[go: up one dir, main page]

CN203977357U - Barge formula moves training dyke - Google Patents

Barge formula moves training dyke Download PDF

Info

Publication number
CN203977357U
CN203977357U CN201420323973.4U CN201420323973U CN203977357U CN 203977357 U CN203977357 U CN 203977357U CN 201420323973 U CN201420323973 U CN 201420323973U CN 203977357 U CN203977357 U CN 203977357U
Authority
CN
China
Prior art keywords
barge
water
ballast compartments
injection valve
watertight ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420323973.4U
Other languages
Chinese (zh)
Inventor
王义兵
董红明
顾国华
陈建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Changjiang Waterway Engineering Bureau
Original Assignee
Nanjing Changjiang Waterway Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Changjiang Waterway Engineering Bureau filed Critical Nanjing Changjiang Waterway Engineering Bureau
Priority to CN201420323973.4U priority Critical patent/CN203977357U/en
Application granted granted Critical
Publication of CN203977357U publication Critical patent/CN203977357U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

What the utility model barge formula moved that training dyke relates to is that a kind of barge that utilizes is as the waterway regulation works of training dyke construction.Barge formula moves training dyke and comprises barge, water filling member, water discharge member and control member; Barge formula moves training dyke usings the main body of barge as dam structure, watertight ballast compartments is set in barge, above watertight ballast compartments, be provided with water filling member, below is provided with water discharge member, at the upper surface of barge hull corresponding to watertight ballast compartments, control member is installed; Water filling member comprises water injection valve, water injection valve pipeline, flase floor; Water filling member distributes at barge profile, and position, below minimum drinking water position, is provided with water injection valve at barge profile, is connected with water injection valve pipeline on water injection valve, and the flase floor of filtering foreign material is installed on water injection valve pipeline; Water discharge member comprises catch pit, well lid, and catch pit gos deep into watertight ballast compartments and is communicated with watertight ballast compartments, in the outer face of catch pit, well lid is installed.

