CN201313940Y - Planer furnace structure in the middle of the overhaul workshop - Google Patents
Planer furnace structure in the middle of the overhaul workshop Download PDFInfo
- Publication number
- CN201313940Y CN201313940Y CNU2008202202440U CN200820220244U CN201313940Y CN 201313940 Y CN201313940 Y CN 201313940Y CN U2008202202440 U CNU2008202202440 U CN U2008202202440U CN 200820220244 U CN200820220244 U CN 200820220244U CN 201313940 Y CN201313940 Y CN 201313940Y
- Authority
- CN
- China
- Prior art keywords
- furnace
- planer
- dig
- furnace structure
- dust collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 claims abstract description 31
- 239000000428 dust Substances 0.000 claims abstract description 30
- 239000002699 waste material Substances 0.000 claims abstract description 25
- 230000008439 repair process Effects 0.000 claims description 15
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims 3
- 238000007599 discharging Methods 0.000 claims 2
- 239000000463 material Substances 0.000 abstract description 12
- 238000003912 environmental pollution Methods 0.000 abstract description 5
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 abstract description 4
- 229910052782 aluminium Inorganic materials 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012938 design process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Electrolytic Production Of Metals (AREA)
Abstract
本实用新型涉及一种大修车间中部刨炉结构,尤其涉及一种在电解铝厂电解槽集中大修车间的大修车间中部刨炉结构。大修车间中部刨炉结构,包括电解槽、刨炉工段,在刨炉工段设有刨炉平台,刨炉平台上设有拆除运输装卸设备,在刨炉平台上方设有刨炉工序收尘罩,刨炉工序收尘罩罩住拆除运输装卸设备的工作范围,在刨炉平台下方设有废料卸载工序收尘装置。本实用新型的优点效果:刨炉工序和废料装载工序的灰尘进行收集,起到防止污染环境的作用。在刨炉平台下面设有运料通道和废料卸载工序收尘装置使在废料卸载工序时降低环境污染和方便运输的作用。
The utility model relates to a planer furnace structure in the middle of an overhaul workshop, in particular to a planer furnace structure in the middle of the overhaul workshop in the concentrated overhaul workshop of electrolytic cells in an electrolytic aluminum plant. The structure of the planer furnace in the middle of the overhaul workshop includes the electrolytic cell and the planer furnace section. There is a planer furnace platform in the planer furnace section. The planer furnace platform is equipped with dismantling, transportation and loading and unloading equipment, and a dust collection cover for the planer furnace process is installed above the planer furnace platform. The dust collection cover for the planer furnace process covers the working range of dismantling the transportation and loading and unloading equipment, and a dust collection device for the waste unloading process is installed under the planer furnace platform. The utility model has the advantages and effects: the dust in the furnace planing process and the waste material loading process is collected to prevent environmental pollution. Under the planer furnace platform, there is a material conveying channel and a waste material unloading process dust collection device to reduce environmental pollution and facilitate transportation during the waste material unloading process.
Description
技术领域 technical field
本实用新型涉及一种大修车间中部刨炉结构,尤其涉及一种在电解铝厂电解槽集中大修车间的大修车间中部刨炉结构。The utility model relates to a planer furnace structure in the middle of the overhaul workshop, in particular to a planer furnace structure in the middle of the overhaul workshop in the concentrated overhaul workshop of the electrolytic cells of the electrolytic aluminum factory.
背景技术 Background technique
在电解铝的生产过程中,其主要生产设备——电解槽内衬的寿命是一定的。但电解槽因其造价高,更换过程复杂,为延长其使用寿命,故对电解槽进行适时的保养和修理是十分必要的。因电解槽设备本身的特殊性和复杂性,决定了其保养和修理的过程,具有极强的专业性和复杂性,在电解槽集中大修车间内对修理工艺的各种阶段进行合理的分区和布局是必要的。In the production process of electrolytic aluminum, the life of the main production equipment - the lining of the electrolytic cell is certain. However, because of the high cost of the electrolyzer and the complicated replacement process, in order to prolong its service life, timely maintenance and repair of the electrolyzer is very necessary. Due to the particularity and complexity of the electrolyzer equipment itself, the process of its maintenance and repair is determined, which is extremely professional and complex. In the centralized overhaul workshop of the electrolyzer, the various stages of the repair process are reasonably divided and layout is necessary.
大规模、大型槽的电解铝厂集中大修车间的刨炉工段通常采用热刨、干法的刨炉工艺。其工艺过程中无论是刨炉,还是废料的装卸都不可避免的产生大量的粉尘。而刨炉过程对环境所造成一定的污染是设计过程中必须解决的问题。The planing furnace section of the centralized overhaul workshop of the electrolytic aluminum plant with large-scale and large-scale tanks usually adopts hot planing and dry planing furnace technology. During the process, whether it is planing furnace or waste loading and unloading, a large amount of dust will inevitably be generated. The environmental pollution caused by the planing furnace process is a problem that must be solved in the design process.
