[go: up one dir, main page]

CN201026459Y - Semi-mobile crushing station device directly receiving ore - Google Patents

Semi-mobile crushing station device directly receiving ore Download PDF

Info

Publication number
CN201026459Y
CN201026459Y CNU2007200113378U CN200720011337U CN201026459Y CN 201026459 Y CN201026459 Y CN 201026459Y CN U2007200113378 U CNU2007200113378 U CN U2007200113378U CN 200720011337 U CN200720011337 U CN 200720011337U CN 201026459 Y CN201026459 Y CN 201026459Y
Authority
CN
China
Prior art keywords
crusher
semi
ore
mobile crushing
station device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200113378U
Other languages
Chinese (zh)
Inventor
吕成林
杨洪波
王志刚
郭天辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CNU2007200113378U priority Critical patent/CN201026459Y/en
Application granted granted Critical
Publication of CN201026459Y publication Critical patent/CN201026459Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Disintegrating Or Milling (AREA)
  • Crushing And Grinding (AREA)

Abstract

本实用新型涉及一种直接受矿的半移动破碎站装置,其特征是由包括控制塔楼的破碎机组件和排料胶带机组件构成;控制塔楼的破碎机组件:受料槽呈独立支撑的块装连接结构,受料槽安设在主梁的中部,主梁中间连接附梁,在边侧主梁和附梁的顶部设置受料槽;主机架是移设时的主结构架,顶部安设破碎机,底部安设缓冲仓,控制塔楼在主机架的顶部,与主机架不接触,移设时与主机架接触,在破碎机的一侧是碎石锤另一侧是悬臂起重机。破碎机包括旋回破碎机、圆锥破碎机、颚式破碎机、双齿辊破碎机。本实用新型直接受矿的半移动破碎站装置,安全可靠,可广泛的应用于铁矿、铜矿和石灰石矿的破碎工艺,尤其使用于处理量大于1500t/h的大产量采场破碎要求。

Figure 200720011337

The utility model relates to a semi-mobile crushing station device directly receiving ore, which is characterized in that it is composed of a crusher assembly including a control tower and a discharge belt machine assembly; the crusher assembly of the control tower: the receiving trough is an independently supported block The installation connection structure, the receiving trough is installed in the middle of the main beam, the middle of the main beam is connected with the attached beam, and the receiving trough is set on the top of the side main beam and the attached beam; the main frame is the main structural frame when relocating, and the top is installed. A crusher is installed, and a buffer warehouse is installed at the bottom. The control tower is on the top of the main frame and does not touch the main frame. Crusher includes gyratory crusher, cone crusher, jaw crusher, double toothed roller crusher. The semi-mobile crushing station device of the utility model directly receiving ore is safe and reliable, and can be widely used in the crushing process of iron ore, copper ore and limestone ore, especially for the crushing requirements of large-production stope with a processing capacity greater than 1500t/h.

Figure 200720011337

Description

直接受矿的半移动破碎站装置 Semi-mobile crushing station device directly receiving ore

技术领域 technical field

本实用新型涉及一种采场由两大组件组成的半移动破碎站装置,特别涉及一种由包括控制塔楼的破碎机组件和排料胶带机组件组成的采场破碎机直接受矿的半移动破碎站装置。The utility model relates to a semi-mobile crushing station device composed of two large components in the stope, in particular to a semi-mobile crushing station device in the stope which is composed of a crusher component including a control tower and a discharge belt machine component. Crushing plant.

