,为了方便水平液压杆12与吊装电机3之间的连接,在本实用新型中水平液压杆12通过安装座与吊装电机3相连接;安装座布置在电机底座上。Further, in the utility model, the horizontal pushing mechanism includes a horizontal
进一步的,在本实用新型中所述龙门架11通过支架机构与吊装电机3相连接;所述支架机构包括设置在龙门架11上的支撑架10,所述支撑架10上设有电机底座4,所述吊装电机3布置在电机底座4上;所述电机底座4能够在支撑架10上横向移动;所述电机底座4与水平推动机构相连接;本实用新型通过支架机构的设置,方便了吊装电机3在龙门架11上的放置,另外,方便了后续与水平推动机构的之间的连接;为了规避干涉,在支撑架中心区域设有穿接通槽,方便后续使用时吊绳的穿过。Further, in the utility model, the
进一步的,在本实用新型中所述电机底座4下端设有滚动辊轴5;滚动辊轴5的设置,方便了电机机座的移动,进而方便了整个吊装机构的横向移动。Further, in the utility model, the lower end of the motor base 4 is provided with a
具有;have;
本实用新型提升吊装电机3转动,带动承载轨道梁13的拖杆1,完成轨道梁13提升,承载轨道梁13拖杆1底部设置挡块限位和楔形吊架7,楔形吊架7上面大,下面小,起吊时形成水平力防止轨道梁13倾覆。The
轨道梁13提升至高于锚杆顶部时配合水平液压杆12将电机与轨道梁13平移,先左移动时,更换右侧锚杆,完成后向右移动更换左侧,本实用新型通过这样的操作方式,减小轨道梁13吊装的横向移动距离,避免了轨道梁13的摆动风险。When the
具体;specific;
本实用新型公开的吊装系统主要包括吊装电机3、吊绳2与拖杆1;使用时启动吊装电机3通过吊绳2与拖杆1将轨道梁13抬升,拖杆1两端设置挡块限位,同时在拖杆1,挡块限位与轨道梁13接触面加设橡胶垫9,防止刚性接触损坏轨道梁13。The hoisting system disclosed in the utility model mainly includes a hoisting
另外,在本实用新型中拖杆1与吊绳2通过楔形吊架7连接,楔形吊架7与拖杆1采用铰接连接,可转动角度,整体形成上面大,下面小,起吊时楔形吊架7形成水平力,确保轨道梁13稳定,同时设置橡胶垫9,防止刚性破坏。In addition, in the utility model, the tow bar 1 and the
起吊前应先将固定上支座与锚箱的锚杆上的螺栓去除,同时应将轨道梁13之间连接的指形板拆除,防止单片轨道梁13提升时造成轨道梁13破损。Before hoisting, the bolts on the anchor rods that fix the upper support and the anchor box should be removed, and the finger plates connected between the track beams 13 should be removed simultaneously to prevent the track beams 13 from being damaged when the single piece track beams 13 are lifted.
在纵坡处应先将较低一端轨道梁13提升至与较高一端平齐后再两端同步提升,确保轨道梁13稳定性。At the longitudinal slope, the
本实用新型公开的水平推动机构主要包括:水平液压杆12;The horizontal pushing mechanism disclosed in the utility model mainly includes: a horizontal
在本实用新型中平移工作主要由水平液压杆12完成。Translation work is mainly completed by the horizontal
吊装电机3通过吊装电机3底座与吊装电机3支撑架10相连接,吊装电机3支撑架10与龙门架11连接;吊装电机3底座与吊装电机3支撑架10之间采用滚轴连接。The hoisting
轨道梁13抬升至略高于锚杆后,通过装置顶部的水平液压杆12将吊装电机3以及轨道梁13同时水平移动,先左移动时,跟换右侧锚杆,完成后向右移动更换左侧锚杆,以减小总体平移行程。After the
吊杆位置通过增加楔形吊架7,整体形成上面大,下面小,产生水平力,防止轨道梁13倾覆。Suspender position is by increasing wedge-shaped
显然本实用新型具体实现并不受上述方式的限制,只要采用了本实用新型的方法构思和技术方案进行的各种非实质性的改进,均在本实用新型的保护范围之内。Apparently, the specific implementation of the utility model is not limited by the above methods, as long as various insubstantial improvements are made by adopting the method concepts and technical solutions of the utility model, they all fall within the protection scope of the utility model.
