CN216276816U - Connecting assembly for hanging frame of building machine - Google Patents

Connecting assembly for hanging frame of building machine Download PDF

Info

Publication number
CN216276816U
CN216276816U CN202122203759.8U CN202122203759U CN216276816U CN 216276816 U CN216276816 U CN 216276816U CN 202122203759 U CN202122203759 U CN 202122203759U CN 216276816 U CN216276816 U CN 216276816U
Authority
CN
China
Prior art keywords
bailey
building machine
assembly
fixed
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122203759.8U
Other languages
Chinese (zh)
Inventor
瞿晶亮
薛超
朱正明
袁用纪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Dameng Security Technology Co ltd
Original Assignee
Guangzhou Dameng Security Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Dameng Security Technology Co ltd filed Critical Guangzhou Dameng Security Technology Co ltd
Priority to CN202122203759.8U priority Critical patent/CN216276816U/en
Application granted granted Critical
Publication of CN216276816U publication Critical patent/CN216276816U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型提出了一种造楼机挂架连接组件,其包括贝雷架单元、挂架和滑动吊头组件,通过设置滑动吊头组件,在贝雷架桁架下玄杆上左右移动,可快速调节立杆之间的间距,从而适应不同宽度和数量的防护板,便于安装;连接板与立杆之间、以及立杆与立杆之间可通过螺栓插接通孔,快速安装和拆卸,并调节挂架高度;设置转角柱头,可快速连接贝雷架,进一步设置固定吊头组件,与滑动吊头组件相互配合,防止挂架整体水平移动;本实用新型的造楼机挂架连接组件,具有零部件易得、成本低、强度高,且便于快速组装和拆卸的优点,便于大规模推广应用。

Figure 202122203759

The utility model proposes a connecting assembly for a hanger of a building building machine, which comprises a beret frame unit, a hanger and a sliding hanger assembly. Quickly adjust the spacing between the poles to adapt to different widths and numbers of protective panels for easy installation; bolts can be inserted through holes between the connecting plate and the pole, and between the pole and the pole for quick installation and removal , and adjust the height of the hanger; set the corner column head, which can quickly connect the Bailey frame, and further set the fixed hanger assembly, which cooperates with the sliding hanger assembly to prevent the hanger from moving horizontally as a whole; the building machine hanger of the utility model is connected to the hanger The assembly has the advantages of easy availability of parts, low cost, high strength, and easy rapid assembly and disassembly, which is convenient for large-scale popularization and application.

Figure 202122203759

Description

造楼机挂架连接组件Building machine hanger connection components

技术领域technical field

本实用新型涉及建筑施工领域,尤其涉及一种造楼机挂架连接组件。The utility model relates to the field of building construction, in particular to a connecting assembly for a hanger of a building machine.

背景技术Background technique

传统的高层建筑施工平台,一般称之为爬架或者脚手架,通过顶升机构,驱动挂架上升,施工人员在挂架上进行施工作业。The traditional high-rise building construction platform is generally called climbing frame or scaffolding. Through the jacking mechanism, the pylon is driven to rise, and the construction personnel carry out construction work on the pylon.

随着近年来人工成本的快速攀升,建筑行业也面临人力资源不足的情况,于是,造楼机的概念被顺势提出,其在传统爬架或者脚手架的顶部设置了大型作业平台,通过顶升机构,驱动大型作业平台和挂架上升,通过大型作业平台和挂架上搭载的自动化设备,从而快速施工,降低人力资源需求。With the rapid rise of labor costs in recent years, the construction industry is also facing the situation of insufficient human resources. Therefore, the concept of building machine was proposed. It sets up a large working platform on the top of traditional climbing frame or scaffolding. , Drive the large-scale operation platform and the pylon to rise, and through the automatic equipment carried on the large-scale operation platform and the pylon, the construction can be carried out quickly and the demand for human resources can be reduced.