Description

Barge formula moves training dyke
Technical field
What the utility model barge formula moved that training dyke relates to is that a kind of barge that utilizes is as the waterway regulation works of training dyke construction, utilize barge as the agent structure of training dyke, by by barge and the angled submerged of current, play and change local flow direction, guiding current wash away shallow district, river shoal.
Background technology
At present, waterway regulation construction technology is all in river, build regulating structure and adjust and control current as groynes, longitudinal dike, shore protection, closure dam etc. by adopting, and guide river into predetermined drainage gallery and lead off toward downstream, reach and stablize favourable river gesture, improve the object of Fairway navigation condition.
Mostly traditional regulating structure is to adopt by utilize geotextile to carry out river bottom protection in riverbed in the situation that the material pell mell constructions such as soil, piece stone, concrete to become dike.Once this kind of regulating structure moulding, will become permanent construction (except temporary structure), cannot change and adjust according to extraneous bed configuration, and difficulty of construction be large, cost is high, the time cycle is long.
With regard to current river middle and lower reaches waterway regulation technical level, traditional regulating structure still cannot solve the technical barrier facing in addition.Be specially: after 1, Riverine area dam builds up, river middle and lower reaches current are complicated, the husky defeated rule of moving rule, river bed change of water is difficult to grasp, river middle and lower reaches are as plain tract, riverbed is very wide, the riverbed of most sections be not very stable or can rush, movable, regulating structure is often difficult to arrange regulating structure according to the hydrology, husky defeated rule, the river bed change rule etc. of moving of water; 2, river middle and lower reaches alluvial river, feature is the point bar variation of rising that constantly disappears, and the height of point bar has determined the regulated water stage of regulating structure and the width of regulation line, therefore along with disappearing of point bar risen, the regulated water stage of former regulating structure and the layout of regulation line be not all in the designing requirement meeting originally, and regulation function is also affected.
From the problems referred to above, for river middle and lower reaches alluvial river characteristic, river bed change at every moment occurs, once change, the relevant art such as the regulated water stage of original building and regulation line require all not meet regulation requirement, also just do not reach original renovating effect.Therefore be necessary to design a kind of can be according to the situation of change in riverbed, the regulating structure of dynamically adjusting.
Summary of the invention
The purpose of this utility model is for above-mentioned weak point, through exploratory development, provides a kind of barge formula to move training dyke.This kind of training dyke compared traditional jackstone fill training dyke, and difficulty of construction is little, cost is low, instant effect, short construction period; Can flexible arrangement, the design effect that has solved traditional training dyke is the drawback of chamber modelling verification by experiment; And it is convenient to remove, and can be recycled, after having reduced dam body pell mell construction and completing, because river bed change fails to reach the risk of reconstruction that renovating effect brings, enlarging, dismounting; Avoided tissue, the scope of operation of too much ship machine equipment various, the link that building stones are drawn materials, transported, and barge is convenient to traction, floating on the spot, and easy to use.
Barge formula moves training dyke and takes following technical scheme to realize:
Barge formula moves training dyke and comprises barge, water filling member, water discharge member and control member;
Barge formula moves training dyke usings the main body of barge as dam structure, watertight ballast compartments is set in barge, above watertight ballast compartments, be provided with water filling member, below is provided with water discharge member, at the upper surface of barge hull corresponding to watertight ballast compartments, control member is installed;
Water filling member comprises water injection valve, water injection valve pipeline, flase floor; Water filling member distributes at barge profile, and position, below minimum drinking water position, is provided with water injection valve at barge profile, is connected with water injection valve pipeline on water injection valve, and the flase floor of filtering foreign material is installed on water injection valve pipeline;
Water discharge member comprises catch pit, well lid, and catch pit gos deep into watertight ballast compartments and is communicated with watertight ballast compartments, in the outer face of catch pit, well lid is installed; When barge need to be shifted, by dropping into some submersible pumps, watertight ballast compartments inner storing water is expelled to outboard, and can observes watertight ballast compartments height of water level by catch pit.The position of catch pit is arranged according to hull watertight ballast compartments Design coordination.
Described control member comprises extension rod, threshold switch and handle; On water filling member, threshold switch is installed, one end of threshold switch connects extension rod, and extension rod is through the hull of barge, at the other end of extension rod, handle is installed, by closing of handle control valve switch.
The quantity of described watertight ballast compartments is no less than one.
Described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water filling member.
Described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water discharge member.
On described water filling member, emergent flashboard is installed, for did emergent shutoff when water injection valve lost efficacy.
Barge formula move training dyke by traction, locate, lay, in regulation waters, form training dyke, complete regulation function; When riverbed sluices with upstream, husky defeated the moving after rule changes and change of water, former training dyke regulation function is obstructed or declines, and can develop comply with according to river, riverbed gesture to adjust regulation line position, and former barge training dyke is re-started and laid, and has reached again and has recycled.
Barge adopts existing general barge structure, for " cuboid " structure, by existing barge, is converted.
Barge hull, according to stability and ballast demand, is separated into some watertight ballast compartments, can note respectively draining, adjusts hull floading condition.
