[go: up one dir, main page]

CN216276694U - Integrated elevator installation structure - Google Patents

Integrated elevator installation structure Download PDF

Info

Publication number
CN216276694U
CN216276694U CN202122627116.6U CN202122627116U CN216276694U CN 216276694 U CN216276694 U CN 216276694U CN 202122627116 U CN202122627116 U CN 202122627116U CN 216276694 U CN216276694 U CN 216276694U
Authority
CN
China
Prior art keywords
elevator
mounting structure
integrated
galvanized
supporting platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122627116.6U
Other languages
Chinese (zh)
Inventor
刘宜蓉
赵坤
宋裕青
王小梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Edunburgh Elevator Yichang Co ltd
Original Assignee
Shanghai Edunburgh Elevator Yichang Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Edunburgh Elevator Yichang Co ltd filed Critical Shanghai Edunburgh Elevator Yichang Co ltd
Priority to CN202122627116.6U priority Critical patent/CN216276694U/en
Application granted granted Critical
Publication of CN216276694U publication Critical patent/CN216276694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

本实用新型提供一体式加装电梯安装结构,包括电梯基坑,电梯基坑内设有柱脚,柱脚之间通过连接梁连接,装配式电梯的下端钢架与柱脚上端连接,装配式电梯通过支撑平台与建筑体每一层的梯梁进行连接。该安装机构能够方便装配式电梯的安装,提高安装效率。

Figure 202122627116

The utility model provides an integrated installation structure for an installed elevator, comprising an elevator foundation pit, column feet are arranged in the elevator foundation pit, the column feet are connected by connecting beams, the lower end steel frame of the assembled elevator is connected with the upper end of the column feet, and the assembled elevator It is connected with the ladder beams on each floor of the building through the supporting platform. The installation mechanism can facilitate the installation of the assembled elevator and improve the installation efficiency.

