- CN201170378Y CN201170378Y CNU200720075784XU CN200720075784U CN201170378Y CN 201170378 Y CN201170378 Y CN 201170378Y CN U200720075784X U CNU200720075784X U CN U200720075784XU CN 200720075784 U CN200720075784 U CN 200720075784U CN 201170378 Y CN201170378 Y CN 201170378Y
- Authority
- CN
- China
- Prior art keywords
- cable
- pulley
- slideway
- small
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000872 buffer Substances 0.000 claims description 12
- 239000003245 coal Substances 0.000 abstract description 6
- 238000005065 mining Methods 0.000 abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000000725 suspension Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to the coal mine special equipment, which is mainly applied to a cable from a coal mine fully mechanized coal face switch trolley to a face, a pipeline hanging and moving single track hanging device for a mine coal mining face. The equipment comprises a pulley hanging group, slide tracks and a small-sized hydraulic winch. The equipment is characterized in that the pulley hanging group is fixed on a single track both sides of which are provided with small chamfers to be the slide tracks, the slide tracks are fixed on a top plate by anchor cables and provided with a small-sized winch fixing framewhich are connected with small-sized winch rollers; the pulley hanging group comprises a slide connecting ring, a track and two fixing splints; each fixing splint is provided with a shaft, a bearing , a spring cushion and a screw cap; and the shaft is provided with a cable hook provided with a plurality of U-shaped clips.
Description
Technical field
The utility model belongs to the colliery special-purpose equipment, is mainly used in coal mine fully-mechanized mining working switch car and hangs and move to cable, the pipeline of working surface.
Background technique
In coal mine fully-mechanized mining work, banded together originally at present at one section cable, pipeline of fully mechanized mining face to the switch car, be not be placed on underground, hook with iron wire and processing hangs over helping of tunnel exactly, and along with working face extraction is pushed ahead, frequent moves, move difficulty, the mobile working amount is big, and cable, pipeline serious wear are also often damaged when mobile, have not only brought great potential safety hazard, and cable, oil pipe often can only serve a working surface, causes great waste.
Summary of the invention
The purpose of this utility model is in order to overcome the deficiency of above-mentioned technology, a kind of mine coal-cutting working surface monorail crane device is provided, this device is fixed on cable, pipeline on the suspension hooks of organizing under the pulleys more, utilize sheave block on single track, to slide, make the natural torsion of cable store cable and pipeline, utilize hydraulic wireline winch to draw automatically and move forward, move freely, as long as move forward single track, cable, pipeline etc. are not landed all the time in the work.
The purpose of this novel practical technology realizes with following technological scheme; A kind of mine coal-cutting working surface monorail crane device, it comprises that pulley hangs group, slideway, the small-sized hydraulic winch is characterized in that: pulley is hung group and is fixed on the single track, and making little chamfering in the both sides of single track is slideway, slideway is fixed on the top board by anchor cable, returning apparatus has the puffer fixing frame on slideway, is connected with the puffer cylinder on the puffer fixing frame, and described pulley is hung group and comprised the scraper-trough conveyer connecting ring, track, two fixing clamping plates, device has axle on fixing clamping plate, bearing, spring pad, nut, returning apparatus has cable sling on axle, and device has several U type cards on cable sling.
The utility model has the advantages that: this apparatus structure compactness, be convenient to operation, during the advance of the face, unnecessary cable is arranged, just give the oil hydraulic motor fuel feeding, oil hydraulic motor is rotated, last pulley that the pulling wire rope connects, make the reach of cable and pulley, rely on the natural torsion of cable and oil pipe to store cable, when a joint track is vacant, just artificial the dismounting moves forward, by the time the advance of the face is (approximately 60M) to a certain degree the time, just draws the switch car No. one time, draw back cut-off before, the single track that removed is in the past all connected, simultaneously hydraulic wireline winch is dismantled and be advanced to fixing foremost of the most previous single track, just can the Drawing switch car, up to cable with oil pipe is stretching is as the criterion.So repeat, a working surface has been pushed away smoothly, and do not damage cable, reach the purpose of protection cable, saved manpower simultaneously.
Description of drawings
The utility model is described in further detail for figure and embodiment below in conjunction with bowing:
Accompanying drawing 1 is the utility model main structure figure;
Accompanying drawing 2 is pulley assembly structural drawing;
Among the figure, 1, anchor cable, 2, top board, 3, single track, 4, chain sling, 5, puffer fixing frame, 6, puffer cylinder, 7, single track clamping plate, 8,6MM wire rope, 9, appearance rope sheave, 10, oil motor, 11, cable and oil pipe, 12, pulley assembly, 12-1, scraper-trough conveyer connecting ring, 12-2, track, 12-3,204 bearings, 12-4, spring pad 12-5, M16 nut, 12-6, axle, 12-7 clamping plate, 12-8, cable sling, 12-9, U type card.
Embodiment
As shown in the figure, a kind of mine coal-cutting working surface monorail crane device, it comprise pulley hang the group 12, slideway 3-1, the small-sized hydraulic winch, it is characterized in that: pulley is hung group 12 and is fixed on the single track 3, making little chamfering in the both sides of single track 3 is slideway 3-1, and slideway 3-1 is fixed on the top board 2 by anchor cable 1, and returning apparatus has puffer fixing frame 5 on slideway 3-1, on puffer fixing frame 5, be connected with puffer cylinder 6, described pulley is hung group 12 and is comprised scraper-trough conveyer connecting ring 12-1, track 12-2, two fixing clamping plate 12-7, device has a 12-6 on fixing clamping plate 12-7, bearing 12-3, spring pad 12-4, nut 12-5, returning apparatus has cable sling 12-8 on axle 12-6, and device has several U type cards 12-9 on cable sling 12-8.Described hydraulic pressure puffer is made up of six mm wire rope and oil hydraulic motor cylinder, and power provides pull working face one side last sheave block by pumping plant.During use, whole device is fixed on slideway on the top board by anchor cable, and each root gets up with fished joint, then sheave block is placed on the slideway, arrange a determining deviation, fasten on the band iron suspension hook, pass wire rope from each suspension hook and be fixed on last suspension hook and just can use with the u type.When the advance of the face, unnecessary cable is arranged, just give the oil hydraulic motor fuel feeding, oil hydraulic motor is rotated, last pulley that the pulling wire rope connects, make the reach of cable and pulley, rely on the natural torsion of cable and oil pipe to store cable, when a joint track is vacant, just artificial the dismounting moves forward, by the time the advance of the face is (approximately 60M) to a certain degree the time, just draws the switch car No. one time, draw back cut-off before, the single track that removed is in the past all connected, simultaneously hydraulic wireline winch is dismantled and be advanced to fixing foremost of the most previous single track, just can the Drawing switch car, up to cable with oil pipe is stretching is as the criterion.So repeat, a working surface has been pushed away smoothly, and do not damage cable, reach the purpose of protection cable, saved manpower simultaneously.
Claims (1)
1, a kind of mine coal-cutting working surface monorail crane device, it comprises that pulley hangs group (12), slideway (3-1), the small-sized hydraulic winch, it is characterized in that: pulley is hung group (12) and is fixed on the single track (3), doing to go up little chamfering in the both sides of single track (3) is slideway (3-1), slideway (3-1) is fixed on the top board (2) by anchor cable (1), go up returning apparatus at slideway (3-1) puffer fixing frame (5) is arranged, on puffer fixing frame (5), be connected with puffer cylinder (6), described pulley is hung group (12) and is comprised scraper-trough conveyer connecting ring (12-1), track (12-2), two fixing clamping plates (12-7), going up device at fixing clamping plate (12-7) has axle (12-6), bearing (12-3), spring pad (12-4), nut (12-5), going up returning apparatus at axle (12-6) has cable sling (12-8), and going up device at cable sling (12-8) has several U type cards (12-9).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200720075784XU CN201170378Y (en) | 2007-11-20 | 2007-11-20 | Monorail crane device for mine working face |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200720075784XU CN201170378Y (en) | 2007-11-20 | 2007-11-20 | Monorail crane device for mine working face |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201170378Y true CN201170378Y (en) | 2008-12-24 |
Family
ID=40209431
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU200720075784XU Expired - Fee Related CN201170378Y (en) | 2007-11-20 | 2007-11-20 | Monorail crane device for mine working face |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201170378Y (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101807779A (en) * | 2009-02-12 | 2010-08-18 | 西门子公司 | Cable tray |
| CN102332696A (en) * | 2011-09-15 | 2012-01-25 | 山东科技大学 | Shearer cable moving device |
| CN102537519A (en) * | 2012-03-01 | 2012-07-04 | 山西中新唐山沟煤业有限责任公司 | Cable trailing device for fully mechanized coal face transporter head reverse loader |
| CN102620061A (en) * | 2012-03-31 | 2012-08-01 | 深圳市华星光电技术有限公司 | Line guiding mechanism |
| CN102797908A (en) * | 2012-09-13 | 2012-11-28 | 四川宏华石油设备有限公司 | Translation cable trough |
| GB2495503A (en) * | 2011-10-11 | 2013-04-17 | Balfour Beatty Plc | Method and apparatus for the installation of cables or pipes in tunnels |