It is as follows that barge formula moves training dyke using method:
1: according to regulation training dyke axis, the indexs such as regulation scope are determined barge riding position;
2: riverbed, installation position foundation trench is flattened, reach the requirement of laying;
3: barge is dispatched to waters is installed, according to construction survey unwrapping wire, and cast anchor, open the water injecting mechanism of barge side, to watertight ballast compartments in barge, rush priming petock, note adjusting at any time position according to the axis of training dyke, sink to the precalculated position that barge is laid;
Can increase side by side training dyke length by many boats and ships if needed;
4: when needs shift position, close water injecting mechanism, open drainage mechanism, submersible pump is put into watertight ballast compartments by catch pit and discharge unnecessary water, barge floating, moves to barge the position needing, open water injecting mechanism, sink to the precalculated position that barge is laid.
The beneficial effects of the utility model are:
The utility model simplicity of design, effect are remarkable.Using barge as the main body of training dyke, and training dyke adopts barge to carry out the transformation of water storage lattice, and barge opsition dependent fixed point is cast anchor after sinking to the bottom and can be used.Technique is simple, and streamlining, has avoided too much ship machine to drop into and the scope of operation is arranged; Barge formula structure training dyke flexible arrangement, can settle flexibly mobile and reusable, can be with the regulation line after river bed change and regulated water stage, readjust the layout of training dyke, reduced the reconstruction, enlarging, the dismounting risk that after fixed dam builds up, with river bed change, relate to.
Accompanying drawing explanation
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail, wherein:
Fig. 1 is that the utility model barge formula moves training dyke structural entity design structure diagram.
Fig. 2 is that the utility model barge formula moves the structural representation of training dyke inside.
Fig. 3 is the structural representation that the utility model barge formula moves the member of intaking on training dyke.
The specific embodiment
In figure 1, barge, 2, drainage mechanism, 3, water injecting mechanism, 4, controlling organization, 5, submersible pump;
2-1, well lid, 2-2, catch pit;
3-1, water injection valve, 3-2, flase floor, 3-3, water injection valve pipeline, 3-4, emergent flashboard;
4-1, handle, 4-2, extension rod, 4-3, threshold switch;
Barge formula moves training dyke and comprises barge 1, water filling member 3, water discharge member 2 and control member 4;
Barge formula moves training dyke usings the main body of barge 1 as dam structure, in the interior watertight ballast compartments that arranges of barge 1, above watertight ballast compartments, be provided with water filling member 3, below is provided with water discharge member 2, at the upper surface of barge 1 hull corresponding to watertight ballast compartments, control member 4 is installed;
Water filling member 3 comprises water injection valve 3-1, water injection valve pipeline 3-3, flase floor 3-2; Water filling member 3 distributes at barge 1 profile, and position, below minimum drinking water position, is provided with water injection valve 3-1 at barge 1 profile, is connected with water injection valve pipeline 3-3 on water injection valve 3-1, and the flase floor 3-2 of filtering foreign material is installed on water injection valve pipeline 3-3;
Water discharge member 2 comprises catch pit 2-2, well lid 2-1, and catch pit 2-2 gos deep into watertight ballast compartments and is communicated with watertight ballast compartments, in the outer face of catch pit 2-2, well lid 2-1 is installed; When barge 1 need to be shifted, by dropping into some submersible pumps 5, watertight ballast compartments inner storing water is expelled to outboard, and can observes watertight ballast compartments height of water level by catch pit 2-2.The position of catch pit is arranged according to the watertight ballast compartments Design coordination of hull 1.
Described control member 4 comprises extension rod 4-2, threshold switch 4-3 and handle 4-1; Threshold switch 4-3 is installed on water filling member 4, and one end of threshold switch 4-3 connects extension rod 4-2, and extension rod 4-2 is through the hull of barge 1, at the other end of extension rod 4-2, handle 4-1 is installed, by closing of handle 4-1 control valve switch 4-3.
The quantity of described watertight ballast compartments is no less than one.
Described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water filling member 3.
Described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water discharge member 2.
Emergent flashboard 3-4 is installed, for did emergent shutoff when water injection valve 3-1 lost efficacy on described water filling member 3.
Barge formula move training dyke by traction, locate, lay, in regulation waters, form training dyke, complete regulation function; When riverbed sluices with upstream, husky defeated the moving after rule changes and change of water, former training dyke regulation function is obstructed or declines, and can develop comply with according to river, riverbed gesture to adjust regulation line position, and former barge training dyke is re-started and laid, and has reached again and has recycled.
Barge adopts existing general barge structure, for " cuboid " structure, by existing barge, is converted.
Barge hull, according to stability and ballast demand, is separated into some watertight ballast compartments, can note respectively draining, adjusts hull floading condition.
It is as follows that barge formula moves training dyke using method:
1: according to regulation training dyke axis, the indexs such as regulation scope are determined barge riding position;
2: riverbed, installation position foundation trench is flattened, reach the requirement of laying;
3: barge 1 is dispatched to waters is installed, according to construction survey unwrapping wire, and cast anchor, open the water injecting mechanism 3 of barge side, to the interior watertight ballast compartments of barge 1, rush priming petock, note adjusting at any time position according to the axis of training dyke, sink to the precalculated position that barge is laid;
Can increase side by side training dyke length by many boats and ships if needed;
4: when needs shift position, close water injecting mechanism 3, open drainage mechanism 2, submersible pump 5 is put into watertight ballast compartments by catch pit 2-2 and discharge unnecessary water, barge 1 floating, moves to barge 1 position needing, open water injecting mechanism 3 and sink, sink to the precalculated position that barge is laid.

