CN202817606U - Horizontal supporting frame for replacing line insulator - Google Patents
Horizontal supporting frame for replacing line insulator Download PDFInfo
- Publication number
- CN202817606U CN202817606U CN 201220535285 CN201220535285U CN202817606U CN 202817606 U CN202817606 U CN 202817606U CN 201220535285 CN201220535285 CN 201220535285 CN 201220535285 U CN201220535285 U CN 201220535285U CN 202817606 U CN202817606 U CN 202817606U
- Authority
- CN
- China
- Prior art keywords
- rod
- main stress
- wire
- card
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Insulators (AREA)
Abstract
一种更换线路绝缘子用托平架,包括左导线卡,左导线卡前端连接有前丝杆,前丝杆上连接有前紧线器,前紧线器外面连接有前紧线把手,前丝杆另一端铰接有前主受力杆,前主受力杆右部开有定位孔;左导线卡后端连接有后丝杆,后丝杆位于前丝杆后方,后丝杆上连接有后紧线器,后紧线器外面连接有后紧线把手,后丝杆另一端铰接有后主受力杆,后主受力杆右部也开有定位孔;前主受力杆与后主受力杆之间连接有右导线卡,右导线卡与前主受力杆为左右滑动连接,右导线卡与后主受力杆也为左右滑动连接,右导线卡前端和后端均连接有定位螺栓,定位螺栓与定位孔相对应;左导线卡下面连接有前吊杆和后吊杆,前吊杆位于后吊杆前方,前吊杆下端铰接有前托杆。
A support flat frame for replacing line insulators, including a left conductor clamp, a front screw rod connected to the front end of the left conductor clamp, a front wire tensioner connected to the front screw rod, a front wire tensioner handle connected to the front wire tensioner, a front wire The other end of the rod is hinged with the front main force rod, and the right part of the front main force rod has a positioning hole; Thread tensioner, the rear thread tensioner is connected with a rear tightening handle, the other end of the rear screw rod is hinged with a rear main stress rod, and a positioning hole is also opened on the right part of the rear main stress rod; the front main stress rod is connected with the rear main stress rod There is a right wire card connected between the force rods, the right wire card is connected to the front main force rod by sliding left and right, and the right wire card is also connected to the rear main force rod by sliding left and right, the front end and the rear end of the right wire card are connected with Positioning bolt, positioning bolt is corresponding to positioning hole; Front suspension rod and rear suspension rod are connected below the left conductor card, and front suspension rod is positioned at rear suspension rod front, and front support rod is hinged with front suspension rod lower end.
Description
技术领域 technical field
本实用新型涉及一种电工用具,尤其涉及一种更换线路绝缘子用托平架。 The utility model relates to an electrical appliance, in particular to a support flat frame for replacing line insulators.
背景技术 Background technique
绝缘子是一种特殊的绝缘控件,能够在架空输电线路中起到重要作用,例如支撑导线和防止电流回地。由于种种原因需要更换绝缘子,目前采用的方法是,首先将旧绝缘子及导线放回地面,然后更换新绝缘子,最后再将更换后的绝缘子及导线吊回电线杆顶部重新紧固。采用这种方法更换绝缘子操作非常麻烦,还需要占用地面, 由于架空输电线路一般架设在空旷的农田中,如此操作还有可能会毁坏地面上的农作物,带来不必要的损失。 Insulators are special insulation controls that play an important role in overhead transmission lines, such as supporting conductors and preventing current from returning to ground. Need to change insulator because of various reasons, the method that adopts at present is, at first old insulator and lead are put back on the ground, then replace new insulator, finally the insulator after the replacement and lead are hung back to the top of the utility pole and fastened again. It is very troublesome to replace the insulator by this method, and the ground needs to be occupied. Since the overhead transmission line is generally erected in the open farmland, such an operation may destroy the crops on the ground and cause unnecessary losses.
发明内容 Contents of the invention
本实用新型的目的是提供一种操作简单、使用方便的更换线路绝缘子用托平架。 The purpose of the utility model is to provide a simple and easy-to-use supporting platform for replacing line insulators.
为实现上述目的,本实用新型采用的技术方案为: In order to achieve the above object, the technical solution adopted by the utility model is:
一种更换线路绝缘子用托平架,包括左导线卡,其特征是:左导线卡前端连接有前丝杆,前丝杆上连接有前紧线器,前紧线器外面连接有前紧线把手,前丝杆另一端铰接有前主受力杆,前主受力杆右部开有定位孔;左导线卡后端连接有后丝杆,后丝杆位于前丝杆后方,后丝杆上连接有后紧线器,后紧线器外面连接有后紧线把手,后丝杆另一端铰接有后主受力杆,后主受力杆右部也开有定位孔;前主受力杆与后主受力杆之间连接有右导线卡,右导线卡与前主受力杆为左右滑动连接,右导线卡与后主受力杆也为左右滑动连接,右导线卡前端和后端均连接有定位螺栓,定位螺栓与定位孔相对应;左导线卡下面连接有前吊杆和后吊杆,前吊杆位于后吊杆前方,前吊杆下端铰接有前托杆,后吊杆下端铰接有后托杆;右导线卡下面连接有前托绳和后托绳,前托绳位于后托绳前方,前托杆的自由端从前托绳内穿过,后托绳的自由端从后托绳内穿过。 A support flat frame for replacing line insulators, including a left wire clamp, characterized in that: the front end of the left wire clamp is connected with a front screw, the front screw is connected with a front tensioner, and the front tensioner is connected with a front tensioner Handle, the other end of the front screw rod is hinged with the front main force rod, and the right part of the front main force rod has a positioning hole; the rear end of the left guide card is connected with the rear screw rod, and the rear screw rod is located behind the front screw rod The rear thread tensioner is connected to the top, and the rear thread tensioner is connected with a rear thread tension handle. The other end of the rear screw rod is hinged with the rear main stress rod, and the right part of the rear main stress rod also has a positioning hole; the front main stress rod There is a right wire clip connected between the rod and the rear main stress rod, and the right wire clip and the front main stress rod are slidingly connected left and right, and the right wire clip and the rear main stress rod are also connected by sliding left and right. Both ends are connected with positioning bolts, and the positioning bolts correspond to the positioning holes; the front hanger and the rear hanger are connected under the left conductor card, the front hanger is located in front of the rear hanger, the lower end of the front hanger is hinged with the front support rod, and the rear hanger The lower end of the rod is hinged with the rear support rod; the front support rope and the rear support rope are connected under the right conductor card, the front support rope is located in front of the rear support rope, the free end of the front support rod passes through the front support rope, and the free end of the rear support rope Pass through the back rope.
采用本实用新型更换绝缘子时,先将绝缘子两端的导线分别与左导线卡和右导线卡固定连接,然后同时操纵前紧线把手和后紧线把手,使绝缘子两端的导线向绝缘子靠拢,此时可以将旧绝缘子取下,换上新绝缘子,然后取下托平架,恢复送电。整个操作可以在电线杆上直接进行,无需将导线及绝缘子取下和放回,因此方便快捷,既省时又省力,既省人力又省物力。 When the utility model is used to replace the insulator, the wires at both ends of the insulator are fixedly connected to the left wire clamp and the right wire clamp respectively, and then the front tightening handle and the rear tightening handle are manipulated at the same time to make the wires at both ends of the insulator move closer to the insulator. The old insulator can be removed, replaced with a new insulator, and then the leveling bracket can be removed to resume power transmission. The whole operation can be carried out directly on the utility pole without removing and putting back the wires and insulators, so it is convenient and quick, saves time and labor, and saves manpower and material resources.
附图说明 Description of drawings
图1是本实用新型的俯视结构示意图; Fig. 1 is the top view structural representation of the utility model;
图2是本实用新型的主视结构示意图。 Fig. 2 is a front structural schematic view of the utility model.
附图中: In the attached picture:
1、左导线卡;2、前紧线器;3、前紧线把手;4、前丝杆;5、前主受力杆;6、前托杆;7、右导线卡;8、后主受力杆;9、后托杆;10、后丝杆;11、后紧线把手;12、后紧线器;13、定位孔;14、后托绳;15、后吊杆。 1. Left wire clip; 2. Front wire tensioner; 3. Front wire tightening handle; 4. Front screw rod; 5. Front main stress rod; 6. Front supporting rod; Stress rod; 9, rear support rod; 10, rear screw rod; 11, rear tightening handle; 12, rear tightening device; 13, positioning hole; 14, rear support rope; 15, rear suspender.
具体实施方式 Detailed ways
下面结合附图和具体实施例对本实用新型作进一步描述: Below in conjunction with accompanying drawing and specific embodiment the utility model is further described:
一种更换线路绝缘子用托平架,如图1和图2所示,包括左导线卡1,左导线卡1前端连接有前丝杆4,前丝杆4上连接有前紧线器2,前紧线器2外面连接有前紧线把手3,前丝杆4另一端铰接有前主受力杆5,前主受力杆5右部开有定位孔13;左导线卡1后端连接有后丝杆10,后丝杆10位于前丝杆4后方,后丝杆10上连接有后紧线器12,后紧线器12外面连接有后紧线把手11,后丝杆10另一端铰接有后主受力杆8,后主受力杆8右部也开有定位孔13;前主受力杆5与后主受力杆8之间连接有右导线卡7,右导线卡7与前主受力杆5为左右滑动连接,右导线卡7与后主受力杆8也为左右滑动连接,右导线卡7前端和后端均连接有定位螺栓,定位螺栓与定位孔13相对应;左导线卡1下面连接有前吊杆和后吊杆15,前吊杆位于后吊杆15前方,前吊杆下端铰接有前托杆6,后吊杆15下端铰接有后托杆9;右导线卡7下面连接有前托绳和后托绳14,前托绳位于后托绳14前方,前托杆6的自由端从前托绳内穿过,后托绳14的自由端从后托绳14内穿过。
A support flat frame for replacing line insulators, as shown in Figure 1 and Figure 2, comprising a
上面所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的构思和范围进行限定,在不脱离本实用新型设计构思的前提下,本领域中普通工程技术人员对本实用新型的技术方案作出的各种变型和改进,均应落入本实用新型的保护范围,本实用新型请求保护的技术内容,已经全部记载在权利要求书中。 The above-described embodiments are only described to the preferred implementation of the utility model, and are not intended to limit the concept and scope of the utility model. Various modifications and improvements made in the new technical solution should fall within the scope of protection of the utility model, and the technical content claimed in the utility model has been fully recorded in the claims.
本实用新型适用于35KV线路更换绝缘子,具有重量轻、连接可靠、调整方便等优点,该托平架还可以用来更换悬锤。 The utility model is suitable for replacing insulators of 35KV lines, and has the advantages of light weight, reliable connection, convenient adjustment, etc., and the supporting flat frame can also be used to replace the suspension hammer.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220535285 CN202817606U (en) | 2012-10-19 | 2012-10-19 | Horizontal supporting frame for replacing line insulator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220535285 CN202817606U (en) | 2012-10-19 | 2012-10-19 | Horizontal supporting frame for replacing line insulator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202817606U true CN202817606U (en) | 2013-03-20 |
Family
ID=47876424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220535285 Expired - Fee Related CN202817606U (en) | 2012-10-19 | 2012-10-19 | Horizontal supporting frame for replacing line insulator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202817606U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102882155A (en) * | 2012-10-19 | 2013-01-16 | 山东电力集团公司枣庄供电公司 | Supporting frame for replacing line insulator |
| CN104253394A (en) * | 2013-09-05 | 2014-12-31 | 国家电网公司 | Tension insulator string replacement tool |
| CN111313320A (en) * | 2020-02-24 | 2020-06-19 | 国网福建省电力有限公司龙岩供电公司 | a replacement device |
-
2012
- 2012-10-19 CN CN 201220535285 patent/CN202817606U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102882155A (en) * | 2012-10-19 | 2013-01-16 | 山东电力集团公司枣庄供电公司 | Supporting frame for replacing line insulator |
| CN104253394A (en) * | 2013-09-05 | 2014-12-31 | 国家电网公司 | Tension insulator string replacement tool |
| CN104253394B (en) * | 2013-09-05 | 2016-10-05 | 国家电网公司 | A kind of replacing instrument of strain insulator string |
| CN111313320A (en) * | 2020-02-24 | 2020-06-19 | 国网福建省电力有限公司龙岩供电公司 | a replacement device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102420401B (en) | Triangular insulating hanging fulcrum bar | |
| CN203289007U (en) | 10kV insulated wire fixing device | |
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN107171249A (en) | The mounting structure and replacement operation method of a kind of duplex strain insulator string | |
| CN202817606U (en) | Horizontal supporting frame for replacing line insulator | |
| CN203481420U (en) | Grounding wire device used for power transmission line overhauling | |
| CN203300837U (en) | Throwing-hanging type ground wire | |
| CN107780825B (en) | Insulation ladder for live working | |
| CN204896217U (en) | Frame is transported to earth bar | |
| CN204481391U (en) | A kind of replacing double bundle conductor conductor spacer specific purpose tool | |
| CN102882155A (en) | Supporting frame for replacing line insulator | |
| CN103944104B (en) | A kind of charged dismounting Bird's Nest method | |
| CN205693237U (en) | Hanging rack of earthing wire | |
| CN103746316A (en) | Device and method for replacing insulator string of straight corner tower in hot-line work mode | |
| CN208015333U (en) | A kind of 35kV double cables single pole rod rising device | |
| CN206740813U (en) | Electrical test instrument spooler | |
| CN207918157U (en) | A kind of portable tape rod earth wire bobbin winder device | |
| CN204651789U (en) | The special hanger of hot-line insulator string replacement | |
| CN201611699U (en) | Remote control earth wire | |
| CN203967279U (en) | Corner pole circuit interior angle side joint device for connecting earth | |
| CN202127198U (en) | A kind of insulator replacement device for 220 kV strain string double-split conductor | |
| CN203205771U (en) | Tensioning insulating clamp for live replacement of tension insulator | |
| CN204741222U (en) | Portable multi -functional transmission line interruption maintenance appurtenance | |
| CN203039273U (en) | Transformer station tubular busbar double-clamp grounding device | |
| CN202578116U (en) | Single-person on-pole assembler for dual-fan cross arm |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130815 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 277100 ZAOZHUANG, SHANDONG PROVINCE TO: 277000 ZAOZHUANG, SHANDONG PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20130815 Address after: 277000 the Yellow River Road, Xuecheng District, Shandong, No. 999, No. Patentee after: Tai'an Power Supply Co., Ltd. of Shandong Electric Power Corporation Patentee after: State Grid Corporation of China Address before: 277100 No. 60 Guangming Middle Road, Shizhong District, Shandong, Zaozhuang Patentee before: Tai'an Power Supply Co., Ltd. of Shandong Electric Power Corporation |
|
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130320 Termination date: 20131019 |