CN201059566Y CNU2007201496122U CN200720149612U CN201059566Y CN 201059566 Y CN201059566 Y CN 201059566Y CN U2007201496122 U CNU2007201496122 U CN U2007201496122U CN 200720149612 U CN200720149612 U CN 200720149612U CN 201059566 Y CN201059566 Y CN 201059566Y
Authority
CN
China
Prior art keywords
slag
steel band
boiler
deslagging device
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201496122U
Other languages
Chinese (zh)
Inventor
贾临城
戴明德
刘彪
邓叔扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PAITONG TUBE Co Ltd
Original Assignee
BEIJING PAITONG TUBE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING PAITONG TUBE Co Ltd filed Critical BEIJING PAITONG TUBE Co Ltd
Priority to CNU2007201496122U priority Critical patent/CN201059566Y/en
Application granted granted Critical
Publication of CN201059566Y publication Critical patent/CN201059566Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

The utility model relates to a steel band dry type deslagging device for boiler slags in power plant which comprises a boiler transition slag hopper and a steel band deslagging machine, wherein, a furnace bottom deslagging device is arranged between the boiler transition slag hopper and the steel band deslagging machine, an inlet of the furnace bottom deslagging device is provided with a large slag crusher, a grille is arranged below the large slag crusher, the large slag crusher and the grille are supported by a box body, the upper part of the box body is provided with an expansion joint and is hermetically connected with the boiler transition slag hopper, the lower part of the box body is hermetically connected above the steel band deslagging machine; the large slag crusher is a half-open type hydraulic crusher and is provided with a plurality of groups of independent extrusion heads, the extrusion heads are connected with a driving hydraulic cylinder outside the box body through link bars, the driving hydraulic cylinder is arranged on a support outside the box body; the furnace bottom deslagging device can effectively prevent the influence of the radiation heat of the furnace chamber to the convey steel band, has the pre-cooling function, can effectively prevent the larger coking slags from impacting on the convey steel band, and can ensure that the equipment has safe operation; when the successive equipments need to be maintained, the furnace bottom deslagging device plays a role of shutting off the gate and is convenient for short-time maintenance.