Claims (5)

1. barge formula moves a training dyke, it is characterized in that: comprise barge, water filling member, water discharge member and control member;
Barge formula moves training dyke usings the main body of barge as dam structure, watertight ballast compartments is set in barge, above watertight ballast compartments, be provided with water filling member, below is provided with water discharge member, at the upper surface of barge hull corresponding to watertight ballast compartments, control member is installed;
Water filling member comprises water injection valve, water injection valve pipeline, flase floor; Water filling member distributes at barge profile, and position, below minimum drinking water position, is provided with water injection valve at barge profile, is connected with water injection valve pipeline on water injection valve, and the flase floor of filtering foreign material is installed on water injection valve pipeline;
Water discharge member comprises catch pit, well lid, and catch pit gos deep into watertight ballast compartments and is communicated with watertight ballast compartments, in the outer face of catch pit, well lid is installed; When barge need to be shifted, by dropping into some submersible pumps, watertight ballast compartments inner storing water is expelled to outboard, and can observes watertight ballast compartments height of water level by catch pit; The position of catch pit is arranged according to hull watertight ballast compartments Design coordination;
Described control member comprises extension rod, threshold switch and handle; On water filling member, threshold switch is installed, one end of threshold switch connects extension rod, and extension rod is through the hull of barge, at the other end of extension rod, handle is installed, by closing of handle control valve switch.
2. barge formula according to claim 1 moves training dyke, it is characterized in that: the quantity of described watertight ballast compartments is no less than one.
3. barge formula according to claim 1 moves training dyke, it is characterized in that: described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water filling member.
4. barge formula according to claim 1 moves training dyke, it is characterized in that: described watertight ballast compartments, the corresponding installation of each watertight ballast compartments is no less than a water discharge member.
5. barge formula according to claim 1 moves training dyke, it is characterized in that: on described water filling member, emergent flashboard is installed.
CN201420323973.4U 2014-06-18 2014-06-18 Barge formula moves training dyke Withdrawn - After Issue CN203977357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420323973.4U CN203977357U (en) 2014-06-18 2014-06-18 Barge formula moves training dyke

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420323973.4U CN203977357U (en) 2014-06-18 2014-06-18 Barge formula moves training dyke

Publications (1)

Publication Number Publication Date
CN203977357U true CN203977357U (en) 2014-12-03

Family

ID=51974815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420323973.4U Withdrawn - After Issue CN203977357U (en) 2014-06-18 2014-06-18 Barge formula moves training dyke

Country Status (1)

Country Link
CN (1) CN203977357U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047264A (en) * 2014-06-18 2014-09-17 长江南京航道工程局 Barge type mobile diversion dam and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047264A (en) * 2014-06-18 2014-09-17 长江南京航道工程局 Barge type mobile diversion dam and application method thereof
CN104047264B (en) * 2014-06-18 2016-08-24 长江南京航道工程局 Barge formula moves training dyke and using method thereof

Similar Documents

Publication Publication Date Title
CN103938591A (en) Method for reducing heavily silt-carrying river reservoir deposition
JP2019510907A (en) Collected sand collection equipment for coastal erosion prevention
CN103898867A (en) Spur dike, for inland waterway improvement, not connected with embankment
CN102359147B (en) Device and method for taking water from water source
CN102493393A (en) Construction scheme for throwing (filling) long sand-filled tubular sacks inside and outside anti-slide piles to protect feet
CN104863097A (en) Flexible sand stop curtain structure
CN109853491A (en) Gate valve duct type fish pass structure
CN203977357U (en) Barge formula moves training dyke
CN104047264B (en) Barge formula moves training dyke and using method thereof
CN203768987U (en) Shoreside water intake device for nuclear power plant
CN102134844B (en) Automatic dredging and desilting system for rubber dam
CN102912761B (en) Wind force dredging method for river
CN203977358U (en) Caisson type moves training dyke
CN201580547U (en) Pontoon applicable to excavation operation on water surface
CN202430683U (en) Underwater bearing platform type shore protection facility
CN105603942B (en) Dykes and dams super standard flood flood diversion siphon pipe band
RU2010108291A (en) COMPLEX OF HYDROTECHNICAL STRUCTURES FOR PREVENTING FLOODING OF TERRITORIES BELOW THE DAM OF THE KRASNODAR HYDROGROUND ON THE KUBAN RIVER
CN213952114U (en) Combined ecological bank protection structure
CN206220172U (en) Tubular type diversion pumping plant
CN206173891U (en) River protection is with ecological protection slope
CN104612106B (en) A permeable geotechnical soft row structure
CN204849678U (en) Novel butyl dam structure
CN104153320A (en) A pebble shoal regulation method that strengthens the dry-water branch pattern
RU153378U1 (en) HIGH RIVER SOIL RIVER DAM
CN203890952U (en) Spur dike structure suitable for stable river bed of mountain river

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141203

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting