[go: up one dir, main page]

CN205154122U - Manifold for fracturing - Google Patents

Manifold for fracturing Download PDF

Info

Publication number
CN205154122U
CN205154122U CN201520590345.7U CN201520590345U CN205154122U CN 205154122 U CN205154122 U CN 205154122U CN 201520590345 U CN201520590345 U CN 201520590345U CN 205154122 U CN205154122 U CN 205154122U
Authority
CN
China
Prior art keywords
fracturing
pressure
manifold
skew
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520590345.7U
Other languages
Chinese (zh)
Inventor
刘永
孙乾
张春燕
韩书和
孙秀泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Rongteng Petroleum Equipment Co., Ltd.
Original Assignee
SHENGLI OILFIELD RUITE MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENGLI OILFIELD RUITE MACHINERY MANUFACTURING Co Ltd filed Critical SHENGLI OILFIELD RUITE MACHINERY MANUFACTURING Co Ltd
Priority to CN201520590345.7U priority Critical patent/CN205154122U/en
Application granted granted Critical
Publication of CN205154122U publication Critical patent/CN205154122U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model provides a manifold for fracturing, includes that the fracturing that links to each other with the fracturing well head is responsible for a, fracturing person in charge a's one end is passed through the tee bend of Y type and is connected with whole two public straight tube assemblies, the other end of whole two public straight tube assemblies passes through cross connector assembly and is connected with fracturing person in charge b, cross connector assembly's both ends are equipped with pressure release manifold I and pressure release manifold II respectively, the entrance point that a was responsible for to the fracturing sets up a plurality of consecutive skew ts, and the branch pipe import on the skew T all links to each other with the check valve through the plug valve, and the entrance pressure mouth of check valve is linked together with the delivery outlet of high -pressure pump, the utility model discloses can effectively overcome the shortcoming and defect that has the discharge manifold now, increase the structural function of discharge manifold, improve the water power efficiency of fracturing pump truck, under the situation that does not increase job step and intensity of labour, increase manifold for fracturing's entrance pressure passageway, the discharge capacity when having increased the fracturing and improved the operation efficiency, can satisfy the demand of big discharge capacity high pressure fracturing operation, improve fracturing efficiency.

Description

A kind of pressure break manifold
Technical field
The utility model relates to petroleum and natural gas well fracturing engineering technology, in particular to a kind of pressure break manifold.
Background technology
In the development process of conventional gas and oil field, often need to carry out pressure break to obtain better gas channel to reservoir for improving well yield after oil gas well mining enters the later stage, and in unconventionaloil pool exploration operation, due to special geological conditions, oil-bearing reservoir possesses extremely low porosity and permeability mostly, and must carry out pressure break to reservoir could obtain commercial hydrocarbon flow.Pressure break equipment implements the necessary equipment of fracturing technology to reservoir, pressure break equipment is by fracturing unit truck, fracturing blender truck, manifold truck, the composition such as measuring truck and auxiliary equipment, when construction operation, fracturing fluid is discharged through high pressure exhaust manifold after obtaining high pressure by the pressure break plunger displacement pump on fracturing unit truck, flow through the high pressure pipe joint system on manifold truck subsequently and inject well, because pressing crack construction needs formation breakdown and complex geologic conditions, therefore the formation fracture pressure of high-pressure well have up to more than 100MPa, with the exploitation in unconventionaloil pool field, its operational discharge capacity also reaches more than 10m3/min, pressing crack construction scale is progressively to high-pressure large-displacement future development, fracturing pump only have the exhaust manifold of a liquid feeding channel be single go out high pressure pipe joint structure.Present pressing crack construction, manifold used is originated mainly dependence on import, and the manifold of domestic imitation is also manufacture according to inlet line specification, but the manifold of super-pressure category, remain dependence on import.The manifold price of import is high, and ordering period is long, also very inconvenient, moreover, also come with some shortcomings, such as pressure break manifold can only complete the single oil pipe fracturing work that carries out of small displacement or casing fracturing, can not meet oil pipe in 70Mpa multiple stage high-pressure pump infusion pressure break simultaneously, also from oil jacket annular space infusion liquid and will add sand construction.At Oil/gas Well be the distribution of clump formula oil gas field on, the exploitation later stage is volume increase energization, implements fracture acidizing technology, conventional individual well fracture manifold can only meet single homework, and on cluster well oil gas field, constantly shift fracture manifold and work can be caused powerful, and productivity ratio is lower.
Summary of the invention
The utility model, for above problem, provides a kind of entrance pressure passage, increase pressure break discharge capacity of increasing to improve the pressure break manifold of operating efficiency.
The utility model is achieved through the following technical solutions: a kind of pressure break manifold, comprises the pressure break be connected with fracture well head and is responsible for a, and one end of described pressure break supervisor a is connected by the two public straight tube assembly of Y-type three way type and entirety; The other end of overall two public straight tube assembly is responsible for b by four-way connection assembly with pressure break and is connected; The below of described Y-type three way type is provided with Y-type three way type support; Four-way connection support is provided with below described four-way connection assembly; The two ends of described four-way connection assembly are respectively equipped with pressure release manifold I and pressure release manifold II, and the another two ends of four-way connection assembly connect pressure break supervisor b and the two public straight tube assembly of entirety respectively; The described pressure break supervisor b other end is linked in sequence crossover sub, sensor connector, pressure sensor.
Further, the entrance point of described pressure break supervisor a arranges multiple skew T be connected successively, and the arm import on skew T is all connected with one way valve by plug valve, and the entrance pressure mouth of one way valve is connected with the delivery outlet of high-pressure pump; The entrance point that supervisor's port of export and the pressure break of the skew T at end-position place are responsible for a is connected, supervisor's entrance point of the skew T at end-position place is connected with supervisor's port of export of the skew T at its forward position place successively, and supervisor's entrance point of the skew T of head end position is arranged on base.
Further, the arm of described skew T tilts to supervisor's entrance point of skew T.
The usefulness of this utility model is, the utility model effectively can overcome the shortcoming and defect of existing exhaust manifold, increase the structure function of exhaust manifold, improve the water-horse power efficiency of pressure break pump truck, thus under the situation not increasing job step and labour intensity, add the entrance pressure passage of pressure break manifold, discharge capacity when increasing pressure break improve operation effect; This pressure break manifold can meet the demand of huge discharge high pressure fracturing work, improves pressure break efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model pressure break manifold embodiment 1;
In figure, 1 pressure break supervisor a, 2 skew Ts, 3 plug valves, 4 one way valves, 5 bases, the threeway of 6Y type, 7 overall two public straight tube assemblies, 8 four-way connection assemblies, 9 pressure break supervisor b, 10Y type threeway supports, 11 four-way connection supports, 12 pressure release manifold I, 13 pressure release manifold II, 14 crossover subs, 15 sensor connector, 16 pressure sensors.
Detailed description of the invention
Introduce exemplary embodiment of the present utility model in detail with reference to the accompanying drawings.There is provided the object of these exemplary embodiments to be to make those of ordinary skill in the art to be expressly understood the utility model, and can the utility model be realized according to description here.The drawings and specific embodiments are not intended to limit the utility model, and scope of the present utility model is defined by the following claims.
As shown in Figure 1, a kind of pressure break manifold, comprises the pressure break be connected with fracture well head and is responsible for a1, it is characterized in that, one end of described pressure break supervisor a1 is connected by the two public straight tube assembly 7 of Y-type three way type 6 and entirety; The other end of overall two public straight tube assembly 7 is responsible for b9 by four-way connection assembly 8 with pressure break and is connected; The below of described Y-type three way type 6 is provided with Y-type three way type support 10; Four-way connection support 11 is provided with below described four-way connection assembly 8; The two ends of described four-way connection assembly 8 are respectively equipped with pressure release manifold I 12 and pressure release manifold II 13, and the another two ends of four-way connection assembly 8 connect pressure break supervisor b9 and the two public straight tube assembly 7 of entirety respectively; The described pressure break supervisor b9 other end is linked in sequence crossover sub 14, sensor connector 15, pressure sensor 16.
The entrance point of described pressure break supervisor a1 arranges multiple skew T 2 be connected successively, and the arm import on skew T 2 is all connected with one way valve 4 by plug valve 3, and the entrance pressure mouth of one way valve 4 is connected with the delivery outlet of high-pressure pump; The entrance point that supervisor's port of export and the pressure break of the skew T 2 at end-position place are responsible for a1 is connected, supervisor's entrance point of the skew T 2 at end-position place is connected with supervisor's port of export of the skew T 2 at its forward position place successively, and supervisor's entrance point of the skew T 2 of head end position is arranged on base 5.The arm of described skew T 2 tilts to supervisor's entrance point of skew T 2.
The utility model is responsible for 1 is connected and setting parts is connected to form pressure break manifold with the delivery outlet of high-pressure pump on the arm of skew T 2 by being arranged multiple interconnective skew T 2 and pressure break, thus under the situation not increasing job step and labour intensity, add the entrance pressure passage of pressure break manifold, discharge capacity when increasing pressure break improve operation effect; This pressure break manifold can meet the demand of huge discharge high pressure fracturing work, improves pressure break efficiency.
The two ends of the overall two public straight tube assembly 7 of the utility model are connected with Y-type three way type 6 and four-way connection assembly 8 respectively and make its overall U-shaped layout, realize the two discharge function of high pressure pipe joint, the pressure sensor 16 installed can be implemented monitoring high pressure pipe joint fluid pressure and feed back to control system, pressure release manifold I is the same with the function of pressure release manifold II, after construction terminates, open the high-pressure fluid that plug valve can lay down high pressure pipe joint inside, reach the function of safety relief.
The above is only preferred embodiment of the present utility model, should be understood that, due to the finiteness of literal expression, and objectively there is unlimited concrete structure, for those skilled in the art, under the prerequisite not departing from the utility model principle, some improvement, retouching or change can also be made, also above-mentioned technical characteristic can be combined by rights; These improve retouching, change or combination, or the design of utility model and technical scheme are directly applied to other occasion without improving, and all should be considered as protection domain of the present utility model.

Claims (2)

1. a pressure break manifold, comprises the pressure break be connected with fracture well head and is responsible for a(1), it is characterized in that, described pressure break supervisor a(1) one end be connected with entirety pair public straight tube assembly (7) by Y-type three way type (6); The other end of overall two public straight tube assembly (7) is responsible for b(9 by four-way connection assembly (8) with pressure break) be connected; The below of described Y-type three way type (6) is provided with Y-type three way type support (10); Described four-way connection assembly (8) below is provided with four-way connection support (11); The two ends of described four-way connection assembly (8) are respectively equipped with pressure release manifold I (12) and pressure release manifold II (13), and the another two ends of four-way connection assembly (8) meet pressure break supervisor b(9 respectively) and the two public straight tube assembly (7) of entirety; Described pressure break supervisor b(9) other end is linked in sequence crossover sub (14), sensor connector (15), pressure sensor (16);
Described pressure break supervisor a(1) entrance point multiple skew T (2) be connected successively is set, the arm import on skew T (2) is all connected with one way valve (4) by plug valve (3), and the entrance pressure mouth of one way valve (4) is connected with the delivery outlet of high-pressure pump; Supervisor's port of export of the skew T (2) at end-position place is responsible for a(1 with pressure break) entrance point be connected, supervisor's entrance point of the skew T (2) at end-position place is connected with supervisor's port of export of the skew T (2) at its forward position place successively, and supervisor's entrance point of the skew T (2) of head end position is arranged on base (5).
2. pressure break manifold according to claim 1, is characterized in that: the arm of described skew T (2) tilts to supervisor's entrance point of skew T (2).
CN201520590345.7U 2015-08-07 2015-08-07 Manifold for fracturing Expired - Fee Related CN205154122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520590345.7U CN205154122U (en) 2015-08-07 2015-08-07 Manifold for fracturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520590345.7U CN205154122U (en) 2015-08-07 2015-08-07 Manifold for fracturing

Publications (1)

Publication Number Publication Date
CN205154122U true CN205154122U (en) 2016-04-13

Family

ID=55689830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520590345.7U Expired - Fee Related CN205154122U (en) 2015-08-07 2015-08-07 Manifold for fracturing

Country Status (1)

Country Link
CN (1) CN205154122U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761616A (en) * 2016-12-07 2017-05-31 中国石油天然气股份有限公司 Construction operation manifold for online injection acidification of water injection well
CN106968660A (en) * 2017-06-06 2017-07-21 华美孚泰油气增产技术服务有限责任公司 A kind of new pressure break high pressure line connection combination and corresponding high pressure delivery system
CN111219326A (en) * 2020-03-12 2020-06-02 美国杰瑞国际有限公司 A manifold system for low pressure suction and high pressure discharge
CN113803046A (en) * 2021-09-24 2021-12-17 重庆新泰机械有限责任公司 Fracturing manifold with sand filtering function and assembling equipment thereof
CN115405280A (en) * 2021-05-27 2022-11-29 中国石油化工股份有限公司 Fracturing low-pressure manifold and its liquid supply device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761616A (en) * 2016-12-07 2017-05-31 中国石油天然气股份有限公司 Construction operation manifold for online injection acidification of water injection well
CN106968660A (en) * 2017-06-06 2017-07-21 华美孚泰油气增产技术服务有限责任公司 A kind of new pressure break high pressure line connection combination and corresponding high pressure delivery system
CN111219326A (en) * 2020-03-12 2020-06-02 美国杰瑞国际有限公司 A manifold system for low pressure suction and high pressure discharge
CN115405280A (en) * 2021-05-27 2022-11-29 中国石油化工股份有限公司 Fracturing low-pressure manifold and its liquid supply device
CN113803046A (en) * 2021-09-24 2021-12-17 重庆新泰机械有限责任公司 Fracturing manifold with sand filtering function and assembling equipment thereof

Similar Documents

Publication Publication Date Title
CN205154122U (en) Manifold for fracturing
US20240247575A1 (en) Modular fracturing system
US9428995B2 (en) Multi-channel conduit and method for heating a fluid
CN103055549B (en) Introduction-type down-hole multilevel oily-water seperating equipment bottom one
CN203531876U (en) Fracturing manifold
CN106555577B (en) A kind of network fracture flow conductivity optimization method
CN203394483U (en) Thin-layer thickened oil plane steam flooding injection and production system
CN105507865A (en) Re-fracturing method for oil, gas and water wells
US11248456B2 (en) Simultaneous multiple well stimulation
CN205135587U (en) Composite regulation of many wells of polymer partial pressure integration sled dress device
CN108316915B (en) Method for determining optimal dosage of fiber temporary plugging steering fluid in tight reservoir of oil and gas well
CN201539215U (en) CO2 displacement concentric double-tube injection technique tubing string
CN202467788U (en) Composite lifting system for oil well
CN103334732B (en) A kind of pressure break with double go out high pressure pipe joint
CN202990990U (en) Integral combined valve type dual-pipe oil and gas recovery wellhead device
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN108457638B (en) Test device for fracturing fluid distribution by near-wellbore resistance factors in multiple perforation clusters
CN104179477A (en) Electric pump oil production technology pipe column utilizing continuous oil pipe suspension
CN105089631B (en) Horizontal well rod conveying dynamic logging method and device
RU131075U1 (en) INSTALLATION FOR SIMULTANEOUS SEPARATE PRODUCTION AND PUMPING IN ONE WELL
CN205012973U (en) Machine pump drainage liquid gas production device
CN203594432U (en) Dual-discharge high-pressure pipe manifold for fracturing
Qinghai et al. Multi-Stage horizontal fracturing in casing for low permeability reservoirs
CN205577921U (en) Oil -water well drags for sand technology tubular column
CN205297464U (en) Gas injection well head device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190927

Address after: 257100 101, building 1, No. 7, Yicheng Road, Dongying District, Dongying City, Shandong Province

Patentee after: Shandong Rongteng Petroleum Equipment Co., Ltd.

Address before: 257081, Lu Yidong, north of two South Road, Dongying, fourteen, Shengli Industrial Park, Shandong

Patentee before: SHENGLI OILFIELD RUITE MACHINERY MANUFACTURING CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20200807