实用新型内容 Utility model content
为解决上述技术问题本实用新型提供一种大修车间中部刨炉结构,目的能提高修理能力,保证修理质量,同时更能保护和改善修理环境。In order to solve the above technical problems, the utility model provides a planer furnace structure in the middle of the overhaul workshop, which aims to improve the repair ability, ensure the repair quality, and protect and improve the repair environment at the same time.
为达上述目的本实用新型是这样实现的:大修车间中部刨炉结构,包括电解槽、刨炉工段,在刨炉工段设有刨炉平台,刨炉平台上设有拆除运输装卸设备,在刨炉平台上方设有刨炉工序收尘罩,刨炉工序收尘罩罩住拆除运输装卸设备的工作范围,在刨炉平台下方设有废料卸载工序收尘装置。In order to achieve the above purpose, the utility model is realized in the following way: the structure of the planer furnace in the middle of the overhaul workshop includes the electrolytic tank and the planer furnace section, and the planer furnace platform is provided in the planer furnace section, and the planer furnace platform is provided with dismantling, transportation and loading and unloading equipment. There is a dust collection cover for the planing furnace process above the furnace platform, which covers the working range of dismantling the transportation and loading and unloading equipment, and a dust collection device for the waste unloading process is installed below the planing furnace platform.
所述的刨炉工序收尘罩的顶部设有活动门。A dodge door is provided on the top of the dust collection hood for the planer furnace process.
所述的活动门为移动式、卷动式或翻卷式。The movable door is movable, rolling or rolling.
所述的废料卸载工序收尘装置下方与卸料斗连接。The lower part of the dust collecting device in the waste unloading process is connected with the unloading hopper.
所述的废料卸载工序收尘装置与卸料斗设在运料通道内。The dust collecting device and the unloading hopper in the waste unloading process are arranged in the material conveying channel.
所述的运料通道内设有废料运输车。A waste transport vehicle is arranged in the material conveying channel.
所述的运料通道的两侧设有运料通道挡土墙。The two sides of the material conveying passage are provided with retaining walls of the conveying passage.
所述的刨炉工段设置在电解槽集中大修车间的中部。The planer furnace section is set in the middle of the electrolyzer centralized overhaul workshop.
本实用新型的优点效果:刨炉工段设置在集中大修车间的中部时使得电解槽阴极槽壳重车运输距离缩短,在刨炉工序收尘罩上设置活动门解决了电解槽阴极槽壳灵活、方便的运进和运出的问题,并对刨炉工序和废料装载工序的灰尘进行收集,起到防止污染环境的作用。在刨炉平台下面设有运料通道和废料卸载工序收尘装置使在废料卸载工序时降低环境污染和方便运输的作用。The utility model has the advantages and effects: when the planing furnace section is set in the middle of the centralized overhaul workshop, the transportation distance of the cathode tank shell of the electrolytic cell is shortened, and a movable door is set on the dust collection cover of the planing furnace process to solve the problem of flexible cathode tank shell of the electrolytic cell. It is convenient to transport in and out, and collect the dust in the planing furnace process and waste loading process to prevent environmental pollution. Under the planer furnace platform, there is a material conveying channel and a waste material unloading process dust collection device to reduce environmental pollution and facilitate transportation during the waste material unloading process.
附图说明 Description of drawings
图1是本实用新型大修车间中部刨炉结构示意图。Fig. 1 is a structural schematic diagram of the planer furnace in the middle part of the overhaul workshop of the utility model.
图2是图1中的A-A剖示图。Fig. 2 is a sectional view of A-A in Fig. 1 .
图3是图1中的B-B剖示图。Fig. 3 is a B-B sectional view in Fig. 1 .
图中,1、刨炉工序收尘罩;2、活动门;3、拆除运输装卸设备;4、废料卸载工序收尘装置;5、卸料斗;6、废料运输车;7、刨炉平台;8、运料通道;9、运料通道挡土墙;10、电解槽;11、刨炉工段;12、通风机室。In the figure, 1. Dust collecting hood in planing furnace process; 2. Dodge door; 3. Dismantling transportation and handling equipment; 4. Dust collecting device in waste unloading process; 5. Unloading hopper; 6. Waste transport vehicle; 7. Planing furnace platform; 8. Material conveying channel; 9. Retaining wall of material conveying channel; 10. Electrolyzer; 11. Planer furnace section; 12. Ventilator room.
具体实施方式 Detailed ways
下面结合附图对本实用新型做进一步详细说明,但本实用新型的保护范围不受实施例所限。The utility model will be described in further detail below in conjunction with the accompanying drawings, but the protection scope of the utility model is not limited by the embodiments.
