[go: up one dir, main page]

CN206646567U - Self-propulsion type is multi-functional to take out sapin platform - Google Patents

Self-propulsion type is multi-functional to take out sapin platform Download PDF

Info

Publication number
CN206646567U
CN206646567U CN201720067938.4U CN201720067938U CN206646567U CN 206646567 U CN206646567 U CN 206646567U CN 201720067938 U CN201720067938 U CN 201720067938U CN 206646567 U CN206646567 U CN 206646567U
Authority
CN
China
Prior art keywords
pontoon
sand
main
deck
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720067938.4U
Other languages
Chinese (zh)
Inventor
蒋思奇
张俊华
卫华
高德松
曲少军
马怀宝
闫振峰
李昆鹏
秦学谦
付卫山
索虎勤
李涛
李新杰
王远见
樊文玲
郭睿
姬秀明
郜国明
王婷
朱子健
哈佳
任智慧
王子路
王宏巍
马为民
郭淑君
杨东民
朱英民
赵益民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Institute of Hydraulic Research
Original Assignee
Yellow River Institute of Hydraulic Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Institute of Hydraulic Research filed Critical Yellow River Institute of Hydraulic Research
Priority to CN201720067938.4U priority Critical patent/CN206646567U/en
Application granted granted Critical
Publication of CN206646567U publication Critical patent/CN206646567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本实用新型公开了一种自航式多功能抽沙平台,包括基本平台、推进系统、抽沙泵组、抽沙吸管吸头、冲沙泵、抽沙吸管吸头起落系统及供电设备;基本平台包括主浮箱和设在主浮箱两侧的边浮箱,主浮箱和边浮箱均采用全电焊钢质结构,主浮箱与边浮箱之间通过可拆卸的浮箱连接铰链连接;推进系统包括分别安装在边浮箱尾部的挂桨机;抽沙泵组包括两台串联的抽沙泵,主浮箱的前端设有泵机舱,抽沙泵组安装于泵机舱内,抽沙泵组的出口连接有输沙管道。本实用新型采用冲吸式抽沙原理与扫地式作业方式相结合的方法,较适用于淤积层浅薄的水库库区和湖泊水域进行采沙或清淤作业。

The utility model discloses a self-propelled multifunctional sand pumping platform, which comprises a basic platform, a propulsion system, a sand pumping pump group, a sand suction pipe suction head, a sand washing pump, a sand suction pipe suction head lifting system and power supply equipment; The platform includes a main pontoon and side pontoons on both sides of the main pontoon. Both the main pontoon and the side pontoons are made of fully welded steel structure. The main pontoon and the side pontoons are connected by a detachable hinge connection; the propulsion system includes paddle-hanging machines respectively installed at the rear of the side pontoons; the sand pumping pump set includes two sand pumps connected in series, the front end of the main pontoon is provided with a pump engine room, and the sand pump set is installed in the pump engine room. The outlet of the sand suction pump unit is connected with a sand conveying pipeline. The utility model adopts the combination method of flushing suction sand pumping principle and sweeping operation mode, and is more suitable for sand mining or dredging operations in reservoir areas and lake water areas with shallow alluvial layers.

Description

自航式多功能抽沙平台Self-propelled multi-functional sand pumping platform

技术领域technical field

本实用新型属于采沙装备技术领域,主要涉及一种自航式多功能抽沙平台。The utility model belongs to the technical field of sand mining equipment, and mainly relates to a self-propelled multifunctional sand pumping platform.

背景技术Background technique

水库枢纽工程建成运行后,对当地工农业经济发展及防洪安全发挥了重要的作用。大部分水库,尤其是多沙河流水库,汛期洪水含沙量高,水库泥沙淤积就会较为严重,大大缩短了水库的使用寿命,导致蓄水量减少,严重影响了流域地区工农业经济发展。After the completion and operation of the reservoir hub project, it has played an important role in the development of the local industrial and agricultural economy and flood control safety. Most of the reservoirs, especially the reservoirs of sandy rivers, have high sediment concentration in the flood season, and the sediment deposition in the reservoirs will be more serious, which greatly shortens the service life of the reservoirs, leads to a reduction in water storage, and seriously affects the economic development of industry and agriculture in the basin area. .

很多水库工程在规划设计没有考虑排沙设施,为了将水库泥沙排出库外,不得不利用水库导流洞排沙,但导流洞进口闸门启闭平台高程一般较低,必须将水库水位降低很多闸门才能打开。有时将水库放空采用机械拉运和机械辅助水力清淤方式,清除坝前淤积泥沙,但清理单位立方米淤积泥沙的成本很高,且耗费了大量宝贵的水资源。Many reservoir projects do not consider sand discharge facilities in their planning and design. In order to discharge the reservoir sediment out of the reservoir, they have to use the reservoir diversion tunnel to discharge sand. However, the elevation of the opening and closing platform of the diversion tunnel inlet gate is generally low, and the reservoir water level must be lowered. It takes a lot of gates to open. Sometimes the reservoir is emptied by mechanical hauling and mechanically assisted hydraulic dredging to remove the sediment in front of the dam. However, the cost of cleaning the sediment per cubic meter is very high and consumes a lot of precious water resources.

抽沙平台是河流、湖泊中常用到的采沙或清淤设备,但现有的抽沙平台功能较少,尤其是不能适应淤积层浅薄的水库库区和湖泊水域的采沙或清淤作业。Sand pumping platforms are commonly used sand mining or dredging equipment in rivers and lakes, but the existing sand pumping platforms have fewer functions, especially not suitable for sand mining or dredging operations in reservoir areas and lake waters with shallow sediment layers. .

实用新型内容Utility model content

为了解决上述技术问题,本实用新型提供一种适用于淤积层浅薄的水库库区和湖泊水域进行采沙或清淤作业的自航式多功能抽沙平台。In order to solve the above technical problems, the utility model provides a self-propelled multifunctional sand pumping platform suitable for sand mining or dredging operations in reservoir areas and lake waters with shallow alluvial layers.

本实用新型的技术方案是:The technical scheme of the utility model is:

一种自航式多功能抽沙平台,包括基本平台、推进系统、抽沙泵组、抽沙吸管吸头、冲沙泵、抽沙吸管吸头起落系统及供电设备;A self-propelled multifunctional sand pumping platform, including a basic platform, a propulsion system, a sand pumping pump set, a sand suction pipe suction head, a sand flushing pump, a sand suction pipe suction head lifting system and power supply equipment;

基本平台包括主浮箱和设在主浮箱两侧的边浮箱,主浮箱和边浮箱均采用全电焊钢质结构,主浮箱与边浮箱之间通过可拆卸的浮箱连接铰链连接;The basic platform includes a main pontoon and side pontoons located on both sides of the main pontoon. Both the main pontoon and the side pontoons are made of fully welded steel structure. The main pontoon and the side pontoons are connected by detachable pontoons. hinge connection;

推进系统包括分别安装在边浮箱尾部的挂桨机;The propulsion system includes propulsion machines respectively installed at the tail of the side pontoons;

抽沙泵组包括两台串联的抽沙泵,主浮箱的前端设有泵机舱,抽沙泵组安装于泵机舱内,抽沙泵组的出口连接有输沙管道;The sand pump set includes two sand pumps connected in series. The front end of the main buoyancy tank is provided with a pump engine room, and the sand pump set is installed in the pump engine room. The outlet of the sand pump set is connected with a sand pipeline;

抽沙吸管吸头包括抽沙吸水管道和设在抽沙吸水管道前端的抽沙吸头,抽沙吸水管道的后端与抽沙泵组的进口端连接;The suction head of the sand suction pipe includes a sand suction pipe and a sand suction head arranged at the front end of the sand suction pipe, and the rear end of the sand suction pipe is connected to the inlet end of the sand suction pump group;

冲沙泵安装于泵机舱内,冲沙泵的出口端通过管道与抽沙吸头连接,冲沙泵为离心式清水泵;The sand washing pump is installed in the pump engine room, the outlet end of the sand washing pump is connected to the sand suction head through a pipeline, and the sand washing pump is a centrifugal clean water pump;

抽沙吸管吸头起落系统包括卷扬机和起落架,卷扬机设在边浮箱靠近前端的上端面,卷扬机用于驱动抽沙吸管吸头的升降,起落架采用无缝钢管组焊成型;The lifting system of the sand suction pipe suction head includes a hoist and a landing gear. The hoist is located on the upper surface of the side pontoon close to the front end. The hoist is used to drive the lifting of the sand suction suction pipe suction head. The landing gear is assembled and welded with seamless steel pipes;

供电设备包括设在主浮箱后端的柴油发电机组,供电设备为抽沙泵组、冲沙泵、抽沙吸管吸头起落系统提供电力。The power supply equipment includes a diesel generator set arranged at the rear end of the main buoyancy tank, and the power supply equipment provides power for the sand suction pump set, the sand flushing pump, and the lifting and lowering system of the sand suction pipe suction head.