Description

Boiler of power plant lime-ash steel band dry slag-draining device
Technical field
The utility model belongs to the boiler slag removal field, is specifically related to a kind of boiler of power plant lime-ash steel band dry slag-draining device.
Background technology
Present domestic coal-fired boiler in power plant generally adopts hydraulic slag discharging, causes a large amount of discharge of wastewater, contaminated environment, and waste water resource, and there are shortcomings such as link is many, equipment is many, fault is many in hydraulic slag discharging, so the popularization of dried slag removing technology is imperative.How better to simplify dreg removing system, make things convenient for equipment operation maintenance, promote energy-conservation, water saving, environmental protection and ash comprehensive utilization, increase economic efficiency, guarantee that equipment safety operation just becomes the problem that presses for solution.
The utility model content
The purpose of this utility model is to overcome deficiency of the prior art, and a kind of equipment operation maintenance that makes things convenient for is provided, and the boiler of power plant lime-ash steel band dry slag-draining device of equipment safety operation is guaranteed in energy-conserving and environment-protective.
The utility model is realized its purpose by the following technical solutions: a kind of boiler of power plant lime-ash steel band dry slag-draining device, comprise boiler transition slag bucket, steel band slag extractor, and between boiler transition slag bucket and steel band slag extractor, hearth deslagging device is installed; There is big slag disintegrating machine the porch of this hearth deslagging device, and grid is installed in the below of big slag disintegrating machine, and big slag disintegrating machine and grid are by the case supports of hearth deslagging device; There is expansion joint on hearth deslagging device casing top and is connected with the sealing of boiler transition slag bucket, and the hearth deslagging device lower box links to each other with the top sealing of steel band slag extractor.
Described big slag disintegrating machine is the opposite opened hydraulic breaker; This opposite opened hydraulic breaker is equipped with organizes independently extrusion head more, and extrusion head is connected by the outer driving hydraulic cylinder of link rod and hearth deslagging device casing, drives hydraulic cylinder and is installed on the outer support of casing.
Described grid is made up of the passive I-steel of high temperature resistant steel pipe and its underpart, and is connected on the hearth deslagging device casing.
It is tooth-shape structure that described extrusion head is split an end, and extrusion head is conical surface body along the direction of motion, and riser is installed on the extrusion head, and the extrusion head end face becomes comb shape and bottom to extend in the middle of the grid.
The bottom of described extrusion head is equipped with the Roller wheel, and this Roller wheel rolls on the high temperature resistant steel pipe of grid.
The two ends of described hearth deslagging device casing are provided with observation window and camera.
Owing to adopt technique scheme, the beneficial effect of boiler of power plant lime-ash steel band dry slag-draining device provided by the utility model is: hearth deslagging device can prevent effectively that radiation of burner hearth heat is to carrying the influence of steel band, has pre-cooled effect, reduce the thermic load of carrying steel band, can also effectively prevent of the impact of big coking clinker, guarantee equipment safety operation the conveying steel band; When follow-up equipment need be safeguarded, can not influence again under the situation of normal operation of boiler, also can start the opposite opened hydraulic breaker and cut off boiler transition slag bucket and steel band slag extractor, play the effect of shutoff door, be convenient to the maintenance of short time, generally be defined as 8 hours operating modes.
Description of drawings
By the following examples and accompanying drawing the utility model boiler of power plant lime-ash steel band dry slag-draining device is further described.
Fig. 1 is an outline drawing of the present utility model.
Fig. 2 is that the A-A of Fig. 1 is to view.
Fig. 3 is the structure chart of hearth deslagging device in the utility model.
Fig. 4 is an extrusion head structure vertical view in the utility model.
Fig. 5 is an extrusion head structure front view in the utility model.
Fig. 6 is an extrusion head structure side view in the utility model.
Among the figure: 1. boiler transition slag bucket, 2. big slag disintegrating machine, 3. grid, 4. extrusion head, 5. hearth deslagging device, 6. link rod, 7. expansion joint 8. drives hydraulic cylinder, 9. support, 10. steel pipe, 11. I-steel, 12. Roller wheel, 13. the steel band slag extractor, 14. observation windows, 15. risers, 16. steel bands, 17. slag crushers.
The specific embodiment
As shown in Figure 1, 2, 3, dry slag-draining device comprises boiler transition slag bucket 1, steel band slag extractor 13, between boiler transition slag bucket and steel band slag extractor hearth deslagging device 5 is installed; Boiler transition slag bucket 1 is mainly used in the storage slag, and connects boiler and hearth deslagging device 5, boiler transition slag bucket 1 independent support, and inner lining refractory and insulation material, its capacity is determined MCR8 according to boiler slag removal amount size design.Big slag disintegrating machine 2 is arranged in the porch of hearth deslagging device 5, and what present embodiment adopted is the opposite opened hydraulic breaker, can carry out precrushing to big clinker; The opposite opened hydraulic breaker is equipped with organizes independently extrusion head 4 more, and extrusion head 4 is connected by the outer driving hydraulic cylinder 8 of link rod 6 and casing, drives hydraulic cylinder and is installed on the outer support 9 of casing.Grid 3 is installed in the below of big slag disintegrating machine 2, is made up of the passive I-steel 11 of high temperature resistant steel pipe 10 and its underpart, and is connected on the casing.Grid 3 can be protected steel band 16, and big slag can not directly be dropped on the steel band 16 of steel band slag extractor; Big slag disintegrating machine 2 and grid 3 pass through case supports; There is expansion joint 7 on casing top and is connected with 1 sealing of boiler transition slag bucket, and lower box links to each other with the top sealing of steel band slag extractor 13.Extrusion head 4 bottoms of opposite opened hydraulic breaker are equipped with running roller 12, and this running roller rolls on the high temperature resistant steel pipe 10 of grid, and the change sliding friction is rolling friction, has reduced frictional force, make extrusion head 4 on grid 3 back and forth freely, improved operating efficiency.Drive hydraulic cylinder 8 and be located at the casing outside, be not subjected to the baking of 800 ℃ of temperature in the boiler transition slag bucket, oil cylinder can be worked under 30 ℃~50 ℃ nominal situations, and the dismounting of this structure, be convenient to maintenance.Be provided with observation window 14 and camera in the both sides of hearth deslagging device 5, also can observe the slag situation by shooting and monitoring system, the extrusion head that starts the relevant position carries out independent fragmentation, saves energy, increases work efficiency.
Shown in Fig. 4,5,6, it is tooth-shape structure that the extrusion head 4 of opposite opened hydraulic breaker is split an end, and extrusion head is conical surface body along the direction of motion, can reduce contact area, increases pressure, is convenient to the clinker fragmentation; Riser 15 is installed on the extrusion head,, can cuts off big clinker by riser 15 when running into the bulk slag; The extrusion head end face becomes comb shape and bottom to extend in the middle of the grid 3, but combing falls to be stuck in slag between the grid slit like this, makes slag passage unimpeded all the time.
Adopt above technical scheme, big slag can not directly be dropped to carry on the steel band, avoided carrying the damage of steel band, the workload of single roller slag crusher 17 of output steel band outlet is reduced relatively, prolong the service life of single roller slag crusher, improved the comprehensive life of whole dry slag-draining device.Because the shape and the structure of extrusion head, the efficient of handling big slag is improved greatly, and the mediation passage of slag is unimpeded forever, so can reach in time, quickly big slag fragmentation be fallen and transfer out, to satisfy the working condition requirement of boiler, boiler can normally be moved safely.