新型造楼机的大型作业平台可采用贝雷架搭建,为了保证大型作业平台与挂架能快速、高强度的连接,就需要重新设计大型作业平台与挂架的连接组件。The large-scale operation platform of the new building machine can be built with Bailey frame. In order to ensure the fast and high-strength connection between the large-scale operation platform and the pylon, it is necessary to redesign the connection components of the large-scale operation platform and the pylon.

挂架一般包括水平设置的走道板、竖直设置的立杆和竖直设置、连接相邻立杆的防护板,并通过立杆连接大型作业平台。由于防护板的尺寸和数量需要依靠建筑宽度来选择,因此,需要将立杆之间的间距设计成可调节式,从而适应不同宽度和数量的防护板。The hanger generally includes a horizontally arranged walkway board, a vertically arranged vertical pole, and a vertically arranged protective plate connecting adjacent vertical poles, and is connected to a large work platform through the vertical pole. Since the size and quantity of the fenders need to be selected depending on the building width, the spacing between the vertical poles needs to be designed to be adjustable to accommodate fenders of different widths and quantities.

实用新型内容Utility model content

有鉴于此,本实用新型提出了一种造楼机挂架连接组件,能实现立杆之间的间距可调节,从而适应不同宽度和数量的防护板。In view of this, the utility model proposes a building machine hanger connection assembly, which can realize the adjustable spacing between the vertical poles, thereby adapting to different widths and numbers of protective panels.

本实用新型的技术方案是这样实现的:本实用新型提供了一种造楼机挂架连接组件,其包括贝雷架单元和挂架,贝雷架单元包括两个贝雷架桁架和螺杆,贝雷架桁架上、下玄杆两端分别设置有接头,同一贝雷架单元的两个贝雷架桁架并排设置且中间由螺杆紧固连接;所述挂架包括走道板、立杆和防护板,其中,走道板水平设置并与竖直设置的立杆固定,相邻的立杆之间固定连接防护板,还包括滑动吊头组件,滑动吊头组件包括底座和连接板,其中,连接板顶部与底座竖直设置并相互固定,连接板底部连接立杆,底座设置于贝雷架桁架下玄杆上表面,连接板穿过贝雷架桁架下玄杆中间通道。The technical scheme of the present utility model is achieved as follows: the present utility model provides a building machine hanger connection assembly, which includes a beret frame unit and a hanger, and the beray frame unit includes two beray frame trusses and a screw rod, Joints are respectively provided at both ends of the upper and lower black poles of the belay frame truss, and the two belay frame trusses of the same belay frame unit are arranged side by side and are fastened and connected by screws in the middle; A board, wherein the walkway board is arranged horizontally and is fixed with the vertical poles, and the protection board is fixedly connected between adjacent poles, and also includes a sliding lifting head assembly, and the sliding lifting head assembly includes a base and a connecting plate, wherein the connecting The top of the plate and the base are vertically arranged and fixed to each other, the bottom of the connecting plate is connected to the vertical rod, the base is arranged on the upper surface of the lower mysterious rod of the beret truss, and the connecting plate passes through the middle channel of the lower mysterious rod of the beret truss.

在以上技术方案的基础上,优选的,所述连接板设置有两块,相对设置且二者之间设置有可供立杆伸入的通道,连接板上设置有通孔,所述立杆伸入两连接板之间并通过螺栓穿过通孔和立杆进行紧固连接。On the basis of the above technical solutions, preferably, the connecting plate is provided with two pieces, which are arranged opposite to each other and a channel for the vertical rod to extend in between them, and the connecting plate is provided with a through hole, and the vertical rod is provided with a through hole. Extend between the two connecting plates and fasten the connection through the through hole and the vertical rod through bolts.

在以上技术方案的基础上,优选的,还包括转角柱头,所述转角柱头为立方框架结构,立方框架结构八个顶角处分别水平向外延伸设置有转角接头,并通过所述转角接头与贝雷架单元的接头连接,所述转角柱头设置有至少4个,相邻的转角柱头之间连接若干个贝雷架单元。On the basis of the above technical solutions, it is preferable to further include a corner column head, the corner column head is a cubic frame structure, and corner joints are respectively extended horizontally outward at the eight corners of the cubic frame structure, and are connected to the corner joints through the corner joints. The joints of the Bailey frame units are connected, the corner column heads are provided with at least 4, and several Bailey frame units are connected between adjacent corner column heads.