背景技术 Background technique

目前在公知的技术中,处理量大于1500t/h的大产量半移动破碎站,基本是由带受料槽的重型板式给矿机组件、包括控制塔楼的破碎机组件和排料胶带机组件组成的半移动破碎站。随着技术的进步和多年的使用情况,由三大组件组成的半移动破碎站存在:带受料槽的重型板式给矿机组件运营费用和故障率较高,2台半移动破碎站每年的电耗达400万元、耗损重板及附件费达100万元。而在公知的由两大组件组成的半移动破碎站,都是一个翻卸台位,其破碎机的处理量小于1500t/h,满足不了两个翻卸台位处理量大于1500t/h的要求。At present, in the known technology, the large-capacity semi-mobile crushing plant with a processing capacity of more than 1500t/h is basically composed of a heavy-duty apron feeder assembly with a receiving trough, a crusher assembly including a control tower, and a discharge belt conveyor assembly. semi-mobile crushing station. With the advancement of technology and years of use, semi-mobile crushing stations consisting of three major components exist: the operating costs and failure rates of heavy-duty apron feeder components with receiving troughs are relatively high, and the annual cost of two semi-mobile crushing stations is The electricity consumption amounted to 4 million yuan, and the consumption of heavy boards and accessories amounted to 1 million yuan. However, in the known semi-mobile crushing station composed of two major components, there is only one tipping station, and the processing capacity of the crusher is less than 1500t/h, which cannot meet the requirement that the processing capacity of the two dumping stations is greater than 1500t/h. .

发明内容 Contents of the invention

本实用新型克服了上述存在的缺陷,目的是提供一种采场破碎机直接受矿的由包括控制塔楼的破碎机组件和排料胶带机组件组成的半移动破碎站装置。The utility model overcomes the above-mentioned defects, and aims to provide a semi-mobile crushing station device which is composed of a crusher assembly including a control tower and a discharge belt conveyor assembly, where the stope crusher directly receives ore.

本实用新型直接受矿的半移动破碎站装置内容简述:Brief description of the content of the semi-mobile crushing station device directly receiving ore in the utility model:

本实用新型直接受矿的半移动破碎站装置,其特征在于:由包括控制塔楼的破碎机组件和排料胶带机组件构成;控制塔楼的破碎机组件:受料槽呈独立支撑的块装连接结构,受料槽安设在主梁的中部,主梁中间连接附梁,在边侧主梁和附梁的顶部设置受料槽;主机架是移设时的主结构架,顶部安设破碎机,底部安设缓冲仓,控制塔楼在主机架的顶部,与主机架不接触,移设时与主机架接触,在破碎机的一侧是碎石锤另一侧是悬臂起重机。The semi-mobile crushing station device of the utility model directly receiving ore is characterized in that: it is composed of a crusher assembly including a control tower and a discharge belt machine assembly; the crusher assembly of the control tower: the receiving trough is an independently supported block-mounted connection structure, the receiving trough is installed in the middle of the main beam, the middle of the main beam is connected with the attached beam, and the receiving trough is set on the top of the side main beam and the attached beam; the main frame is the main structural frame when moving, and the top is installed with a broken The bottom of the crusher is equipped with a buffer warehouse, and the control tower is on the top of the main frame, which is not in contact with the main frame. When it is moved, it is in contact with the main frame. On one side of the crusher is a crushing hammer and on the other side is a cantilever crane.

破碎机包括:旋回破碎机、圆锥破碎机、颚式破碎机、双齿辊破碎机。Crusher includes: gyratory crusher, cone crusher, jaw crusher, double toothed roller crusher.

受料槽包括:独立支撑的块装连接结构、直接受矿的独立支撑的块装连接结构、与翻卸平台连接一起的独立支撑的块装连接结构。The receiving trough includes: an independently supported block-mounted connection structure, an independently supported block-mounted connection structure directly receiving ore, and an independently supported block-mounted connection structure connected with the tipping platform.

缓冲仓包括:独立行走的块装结构、连接另一排料胶带机的块装结构。The buffer bin includes: a block structure that walks independently, and a block structure that connects to another discharge belt conveyor.

本实用新型直接受矿的半移动破碎站装置,安全可靠,可广泛的应用于铁矿、铜矿和石灰石矿的破碎工艺,尤其使用于处理量大于1500t/h的大产量采场破碎要求。The semi-mobile crushing station device of the utility model directly receiving ore is safe and reliable, and can be widely used in the crushing process of iron ore, copper ore and limestone ore, especially for the crushing requirements of large-production stope with a processing capacity greater than 1500t/h.

附图说明 Description of drawings

图1是直接受矿的半移动破碎站装置的结构示意图Figure 1 is a schematic diagram of the structure of the semi-mobile crushing station device directly receiving ore

图2是直接受矿的半移动破碎站装置的剖视图Figure 2 is a cross-sectional view of the semi-mobile crushing station device directly receiving ore

图中:1是受料槽、2是主梁、3是附梁、4是破碎机、5是主机架、6是缓冲仓、7是控制塔楼、8是碎石锤、9是悬臂起重机、10是排料胶带机组件In the figure: 1 is the receiving trough, 2 is the main beam, 3 is the attached beam, 4 is the crusher, 5 is the main frame, 6 is the buffer warehouse, 7 is the control tower, 8 is the crushing hammer, 9 is the cantilever crane, 10 is the discharge belt machine assembly

具体实施方式 Detailed ways

本实用新型直接受矿的半移动破碎站装置是这样实现的,下面结合附图作具体说明,见图1、图2,本实用新型的直接受矿的半移动破碎站装置,包括受料槽1设计成独立支撑的块装连接结构,受料槽1安设在主梁2的中部,主梁2边侧中间连接附梁3,主梁和附梁顶部安设受料槽1,所述的受料槽1独立支撑,独立组件一次移设,电动轮重型汽车可在两侧同时翻卸。主机架5是移设时的主结构架,顶部安设破碎机4,低部安设缓冲仓6,控制塔楼7在主机架5的顶部,生产时与主机架5不接触,移设时与主机架5接触一起驮运。所述的碎石锤8底部是碎石锤支座,所述的悬臂起重机9用于破碎机的安装和检修。所述的排料胶带机组件10,用于把破碎后的碎石排到下游主胶带机系统,同时作为独立组件一次移设。The semi-mobile crushing station device directly receiving ore of the utility model is realized in this way, and the following is a specific description in conjunction with the accompanying drawings, see Fig. 1 and Fig. 2, the semi-mobile crushing station device directly receiving ore of the present utility model includes a material receiving trough 1 is designed as an independently supported block-mounted connection structure, the material receiving trough 1 is installed in the middle of the main beam 2, the side of the main beam 2 is connected to the attached beam 3 in the middle, and the material receiving trough 1 is installed on the top of the main beam and the attached beam. The material receiving trough 1 is independently supported, and the independent components are moved at one time, and the heavy-duty vehicles with electric wheels can be dumped and unloaded on both sides at the same time. The main frame 5 is the main structural frame when it is moved. The crusher 4 is installed on the top, and the buffer warehouse 6 is installed at the bottom. The control tower 7 is on the top of the main frame 5. It does not contact with the main frame 5 during production. The main frame 5 contacts together for piggybacking. The bottom of the crushing hammer 8 is a crushing hammer support, and the cantilever crane 9 is used for installation and maintenance of the crusher. The discharge belt conveyor assembly 10 is used to discharge the crushed gravel to the downstream main belt conveyor system, and at the same time, it is transferred as an independent component at one time.

本实用新型解决了处理量大于1500t/h的大产量采场破碎要求,在该破碎站装置中,去掉带受料槽的重型板式给矿机组件,把包括控制塔楼的破碎机组件和排料胶带机组件同时向翻卸平台侧平移,两个翻卸台位的翻卸平台凹槽适当加宽,净空与采场15段高相匹配,在凹槽中破碎机直接受两台重型汽车同时翻卸,矿石破碎后通过排料槽给排料胶带机组件排出。在破碎机顶部安设受料槽,受料槽允许两台电动轮重型汽车同时翻卸,受料槽设计成独立支撑的块装连接结构,受料槽安设在主梁中部,主梁边侧中间连接附梁,其边侧主梁和附梁顶部安设受料槽,允许两台电动轮重型汽车同时翻卸。该半移动破碎站装置的移设时间为从原位的拆卸到新位的安装投产,包括控制塔楼的破碎机组件和排料胶带机组件的移设,可在3~5天内完成。The utility model solves the large-production stope crushing requirements with a processing capacity greater than 1500t/h. In the crushing station device, the heavy-duty plate-type feeder assembly with a receiving trough is removed, and the crusher assembly including the control tower and the discharge The belt conveyor assembly moves to the side of the dumping platform at the same time, the grooves of the dumping platform of the two dumping stations are properly widened, and the headroom matches the 15-section height of the stope. In the groove, the crusher is directly supported by two heavy vehicles at the same time. After dumping, the ore is crushed and discharged to the discharge belt conveyor assembly through the discharge chute. A receiving chute is installed on the top of the crusher. The receiving chute allows two heavy-duty vehicles with electric wheels to be dumped at the same time. The receiving chute is designed as an independently supported block connection structure. The attached beam is connected in the middle of the side, and the side main beam and the top of the attached beam are equipped with receiving troughs, allowing two heavy-duty vehicles with electric wheels to dump at the same time. The relocation time of the semi-mobile crushing station device is from the dismantling of the original site to the installation and commissioning of the new site, including the relocation of the crusher components of the control tower and the discharge belt conveyor components, which can be completed within 3 to 5 days.

直接传到塔楼上。当整个破碎机组件搬迁时,破碎机主机架与控制塔楼接触在一起搬运,使包括控制塔楼的破碎机组件一次搬运。所述的破碎机包括旋回破碎机、圆锥破碎机、颚式破碎机、双齿辊破碎机。所述的控制塔楼包括控制室。破碎机旁装有一台锤,用来破碎大块矿岩和冻块。破碎机另一旁装有一台悬臂起重机。在破碎机的下面轨道上,缓冲仓的下部包括吊装式排料槽,以便拖出排料槽进行破碎机的维修和移设。directly to the tower. When the entire crusher assembly is relocated, the main frame of the crusher is moved together with the control tower, so that the crusher assembly including the control tower can be moved at one time. The crushers include gyratory crushers, cone crushers, jaw crushers, and double-toothed roller crushers. The control tower includes a control room. A hammer is installed next to the crusher, which is used to break large ore rocks and frozen blocks. A jib crane is installed on the other side of the crusher. On the lower track of the crusher, the lower part of the buffer bin includes a hoisting discharge chute, so that the discharge chute can be dragged out for maintenance and relocation of the crusher.

Claims (4)

1. a semi-mobile crushing plant device that directly is subjected to the ore deposit is characterized in that: by comprising that breaker assembly and the discharge sealing-tape machine assembly of controlling high building constitute; The breaker assembly of control high building: blow tank (1) is the packaged syndeton of independent support, and blow tank (1) is installed in the middle part of girder (2), connects attaching beam (3) in the middle of the girder (2), at the top of avris girder (2) and attaching beam (3) blow tank (1) is set; Mainframe (5) is the main structure frame that moves when establishing, disintegrating machine (4) is installed at the top, surge bunker (6) is installed in the bottom, control high building (7) is at the top of mainframe (5), do not contact with mainframe (5), moving when establishing and contact with mainframe (5), is stonebreakers' hammer (8) in a side of disintegrating machine (4), and opposite side is cantilever crane (9).
2. the semi-mobile crushing plant device that directly is subjected to the ore deposit according to claim 1 is characterized in that: described disintegrating machine (4) comprising: gyratory crusher, gyratory crusher, jaw crusher, double-geared roller crusher.
3. the semi-mobile crushing plant device that directly is subjected to the ore deposit according to claim 1 is characterized in that: described blow tank (1) comprising: the packaged syndeton of independent support, directly be subjected to the packaged syndeton of the independent support in ore deposit, the packaged syndeton of the independent support that connects with the dumping platform.
4. the semi-mobile crushing plant device that directly is subjected to the ore deposit according to claim 1 is characterized in that: described surge bunker (6) comprising: the packaged structure of independent ambulation, connect the packaged structure of another discharge sealing-tape machine.
CNU2007200113378U 2007-03-27 2007-03-27 Semi-mobile crushing station device directly receiving ore Expired - Fee Related CN201026459Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200113378U CN201026459Y (en) 2007-03-27 2007-03-27 Semi-mobile crushing station device directly receiving ore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200113378U CN201026459Y (en) 2007-03-27 2007-03-27 Semi-mobile crushing station device directly receiving ore

Publications (1)

Publication Number Publication Date
CN201026459Y true CN201026459Y (en) 2008-02-27

Family

ID=39130660

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200113378U Expired - Fee Related CN201026459Y (en) 2007-03-27 2007-03-27 Semi-mobile crushing station device directly receiving ore

Country Status (1)

Country Link
CN (1) CN201026459Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266815A (en) * 2011-07-25 2011-12-07 河南心连心化肥有限公司 Mobile crusher device
CN107185696A (en) * 2017-07-05 2017-09-22 鞍钢集团矿业有限公司 Comb shape blow tank at the top of gyratory crusher
CN113058725A (en) * 2021-03-26 2021-07-02 中冶北方(大连)工程技术有限公司 Integrated form gyratory crushing workstation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266815A (en) * 2011-07-25 2011-12-07 河南心连心化肥有限公司 Mobile crusher device
CN107185696A (en) * 2017-07-05 2017-09-22 鞍钢集团矿业有限公司 Comb shape blow tank at the top of gyratory crusher
CN113058725A (en) * 2021-03-26 2021-07-02 中冶北方(大连)工程技术有限公司 Integrated form gyratory crushing workstation
CN113058725B (en) * 2021-03-26 2023-03-10 中冶北方(大连)工程技术有限公司 Integrated form gyratory crushing workstation

Similar Documents

Publication Publication Date Title
CN103334755B (en) Slope hoisting and crushing system for deep open-pit mine
CN106733115A (en) A kind of crawler-type mobile crushing and screening station
CN206567067U (en) A kind of crawler belt movement jaw crushing screening station
CN106000609A (en) Track type mobile crushing station
CN110787895A (en) A crushing system and crushing process method for mine siliceous raw materials
CN201026459Y (en) Semi-mobile crushing station device directly receiving ore
CN201350415Y (en) Split seat type semi-mobile crushing and screening plant device
CN204412329U (en) A kind of calcium carbide coarse crushing system
CN101660043B (en) Classified stacking method of oxidized mine with high content of mud
CN201482547U (en) Movable crushing station
CN201510926U (en) Jigging type coal washing device
CN203540677U (en) Raw coal crushing and sieving system
CN202398380U (en) Gyratory crusher provided with cross-beam liner plate for preventing materials from swelling
CN201197956Y (en) Semi-mobile crushing station cantilever type receiving trough device
CN210079765U (en) Integrated mobile crushing station
CN205182907U (en) Screening system is smashed to useless pottery
CN202497921U (en) Cyclic crushing and screening system
CN206881881U (en) Nickel soil ore deposit pretreating device
CN205868366U (en) Ore crushing facility in metallurgical mine in underground
CN201752671U (en) Glass breaking device
CN205503124U (en) System of portable waste rock breakage in pit
CN217093841U (en) Limestone crushing device
CN105883438A (en) Car dumper unloading system with function of conducting secondary crushing on large block materials
CN201086029Y (en) Low-drop height pulverizing station
CN219971224U (en) Buffer type ore unloading hopper for ore dressing plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080227

Termination date: 20160327

CF01 Termination of patent right due to non-payment of annual fee