Figure 202122627116

Description

Integrated elevator installation structure
Technical Field
The utility model relates to the field of elevator installation, in particular to an integrated installation structure for an additionally-installed elevator.
Background
The elevator is additionally arranged in the existing house, is a popular civil engineering which is beneficial to common people, and enables a plurality of existing residential buildings including old residential district units to be provided with the elevator, so that the elevator is distinguished from 'difficulty in climbing buildings', great convenience is brought to travel, and people can obtain 'top-down' happiness.
At present, Yichang has a plurality of old districts which are additionally provided with elevators, and one elevator needs at least three months from the work to the completion, wherein only the building and welding of the elevator derrick needs one month. Therefore, the integrated assembly type elevator is produced at the same time, but the assembly type elevator has the problems of difficult installation and difficult waterproof solution.
Disclosure of Invention
The utility model aims to provide an integrated installation structure for an additional elevator, which is convenient for installation of an assembled elevator and improves the installation efficiency.
In order to solve the technical problems, the technical scheme adopted by the utility model is as follows: elevator mounting structure is installed additional to integral type, including the elevator foundation ditch, be equipped with the column base in the elevator foundation ditch, connect through the tie-beam between the column base, the lower extreme steelframe and the column base upper end of assembled elevator are connected, and the assembled elevator passes through supporting platform and is connected with the ladder roof beam of each layer of the building body.
In a preferred scheme, two sides of the supporting platform are provided with fences or protective walls.
In a preferable scheme, a brick wall protection foot is arranged on the outer side of the lower end of the fabricated elevator.
In the preferred scheme, the bottom of the outer side of the brick wall toe guard is provided with stacking concrete
In a preferred scheme, the supporting platform comprises a supporting steel frame and a concrete slab erected on the upper side of the supporting steel frame.
In a preferred embodiment, a galvanized steel plate is laid on the upper side of the concrete slab.
In the preferred scheme, the top of the fabricated elevator is provided with a waterproof heat-insulating plate, the waterproof heat-insulating plate comprises an upper layer of galvanized plate and a lower layer of galvanized plate, and a rock wool heat-insulating plate is clamped between the two layers of galvanized plates.
According to the integrated installation structure for the additional elevator, the installation of the assembled elevator in the elevator foundation pit is realized by arranging the column feet and the connecting beams, and the combination of the elevator and the existing building is realized by arranging the supporting platform, so that the installation of the additional elevator is realized. Preferably, through setting up brick wall banket and piling up the concrete, realize effectively preventing the rainwater to the damage of elevator to the protection of installing the elevator lower extreme additional. Set up waterproof heat insulating board at the elevator top, can play waterproof and thermal-insulated effect, further protect installing the elevator additional.
Drawings
The utility model is further illustrated with reference to the accompanying drawings and examples:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the installation of the column shoe;
FIG. 3 is a plan view of a support platform of a layer;
FIG. 4 is a partial schematic view of the present invention;
in the figure: elevator foundation ditch 1, column base 2, tie-beam 3, assembled elevator 4, supporting platform 5, terraced roof beam 6, rail 7, protecting wall 8, brick wall banket 9, waterproof heat insulating board 10, pile concrete 11, support steelframe 501, concrete slab 502, galvanized sheet 1001, rock wool heat insulating board 1002.
Detailed Description
As shown in fig. 1~2, elevator mounting structure is installed additional to integral type, including elevator foundation ditch 1, carry out concrete placement and water repellent in the elevator foundation ditch 1, be equipped with column base 2 in the elevator foundation ditch 1, connect through tie-beam 3 between the column base 2, 3 pre-buried in the concrete layer in elevator foundation ditch 1 of tie-beam, perhaps 3 bottoms of tie-beam and lateral wall are equipped with the anchor pole, the anchor pole is pre-buried in the concrete of 1 bottom of elevator foundation ditch and inner wall, assembled elevator 4's lower extreme steelframe and 2 upper end connections of column base, assembled elevator 4 is connected with the terraced roof beam 6 of each layer of building body through supporting platform 5. According to original housing construction, the barricade of 6 positions on the ladder roof beam is demolishd, and supporting platform 5 sets up in 6 tops on the ladder roof beam, and supporting platform 5 is connected through the bar planting with the overlap section of ladder roof beam 6.
The assembled elevator 4 comprises a steel frame and a decorative plate arranged on the outer side of the steel frame, the traction machine is arranged on a steel beam at the top of the steel frame, a guide rail of the lift car is connected with the steel frame through a guide rail frame, and a buffer is arranged in the elevator foundation pit 1. The fabricated elevator 4 is set to be of a multi-section structure and is hoisted through a tower crane during installation.
Preferably, as shown in fig. 1 and 4, the supporting platform 5 is provided with fences 7 or protective walls 8 at both sides. Through setting up rail 7 or guard wall 8 guarantee current safety, can also set up the window on the guard wall 8.
Preferably, as shown in fig. 2, the outer side of the lower end of the fabricated elevator 4 is provided with a brick wall toe guard 9. Can protect the inoxidizing coating in the 4 lower extreme outsides of assembled elevator through setting up brick wall banket 9, can play certain waterproof effect simultaneously.
Further, brick wall banket 9 outside bottom is equipped with piles and builds concrete 11, and the cross section of piling and building concrete 11 is the triangle-shaped structure. Pile concrete 11 through setting up and can improve the intensity of brick wall banket 9 on the one hand, on the other hand can improve water-proof effects.
Preferably, as shown in fig. 3, the support platform 5 includes a support steel frame 501 and a concrete slab 502 erected on an upper side of the support steel frame 501. Through setting up support steel frame 501, play the guard action to whole supporting platform 5, convenient being connected with the steelframe of terraced roof beam 6 and assembled elevator 4 simultaneously.
Further, a galvanized steel plate is laid on the upper side of the concrete slab 502. The galvanized steel plate is arranged, so that the supporting platform 5 is consistent with the height of the lift car, and the ground is protected.
Preferably, as shown in fig. 4, a waterproof and heat-insulating board 10 is arranged on the top of the fabricated elevator 4, the waterproof and heat-insulating board 10 includes an upper galvanized plate 1001 and a lower galvanized plate 1001, and a rock wool heat-insulating board 1002 is sandwiched between the two galvanized plates 1001.
Because the fabricated elevator 4 is disposed outdoors, the fabricated elevator 4 can be subjected to waterproof protection and heat insulation treatment by providing the galvanized sheet 1001 and the rock wool heat insulation board 1002.
This integral type installs elevator mounting structure additional, can make things convenient for the installation of assembled elevator, can improve the installation effectiveness, realize with the cooperation of existing building, can prevent simultaneously that the rainwater infiltration from advancing in the elevator foundation ditch, can guarantee the safety and the normal operating of facility.