进一步优选的,还包括固定吊头组件,所述固定吊头组件与转角柱头底部固定并连接立杆。Further preferably, it also includes a fixed lifting head assembly, the fixed lifting head assembly is fixed to the bottom of the corner column head and connected to the vertical pole.

更进一步优选的,固定吊头组件包括第二底座、第二连接板和U形螺栓,其中,第二底座设置于贝雷架桁架下玄杆下表面并通过U形螺栓紧固连接贝雷架桁架与第二底座,第二连接板顶部与第二底座固定且底部连接立杆。Further preferably, the fixed lifting head assembly includes a second base, a second connecting plate and a U-shaped bolt, wherein the second base is arranged on the lower surface of the lower black pole of the beret truss and is fastened and connected to the beret through U-shaped bolts. The truss is connected with the second base, the top of the second connecting plate is fixed with the second base, and the bottom is connected with the vertical rod.

进一步优选的,所述立杆上从上至下依次开设有若干贯穿孔,并通过螺栓穿过通孔和贯穿孔进行紧固连接。Further preferably, a plurality of through holes are formed on the vertical rod in sequence from top to bottom, and the bolts pass through the through holes and the through holes for fast connection.

更进一步优选的,所述立杆包括第一立杆和若干第二立杆,所述第一立杆与连接板连接,其中一第二立杆部分伸入第一立杆内并与之通过螺栓穿过贯穿孔进行紧固连接,第二立杆相互依次部分嵌套并通过螺栓穿过贯穿孔进行紧固连接。Further preferably, the vertical rod includes a first vertical rod and a plurality of second vertical rods, the first vertical rod is connected with the connecting plate, and a second vertical rod part extends into the first vertical rod and passes through it. The bolts pass through the through holes for fast connection, and the second vertical rods are partially nested with each other in sequence and are fastened and connected through the through holes through the bolts.

再进一步优选的,所述第一立杆由内管和外管组成,内管嵌套在外管顶部内侧并与之焊接固定,并通过螺栓穿过内管和外管上的贯穿孔和通孔进行紧固连接。Still further preferably, the first vertical rod is composed of an inner tube and an outer tube, the inner tube is nested on the inside of the top of the outer tube and fixed by welding, and passes through the through holes and through holes on the inner tube and the outer tube through bolts. Make a tight connection.

再更进一步优选的,所述第二立杆由内管和外管组成,内管底部嵌套在外管顶部内侧并与之焊接固定,内管嵌入其它立杆的外管内并通过螺栓穿过内管和外管上的贯穿孔进行紧固连接。Still further preferably, the second vertical rod is composed of an inner tube and an outer tube, the bottom of the inner tube is nested inside the top of the outer tube and fixed by welding, and the inner tube is embedded in the outer tube of other vertical rods and passes through the inner tube through bolts. The through holes on the tube and the outer tube make a tight connection.

更进一步优选的,滑动吊头组件还包括加强板,所述加强板设置于两连接板之间并分别与两连接板和底座焊接固定。More preferably, the sliding lifting head assembly further includes a reinforcing plate, the reinforcing plate is arranged between the two connecting plates and is welded and fixed to the two connecting plates and the base respectively.

本实用新型的造楼机挂架连接组件相对于现有技术具有以下有益效果:Compared with the prior art, the building machine hanger connection assembly of the present invention has the following beneficial effects:

(1)通过设置滑动吊头组件,在贝雷架桁架下玄杆上左右移动,可快速调节立杆之间的间距,从而适应不同宽度和数量的防护板,便于安装;(1) By setting the sliding lifting head assembly and moving left and right on the lower rod of the Bailey truss, the spacing between the vertical rods can be quickly adjusted, so as to adapt to different widths and numbers of protective panels and facilitate installation;

(2)连接板与立杆之间、以及立杆与立杆之间可通过螺栓插接通孔,快速安装和拆卸,并调节挂架高度;(2) Bolts can be inserted into the through holes between the connecting plate and the pole, and between the pole and the pole, to quickly install and disassemble, and adjust the height of the hanger;

(3)设置转角柱头,可快速连接贝雷架,进一步设置固定吊头组件,与滑动吊头组件相互配合,防止挂架整体水平移动;(3) The corner column head is provided, which can be quickly connected to the Bailey frame, and the fixed lifting head assembly is further arranged to cooperate with the sliding lifting head assembly to prevent the overall horizontal movement of the hanger;

(4)本实用新型的造楼机挂架连接组件,具有零部件易得、成本低、强度高,且便于快速组装和拆卸的优点,便于大规模推广应用。(4) The building machine hanger connection assembly of the present invention has the advantages of easy-to-obtain parts, low cost, high strength, convenient quick assembly and disassembly, and is convenient for large-scale popularization and application.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本实用新型的造楼机挂架连接组件的立体图;1 is a perspective view of a building machine hanger connection assembly of the present invention;

图2为本实用新型的造楼机挂架连接组件的部分结构立体图;2 is a perspective view of a part of the structure of the building machine hanger connection assembly of the present invention;

图3为本实用新型的造楼机挂架连接组件的承重结构部分的立体图;3 is a perspective view of the load-bearing structure part of the building machine hanger connection assembly of the present invention;

图4为图2中椭圆区域的放大图;Fig. 4 is an enlarged view of the elliptical region in Fig. 2;

图5为本实用新型的造楼机挂架连接组件的固定吊头组件的立体图;5 is a perspective view of a fixed lifting head assembly of the building machine hanger connection assembly of the present invention;

图6为图2中圆形区域的放大图;Figure 6 is an enlarged view of the circular area in Figure 2;

图7为本实用新型的造楼机挂架连接组件的滑动吊头组件部分的立体图;7 is a perspective view of the sliding head assembly part of the building machine hanger connection assembly of the present invention;

图8为本实用新型的造楼机挂架连接组件的立杆部分的立体图。FIG. 8 is a perspective view of the vertical rod part of the building machine hanger connection assembly of the present invention.

具体实施方式Detailed ways

下面将结合本实用新型实施方式,对本实用新型实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式仅仅是本实用新型一部分实施方式,而不是全部的实施方式。基于本实用新型中的实施方式,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施方式,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

如图1所示,结合图2~图8,本实用新型的造楼机挂架连接组件,其包括若干贝雷架单元1、挂架2、滑动吊头组件3、转角柱头4和固定吊头组件5。As shown in FIG. 1 , in conjunction with FIGS. 2 to 8 , the building machine hanger connection assembly of the present invention includes a plurality of belay frame units 1 , a hanger 2 , a sliding hanger assembly 3 , a corner column head 4 and a fixed hanger Head assembly 5.

贝雷架单元1,设置有若干个,首尾相互连接,形成直线排列的承重结构,这部分可采用现有技术。具体的,所述承重结构由顶升机构驱动,进行升降。具体的,贝雷架单元1包括两个贝雷架桁架11和螺杆12,贝雷架桁架11上、下玄杆两端分别设置有接头13,同一贝雷架单元1的两个贝雷架桁架11并排设置且中间由螺杆12紧固连接。The Bailey rack unit 1 is provided with several pieces, and the ends are connected to each other to form a load-bearing structure arranged in a straight line, and the existing technology can be used for this part. Specifically, the load-bearing structure is driven by a jacking mechanism to lift and lower. Specifically, the Bailey frame unit 1 includes two Bailey frame trusses 11 and screws 12 , the upper and lower black rods of the Bailey frame truss 11 are respectively provided with joints 13 , and the two Bailey frames of the same Bailey frame unit 1 are provided with joints 13 respectively. The trusses 11 are arranged side by side and are fastened with screws 12 in the middle.