作为优选,所述的主浮箱包括主浮箱甲板板和主浮箱船底板,主浮箱甲板板和主浮箱船底板通过主浮箱舷侧板焊接在一起,主浮箱甲板板、主浮箱船底板、主浮箱舷侧板围成中空的主浮箱;主浮箱的内腔的底部设有与主浮箱船底板焊接在一起的主浮箱中龙骨和主浮箱实肋板;主浮箱的内腔中设有连接主浮箱甲板板和主浮箱船底板的主浮箱舱壁板和主浮箱支柱,主浮箱舱壁板的侧面设有主浮箱舱壁垂直桁和主浮箱舱壁扶强材,主浮箱舱壁板和主浮箱中龙骨连接处设有主浮箱龙骨舱壁肘板;主浮箱甲板板的下端面设有主浮箱甲板纵桁、主浮箱甲板横梁和主浮箱甲板强横梁,主浮箱甲板纵桁与主浮箱甲板横梁连接处设有主浮箱甲板纵桁防倾肘板;主浮箱舱壁板和主浮箱甲板纵桁连接处设有主浮箱纵桁舱壁肘板;主浮箱支柱和主浮箱甲板纵桁连接处设有主浮箱支柱肘板和主浮箱支柱垫板;主浮箱舷侧板的内侧设有主浮箱舷侧纵桁、主浮箱强肋骨、主浮箱普通肋骨,主浮箱舷侧纵桁与主浮箱普通肋骨连接处设有主浮箱舷侧纵桁防倾肘板,主浮箱强肋骨和主浮箱实肋板之间连接有主浮箱舭肘板,主浮箱普通肋骨和主浮箱甲板横梁之间连接有主浮箱普梁肘板,主浮箱强肋骨和主浮箱甲板强横梁之间连接有主浮箱强梁肘板。As preferably, the main pontoon comprises a main pontoon deck and a main pontoon bottom, the main pontoon deck and the main pontoon bottom are welded together through the main pontoon side plate, the main pontoon deck, the main buoy The bottom plate of the boxship and the side plate of the main pontoon form a hollow main pontoon; the bottom of the inner cavity of the main pontoon is provided with the middle keel of the main pontoon and the solid floor of the main pontoon welded together with the bottom plate of the main pontoon; The main pontoon bulkhead and main pontoon pillars connecting the main pontoon deck and the main pontoon bottom plate are arranged in the inner chamber of the pontoon, and the main pontoon bulkhead vertical girders and Main pontoon bulkhead stiffeners, main pontoon keel bulkhead brackets are installed at the connection between the main pontoon bulkhead plate and the main pontoon middle keel; main pontoon deck girders are provided on the lower end of the main pontoon deck , the main pontoon deck beam and the main pontoon deck strong beam, the main pontoon deck girder anti-tilt bracket is provided at the connection between the main pontoon deck girder and the main pontoon deck beam; the main pontoon bulkhead and the main buoy Main pontoon girder bulkhead brackets are provided at the connection of tank deck girders; main pontoon support brackets and main pontoon support pads are provided at the connection between main pontoon struts and main pontoon deck girders; The side girders of the main pontoon, the strong ribs of the main pontoon, and the ordinary ribs of the main pontoon are arranged on the inner side of the side plate. Truss anti-tilt brackets, main pontoon bilge brackets connected between main pontoon strong ribs and main pontoon solid floors, main pontoon general beam elbows connected between main pontoon ordinary ribs and main pontoon deck beams The main pontoon strong beam bracket is connected between the main pontoon strong rib and the main pontoon deck transverse beam.

作为优选,所述的边浮箱包括边浮箱甲板板和边浮箱船底板,边浮箱甲板板和边浮箱船底板通过边浮箱舷侧板焊接在一起,边浮箱甲板板、边浮箱船底板、边浮箱舷侧板围成中空的边浮箱;边浮箱的内腔的底部设有与边浮箱船底板焊接在一起的边浮箱中龙骨和边浮箱实肋板;边浮箱的内腔中设有连接边浮箱甲板板和边浮箱船底板的边浮箱舱壁板和边浮箱支柱,边浮箱舱壁板的侧面设有边浮箱舱壁垂直桁和边浮箱舱壁扶强材,边浮箱舱壁板和边浮箱中龙骨连接处设有边浮箱龙骨舱壁肘板;边浮箱甲板板的下端面设有边浮箱甲板纵桁、边浮箱甲板横梁和边浮箱甲板强横梁,边浮箱甲板纵桁与边浮箱甲板横梁连接处设有边浮箱甲板纵桁防倾肘板;边浮箱舱壁板和边浮箱甲板纵桁连接处设有边浮箱纵桁舱壁肘板;边浮箱支柱和边浮箱甲板纵桁连接处设有边浮箱支柱肘板和边浮箱支柱垫板;边浮箱舷侧板的内侧设有边浮箱舷侧纵桁、边浮箱强肋骨和边浮箱普通肋骨,边浮箱舷侧纵桁与边浮箱普通肋骨连接处设有边浮箱舷侧纵桁防倾肘板,边浮箱强肋骨及边浮箱普通肋骨和边浮箱实肋板连接处连接有边浮箱舭肘板,边浮箱普通肋骨和边浮箱甲板横梁连接处连接有边浮箱普梁肘板,边浮箱强肋骨和边浮箱甲板强横梁连接处连接有边浮箱强梁肘板。As preferably, the side pontoon comprises a side pontoon deck and a side pontoon bottom plate, the side pontoon deck and the side pontoon bottom are welded together by the side pontoon side plate, the side pontoon deck, the side pontoon The bottom plate of the box ship and the side plate of the side pontoon box form a hollow side pontoon; the bottom of the inner cavity of the side pontoon is provided with the middle keel of the side pontoon and the solid floor of the side pontoon welded together with the bottom plate of the side pontoon; The side pontoon bulkhead and side pontoon pillars connecting the side pontoon deck and the side pontoon bottom plate are arranged in the inner chamber of the pontoon, and the side pontoon bulkhead is provided with side pontoon bulkhead vertical girders and Side pontoon bulkhead stiffeners, side pontoon keel bulkhead brackets are provided at the junction of side pontoon bulkhead panels and side pontoon mid-keel; side pontoon deck girders are provided on the lower end of side pontoon deck plates , side pontoon deck beams and side pontoon deck strength beams, side pontoon deck girders are provided with side pontoon deck girder anti-tilt brackets at the junction of side pontoon deck girders and side pontoon deck beams; Side pontoon tank longitudinal girder bulkhead brackets are provided at the connection of side pontoon tank girders; Side pontoon side girders, side pontoon strong ribs and side pontoon common ribs are arranged on the inner side of the side pontoon, side pontoon side longitudinal girders and side pontoon common ribs are connected The truss anti-tilt bracket, side pontoon strong ribs and side pontoon common ribs and side pontoon solid ribs are connected with side pontoon bilge brackets, and the joints between side pontoon common ribs and side pontoon deck beams are connected with Side pontoon general beam brackets, side pontoon strong ribs and side pontoon deck web beams are connected with side pontoon strong beam brackets.

作为优选,所述的浮箱连接铰链包括双耳绞座、单耳绞座、带齿条铰轴及齿轮副,单耳绞座通过带齿条铰轴与双耳铰座铰接链接,双耳绞座的上端面还设有齿轮副,带齿条铰轴和齿轮副啮合;双耳绞座与主浮箱焊接连接,单耳绞座与边浮箱焊接连接。As a preference, the buoyant box connection hinge includes a two-ear hinge seat, a single-ear hinge seat, a hinge shaft with a rack and a gear pair, the single-ear hinge seat is hinged with the double-ear hinge seat through a rack hinge shaft, and the two ears The upper end surface of the winch is also provided with a gear pair, and the hinge shaft with the rack is meshed with the gear pair; the double ear winch is welded to the main pontoon, and the single ear is welded to the side pontoon.

作为优选,所述的两台串联的抽沙泵分别为一级抽沙泵和二级抽沙泵,一级抽沙泵和二级抽沙泵分别连接有驱动电机,二级抽沙泵的出口端与输沙管道连接;泵机舱的前端设有透孔吸水管绞座和盲孔吸水管绞座,一级抽沙泵的进口端连接有管道,管道上设有手动蝶阀,管道的前端连接有水密转动节,水密转动节的前端穿装入透孔吸水管绞座和盲孔吸水管绞座中,透孔吸水管绞座和盲孔吸水管绞座之间的水密转动节的侧壁设有进口,抽沙吸水管道的后端与水密转动节的进口连接。As preferably, the two series-connected sand pumps are respectively a primary sand pump and a secondary sand pump, the primary sand pump and the secondary sand pump are respectively connected with a drive motor, and the secondary sand pump The outlet end is connected to the sand pipeline; the front end of the pump cabin is provided with a penetrating hole suction pipe winch and a blind hole suction pipe winch. A watertight swivel joint is connected, and the front end of the watertight swivel joint is inserted into the through-hole suction pipe winch and the blind-hole suction pipe winch, and the side of the watertight swivel joint between the through-hole suction pipe winch and the blind-hole suction pipe winch The wall is provided with an inlet, and the rear end of the sand and water suction pipe is connected with the inlet of the watertight rotating joint.

作为优选,所述的起落架包括A架、斜拉杆、牵引滑轮系;A架及斜拉杆下端铰接连接在边浮箱的内侧壁上端甲板边缘;A架与斜栏杆上端铰接链接;斜栏杆由主杆和调节杆组成;牵引滑轮系由吊轮1只、导向轮3只组成,吊轮和2只导向轮以螺栓连接在A架顶端,1只导向轮以螺栓连接在A架底端; A架的前端通过拉绳与抽沙吸管的侧壁固定连接。As preferably, the landing gear includes an A frame, a diagonal stay rod, and a traction pulley system; the lower end of the A frame and the diagonal stay rod is hingedly connected to the upper deck edge of the inner side wall of the side pontoon; the A frame is hingedly linked with the upper end of the inclined railing; the inclined railing is composed of The main rod and the adjusting rod are composed; the traction pulley system is composed of 1 suspension wheel and 3 guide wheels. The suspension wheel and 2 guide wheels are connected to the top of frame A with bolts, and 1 guide wheel is connected to the bottom of frame A with bolts; The front end of the A frame is fixedly connected with the side wall of the sand suction pipe by a stay cord.

作为优选,所述的抽沙吸头包括屏蔽罩壳体,屏蔽罩壳体的下端设有破土刀板,屏蔽罩壳体的上端设有铰接座板、冲砂管及抽沙管头,铰接座板与抽沙吸管的前端铰接,冲砂管与冲沙泵的出口端连通,冲砂管的下端设有冲沙接头,抽沙管头与抽沙吸管连通。As a preference, the sand suction head includes a shield casing, the lower end of the shield casing is provided with a soil-breaking knife plate, and the upper end of the shield casing is provided with a hinged seat plate, a sand washing pipe and a sand suction pipe head, and the hinged The seat plate is hinged with the front end of the sand suction pipe, the sand washing pipe is connected with the outlet end of the sand washing pump, the sand washing pipe is provided with a sand washing joint at the lower end, and the sand suction pipe head is connected with the sand suction pipe.

作为优选,还包括抽沙吸头工况平衡系统,抽沙吸头工况平衡系统包括喷射泵和调节浮筒,调节浮筒安装在抽沙吸管靠近前端的下方,调节浮筒为钢制结构;通过喷射泵改变调节浮筒内的积水量。As preferably, it also includes a sand pumping suction head working condition balance system, the sand pumping suction head working condition balancing system includes a jet pump and an adjustment buoy, the adjustment buoy is installed below the sand suction pipe near the front end, and the adjustment buoy is a steel structure; The pump changes and adjusts the accumulated water volume in the buoy.

作为优选,还包括河床质采样系统,河床质采样系统包括震动重锤式深水采样器、采样操作平台,采样操作平台安装在主浮箱的前端,采样操作平台与主浮箱和边浮箱均连接在一起,震动重锤式深水采样器包括与采样操作平台连接的托架,托架的上端连接有两个平行的导轨,两个导轨之间设有采样管,采样管的下端固定安装在托架上,采样管的上端通过滑块滑动穿装在两个导轨上,采样管的上端端口连接有震动锤,起落架的前端设有滑轮,滑轮中滑动缠绕有钢丝绳,钢丝绳的下端与震动锤固定连接。As preferably, it also includes a river bed quality sampling system, the river bed quality sampling system includes a vibration hammer type deep water sampler, a sampling operation platform, the sampling operation platform is installed on the front end of the main floating tank, and the sampling operation platform is connected to the main floating tank and the side floating tank. Connected together, the vibrating hammer type deep water sampler includes a bracket connected to the sampling operation platform. The upper end of the bracket is connected with two parallel guide rails, and a sampling tube is arranged between the two guide rails. The lower end of the sampling tube is fixed on the On the bracket, the upper end of the sampling tube slides through the two guide rails. The upper end port of the sampling tube is connected with a vibrating hammer. Hammer fixed connection.

本实用新型的有益效果是:The beneficial effects of the utility model are:

本实用新型采用冲吸式抽沙原理与扫地式作业方式相结合的方法,较适用于淤积层浅薄的水库库区和湖泊水域进行采沙或清淤作业;平台采用了浮箱组合形式,同时浮箱连接件采用了可拆卸铰链组,因此平台可以自如拆解和组装,拆解后的平台浮箱可以通过公路正常运输,因此可以实现平台远途迁移作业,适用于施工工地的转移。The utility model adopts the combination method of flushing suction sand pumping principle and sweeping operation mode, which is more suitable for sand mining or dredging operations in reservoir areas and lake waters with shallow sedimentation layers; the platform adopts the combination form of floating boxes, and The buoy box connection adopts a detachable hinge group, so the platform can be disassembled and assembled freely, and the disassembled platform buoy box can be transported normally by road, so it can realize the long-distance migration of the platform, which is suitable for the transfer of the construction site.

附图说明Description of drawings

图1是本实用新型一种形式的结构示意图的俯视图;Fig. 1 is the top view of the structural representation of a form of the utility model;

图2是图1的主视图;Fig. 2 is the front view of Fig. 1;

图3是本实用新型中主浮箱的俯视图;Fig. 3 is the top view of main floating tank in the utility model;

图4是本实用新型中主浮箱的仰视图;Fig. 4 is the bottom view of main pontoon in the utility model;

图5是本实用新型中主浮箱的纵剖视图;Fig. 5 is the longitudinal sectional view of main floating tank in the utility model;

图6是本实用新型中主浮箱的2#、4#、7#、15#、18#、20#位置的横剖面图;Fig. 6 is the cross-sectional view of the 2#, 4#, 7#, 15#, 18#, 20# positions of the main floating tank in the utility model;

图7是本实用新型中主浮箱的9#、13#位置的横剖面图;Fig. 7 is the cross-sectional view of the 9#, 13# positions of the main floating tank in the utility model;

图8是本实用新型中主浮箱的1#、3#、5#、8#、14#、17#、19#、21#位置的横剖面图;Fig. 8 is the cross-sectional view of the 1#, 3#, 5#, 8#, 14#, 17#, 19#, 21# positions of the main floating tank in the utility model;

图9是本实用新型中主浮箱的10#、12#位置的横剖面图;Fig. 9 is the cross-sectional view of the 10#, 12# positions of the main floating tank in the utility model;

图10是本实用新型中主浮箱的11#位置的横剖面图;Figure 10 is a cross-sectional view of the 11# position of the main floating tank in the utility model;

图11是本实用新型中边浮箱的俯视图;Fig. 11 is the top view of the side pontoon in the utility model;

图12是本实用新型中边浮箱的仰视图;Fig. 12 is the bottom view of the side pontoon in the utility model;

图13是本实用新型中边浮箱的纵剖视图;Fig. 13 is a longitudinal sectional view of the side pontoon in the utility model;

图14是本实用新型中边浮箱的1#、3#、5#、8#、10#、12#、14#、16#、18#、20#位置的横剖面图;Fig. 14 is the cross-sectional view of the 1#, 3#, 5#, 8#, 10#, 12#, 14#, 16#, 18#, 20# positions of the side pontoon in the utility model;

图15是本实用新型中边浮箱的2#、4#、7#、9#、13#、17#、19#位置的横剖面图;Fig. 15 is the cross-sectional view of the 2#, 4#, 7#, 9#, 13#, 17#, 19# positions of the side pontoon in the utility model;

图16是本实用新型中边浮箱的11#、21#位置的横剖面图;Fig. 16 is the cross-sectional view of the 11#, 21# positions of the side pontoon in the utility model;

图17是本实用新型中边浮箱的22#、24#、27#、29#、31#位置的横剖面图;Fig. 17 is the cross-sectional view of the 22#, 24#, 27#, 29#, 31# positions of the side pontoon in the utility model;

图18是本实用新型中边浮箱的23#、25#、28#、30#位置的横剖面图;Fig. 18 is the cross-sectional view of the 23#, 25#, 28#, 30# positions of the side pontoon in the utility model;

图19是本实用新型中浮箱连接铰链的右视图;Fig. 19 is a right view of the connecting hinge of the floating tank in the utility model;

图20是本实用新型中浮箱连接铰链的主视图;Fig. 20 is the front view of the connecting hinge of the floating tank in the utility model;

图21是图19中的A-A剖视图;Fig. 21 is A-A sectional view among Fig. 19;

图22是图21中的B-B剖视图;Figure 22 is a B-B sectional view in Figure 21;

图23是本实用新型中抽沙泵组的俯视图;Fig. 23 is a top view of the sand pump group in the utility model;

图24是本实用新型中起落架的俯视图;Figure 24 is a top view of the landing gear in the utility model;

图25是本实用新型中起落架的主视图;Fig. 25 is the front view of landing gear in the utility model;

图26是本实用新型中抽沙吸头的俯视图;Fig. 26 is a top view of the sand suction head in the utility model;

图27是本实用新型中抽沙吸头的主视图;Fig. 27 is a front view of the sand suction head in the utility model;

图28是本实用新型中泵组管系原理图;Fig. 28 is a schematic diagram of the piping system of the pump group in the utility model;

图29是本实用新型另一种形式的结构示意图的俯视图;Fig. 29 is a top view of another form of the utility model;

图30是图29的主视图;Fig. 30 is the front view of Fig. 29;

图31是本实用新型中震动重锤式深水采样器的主视图;Fig. 31 is the front view of the vibrating hammer type deep water sampler in the utility model;

图中:1为主浮箱,2为边浮箱,3为边浮箱,4为发电机组,5为挂桨机,6为浮箱连接铰链,7为工作室,8为控制室,9为泵机舱,10为输沙管道,11为卷扬机,12为起落架,13为抽沙吸管,14为调节浮筒,15为抽沙吸头,16为螺旋桨,17为采样操作平台,18为震动重锤式深水采样器;In the figure: 1 is the main pontoon, 2 is the side pontoon, 3 is the side pontoon, 4 is the generator set, 5 is the propeller hanger, 6 is the connecting hinge of the pontoon, 7 is the working room, 8 is the control room, 9 10 is the sand delivery pipeline, 11 is the hoist, 12 is the landing gear, 13 is the sand suction pipe, 14 is the adjustment buoy, 15 is the sand suction head, 16 is the propeller, 17 is the sampling operation platform, and 18 is the vibration Heavy hammer deep water sampler;

101为主浮箱甲板板,102为主浮箱甲板纵桁,103为主浮箱甲板横梁,104为主浮箱甲板强横梁,105为主浮箱船底板,106为主浮箱实肋板,107为主浮箱中龙骨,108为主浮箱舷侧板,109为主浮箱普通肋骨,110为主浮箱强肋骨,111为主浮箱舷侧纵桁,112为主浮箱舱壁板,113为主浮箱舱壁垂直桁,114为主浮箱舱壁扶强材,115为主浮箱支柱,116为主浮箱桁架斜杆,117为主浮箱舭肘板,118为主浮箱强梁肘板,119为主浮箱普梁肘板,120为主浮箱龙骨舱壁肘板,121为主浮箱纵桁舱壁肘板,122为主浮箱甲板纵桁防倾肘板,123为主浮箱舷侧纵桁防倾肘板,124为主浮箱支柱肘板,125为主浮箱支柱垫板;101 is the main pontoon deck plate, 102 is the main pontoon deck girder, 103 is the main pontoon deck beam, 104 is the main pontoon deck beam, 105 is the main pontoon bottom plate, 106 is the main pontoon solid floor, 107 is the middle keel of the main pontoon, 108 is the side plate of the main pontoon, 109 is the common rib of the main pontoon, 110 is the strong rib of the main pontoon, 111 is the side girder of the main pontoon, and 112 is the bulkhead of the main pontoon 113 is the vertical girder of the main pontoon bulkhead, 114 is the stiffener of the main pontoon bulkhead, 115 is the main pontoon pillar, 116 is the main pontoon truss slant, 117 is the main bilge bracket of the main pontoon, 118 is Main pontoon beam bracket, 119 main pontoon general beam bracket, 120 main pontoon keel bulkhead bracket, 121 main pontoon girder bulkhead bracket, 122 main pontoon deck girder anti-tilt Brackets, 123 is the main pontoon side girder anti-tilt bracket, 124 is the main pontoon strut bracket, 125 is the main pontoon strut backing plate;

201为边浮箱甲板上面板,202为边浮箱甲板纵桁,203为边浮箱甲板横梁,204为边浮箱甲板强横梁,205为边浮箱船底板,206为边浮箱实肋板,207为边浮箱中龙骨,208为边浮箱舷侧板,209为边浮箱普通肋骨,210为边浮箱强肋骨,211为边浮箱舷侧纵桁,212为边浮箱舱壁板,213为边浮箱舱壁垂直桁,214为边浮箱舱壁扶强材,215为边浮箱支柱,216为边浮箱桁架斜杆,217为边浮箱舭肘板,218为边浮箱强梁肘板,219为边浮箱普梁肘板,220为边浮箱龙骨舱壁肘板,221为边浮箱纵桁舱壁肘板,222为边浮箱甲板纵桁防倾肘板,223为边浮箱舷侧纵桁防倾肘板,224为边浮箱支柱肘板,225为边浮箱支柱垫板。201 is the upper panel of the side pontoon deck, 202 is the girder of the side pontoon deck, 203 is the beam of the side pontoon deck, 204 is the strong beam of the side pontoon deck, 205 is the bottom plate of the side pontoon, and 206 is the solid floor of the side pontoon , 207 is the middle keel of the side pontoon, 208 is the side plate of the side pontoon, 209 is the common rib of the side pontoon, 210 is the strong rib of the side pontoon, 211 is the side girder of the side pontoon, 212 is the cabin of the side pontoon Wall plate, 213 is the vertical girder of the side pontoon bulkhead, 214 is the stiffener of the side pontoon bulkhead, 215 is the pillar of the side pontoon tank, 216 is the inclined rod of the side pontoon truss, 217 is the bilge bracket of the side pontoon tank, 218 219 is the general beam bracket of the side pontoon tank, 220 is the bracket of the keel bulkhead of the side pontoon tank, 221 is the bracket of the longitudinal girder bulkhead of the side pontoon tank, and 222 is the longitudinal girder bracket of the side pontoon tank deck Tilting brackets, 223 is the side girder anti-tilt bracket of the side pontoon tank, 224 is the bracket of the side pontoon tank strut, 225 is the backing plate of the side pontoon tank strut.

601为双耳绞座,602为单耳绞座,603为带齿条铰轴,604为齿轮副;901为二级抽沙泵,902为一级抽沙泵,903为手动蝶阀,904为水密转动节,905为透孔吸水管绞座,906为盲孔吸水管绞座;1201为A架,1202为斜拉杆,1203为万向支座,1204为A架支座,1205为起落架安装基座,1206为调节杆;1501为屏蔽罩壳体,1502为铰接座板,1503为冲砂管,1504为抽沙管头,1505为破土刀板;1801为钢丝绳,1802为震动锤,1803为导轨,1804为采样管,1805为托架;601 is double ear winch, 602 is single ear winch, 603 is hinge shaft with rack, 604 is gear pair; 901 is two-stage sand pump, 902 is one-stage sand pump, 903 is manual butterfly valve, 904 is Watertight rotating joint, 905 is the through hole suction pipe winch, 906 is the blind hole suction pipe winch; 1201 is the A frame, 1202 is the diagonal rod, 1203 is the universal support, 1204 is the A frame support, 1205 is the landing gear Installation base, 1206 is the adjustment rod; 1501 is the shield shell, 1502 is the hinged seat plate, 1503 is the sand washing pipe, 1504 is the sand pumping pipe head, 1505 is the soil breaking blade; 1801 is the steel wire rope, 1802 is the vibration hammer, 1803 is a guide rail, 1804 is a sampling tube, and 1805 is a bracket;

V1为冲砂泵,V2为球阀,V3为喷射泵,V4为球阀,V5为一级抽沙泵,V6为二级抽沙泵,V7为管道流量计,V8为闸阀,V9为润滑密封潜水泵。V1 is a sand washing pump, V2 is a ball valve, V3 is a jet pump, V4 is a ball valve, V5 is a first-stage sand pump, V6 is a second-stage sand pump, V7 is a pipeline flowmeter, V8 is a gate valve, and V9 is a lubricated and sealed submersible pump. Pump.

具体实施方式detailed description

实施例一:参见图1-28,一种自航式多功能抽沙平台,包括基本平台、推进系统、抽沙泵组、抽沙吸管吸头、冲沙泵、抽沙吸管吸头起落系统、抽沙吸头工况平衡系统及供电设备。Embodiment 1: Referring to Figure 1-28, a self-propelled multifunctional sand pumping platform includes a basic platform, a propulsion system, a sand pumping pump set, a sand suction pipe suction head, a sand flushing pump, and a sand suction suction pipe suction head lifting system , Sand suction head working condition balance system and power supply equipment.

基本平台包括主浮箱1和设在主浮箱1两侧的边浮箱2,主浮箱1和边浮箱2均采用全电焊钢质结构,主浮箱1与边浮箱2之间通过可拆卸的浮箱连接铰链6连接。The basic platform includes a main pontoon 1 and side pontoons 2 located on both sides of the main pontoon 1. Connected by detachable pontoon connecting hinge 6.

推进系统包括分别安装在边浮箱2尾部的挂桨机5,挂桨机5装机功率为25HP×2台。The propulsion system includes paddle hangers 5 respectively installed at the tail of side pontoons 2, and the installed power of paddle hangers 5 is 25HP×2.

抽沙泵组包括两台串联的抽沙泵,主浮箱1的前端设有泵机舱9,抽沙泵组安装于泵机舱9内,抽沙泵组的出口连接有输沙管道10。The sand pump group includes two sand pumps connected in series. The front end of the main buoy tank 1 is provided with a pump cabin 9, and the sand pump group is installed in the pump cabin 9. The outlet of the sand pump group is connected with a sand pipeline 10.

抽沙吸管吸头包括抽沙吸水管道和设在抽沙吸水管道前端的抽沙吸头15,抽沙吸水管道的后端与抽沙泵组的进口端连接。抽沙吸水管道采用φ219×6无缝钢管制作,经14#槽钢组焊加固成单臂梁形式。Sand suction pipe suction head comprises suction sand suction pipeline and the sand suction suction head 15 that is located at the sand suction water pipeline front end, and the rear end of suction sand suction pipeline is connected with the inlet end of sand suction pump group. The sand and water suction pipes are made of φ219×6 seamless steel pipes, which are welded and reinforced by 14# channel steel into a single-arm beam form.

冲沙泵安装于泵机舱9内,冲沙泵的出口端通过管道与抽沙吸头15连接,冲沙泵为离心式清水泵。离心式清水泵扬程h=80m,流量Q=100m3/h,电机功率37kw。The sand washing pump is installed in the pump cabin 9, and the outlet end of the sand washing pump is connected with the sand suction head 15 through a pipeline, and the sand washing pump is a centrifugal clear water pump. Centrifugal clean water pump head h=80m, flow Q=100m 3 /h, motor power 37kw.

抽沙吸管吸头起落系统包括卷扬机11和起落架12,卷扬机11设在边浮箱2靠近前端的上端面,卷扬机11用于驱动抽沙吸管吸头的升降,起落架12采用无缝钢管组焊成型。The lifting system of the sand suction pipe suction head includes a winch 11 and an undercarriage 12. The hoist 11 is arranged on the upper surface of the side pontoon 2 close to the front end. The hoist 11 is used to drive the lifting of the sand suction suction head. The landing gear 12 adopts a seamless steel pipe assembly. welding forming.

抽沙吸头工况平衡系统包括喷射泵和调节浮筒14,调节浮筒14安装在抽沙吸管13靠近前端的下方,调节浮筒14为钢制结构。喷射泵型号为CP20-0.3,流量Q=20m3/h;调节浮筒14可调节重量为0—600kg。平台进行抽沙作业时,为了确保抽沙吸头15能够有效跟踪河床淤积层表面,并使吸头刀片组切入淤积层一定深度,而又不能使吸头陷入淤积层,需要调节吸头对淤积层的压力。此功能由抽沙吸头15平衡系统实现,需要增压时,向调节浮筒14注水,可以增加抽沙吸头15对淤积层的压力;需要减压时,通过喷射泵排除调节浮筒14内的积水,可以减轻抽沙吸头15对淤积层的压力。The working condition balance system of the sand suction head includes a jet pump and an adjustment buoy 14, the adjustment buoy 14 is installed below the sand suction pipe 13 near the front end, and the adjustment buoy 14 is a steel structure. The jet pump model is CP20-0.3, the flow rate Q=20m 3 /h; the adjustable float 14 can adjust the weight from 0 to 600kg. When the sand pumping operation is carried out on the platform, in order to ensure that the suction head 15 can effectively track the surface of the sediment layer of the river bed, and make the blade group of the suction head cut into the sediment layer to a certain depth without causing the suction head to fall into the sediment layer, it is necessary to adjust the impact of the suction head on the sediment layer. layer pressure. This function is realized by the balance system of the sand suction head 15. When pressurization is required, water injection to the adjustment buoy 14 can increase the pressure of the sand suction head 15 on the sediment layer; Accumulation of water can alleviate the pressure of the suction head 15 on the deposit layer.

供电设备包括设在主浮箱1后端的柴油发电机组4,供电设备为抽沙泵组、冲沙泵、抽沙吸管吸头起落系统、抽沙吸头工况平衡系统提供电力。柴油发电机组4单机容量为150kw,总供电容量为300kw。The power supply equipment includes a diesel generator set 4 located at the rear end of the main buoyancy tank 1, and the power supply equipment provides power for the sand suction pump group, the sand flushing pump, the lifting system of the sand suction pipe suction head, and the working condition balance system of the sand suction suction head. Diesel generator set 4 has a stand-alone capacity of 150kw and a total power supply capacity of 300kw.

主浮箱1长度为11.00m,主浮箱1宽度为3.50m,型深为1.40m。主浮箱1包括主浮箱甲板板101和主浮箱船底板105,主浮箱甲板板101和主浮箱船底板105通过主浮箱舷侧板108焊接在一起,主浮箱甲板板101、主浮箱船底板105、主浮箱舷侧板108围成中空的主浮箱。主浮箱的内腔的底部设有与主浮箱船底板105焊接在一起的主浮箱中龙骨107和主浮箱实肋板106。主浮箱的内腔中设有连接主浮箱甲板板101和主浮箱船底板105的主浮箱舱壁板112和主浮箱支柱115,主浮箱舱壁板112的侧面设有主浮箱舱壁垂直桁113和主浮箱舱壁扶强材114,主浮箱舱壁板112和主浮箱中龙骨107连接处设有主浮箱龙骨舱壁肘板120。主浮箱甲板板101的下端面设有主浮箱甲板纵桁102、主浮箱甲板横梁103和主浮箱甲板强横梁104,主浮箱甲板纵桁102与主浮箱甲板横梁103连接处设有主浮箱甲板纵桁防倾肘板122。主浮箱舱壁板112和主浮箱甲板纵桁102连接处设有主浮箱纵桁舱壁肘板121。主浮箱支柱115和主浮箱甲板纵桁102连接处设有主浮箱支柱肘板124和主浮箱支柱垫板125。主浮箱舷侧板108的内侧设有主浮箱舷侧纵桁111、主浮箱强肋骨110和主浮箱普通肋骨109,主浮箱舷侧纵桁111与主浮箱普通肋骨109连接处设有主浮箱舷侧纵桁防倾肘板123,主浮箱强肋骨110和主浮箱实肋板106之间连接有主浮箱舭肘板117,主浮箱普通肋骨109和主浮箱甲板横梁103之间连接有主浮箱普梁肘板119,主浮箱强肋骨110和主浮箱甲板强横梁104之间连接有主浮箱强梁肘板118。The length of the main pontoon 1 is 11.00m, the width of the main pontoon 1 is 3.50m, and the molded depth is 1.40m. Main pontoon 1 comprises main pontoon deck 101 and main pontoon bottom 105, main pontoon deck 101 and main pontoon bottom 105 are welded together by main pontoon side plate 108, main pontoon deck 101, main pontoon The bottom plate 105 of the pontoon ship and the side plate 108 of the main pontoon form a hollow main pontoon. The bottom of the inner chamber of the main pontoon is provided with a keel 107 in the main pontoon welded together with the bottom plate 105 of the main pontoon and a real rib 106 of the main pontoon. The inner cavity of the main pontoon is provided with a main pontoon bulkhead 112 and a main pontoon pillar 115 connecting the main pontoon deck 101 and the main pontoon bottom plate 105, and the side of the main pontoon bulkhead 112 is provided with a main buoy. The main pontoon keel bulkhead bracket 120 is provided at the junction of the tank bulkhead vertical girder 113 and the main pontoon bulkhead stiffener 114, the main pontoon bulkhead plate 112 and the main pontoon middle keel 107. The lower end surface of the main pontoon deck plate 101 is provided with a main pontoon deck girder 102, a main pontoon deck beam 103 and a main pontoon deck strong beam 104, and the connection between the main pontoon deck girder 102 and the main pontoon deck beam 103 An anti-tilt bracket 122 is provided on the girder of the main pontoon deck. The main pontoon bulkhead bracket 121 is provided at the junction of the main pontoon bulkhead plate 112 and the main pontoon deck girder 102 . A main pontoon support bracket 124 and a main pontoon support backing plate 125 are provided at the junction of the main pontoon support 115 and the main pontoon deck girder 102 . The inner side of the main pontoon side plate 108 is provided with the main pontoon side stringer 111, the main pontoon strong rib 110 and the main pontoon common rib 109, and the main pontoon side stringer 111 is connected with the main pontoon common rib 109 There is an anti-tilt bracket 123 for the side longitudinal girder of the main pontoon tank, a main pontoon bilge bracket 117 is connected between the strong rib 110 of the main pontoon tank and the solid floor 106 of the main pontoon tank, the common rib 109 of the main pontoon tank and the main Main pontoon general beam brackets 119 are connected between the pontoon deck beams 103 , and main pontoon strong beam brackets 118 are connected between the main pontoon strong ribs 110 and the main pontoon deck strong beams 104 .

边浮箱2长度为16.50m,边浮箱2宽度为1.75m,型深为1.40m,边浮箱3和边浮箱2的结构相同。边浮箱2包括边浮箱甲板板和边浮箱船底板205,边浮箱甲板板和边浮箱船底板205通过边浮箱舷侧板208焊接在一起,边浮箱甲板板、边浮箱船底板205、边浮箱舷侧板208围成中空的边浮箱。边浮箱的内腔的底部设有与边浮箱船底板205焊接在一起的边浮箱中龙骨207和边浮箱实肋板206。边浮箱的内腔中设有连接边浮箱甲板板和边浮箱船底板205的边浮箱舱壁板212和边浮箱支柱215,边浮箱舱壁板212的侧面设有边浮箱舱壁垂直桁213和边浮箱舱壁扶强材214,边浮箱舱壁板212和边浮箱中龙骨207连接处设有边浮箱龙骨舱壁肘板220。边浮箱甲板板的下端面设有边浮箱甲板纵桁202、边浮箱甲板横梁203和边浮箱甲板强横梁204,边浮箱甲板纵桁202与边浮箱甲板横梁203连接处设有边浮箱甲板纵桁防倾肘板222。边浮箱舱壁板212和边浮箱甲板纵桁202连接处设有边浮箱纵桁舱壁肘板221。边浮箱支柱215和边浮箱甲板纵桁202连接处设有边浮箱支柱肘板224和边浮箱支柱垫板225。边浮箱舷侧板208的内侧设有边浮箱舷侧纵桁211、边浮箱强肋骨210和边浮箱普通肋骨209,边浮箱舷侧纵桁211与边浮箱普通肋骨209连接处设有边浮箱舷侧纵桁防倾肘板223,边浮箱强肋骨210及边浮箱普通肋骨209和边浮箱实肋板206连接处连接有边浮箱舭肘板217,边浮箱普通肋骨209和边浮箱甲板横梁203连接处连接有边浮箱普梁肘板219,边浮箱强肋骨210和边浮箱甲板强横梁204连接处连接有边浮箱强梁肘板218。The length of the side pontoon 2 is 16.50m, the width of the side pontoon 2 is 1.75m, and the molded depth is 1.40m. The structure of the side pontoon 3 and the side pontoon 2 is the same. Limit pontoon 2 comprises limit pontoon deck and limit pontoon bottom plate 205, limit pontoon deck and limit pontoon bottom plate 205 are welded together by limit pontoon side plate 208, limit pontoon deck, limit pontoon bottom plate 205, side pontoon tank side plate 208 surrounds a hollow side pontoon tank. The bottom of the inner chamber of the side pontoon is provided with the middle keel 207 of the side pontoon and the solid rib 206 of the side pontoon welded together with the bottom plate 205 of the side pontoon. The inner cavity of the side pontoon is provided with a side pontoon bulkhead 212 and a side pontoon pillar 215 connecting the side pontoon deck and the side pontoon bottom plate 205, and the side of the side pontoon bulkhead 212 is provided with a side pontoon Bulkhead vertical girders 213, side pontoon bulkhead stiffeners 214, side pontoon bulkhead panels 212 and side pontoon middle keel 207 are connected with side pontoon keel bulkhead brackets 220. The lower end surface of the side pontoon deck is provided with side pontoon deck girders 202, side pontoon deck beams 203 and side pontoon deck strong beams 204, and the junction of side pontoon deck girders 202 and side pontoon deck beams 203 is provided with Side pontoon deck longitudinal girder anti-tilt bracket 222. Side pontoon bulkhead panels 212 and side pontoon deck girders 202 are connected with side pontoon girder bulkhead brackets 221 . A side pontoon support bracket 224 and a side pontoon support backing plate 225 are provided at the junction of the side pontoon support 215 and the side pontoon deck girder 202 . The inner side of side pontoon side plate 208 is provided with side pontoon side stringer 211, side pontoon strong rib 210 and side pontoon common rib 209, side pontoon side girder 211 is connected with side pontoon common rib 209 Side pontoon side longitudinal girder anti-tilt bracket 223 is provided at the side pontoon tank, side pontoon strong rib 210, side pontoon normal rib 209 and side pontoon solid rib 206 are connected to side pontoon tank bilge bracket 217, side pontoon tank bilge bracket 217 is The common rib 209 of the pontoon tank and the deck beam 203 of the side pontoon tank are connected with the common beam bracket 219 of the side pontoon tank, and the strong rib 210 of the side pontoon tank and the strong beam 204 of the side pontoon tank deck are connected with the side pontoon tank strong beam bracket 218 .

浮箱连接铰链6包括双耳绞座601、单耳绞座602、带齿条铰轴603及齿轮副604,单耳绞座602通过带齿条铰轴603与双耳铰座601铰接链接,双耳绞座601的上端面还设有齿轮副604,带齿条铰轴603和齿轮副604啮合。双耳绞座601与主浮箱1焊接连接,单耳绞座602与边浮箱2焊接连接。主浮箱1与每只边浮箱2之间分上下两层共设连接铰链8处,能够保证浮箱连接的强度和刚性。平台采用了浮箱组合形式,同时浮箱连接件采用了可拆卸铰链组,因此平台可以自如拆解和组装。拆解后的平台浮箱可以通过公路正常运输,因此可以实现平台远途迁移作业。适用于施工工地的转移。The buoyant box connecting hinge 6 comprises a double-ear hinged seat 601, a single-eared hinged seat 602, a rack hinge shaft 603 and a gear pair 604, and the single-ear hinged seat 602 is hingedly linked with the double-ear hinged seat 601 by a rack hinge shaft 603. A gear pair 604 is also provided on the upper end surface of the double-ear hinged seat 601, and the belt rack hinge shaft 603 is meshed with the gear pair 604. The two-ear hinged seat 601 is welded to the main pontoon 1, and the single-eared hinged seat 602 is welded to the side pontoon 2. Between the main pontoon 1 and every side pontoon 2, there are 8 connecting hinges in two layers up and down, which can ensure the strength and rigidity of the connection of the pontoon. The platform adopts the combination form of the pontoon, and the connection of the pontoon adopts a detachable hinge group, so the platform can be disassembled and assembled freely. The disassembled platform pontoons can be transported normally by road, so the platform can be moved over long distances. Suitable for transfers on construction sites.

两台串联的抽沙泵分别为一级抽沙泵902和二级抽沙泵901,一级抽沙泵902和二级抽沙泵901分别连接有驱动电机,二级抽沙泵902的出口端与输沙管道10连接;泵机舱9的前端设有透孔吸水管绞座905和盲孔吸水管绞座906,一级抽沙泵902的进口端连接有管道,管道上设有手动蝶阀903,管道的前端连接有水密转动节904,水密转动节904的前端穿装入透孔吸水管绞座905和盲孔吸水管绞座906中,透孔吸水管绞座905和盲孔吸水管绞座906之间的水密转动节904的侧壁设有进口,抽沙吸水管道的后端与水密转动节904的进口连接。一级抽沙泵902型号为200PN-35,扬程h=40m,流量Q=400m3/h,电机功率90kw;二级抽沙泵901型号为200ZE-45,扬程h=41m,流量Q=400m3/h,驱动电机功率110kw。The two series-connected sand pumps are respectively a primary sand pump 902 and a secondary sand pump 901. The primary sand pump 902 and the secondary sand pump 901 are respectively connected with drive motors, and the outlet of the secondary sand pump 902 The end is connected with the sand pipeline 10; the front end of the pump cabin 9 is provided with a through-hole suction pipe winch 905 and a blind hole suction pipe winch 906, and the inlet end of the primary sand pump 902 is connected with a pipeline, and a manual butterfly valve is provided on the pipeline. 903, the front end of the pipeline is connected with a watertight rotary joint 904, and the front end of the watertight rotary joint 904 is inserted into the through-hole suction pipe winch 905 and the blind-hole suction pipe winch 906, the through-hole suction pipe winch 905 and the blind-hole suction pipe The side wall of the watertight swivel joint 904 between the winch seats 906 is provided with an inlet, and the rear end of the sand suction pipe is connected with the inlet of the watertight swivel joint 904 . The model of the first-stage sand pump 902 is 200PN-35, head h=40m, flow Q=400m 3 /h, motor power 90kw; the model of the second-stage sand pump 901 is 200ZE-45, head h=41m, flow Q=400m 3 /h, drive motor power 110kw.

起落架12包括A架1201、斜拉杆1202、牵引滑轮系。A架1201及斜拉杆1202下端铰接连接在边浮箱2的内侧壁上端甲板边缘。A架1201与斜栏杆1202上端铰接链接。斜栏杆1202由主杆和调节杆1206组成。牵引滑轮系由吊轮1只、导向轮3只组成,吊轮和2只导向轮以螺栓连接在A架1201顶端,1只导向轮以螺栓连接在A架1201底端。斜拉杆1202与卷扬机11的转动轴固定连接;A架1201的前端通过拉绳与抽沙吸管13的侧壁固定连接。卷扬机11牵引能力为3t,牵引速度为16m/min,电机功率7.5kw。The landing gear 12 includes an A frame 1201, a diagonal stay rod 1202, and a traction pulley train. The lower ends of the A frame 1201 and the diagonal stay rods 1202 are hingedly connected to the upper deck edge of the inner side wall of the side pontoon tank 2 . The A frame 1201 is hingedly linked with the upper end of the inclined railing 1202 . The inclined railing 1202 is made up of a main bar and an adjusting bar 1206 . The traction pulley system is made up of 1 suspension wheel and 3 guide wheels. The suspension wheel and 2 guide wheels are connected to the A frame 1201 top with bolts, and 1 guide wheel is connected to the A frame 1201 bottom with bolts. Diagonal stay rod 1202 is fixedly connected with the rotating shaft of winch 11; The hoist 11 has a traction capacity of 3t, a traction speed of 16m/min, and a motor power of 7.5kw.

抽沙吸头15包括屏蔽罩壳体1501,屏蔽罩壳体1501的下端设有破土刀板1505,屏蔽罩壳体1501的上端设有铰接座板1502、冲砂管1503及抽沙管头1504,铰接座板1502与抽沙吸管13的前端铰接,冲砂管1503与冲沙泵的出口端连通,冲砂管1503的下端设有冲沙接头,抽沙管头1504与抽沙吸管13连通。屏蔽罩壳体1501、破土刀板1505、铰接座板1502、冲砂管1503及抽沙管头1504均为钢质结构。Sand pumping suction head 15 includes a shield housing 1501, the lower end of the shield housing 1501 is provided with a soil-breaking knife plate 1505, and the upper end of the shield housing 1501 is provided with a hinged seat plate 1502, a sand washing pipe 1503 and a sand pumping pipe head 1504 , the hinged seat plate 1502 is hinged with the front end of the sand suction pipe 13, the sand flushing pipe 1503 communicates with the outlet end of the sand flushing pump, the lower end of the sand flushing pipe 1503 is provided with a sand flushing joint, and the sand suction pipe head 1504 communicates with the sand suction pipe 13 . The shield casing 1501, the soil-breaking knife plate 1505, the hinged seat plate 1502, the sand washing pipe 1503 and the sand pumping pipe head 1504 are all steel structures.

平台抽沙工作原理Working principle of platform sand pumping

平台进行抽沙作业时,通过抽沙吸管吸头起落系统将抽沙吸头15下放至河床淤积层面上;经抽沙吸头工况平衡系统调整,使吸头破土刀片组切入淤积层;然后由平台推进系统将平台向后缓缓推进,强制拖动吸头缓缓移动,实现吸头对淤积层的破碎处理;破碎处理过的淤积层再次经冲沙喷嘴喷射的高压水流扰动,在吸头折流壳体内形成泥浆;泥浆由设在吸头折流壳体内的吸入口,被吸入吸水管道,再经抽沙泵组送入输沙管道10。When the sand pumping operation is carried out on the platform, the sand pumping suction head 15 is lowered to the sedimentation layer of the river bed through the sand pumping pipe suction head lifting system; the suction head is adjusted by the working condition balance system of the sand pumping suction head so that the soil breaking blade group of the suction head cuts into the sedimentation layer; and then The platform propulsion system slowly pushes the platform backwards, forcing the suction head to move slowly to realize the crushing treatment of the sediment layer by the suction head; the crushed sediment layer is disturbed by the high-pressure water jet sprayed by the sand washing nozzle again, Slurry is formed in the head baffle shell; the mud is sucked into the suction pipe by the suction port located in the suction head baffle shell, and then sent into the sand delivery pipeline 10 through the sand pump group.

平台采用了浮箱组合形式,同时浮箱连接件采用了可拆卸铰链组,因此平台可以自如拆解和组装。拆解后的平台浮箱可以通过公路正常运输,因此可以实现平台远途迁移作业。适用于施工工地的转移。The platform adopts the combination form of the pontoon, and the connection of the pontoon adopts a detachable hinge group, so the platform can be disassembled and assembled freely. The disassembled platform pontoons can be transported normally by road, so the platform can be moved over long distances. Suitable for transfers on construction sites.

在冲吸式抽沙吸头15的基础上增加了破土刀片组,淤积层在被冲吸以前进行了破碎处理,吸头的功能得到了扩展,提高了抽沙效率,增强了冲吸式抽沙吸头15的适应性。On the basis of the flushing sand suction head 15, a soil-breaking blade group is added, and the sediment layer is crushed before being flushed. Adaptability of sand suction head 15.

平台增设了抽沙吸头工况平衡系统,改变了常规抽沙平台作业形式,使平台实现了移动中抽沙作业功能。本抽沙平台更适宜于淤积层浅薄的水库和湖泊水域进行清淤或抽沙作业。The platform is equipped with a sand suction suction head working condition balance system, which changes the operation form of the conventional sand pumping platform and enables the platform to realize the function of sand pumping while moving. The sand pumping platform is more suitable for dredging or sand pumping operations in reservoirs and lakes with shallow sediment layers.

实施例二:参见图29-31,实施例二与实施例一基本相同,相同之处不再赘述,不同之处是:还包括河床质采样系统,河床质采样系统包括震动重锤式深水采样器18、采样操作平台17,采样操作平台17安装在主浮箱1的前端,采样操作平台17与主浮箱1和边浮箱2均连接在一起,震动重锤式深水采样器18包括与采样操作平台17连接的托架1805,托架1805的上端连接有两个平行的导轨1803,两个导轨1803之间设有采样管1804,采样管1804的下端固定安装在托架1805上,采样管1804的上端通过滑块滑动穿装在两个导轨1803上,采样管1804的上端端口连接有震动锤1802,起落架12的前端设有滑轮,滑轮中滑动缠绕有钢丝绳1801,钢丝绳1801的下端与震动锤1802固定连接。Embodiment 2: Referring to Figures 29-31, Embodiment 2 is basically the same as Embodiment 1, and the similarities will not be repeated. The difference is that it also includes a river bed quality sampling system, which includes a vibrating hammer type deep water sampling device 18, sampling operation platform 17, the sampling operation platform 17 is installed on the front end of the main floating tank 1, the sampling operation platform 17 is connected with the main floating tank 1 and the side floating tank 2, and the vibration weight type deep water sampler 18 includes and The bracket 1805 connected to the sampling operation platform 17, the upper end of the bracket 1805 is connected with two parallel guide rails 1803, a sampling tube 1804 is arranged between the two guide rails 1803, the lower end of the sampling tube 1804 is fixedly installed on the bracket 1805, sampling The upper end of the pipe 1804 is slid and mounted on two guide rails 1803 through a slider. The upper port of the sampling pipe 1804 is connected with a vibrating hammer 1802. The front end of the landing gear 12 is provided with a pulley, and a steel wire rope 1801 is slid and wound around the pulley. The lower end of the steel wire rope 1801 is It is fixedly connected with the vibration hammer 1802.

平台经简易的转换装配即转换为河床质采样平台,搭载河床质采样装备,航行至采样地点,即可进行采样作业。平台上的发电机组4可供采样装备用电,起落系统满足采样作业要求。平台采样作业安全、简便、效率较高。The platform can be transformed into a riverbed quality sampling platform through simple conversion and assembly, equipped with riverbed quality sampling equipment, sailing to the sampling site, and then sampling operations can be carried out. The generator set 4 on the platform can supply electricity for the sampling equipment, and the lifting system meets the requirements of the sampling operation. The platform sampling operation is safe, convenient and efficient.

以上所述的实施例仅仅是对本实用新型的优选实施方式进行描述,在不脱离本实用新型设计精神的前提下,本领域普通技术人员对本实用新型的技术方案作出的各种变形和改进,均应落入本实用新型权利要求书确定的保护范围内。The above-mentioned embodiments are only descriptions of preferred implementations of the utility model. Without departing from the design spirit of the utility model, various deformations and improvements made by those skilled in the art to the technical solution of the utility model are acceptable. Should fall within the scope of protection determined by the claims of the utility model.

Claims (9)

1.一种自航式多功能抽沙平台,其特征在于,包括基本平台、推进系统、抽沙泵组、抽沙吸管吸头、冲沙泵、抽沙吸管吸头起落系统及供电设备;1. A self-propelled multifunctional sand pumping platform, characterized in that it comprises a basic platform, a propulsion system, a sand suction pump group, a sand suction suction pipe suction head, a sand washing pump, a sand suction suction pipe suction lifting system and power supply equipment; 基本平台包括主浮箱和设在主浮箱两侧的边浮箱,主浮箱和边浮箱均采用全电焊钢质结构,主浮箱与边浮箱之间通过可拆卸的浮箱连接铰链连接;The basic platform includes a main pontoon and side pontoons located on both sides of the main pontoon. Both the main pontoon and the side pontoons are made of fully welded steel structure. The main pontoon and the side pontoons are connected by detachable pontoons. hinge connection; 推进系统包括分别安装在边浮箱尾部的挂桨机;The propulsion system includes propulsion machines respectively installed at the tail of the side pontoons; 抽沙泵组包括两台串联的抽沙泵,主浮箱的前端设有泵机舱,抽沙泵组安装于泵机舱内,抽沙泵组的出口连接有输沙管道;The sand pump set includes two sand pumps connected in series. The front end of the main buoyancy tank is provided with a pump engine room, and the sand pump set is installed in the pump engine room. The outlet of the sand pump set is connected with a sand pipeline; 抽沙吸管吸头包括抽沙吸水管道和设在抽沙吸水管道前端的抽沙吸头,抽沙吸水管道的后端与抽沙泵组的进口端连接;The suction head of the sand suction pipe includes a sand suction pipe and a sand suction head arranged at the front end of the sand suction pipe, and the rear end of the sand suction pipe is connected to the inlet end of the sand suction pump group; 冲沙泵安装于泵机舱内,冲沙泵的出口端通过管道与抽沙吸头连接,冲沙泵为离心式清水泵;The sand washing pump is installed in the pump engine room, the outlet end of the sand washing pump is connected to the sand suction head through a pipeline, and the sand washing pump is a centrifugal clean water pump; 抽沙吸管吸头起落系统包括卷扬机和起落架,卷扬机设在边浮箱靠近前端的上端面,卷扬机用于驱动抽沙吸管吸头的升降,起落架采用无缝钢管组焊成型;The lifting system of the sand suction pipe suction head includes a hoist and a landing gear. The hoist is located on the upper surface of the side pontoon close to the front end. The hoist is used to drive the lifting of the sand suction suction pipe suction head. The landing gear is assembled and welded with seamless steel pipes; 供电设备包括设在主浮箱后端的柴油发电机组,供电设备为抽沙泵组、冲沙泵、抽沙吸管吸头起落系统提供电力。The power supply equipment includes a diesel generator set arranged at the rear end of the main buoyancy tank, and the power supply equipment provides power for the sand suction pump set, the sand flushing pump, and the lifting and lowering system of the sand suction pipe suction head. 2.根据权利要求1所述的自航式多功能抽沙平台,其特征在于,所述的主浮箱包括主浮箱甲板板和主浮箱船底板,主浮箱甲板板和主浮箱船底板通过主浮箱舷侧板焊接在一起,主浮箱甲板板、主浮箱船底板、主浮箱舷侧板围成中空的主浮箱;主浮箱的内腔的底部设有与主浮箱船底板焊接在一起的主浮箱中龙骨和主浮箱实肋板;主浮箱的内腔中设有连接主浮箱甲板板和主浮箱船底板的主浮箱舱壁板和主浮箱支柱,主浮箱舱壁板的侧面设有主浮箱舱壁垂直桁和主浮箱舱壁扶强材,主浮箱舱壁板和主浮箱中龙骨连接处设有主浮箱龙骨舱壁肘板;主浮箱甲板板的下端面设有主浮箱甲板纵桁、主浮箱甲板横梁和主浮箱甲板强横梁,主浮箱甲板纵桁与主浮箱甲板横梁连接处设有主浮箱甲板纵桁防倾肘板;主浮箱舱壁板和主浮箱甲板纵桁连接处设有主浮箱纵桁舱壁肘板;主浮箱支柱和主浮箱甲板纵桁连接处设有主浮箱支柱肘板和主浮箱支柱垫板;主浮箱舷侧板的内侧设有主浮箱舷侧纵桁、主浮箱强肋骨、主浮箱普通肋骨,主浮箱舷侧纵桁与主浮箱普通肋骨连接处设有主浮箱舷侧纵桁防倾肘板,主浮箱强肋骨和主浮箱实肋板之间连接有主浮箱舭肘板,主浮箱普通肋骨和主浮箱甲板横梁之间连接有主浮箱普梁肘板,主浮箱强肋骨和主浮箱甲板强横梁之间连接有主浮箱强梁肘板。2. The self-propelled multifunctional sand pumping platform according to claim 1, characterized in that, said main pontoon comprises a main pontoon deck and a main pontoon bottom plate, and a main pontoon deck and a main pontoon bottom plate The main pontoon side plate is welded together, the main pontoon deck plate, the main pontoon ship bottom plate, and the main pontoon side plate form a hollow main pontoon; The middle keel of the main pontoon and the solid floor of the main pontoon with the bottom plates welded together; the inner cavity of the main pontoon is provided with a main pontoon bulkhead and a main pontoon pillar connecting the deck plate of the main pontoon and the bottom plate of the main pontoon , the side of the main pontoon bulkhead plate is provided with the main pontoon bulkhead vertical girder and the main pontoon bulkhead stiffener, and the main pontoon keel bulkhead is provided at the connection between the main pontoon bulkhead plate and the main pontoon middle keel Brackets; main pontoon deck girders, main pontoon deck beams and main pontoon deck beams are provided on the lower end of the main pontoon deck plate, and main pontoon deck beams and main pontoon deck beams are connected by main The anti-tilt bracket of the pontoon deck girder; the main pontoon tank girder bulkhead bracket is provided at the connection between the main pontoon tank bulkhead plate and the main pontoon deck girder; the main pontoon tank pillar and the main pontoon deck girder connection There are main pontoon pillar brackets and main pontoon pillar backing plates; main pontoon side side girders, main pontoon strong ribs, main pontoon ordinary ribs, main pontoon side The main pontoon side girder anti-tilt bracket is provided at the connection between the side girder and the main pontoon general frame, the main pontoon bilge bracket is connected between the main pontoon strong rib and the main pontoon solid floor, and the main pontoon The main pontoon beam brackets are connected between the normal ribs of the tank and the main pontoon deck beams, and the main pontoon beam brackets are connected between the main pontoon strong ribs and the main pontoon deck beams. 3.根据权利要求2所述的自航式多功能抽沙平台,其特征在于,所述的边浮箱包括边浮箱甲板板和边浮箱船底板,边浮箱甲板板和边浮箱船底板通过边浮箱舷侧板焊接在一起,边浮箱甲板板、边浮箱船底板、边浮箱舷侧板围成中空的边浮箱;边浮箱的内腔的底部设有与边浮箱船底板焊接在一起的边浮箱中龙骨和边浮箱实肋板;边浮箱的内腔中设有连接边浮箱甲板板和边浮箱船底板的边浮箱舱壁板和边浮箱支柱,边浮箱舱壁板的侧面设有边浮箱舱壁垂直桁和边浮箱舱壁扶强材,边浮箱舱壁板和边浮箱中龙骨连接处设有边浮箱龙骨舱壁肘板;边浮箱甲板板的下端面设有边浮箱甲板纵桁、边浮箱甲板横梁和边浮箱甲板强横梁,边浮箱甲板纵桁与边浮箱甲板横梁连接处设有边浮箱甲板纵桁防倾肘板;边浮箱舱壁板和边浮箱甲板纵桁连接处设有边浮箱纵桁舱壁肘板;边浮箱支柱和边浮箱甲板纵桁连接处设有边浮箱支柱肘板和边浮箱支柱垫板;边浮箱舷侧板的内侧设有边浮箱舷侧纵桁、边浮箱强肋骨和边浮箱普通肋骨,边浮箱舷侧纵桁与边浮箱普通肋骨连接处设有边浮箱舷侧纵桁防倾肘板,边浮箱强肋骨及边浮箱普通肋骨和边浮箱实肋板连接处连接有边浮箱舭肘板,边浮箱普通肋骨和边浮箱甲板横梁连接处连接有边浮箱普梁肘板,边浮箱强肋骨和边浮箱甲板强横梁连接处连接有边浮箱强梁肘板。3. The self-propelled multifunctional sand pumping platform according to claim 2, wherein the side pontoon comprises a side pontoon deck and a side pontoon bottom, and a side pontoon deck and a side pontoon bottom The side pontoons are welded together, and the side pontoon deck, the side pontoon bottom plate, and the side pontoon side panels form a hollow side pontoon; the bottom of the inner cavity of the side pontoon is provided with a The middle keel of the side pontoon and the solid floor of the side pontoon with the bottom plates welded together; the inner cavity of the side pontoon is provided with side pontoon bulkheads and side pontoon pillars connecting the side pontoon deck and the side pontoon bottom plate , side pontoon bulkhead panels are provided with side pontoon bulkhead vertical girders and side pontoon bulkhead stiffeners, side pontoon bulkhead panels and side pontoon middle keel joints are provided with side pontoon keel bulkheads Brackets; side pontoon deck girders, side pontoon deck beams and side pontoon deck beams are provided on the lower end of the side pontoon deck plate, side pontoon deck girders and side pontoon deck beams are connected by edge The anti-tilt bracket of the girder of the pontoon deck; the bulkhead bracket of the side pontoon tank and the girder of the side pontoon deck are provided with brackets for the bulkhead of the girder of the side pontoon tank; There are side pontoon support brackets and side pontoon support plates; side pontoon side side girders, side pontoon strong ribs and side pontoon ordinary ribs are arranged on the inner side of side pontoon side side plates. Side girders and side pontoon common ribs are connected with side pontoon side girder anti-tilt brackets, side pontoon strong ribs and side pontoon common ribs are connected with side pontoon solid ribs with side pontoon The bilge bracket, the side pontoon common frame and the side pontoon deck beam are connected to the side pontoon beam bracket, and the side pontoon strong rib and the side pontoon deck beam are connected to the side pontoon beam bracket. 4.根据权利要求3所述的自航式多功能抽沙平台,其特征在于,所述的浮箱连接铰链包括双耳绞座、单耳绞座、带齿条铰轴及齿轮副,单耳绞座通过带齿条铰轴与双耳铰座铰接链接,双耳绞座的上端面还设有齿轮副,带齿条铰轴和齿轮副啮合;双耳绞座与主浮箱焊接连接,单耳绞座与边浮箱焊接连接。4. The self-propelled multifunctional sand pumping platform according to claim 3, characterized in that, the connecting hinge of the pontoon comprises a double-ear hinge seat, a single-ear hinge seat, a hinge shaft with a rack and a gear pair, and the single The double ear hinge base is hinged with the double ear hinge base through the hinge shaft with rack, and the upper end surface of the double ear hinge base is also provided with a gear pair, which meshes with the rack hinge shaft and the gear pair; the double ear hinge base is welded to the main buoyancy tank , the single-ear hinged seat is welded to the side pontoon. 5.根据权利要求4所述的自航式多功能抽沙平台,其特征在于,所述的两台串联的抽沙泵分别为一级抽沙泵和二级抽沙泵,一级抽沙泵和二级抽沙泵分别连接有驱动电机,二级抽沙泵的出口端与输沙管道连接;泵机舱的前端设有透孔吸水管绞座和盲孔吸水管绞座,一级抽沙泵的进口端连接有管道,管道上设有手动蝶阀,管道的前端连接有水密转动节,水密转动节的前端穿装入透孔吸水管绞座和盲孔吸水管绞座中,透孔吸水管绞座和盲孔吸水管绞座之间的水密转动节的侧壁设有进口,抽沙吸水管道的后端与水密转动节的进口连接。5. The self-propelled multifunctional sand pumping platform according to claim 4, characterized in that, the two series-connected sand pumps are respectively a primary sand pump and a secondary sand pump, and the primary sand pump The pump and the secondary sand pump are respectively connected with a drive motor, and the outlet end of the secondary sand pump is connected to the sand pipeline; The inlet end of the sand pump is connected with a pipeline, and the pipeline is equipped with a manual butterfly valve. The front end of the pipeline is connected with a watertight rotary joint. The side wall of the watertight swivel joint between the suction pipe winch and the blind hole suction pipe winch is provided with an inlet, and the rear end of the sand suction pipe is connected with the inlet of the watertight swivel. 6.根据权利要求5所述的自航式多功能抽沙平台,其特征在于,所述的起落架包括A架、斜拉杆、牵引滑轮系;A架及斜拉杆下端铰接连接在边浮箱的内侧壁上端甲板边缘;A架与斜栏杆上端铰接链接;斜栏杆由主杆和调节杆组成;牵引滑轮系由吊轮1只、导向轮3只组成,吊轮和2只导向轮以螺栓连接在A架顶端,1只导向轮以螺栓连接在A架底端; A架的前端通过拉绳与抽沙吸管的侧壁固定连接。6. The self-propelled multifunctional sand pumping platform according to claim 5, wherein the landing gear comprises an A-frame, a diagonal stay rod, and a traction pulley system; the lower ends of the A-frame and the diagonal stay rod are hingedly connected to the side pontoon The upper deck edge of the inner side wall; the A frame is hinged with the upper end of the inclined railing; the inclined railing is composed of a main rod and an adjusting rod; the traction pulley system is composed of 1 suspension wheel and 3 guide wheels, and the suspension wheel and 2 guide wheels are connected by bolts. It is connected to the top of frame A, and one guide wheel is connected to the bottom of frame A with bolts; the front end of frame A is fixedly connected to the side wall of the sand suction pipe through a pull rope. 7.根据权利要求6所述的自航式多功能抽沙平台,其特征在于,所述的抽沙吸头包括屏蔽罩壳体,屏蔽罩壳体的下端设有破土刀板,屏蔽罩壳体的上端设有铰接座板、冲砂管及抽沙管头,铰接座板与抽沙吸管的前端铰接,冲砂管与冲沙泵的出口端连通,冲砂管的下端设有冲沙接头,抽沙管头与抽沙吸管连通。7. The self-propelled multifunctional sand pumping platform according to claim 6, characterized in that, the sand suction head comprises a shield casing, the lower end of the shield casing is provided with a soil-breaking knife plate, and the shield casing The upper end of the body is provided with a hinged seat plate, a sand washing pipe and a sand suction pipe head. The hinged seat plate is hinged with the front end of the sand suction pipe. Joint, the sand suction pipe head is connected with the sand suction suction pipe. 8.根据权利要求7所述的自航式多功能抽沙平台,其特征在于,还包括抽沙吸头工况平衡系统,抽沙吸头工况平衡系统包括喷射泵和调节浮筒,调节浮筒安装在抽沙吸管靠近前端的下方,调节浮筒为钢制结构;通过喷射泵改变调节浮筒内的积水量。8. The self-propelled multifunctional sand pumping platform according to claim 7, characterized in that it also includes a sand suction head working condition balance system, the sand suction head working condition balance system includes a jet pump and an adjustment buoy, and the adjustment buoy It is installed under the sand suction pipe close to the front end, and the adjustment buoy is made of steel; the amount of accumulated water in the adjustment buoy is changed by the jet pump. 9.根据权利要求8所述的自航式多功能抽沙平台,其特征在于,还包括河床质采样系统,河床质采样系统包括震动重锤式深水采样器、采样操作平台,采样操作平台安装在主浮箱的前端,采样操作平台与主浮箱和边浮箱均连接在一起,震动重锤式深水采样器包括与采样操作平台连接的托架,托架的上端连接有两个平行的导轨,两个导轨之间设有采样管,采样管的下端固定安装在托架上,采样管的上端通过滑块滑动穿装在两个导轨上,采样管的上端端口连接有震动锤,起落架的前端设有滑轮,滑轮中滑动缠绕有钢丝绳,钢丝绳的下端与震动锤固定连接。9. The self-propelled multifunctional sand pumping platform according to claim 8 is characterized in that it also includes a riverbed quality sampling system, and the riverbed quality sampling system includes a vibrating hammer type deep-water sampler, a sampling operation platform, and the sampling operation platform is installed At the front end of the main pontoon, the sampling operation platform is connected with the main pontoon and side pontoons. The vibrating hammer type deep water sampler includes a bracket connected with the sampling operation platform. The upper end of the bracket is connected with two parallel There is a sampling tube between the two guide rails. The lower end of the sampling tube is fixedly installed on the bracket. The front end of the falling frame is provided with a pulley, and a wire rope is slidably wound around the pulley, and the lower end of the wire rope is fixedly connected with the vibration hammer.
CN201720067938.4U 2017-01-20 2017-01-20 Self-propulsion type is multi-functional to take out sapin platform Expired - Fee Related CN206646567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720067938.4U CN206646567U (en) 2017-01-20 2017-01-20 Self-propulsion type is multi-functional to take out sapin platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720067938.4U CN206646567U (en) 2017-01-20 2017-01-20 Self-propulsion type is multi-functional to take out sapin platform

Publications (1)

Publication Number Publication Date
CN206646567U true CN206646567U (en) 2017-11-17

Family

ID=60283668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720067938.4U Expired - Fee Related CN206646567U (en) 2017-01-20 2017-01-20 Self-propulsion type is multi-functional to take out sapin platform

Country Status (1)

Country Link
CN (1) CN206646567U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812171A (en) * 2017-01-20 2017-06-09 黄河水利委员会黄河水利科学研究院 The portable three floating bodies silt extraction system of medium and small reservoirs
CN108909958A (en) * 2018-07-27 2018-11-30 中交广州航道局有限公司 A kind of barge sands device and its installation method
CN109759387A (en) * 2019-01-15 2019-05-17 长沙理工大学 A device for cleaning up sediment from coral reefs

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812171A (en) * 2017-01-20 2017-06-09 黄河水利委员会黄河水利科学研究院 The portable three floating bodies silt extraction system of medium and small reservoirs
CN106812171B (en) * 2017-01-20 2022-09-23 黄河水利委员会黄河水利科学研究院 Portable three-floating body silt extraction system for small and medium reservoirs
CN108909958A (en) * 2018-07-27 2018-11-30 中交广州航道局有限公司 A kind of barge sands device and its installation method
CN108909958B (en) * 2018-07-27 2024-05-07 中交广州航道局有限公司 Barge sand paving device, installation method and sand paving process
CN109759387A (en) * 2019-01-15 2019-05-17 长沙理工大学 A device for cleaning up sediment from coral reefs
CN109759387B (en) * 2019-01-15 2022-07-19 长沙理工大学 Device for cleaning sediment on coral reef

Similar Documents

Publication Publication Date Title
US4746244A (en) Apparatus for the generation of hydroelectric power and method of manufacturing and installing same
CN106284262B (en) Hydro powered self-rotary blocks dirty drift
US3651943A (en) Pollution suction water sweeper
CN204252190U (en) A kind of split type strand inhales sludge scavenging ship
CN206646567U (en) Self-propulsion type is multi-functional to take out sapin platform
CN106812171B (en) Portable three-floating body silt extraction system for small and medium reservoirs
CN213204268U (en) Light amphibious silt remover for artificial wetland
CN107989106A (en) A kind of ecological dredging ship
CN204401677U (en) A kind of Dredging ship
CN109944287A (en) Dredging operation system below harbour
CN113089748B (en) An urban dredging robot and control method for online control of sludge solubility
CN205636851U (en) Novel desilting ship
CN206554150U (en) Distance type dredger
CN202706091U (en) On-water locating and stabilizing mechanism of riverway dredging engineering machinery
CN210134470U (en) Dredging operation system under the wharf
CN204080895U (en) A kind of soil-shifting machine and be provided with the dredger of this soil-shifting machine
CN214090073U (en) A equipment for river course desilting
CN112027003A (en) Portable rubbish cleaning boat suitable for water course is transferred north to south water
CN218813592U (en) Floating frame type water bloom blue algae collecting device
CN111851621B (en) A decentralized energy-saving and environmentally friendly sediment desilting system
CN1296573C (en) Automatic desilting quene apparatus
CN211735571U (en) Dispersed energy-saving environment-friendly silt dredging system
CN207032346U (en) The amphibious dredger of fast disassembly type
CN204252191U (en) Narrow training of river channel sludge scavenging ship
CN114319494A (en) River channel slurry flushing and bottom cleaning intelligent integrated operation machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171117

Termination date: 20190120