Claims (6)

1. a boiler of power plant lime-ash steel band dry slag-draining device comprises boiler transition slag bucket (1), steel band slag extractor (13), it is characterized in that: between boiler transition slag bucket (1) and steel band slag extractor (13) hearth deslagging device (5) is installed; There is big slag disintegrating machine (2) porch of this hearth deslagging device (5), below big slag disintegrating machine grid (3) is installed, and big slag disintegrating machine (2) and grid (3) are by the case supports of hearth deslagging device (5); There is expansion joint (7) on hearth deslagging device (5) casing top and is connected with boiler transition slag bucket (1) sealing, and hearth deslagging device (5) lower box links to each other with the top sealing of steel band slag extractor (13).
2. boiler of power plant lime-ash steel band dry slag-draining device according to claim 1, it is characterized in that: described big slag disintegrating machine (2) is the opposite opened hydraulic breaker; This opposite opened hydraulic breaker is equipped with organizes independently extrusion head (4) more, and extrusion head (4) is connected by the outer driving hydraulic cylinder (8) of link rod (6) and casing, drives hydraulic cylinder (8) and is installed on the outer support (9) of hearth deslagging device (5) casing.
3. boiler of power plant lime-ash steel band dry slag-draining device according to claim 1, it is characterized in that: described grid (3) is made up of the passive I-steel of high temperature resistant steel pipe (10) and its underpart (11), and is connected on hearth deslagging device (5) casing.
4. boiler of power plant lime-ash steel band dry slag-draining device according to claim 2, it is characterized in that: it is tooth-shape structure that described extrusion head (4) is split an end, extrusion head (4) is conical surface body along the direction of motion, riser (15) is installed on the extrusion head (4), and extrusion head (4) end face becomes comb shape and bottom to extend in the middle of the grid (3).
5. boiler of power plant lime-ash steel band dry slag-draining device according to claim 2 is characterized in that: the bottom of described extrusion head (4) is equipped with Roller wheel (12), and this Roller wheel (12) is gone up at the high temperature resistant steel pipe (10) of grid (3) and rolled.
6. boiler of power plant lime-ash steel band dry slag-draining device according to claim 1 is characterized in that: the two ends of described hearth deslagging device (5) casing are provided with observation window (14) and camera.
CNU2007201496122U 2007-06-13 2007-06-13 Power plant boiler ash steel belt dry-type residue discharging device Expired - Fee Related CN201059566Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201496122U CN201059566Y (en) 2007-06-13 2007-06-13 Power plant boiler ash steel belt dry-type residue discharging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201496122U CN201059566Y (en) 2007-06-13 2007-06-13 Power plant boiler ash steel belt dry-type residue discharging device