Claims (7)

1. Elevator mounting structure is installed additional to integral type, its characterized in that: including elevator foundation ditch (1), be equipped with column base (2) in elevator foundation ditch (1), connect through tie-beam (3) between column base (2), the lower extreme steelframe of assembled elevator (4) is connected with column base (2) upper end, and assembled elevator (4) are connected through terraced roof beam (6) of supporting platform (5) and each layer of the building body.
2. The integrated retrofit elevator mounting structure of claim 1, wherein: and fences (7) or protective walls (8) are arranged on two sides of the supporting platform (5).
3. The integrated retrofit elevator mounting structure of claim 1, wherein: and a brick wall protection pin (9) is arranged on the outer side of the lower end of the assembly type elevator (4).
4. The integrated retrofit elevator mounting structure of claim 3, wherein: and piling concrete (11) is arranged at the bottom of the outer side of the brick wall protection foot (9).
5. The integrated retrofit elevator mounting structure of claim 1, wherein: the supporting platform (5) comprises a supporting steel frame (501) and a concrete slab (502) erected on the upper side of the supporting steel frame (501).
6. The integrated retrofit elevator mounting structure of claim 5, wherein: the upper side of the concrete slab (502) is paved with a galvanized steel plate.
7. The integrated retrofit elevator mounting structure of claim 1, wherein: the top of the fabricated elevator is provided with a waterproof heat-insulating plate (10), the waterproof heat-insulating plate (10) comprises an upper galvanized plate and a lower galvanized plate (1001), and a rock wool heat-insulating plate (1002) is clamped between the two galvanized plates (1001).
CN202122627116.6U 2021-10-29 2021-10-29 Integrated elevator installation structure Expired - Fee Related CN216276694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122627116.6U CN216276694U (en) 2021-10-29 2021-10-29 Integrated elevator installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122627116.6U CN216276694U (en) 2021-10-29 2021-10-29 Integrated elevator installation structure

Publications (1)

Publication Number Publication Date
CN216276694U true CN216276694U (en) 2022-04-12

Family

ID=81004545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122627116.6U Expired - Fee Related CN216276694U (en) 2021-10-29 2021-10-29 Integrated elevator installation structure

Country Status (1)

Country Link
CN (1) CN216276694U (en)

Similar Documents

Publication Publication Date Title
CN103046755B (en) The construction method of the light steel integrated house of pastoral area assembling
CN106013241B (en) Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method
CN110847063B (en) Method for dismantling multi-span double-arch bridge
US20130199113A1 (en) Floatable Constructions
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN106013052A (en) Steel sheet pile and open caisson combined underground garage and construction method thereof
CN115559351B (en) Reverse construction method for multi-layer basement of all-steel structure
CN102296843A (en) Multi-arch multilayer plant-separation type parking device
CN105421477A (en) Construction method for tower crane foundation
CN216276694U (en) Integrated elevator installation structure
CN201077988Y (en) Hidden beam-column type prestressing force earth nail wall
CN106760872A (en) A kind of segment girder precast measurement formula of consolidating superelevation observation tower
CN105888281A (en) Method for utilizing jacking storey-adding technique to promote integrated function of community
CN202125099U (en) Multi-arch multi-layer plant separating type parking device
CN112431407A (en) Construction method for formwork of building main body cantilever structure
CN215101404U (en) Construction elevator mounting structure in well
RU55388U1 (en) SPATIAL REINFORCED CONCRETE FOUNDATION PLATFORM FOR SMALL-STOREY BUILDINGS FOR CONSTRUCTION IN SPECIAL GROUND CONDITIONS AND SEISMICITY IN ASSEMBLY AND MONOLITHIC OPTIONS
CN205875210U (en) Hat liang ji upright executes in groove to do and digs method station integrated structure system with lid
CN214302989U (en) Add on-ground prefabricated parking garage
CN116255033A (en) Construction method of steel structure conversion layer for stage mechanical equipment
JP6163681B2 (en) Support structure for tsunami and other disaster prevention pillars
CN109736589B (en) Construction method of lattice column force transmission component
CN219604133U (en) Steel bridge platform between deep foundation pit supporting beam and tower crane foundation
CN113309145A (en) Method for dismantling through-floor tower crane for large building construction
CN220952996U (en) A cable hoisting system for a long-span railway suspension bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220412

CF01 Termination of patent right due to non-payment of annual fee