如图1、图2和图3所示本实用新型大修车间中部刨炉结构,包括电解槽10、刨炉工段11,刨炉工段11设置在电解槽集中大修车间的中部,电解槽集中大修车间外设有通风机室12,在刨炉工段11设有刨炉平台7,刨炉平台7上设有拆除运输装卸设备3,拆除运输装卸设备3刨炉、装载和卸载的多用性功能,在刨炉平台7上方设有刨炉工序收尘罩1,刨炉工序收尘罩1罩住拆除运输装卸设备3的工作范围,刨炉工序收尘罩1的顶部设有活动门2,活动门为移动式、卷动式或翻卷式,在刨炉平台7下方设有废料卸载工序收尘装置4,废料卸载工序收尘装置4下方与卸料斗5连接,废料卸载工序收尘装置4下方与卸料斗5设在运料通道8内,运料通道8内设有废料运输车6,运料通道8的两侧设有运料通道挡土墙9;如图3所示运料通道8为斜坡运料通道。As shown in Figure 1, Figure 2 and Figure 3, the planer furnace structure in the middle of the overhaul workshop of the utility model includes an
本实用新型的工作原理如下:拆除运输装卸设备3进行刨炉作业时,通过刨炉工序收尘罩1内的空气造成负压,来实现刨炉作业和废料装载作业的收尘目的。电解槽阴极槽壳内拆除的废料通过卸料斗5装入废料运输车6,废料卸载工序收尘装置4对卸载废料产生的灰尘进行收集。The working principle of the utility model is as follows: when the transportation and loading and unloading
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008202202440U CN201313940Y (en) | 2008-12-03 | 2008-12-03 | Planer furnace structure in the middle of the overhaul workshop |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008202202440U CN201313940Y (en) | 2008-12-03 | 2008-12-03 | Planer furnace structure in the middle of the overhaul workshop |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201313940Y true CN201313940Y (en) | 2009-09-23 |
Family
ID=41125732
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008202202440U Expired - Lifetime CN201313940Y (en) | 2008-12-03 | 2008-12-03 | Planer furnace structure in the middle of the overhaul workshop |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201313940Y (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101654793B (en) * | 2008-08-19 | 2011-02-02 | 沈阳铝镁设计研究院 | Electrolytic cell gathering overhaul workshop middle digging structure |
-
2008
- 2008-12-03 CN CNU2008202202440U patent/CN201313940Y/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101654793B (en) * | 2008-08-19 | 2011-02-02 | 沈阳铝镁设计研究院 | Electrolytic cell gathering overhaul workshop middle digging structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018040263A1 (en) | Lead-acid battery storage container | |
| CN203652820U (en) | Unpowered ash discharge system of clinker silo top bag dust filter | |
| CN201313940Y (en) | Planer furnace structure in the middle of the overhaul workshop | |
| CN102942071A (en) | High efficient and environment-friendly pebble coal full-sealing discharge device | |
| CN210140604U (en) | Recovery device for blast furnace damping-down and diffusing coal gas | |
| CN203668309U (en) | Device for recycling water vapor of coke quenching tower subjected to wet coke quenching and removing dust | |
| CN210151146U (en) | Converter tertiary dust excluding hood and converter tertiary dust excluding system | |
| CN201313941Y (en) | Electrolyzer liner removal structure | |
| CN212245416U (en) | Slag bin dust collecting device of dry slag discharging system | |
| CN202454693U (en) | Integrated retreating equipment for waste lead storage batteries | |
| CN206695616U (en) | Furnace charge blanking transporter | |
| CN206265916U (en) | A kind of dust arrester for tippler | |
| CN211755550U (en) | Slag discharging device of medium-speed coal mill | |
| CN101654793B (en) | Electrolytic cell gathering overhaul workshop middle digging structure | |
| CN101575716A (en) | Electrolyzer liner dismounting structure of electrolyzer centralized overhaul workshop | |
| CN204911539U (en) | Old and useless honeycomb formula denitration catalyst ash handling equipment | |
| CN101824629B (en) | Structure for removing cathode lining of electrolytic bath | |
| CN211522105U (en) | Device for collecting smoke dust of coke oven | |
| CN203316232U (en) | Pebble coal drain-off system of medium speed coal mill | |
| CN206122311U (en) | Lead acid battery storage compartment | |
| CN202263631U (en) | Internal circulation dust removing device of crushing system | |
| CN201485510U (en) | A structure for removing the cathode liner of an electrolytic cell | |
| CN217498046U (en) | High-efficient dust collector of portable belt tripper | |
| CN222794295U (en) | Ash collecting bin ash discharging device | |
| CN202935969U (en) | High efficient and environment friendly pebble coal omniseal discharge device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20090923 Effective date of abandoning: 20081203 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20090923 Effective date of abandoning: 20081203 |