Publications (1)

Publication Number Publication Date
CN201059566Y true CN201059566Y (en) 2008-05-14

Family

ID=39408039

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201496122U Expired - Fee Related CN201059566Y (en) 2007-06-13 2007-06-13 Power plant boiler ash steel belt dry-type residue discharging device

Country Status (1)

Country Link
CN (1) CN201059566Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011022929A1 (en) * 2009-08-31 2011-03-03 北京国电富通科技发展有限责任公司 Device for discharging slag from bottom of coal-fired boiler
CN101358149B (en) * 2008-09-19 2011-06-15 湖北三盟机械制造有限公司 Bent tube type slag water sealing squeezing slag removal machine
CN110715309A (en) * 2019-09-29 2020-01-21 华能洛阳热电有限责任公司 Hydraulic breaking shut-off door

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101358149B (en) * 2008-09-19 2011-06-15 湖北三盟机械制造有限公司 Bent tube type slag water sealing squeezing slag removal machine
WO2011022929A1 (en) * 2009-08-31 2011-03-03 北京国电富通科技发展有限责任公司 Device for discharging slag from bottom of coal-fired boiler
US20120160141A1 (en) * 2009-08-31 2012-06-28 Beijing Guodian Futong Science And Technology Development Co., Ltd. Bottom ash discharging device for coal-fired boiler
RU2515935C2 (en) * 2009-08-31 2014-05-20 Беиджинг Гуодиан Футонг Сайенс Энд Текхнолоджи Девелопмент Ко., Лтд. Slag removal device for solid fuel boiler
US8746157B2 (en) 2009-08-31 2014-06-10 Beijing Guodian Futong Science And Technology Development Co., Ltd. Bottom ash discharging device for coal-fired boiler
CN110715309A (en) * 2019-09-29 2020-01-21 华能洛阳热电有限责任公司 Hydraulic breaking shut-off door

Similar Documents

Publication Publication Date Title
CN101644439B (en) Coal burning boiler hearth deslagging device
CN102580832A (en) Isolating and slag crushing device applicable to dry slag extractor and method for same
CN201476032U (en) Mechanical slag removal device of pulverized-coal boiler
CN201059566Y (en) Power plant boiler ash steel belt dry-type residue discharging device
CN203486441U (en) Dry quenching double-fork chute device
CN103322580B (en) Water-cooling dry-type slag discharge device of pulverized coal boiler
CN202709144U (en) Dry-type slag discharging waste heat recovery device of coal-powder boiler
CN201561434U (en) Hydraulic shutoff door device
CN101596472A (en) Cement clinker roller crusher
CN202432531U (en) Bottom slag conveying device for high-slag-quantity coal-fired power plant
CN201513906U (en) Bottom slagging device for coal-fired boiler
CN210425070U (en) Tertiary conveying system of coal fired power plant boiler dry slag removal
CN201074822Y (en) Precooling slag air piping device
CN216744397U (en) Boiler ash removing system
CN210662886U (en) Coal-fired boiler cooling, conveying and processing system with extra-large slag quantity
CN2459550Y (en) High-temp. slag dry delivery device for coal boiler
CN201697478U (en) Electric furnace thermal storage temperature equilibrium settling chamber
CN204955179U (en) Internal mixer
CN202410788U (en) Isolating and slag crushing device suitable for dry-type slag extractor
CN101387405B (en) Novel heavy duty frame stressing layering coal supply apparatus
CN113154418B (en) Implementation scheme for transforming wet slag dragging system into dry slag discharging system
CN207962691U (en) Split type pnenmatic slag handling system
CN201149262Y (en) Scratch board type conveying steel belt of wind cooling dry type slag discharge machine
CN210449363U (en) Slag discharging and breaking device for utilizing waste heat of blast furnace slag
CN201487971U (en) A coal-fired boiler slag discharge device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080514

Termination date: 20140613

EXPY Termination of patent right or utility model