| CN103663140A (en) * | 2013-12-27 | 2014-03-26 | 贵州永润煤业有限公司 | Method and device for assembling and lifting roadheader |
| CN103758564A (en) * | 2013-12-31 | 2014-04-30 | 中国矿业大学 | Method for suspending monorail crane in soft and weak coal seam roadway |
| CN104453894A (en) * | 2014-10-24 | 2015-03-25 | 安徽恒源煤电股份有限公司 | Cable bearing and moving device of comprehensive mechanical heading machine |
| CN105650112A (en) * | 2016-03-25 | 2016-06-08 | 孟书芳 | Suspension sliding block of sheet splitting machine |
| CN105804677A (en) * | 2016-03-29 | 2016-07-27 | 四川宏华石油设备有限公司 | Pipe processing device |
| CN108879561A (en) * | 2018-07-19 | 2018-11-23 | 淮南矿业(集团)有限责任公司 | A kind of drilling machine Randomized Cable support cable device |
| CN113107482A (en) * | 2021-04-30 | 2021-07-13 | 张兵 | Coal cutter cable clamping plate tractor for large-inclination-angle fully-mechanized coal mining face and use method thereof |
-
2007
- 2007-11-20 CN CNU200720075784XU patent/CN201170378Y/en not_active Expired - Fee Related
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101807779A (en) * | 2009-02-12 | 2010-08-18 | 西门子公司 | Cable tray |
| CN101807779B (en) * | 2009-02-12 | 2013-05-15 | 西门子公司 | Cable tray |
| CN102332696A (en) * | 2011-09-15 | 2012-01-25 | 山东科技大学 | Shearer cable moving device |
| GB2495503A (en) * | 2011-10-11 | 2013-04-17 | Balfour Beatty Plc | Method and apparatus for the installation of cables or pipes in tunnels |
| CN102537519A (en) * | 2012-03-01 | 2012-07-04 | 山西中新唐山沟煤业有限责任公司 | Cable trailing device for fully mechanized coal face transporter head reverse loader |
| CN102620061A (en) * | 2012-03-31 | 2012-08-01 | 深圳市华星光电技术有限公司 | Line guiding mechanism |
| CN102797908A (en) * | 2012-09-13 | 2012-11-28 | 四川宏华石油设备有限公司 | Translation cable trough |
| CN103663140A (en) * | 2013-12-27 | 2014-03-26 | 贵州永润煤业有限公司 | Method and device for assembling and lifting roadheader |
| CN103758564A (en) * | 2013-12-31 | 2014-04-30 | 中国矿业大学 | Method for suspending monorail crane in soft and weak coal seam roadway |
| CN104453894A (en) * | 2014-10-24 | 2015-03-25 | 安徽恒源煤电股份有限公司 | Cable bearing and moving device of comprehensive mechanical heading machine |
| CN105650112A (en) * | 2016-03-25 | 2016-06-08 | 孟书芳 | Suspension sliding block of sheet splitting machine |
| CN105804677A (en) * | 2016-03-29 | 2016-07-27 | 四川宏华石油设备有限公司 | Pipe processing device |
| CN108879561A (en) * | 2018-07-19 | 2018-11-23 | 淮南矿业(集团)有限责任公司 | A kind of drilling machine Randomized Cable support cable device |
| CN113107482A (en) * | 2021-04-30 | 2021-07-13 | 张兵 | Coal cutter cable clamping plate tractor for large-inclination-angle fully-mechanized coal mining face and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201170378Y (en) | Monorail crane device for mine working face | |
| CN103950453B (en) | Drive traveling train | |
| CN103742138B (en) | One fells and transports coal all-in-one | |
| CN203796302U (en) | Circulation self-moving type forepoling auxiliary rack moving device | |
| CN202988067U (en) | Horizontal corner conveying device for coal mine | |
| CN102797485B (en) | Rotary accommodating platform for hydraulic support for fully mechanized mining for coal mine | |
| CN103170963B (en) | Dual-arm robot | |
| CN201282320Y (en) | Device for automatically sliding coal cutter set cable wire | |
| CN101537561B (en) | Lifting tool car of fully-mechanized equipment | |
| CN202900291U (en) | Rotation placing platform of coal mine combined mining hydraulic support | |
| CN108408553B (en) | Chain type continuous rope feeding clamping mechanism | |
| CN201323431Y (en) | Sliding cable dragging frame | |
| CN201851122U (en) | Rack type hydraulic pressure belt tail propelling device | |
| CN202611727U (en) | Hydraulic chain type plastering rack platform | |
| CN204433682U (en) | Fully-mechanized mining working elevating conveyor and the automatic push unit of belt conveyer tail | |
| CN203228226U (en) | Single-arm manipulator | |
| CN204677201U (en) | A kind of mechanical coal mining machine | |
| CN204020894U (en) | The drive train of advancing | |
| CN205051315U (en) | Combine and adopt working face coal -winning machine cable follow -up draw gear | |
| CN208776243U (en) | A kind of adjustable conductor rope wheel apparatus | |
| CN202130917U (en) | Cable moving device for mine shaft | |
| CN202691287U (en) | Combined-mining hydraulic cable pulling and removing device | |
| CN201604997U (en) | Bilateral automatic tail moving device | |
| CN203294693U (en) | Self-moving machine tail for belt conveyer | |
| CN201025065Y (en) | Transport plane self-shift device for cannon exploration working ground |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081224 Termination date: 20111120 |