Claims (8)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222364208.4U CN218595857U (en) | 2022-09-06 | 2022-09-06 | Hoisting system is changed to track roof beam stock |
| PCT/CN2023/104392 WO2024051316A1 (en) | 2022-09-06 | 2023-06-30 | Hoisting system for track beam anchor rod replacement |
| DE212023000077.6U DE212023000077U1 (en) | 2022-09-06 | 2023-06-30 | Lifting system for replacing anchors of a railway track support |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222364208.4U CN218595857U (en) | 2022-09-06 | 2022-09-06 | Hoisting system is changed to track roof beam stock |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218595857U true CN218595857U (en) | 2023-03-10 |
Family
ID=85398659
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222364208.4U Active CN218595857U (en) | 2022-09-06 | 2022-09-06 | Hoisting system is changed to track roof beam stock |
Country Status (3)
| Country | Link |
|---|---|
| CN (1) | CN218595857U (en) |
| DE (1) | DE212023000077U1 (en) |
| WO (1) | WO2024051316A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024051316A1 (en) * | 2022-09-06 | 2024-03-14 | 中铁上海工程局集团有限公司 | Hoisting system for track beam anchor rod replacement |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104555732A (en) * | 2015-01-18 | 2015-04-29 | 河南省中原起重机械总厂 | Multifunctional portal crane |
| CN207078935U (en) * | 2017-05-04 | 2018-03-09 | 中交第二航务工程局有限公司 | A kind of portable full circle swinging mast loop wheel machine anchor |
| CN110053634B (en) * | 2019-05-05 | 2024-05-28 | 中铁上海工程局集团有限公司 | A straddle-type rail beam transporter and use method thereof |
| CN110407097B (en) * | 2019-07-22 | 2021-04-27 | 中国电建集团河南工程有限公司 | Construction method for hoisting novel phase modulator based on portal frame and Lao Xinge device |
| CN212712462U (en) * | 2020-05-20 | 2021-03-16 | 中铁二局集团有限公司 | Steel rail hoisting device |
| CN113636467A (en) * | 2021-07-28 | 2021-11-12 | 中国三冶集团有限公司宁波分公司 | A rolling mill stand hoisting device |
| CN115369708A (en) * | 2022-09-06 | 2022-11-22 | 中铁上海工程局集团有限公司 | Replacement equipment and replacement method for single-rail support anchor rod in limited space |
| CN218595857U (en) * | 2022-09-06 | 2023-03-10 | 中铁上海工程局集团有限公司 | Hoisting system is changed to track roof beam stock |
-
2022
- 2022-09-06 CN CN202222364208.4U patent/CN218595857U/en active Active
-
2023
- 2023-06-30 DE DE212023000077.6U patent/DE212023000077U1/en active Active
- 2023-06-30 WO PCT/CN2023/104392 patent/WO2024051316A1/en not_active Ceased
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024051316A1 (en) * | 2022-09-06 | 2024-03-14 | 中铁上海工程局集团有限公司 | Hoisting system for track beam anchor rod replacement |
Also Published As
| Publication number | Publication date |
|---|---|
| DE212023000077U1 (en) | 2024-03-25 |
| WO2024051316A1 (en) | 2024-03-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106744312B (en) | The hanging method of tower turnover device and tower | |
| CN109695204B (en) | Bridge girder erection machine and bridge girder erection method | |
| CN201250064Y (en) | Front launching nose type bridge girder erection machine for bridge erection | |
| CN108149589B (en) | Large span tunnel box girder bridge erecting machine | |
| CN104594198A (en) | Method for erecting parallel box girders in tunnel | |
| CN218595857U (en) | Hoisting system is changed to track roof beam stock | |
| CN216377245U (en) | Tire gantry crane capable of moving stably | |
| CN108130862B (en) | Tunnel beam transport vehicle | |
| CN111960326A (en) | Traction lift platform for railway rescue | |
| CN109112963B (en) | Bridge hoisting equipment | |
| CN204211152U (en) | A conveyer is rolled in a kind of lifting | |
| CN211496663U (en) | A gantry crane support device | |
| CN211496614U (en) | A variable height gantry crane | |
| CN211444749U (en) | A fine-tuning displacement system for a trolley spreader on a crossing-type quay crane | |
| CN108166392A (en) | A kind of floorings hanging device and method | |
| CN221191230U (en) | Auxiliary device for hoisting bridge girder erection machine | |
| CN207904776U (en) | Cross tunnel beam car | |
| CN215621959U (en) | Variable-track hydraulic electric transverse beam moving vehicle | |
| CN214883046U (en) | Repair beam erection equipment | |
| CN211496612U (en) | A gantry crane bracket with lifting function | |
| CN214648235U (en) | Mine tunnel slide rail motor car | |
| CN212000667U (en) | Rotary folding beam replacing machine | |
| CN211973154U (en) | Foldable beam replacing machine | |
| CN209051466U (en) | Cabinet body positioning apparatus | |
| CN115369708A (en) | Replacement equipment and replacement method for single-rail support anchor rod in limited space |