所述挂架2包括走道板21、立杆22和防护板23,其中,走道板21水平设置并与竖直设置的立杆22固定,相邻的立杆22之间固定连接防护板23。具体的,所述走道板21上对应设置有多个立杆22,多个立杆22分别与顶部的承重结构连接,而相邻的立杆22之间各设置防护板23。The hanger 2 includes a walkway board 21 , a vertical rod 22 and a protective board 23 , wherein the walkway board 21 is arranged horizontally and fixed to the vertical vertical rod 22 , and the protective board 23 is fixedly connected between adjacent vertical rods 22 . Specifically, a plurality of vertical rods 22 are correspondingly disposed on the walkway board 21 , and the plurality of vertical rods 22 are respectively connected to the load-bearing structure at the top, and a protective plate 23 is provided between adjacent vertical rods 22 .

转角柱头4,设置于转角部位,连接1~4个贝雷架单元1。所述转角柱头4为立方框架结构,立方框架结构八个顶角处分别水平向外延伸设置有转角接头40,并通过所述转角接头40与贝雷架单元1的接头13连接。具体的,转角柱头4包括八根型材、8根斜杆、16个转角接头40,所述八根型材首尾连接形成立方框架,具体的,所述八根型材可采用方管钢材焊接而成。8根斜杆两两交叉设置于立方框架的前、后、左和右四个面内。具体的,所述斜杆起斜向支撑作用,可采用方管钢材,处于避位考虑,每根斜杆可以通过两根方管钢材焊接而成。如此,通过在转角柱头4上连接两个、三个或四个贝雷架单元1,形成“L”形、“丁”字形或“十”字形的承重结构。具体的,所述转角柱头4设置有至少4个,相邻的转角柱头4之间连接若干个贝雷架单元1。The corner column head 4 is arranged at the corner position, and is connected with 1 to 4 beret frame units 1 . The corner column head 4 is a cubic frame structure, and corner joints 40 extend horizontally outwards at the eight top corners of the cubic frame structure respectively, and are connected to the joint 13 of the Bailey frame unit 1 through the corner joints 40 . Specifically, the corner column head 4 includes eight profiles, 8 inclined rods, and 16 corner joints 40. The eight profiles are connected end to end to form a cubic frame. Specifically, the eight profiles can be welded from square tube steel. Eight oblique rods are arranged in the front, rear, left and right sides of the cubic frame. Specifically, the oblique rods play an oblique support role, and can be made of square tube steel. Considering the avoidance of position, each oblique rod can be formed by welding two square tube steels. In this way, by connecting two, three or four Bailey frame units 1 on the corner column head 4, an "L"-shaped, "T"-shaped or "cross"-shaped load-bearing structure is formed. Specifically, at least four corner post heads 4 are provided, and several beret frame units 1 are connected between adjacent corner post heads 4 .

滑动吊头组件3,用于连接承重结构和挂架2,并可左右滑动。滑动吊头组件3包括底座31、连接板32和加强板34,其中,连接板32顶部与底座31竖直设置并相互固定,连接板32底部连接立杆22,底座31设置于贝雷架桁架11下玄杆上表面,连接板32穿过贝雷架桁架11下玄杆中间通道。如此,滑动吊头组件3可沿着贝雷架桁架11下玄杆中间通道左右滑动,便于调节立杆22之间的间距,从而适应不同宽度和数量的防护板23,便于安装。具体的,所述连接板32设置有两块,相对设置且二者之间设置有可供立杆22伸入的通道,连接板32上设置有通孔33,所述立杆22伸入两连接板32之间并通过螺栓穿过通孔33和立杆22进行紧固连接。通过螺栓插接固定立杆22和连接板32,可实现快速连接和拆卸。具体的,还包括加强板34,所述加强板34设置于两连接板32之间并分别与两连接板32和底座31焊接固定。The sliding lifting head assembly 3 is used to connect the load-bearing structure and the hanger 2, and can slide left and right. The sliding lifting head assembly 3 includes a base 31, a connecting plate 32 and a reinforcing plate 34, wherein the top of the connecting plate 32 and the base 31 are vertically arranged and fixed to each other, the bottom of the connecting plate 32 is connected to the vertical rod 22, and the base 31 is arranged on the Bailey truss 11. On the upper surface of the lower mysterious rod, the connecting plate 32 passes through the middle channel of the lower mysterious rod of the Bailey truss 11. In this way, the sliding lifting head assembly 3 can slide left and right along the middle channel of the lower poles of the Bailey truss 11, so as to adjust the spacing between the vertical poles 22, so as to adapt to different widths and numbers of protective plates 23 and facilitate installation. Specifically, the connecting plate 32 is provided with two pieces, which are arranged opposite to each other and there is a channel for the vertical rod 22 to extend between them. The connecting plates 32 are fastened with bolts passing through the through holes 33 and the vertical rod 22 . Fast connection and disassembly can be achieved by bolting the fixed vertical rod 22 and the connecting plate 32 . Specifically, the reinforcing plate 34 is also included. The reinforcing plate 34 is disposed between the two connecting plates 32 and is welded and fixed to the two connecting plates 32 and the base 31 respectively.

固定吊头组件5,用于连接承重结构和挂架2。所述固定吊头组件5与转角柱头4底部固定并连接立杆22。如此,通过固定吊头组件5对挂架2进行限位,防止其随着滑动吊头组件3整体左右移动。具体的,固定吊头组件5包括第二底座51、第二连接板52和U形螺栓53,其中,第二底座51设置于贝雷架桁架11下玄杆下表面并通过U形螺栓53紧固连接贝雷架桁架11与第二底座51,第二连接板52顶部与第二底座51固定且底部连接立杆22。The hanging head assembly 5 is fixed for connecting the load-bearing structure and the hanger 2 . The fixed lifting head assembly 5 is fixed to the bottom of the corner column head 4 and connected to the vertical rod 22 . In this way, the hanger 2 is limited by fixing the hanging head assembly 5 to prevent it from moving left and right along with the sliding hanging head assembly 3 as a whole. Specifically, the fixed lifting head assembly 5 includes a second base 51 , a second connecting plate 52 and U-shaped bolts 53 , wherein the second base 51 is arranged on the lower surface of the lower rod of the Bailey truss 11 and is fastened by the U-shaped bolts 53 The beret truss 11 is fixedly connected to the second base 51 , the top of the second connecting plate 52 is fixed to the second base 51 and the bottom is connected to the vertical rod 22 .

为了便于与连接板32快速连接并调节挂架2的高度,所述立杆22上从上至下依次开设有若干贯穿孔220,并通过螺栓穿过通孔33和贯穿孔220进行紧固连接。In order to facilitate quick connection with the connecting plate 32 and adjust the height of the hanger 2 , a plurality of through holes 220 are formed on the vertical rod 22 from top to bottom in sequence, and bolts pass through the through holes 33 and the through holes 220 for fast connection. .

具体的,所述立杆22包括第一立杆221和若干第二立杆222,所述第一立杆221与连接板32连接,其中一第二立杆222部分伸入第一立杆221内并与之通过螺栓穿过贯穿孔220进行紧固连接,第二立杆222相互依次部分嵌套并通过螺栓穿过贯穿孔220进行紧固连接。如此,可调节挂架2相对于连接板32的高度。Specifically, the vertical rod 22 includes a first vertical rod 221 and a plurality of second vertical rods 222 , the first vertical rod 221 is connected with the connecting plate 32 , and a second vertical rod 222 partially extends into the first vertical rod 221 The second vertical rods 222 are partially nested with each other and are fastened through the through holes 220 through bolts. In this way, the height of the hanger 2 relative to the connecting plate 32 can be adjusted.

具体的,所述第一立杆221由内管和外管组成,内管嵌套在外管顶部内侧并与之焊接固定,并通过螺栓穿过内管和外管上的贯穿孔220和通孔33进行紧固连接。Specifically, the first vertical rod 221 is composed of an inner tube and an outer tube. The inner tube is nested inside the top of the outer tube and fixed to it by welding, and passes through the through holes 220 and through holes on the inner tube and the outer tube through bolts. 33 Make a tight connection.

具体的,所述第二立杆222由内管和外管组成,内管底部嵌套在外管顶部内侧并与之焊接固定,内管嵌入其它立杆22的外管内并通过螺栓穿过内管和外管上的贯穿孔220进行紧固连接。Specifically, the second vertical rod 222 is composed of an inner tube and an outer tube. The bottom of the inner tube is nested inside the top of the outer tube and fixed to it by welding. The inner tube is embedded in the outer tube of other vertical rods 22 and passes through the inner tube through bolts. Fasten connection with the through hole 220 on the outer tube.

以上所述仅为本实用新型的较佳实施方式而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only the preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the within the scope of protection of the present invention.

Claims (10)

1. A building machine hanging rack connecting assembly comprises a Bailey rack unit (1) and a hanging rack (2), wherein the Bailey rack unit (1) comprises two Bailey rack trusses (11) and a screw (12), two ends of an upper Xuan rod and a lower Xuan rod of the Bailey rack truss (11) are respectively provided with a joint (13), the two Bailey rack trusses (11) of the same Bailey rack unit (1) are arranged side by side, and the middles of the two Bailey rack trusses are fastened and connected through the screw (12); stores pylon (2) are including walking guidance tape (21), pole setting (22) and guard plate (23), and wherein, walk guidance tape (21) level setting and fixed with pole setting (22) of vertical setting, fixed connection guard plate (23), its characterized in that between adjacent pole setting (22): still include slip hanging head subassembly (3), slip hanging head subassembly (3) include base (31) and connecting plate (32), and wherein, connecting plate (32) top and base (31) vertical setting and reciprocal anchorage, pole setting (22) are connected to connecting plate (32) bottom, and base (31) set up and fights the upper surface under bailey truss (11), and connecting plate (32) pass bailey truss (11) and fights the middle passageway of pole down.
2. A building machine hanger connection assembly as defined in claim 1, wherein: the connecting plates (32) are arranged in two blocks, the connecting plates are oppositely arranged, a channel for the vertical rod (22) to extend into is arranged between the connecting plates, a through hole (33) is formed in each connecting plate (32), and the vertical rod (22) extends into the space between the two connecting plates (32) and penetrates through the through hole (33) and the vertical rod (22) through bolts to be fixedly connected.
3. A building machine hanger connection assembly as defined in claim 1, wherein: the angle column head is characterized by further comprising an angle column head (4), the angle column head (4) is of a cubic frame structure, eight vertex angles of the cubic frame structure respectively extend outwards horizontally to form angle joints (40), the angle joints (40) are connected with joints (13) of the Bailey truss units (1), at least 4 angle column heads are arranged, and a plurality of Bailey truss units (1) are connected between adjacent angle column heads (4).
4. A building machine hanger connection assembly as defined in claim 3, wherein: the device also comprises a fixed hanging head assembly (5), wherein the fixed hanging head assembly (5) is fixed with the bottom of the corner column head (4) and is connected with a vertical rod (22).
5. A building machine hanger connection assembly as defined in claim 4, wherein: fixed first subassembly (5) of hanging includes second base (51), second connecting plate (52) and U-shaped bolt (53), and wherein, second base (51) set up and fights the lower surface of the frame truss (11) and pass through U-shaped bolt (53) fastening connection bailey frame truss (11) and second base (51) under bailey frame truss (11), and pole (22) are connected to fixed just bottom of second connecting plate (52) top and second base (51).
6. A building machine hanger connection assembly as defined in claim 2, wherein: a plurality of through holes (220) are sequentially formed in the vertical rod (22) from top to bottom, and the vertical rod penetrates through the through holes (33) and the through holes (220) through bolts to be fastened and connected.
7. A building machine hanger connection assembly as defined in claim 6, wherein: the upright posts (22) comprise first upright posts (221) and a plurality of second upright posts (222), the first upright posts (221) are connected with the connecting plate (32), part of one second upright post (222) extends into the first upright post (221) and penetrates through the through holes (220) through bolts to be fastened and connected, and the second upright posts (222) are partially nested in sequence and penetrate through the through holes (220) through bolts to be fastened and connected.
8. A building machine hanger connection assembly as defined in claim 7, wherein: the first upright rod (221) consists of an inner pipe and an outer pipe, the inner pipe is nested on the inner side of the top of the outer pipe and is welded and fixed with the outer pipe, and the inner pipe and the outer pipe are fastened and connected through a through hole (220) and a through hole (33) in the inner pipe and the outer pipe through bolts.
9. A building machine hanger connection assembly as defined in claim 8, wherein: the second upright stanchion (222) consists of an inner pipe and an outer pipe, the bottom of the inner pipe is nested inside the top of the outer pipe and is welded and fixed with the outer pipe, and the inner pipe is embedded into the outer pipes of other upright stanchions (22) and passes through holes (220) on the inner pipe and the outer pipe through bolts for fastening connection.
10. A building machine hanger connection assembly as defined in claim 2, wherein: the sliding hanging head assembly (3) further comprises a reinforcing plate (34), and the reinforcing plate (34) is arranged between the two connecting plates (32) and is respectively welded and fixed with the two connecting plates (32) and the base (31).
CN202122203759.8U 2021-09-10 2021-09-10 Connecting assembly for hanging frame of building machine Active CN216276816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122203759.8U CN216276816U (en) 2021-09-10 2021-09-10 Connecting assembly for hanging frame of building machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122203759.8U CN216276816U (en) 2021-09-10 2021-09-10 Connecting assembly for hanging frame of building machine

Publications (1)

Publication Number Publication Date
CN216276816U true CN216276816U (en) 2022-04-12

Family

ID=81063420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122203759.8U Active CN216276816U (en) 2021-09-10 2021-09-10 Connecting assembly for hanging frame of building machine

Country Status (1)

Country Link
CN (1) CN216276816U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892982A (en) * 2022-06-01 2022-08-12 中铁一局集团建筑安装工程有限公司 Energy-saving building machine and truss structure thereof
CN115749232A (en) * 2022-10-28 2023-03-07 厦门安科科技有限公司 Building machine and building method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892982A (en) * 2022-06-01 2022-08-12 中铁一局集团建筑安装工程有限公司 Energy-saving building machine and truss structure thereof
CN114892982B (en) * 2022-06-01 2024-05-17 中铁一局集团建筑安装工程有限公司 Energy-saving building machine and truss structure thereof
CN115749232A (en) * 2022-10-28 2023-03-07 厦门安科科技有限公司 Building machine and building method thereof

Similar Documents

Publication Publication Date Title
CN207048306U (en) Sliding formwork flexibility platform
CN216276809U (en) Building machine bailey frame connecting assembly
CN212656515U (en) Adjustable movable scaffold
CN216276816U (en) Connecting assembly for hanging frame of building machine
CN213626572U (en) Tool type external cantilever operation platform
CN216042482U (en) A spliced operating platform
CN220599110U (en) Movable bridge type operation platform
CN111927071B (en) Portable operation platform
CN216276815U (en) Connecting assembly for hanging frame of building machine
CN212867550U (en) Assembled subway subsurface excavation construction is overhead pedestrian passageway device for vertical well
CN220395120U (en) Overhanging type operation platform
CN216276813U (en) Building machine walkway plate connecting assembly
CN216276814U (en) Building machine walkway plate connecting assembly
CN219431321U (en) Adjustable operation platform for elevator well construction
CN209081302U (en) A tower crane attached assembled operation maintenance platform
CN217652433U (en) Inclined ladder platform operation frame for mounting steel structure barrel
CN216664932U (en) Building machine hanger connection components
CN107059641B (en) Goods shelf type pier body outer scaffold
CN216276810U (en) Connecting assembly for hanging frame of building machine
CN213774398U (en) Elevator shaft operating platform
CN115749231A (en) Climbing type operation platform for high-rise building construction
CN211037766U (en) Attached lifting scaffold body structure
CN209874433U (en) A modular integral mobile operating frame
CN116937413A (en) Easy-to-install power line modularized crossing frame
CN215564254U (en) Scaffold frame that construction was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240103

Granted publication date: 20220412

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20250220

Granted publication date: 20220412