[go: up one dir, main page]

CN204477569U - For the instrument of pipe pressurized connection - Google Patents

For the instrument of pipe pressurized connection Download PDF

Info

Publication number
CN204477569U
CN204477569U CN201520080347.1U CN201520080347U CN204477569U CN 204477569 U CN204477569 U CN 204477569U CN 201520080347 U CN201520080347 U CN 201520080347U CN 204477569 U CN204477569 U CN 204477569U
Authority
CN
China
Prior art keywords
pipe
drill
valve
tool
under pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520080347.1U
Other languages
Chinese (zh)
Inventor
于晓瑞
张�杰
刘勇
陈冬
侯勇强
李树河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201520080347.1U priority Critical patent/CN204477569U/en
Application granted granted Critical
Publication of CN204477569U publication Critical patent/CN204477569U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

本实用新型公开了一种用于管道带压连接的工具,包括开孔设备和主管焊接接管部分两部分,其中:开孔设备包括钻杆、设置于钻杆顶部的钻头和套刀,起支撑作用的主体,设置于钻杆尾部的扳手以及拉杆、顶板、铜瓦、压母、密封圈、丝杠和板把;主管焊接接管部分包括接管,接管上设有阀门,阀门和接管之间设有法兰和密封垫。本实用新型用于管道带压连接的工具,能够不停止输送主管介质,不降低压力,不进行放散、吹扫、置换等,保证生产正常运行的情况下进行支管连接。该工具方便、快捷、安全、可靠,即不影响正常生产,又环保节能,施工费用低、劳动强度低,但技术性强,因此操作过程中要缜密安排。

The utility model discloses a tool used for pipeline connection under pressure, which comprises two parts: a hole-opening device and a main pipe welding connection part, wherein: the hole-opening device includes a drill pipe, a drill bit and a set of cutters arranged on the top of the drill pipe, and supports the The main body of the function is the wrench set at the tail of the drill pipe, the pull rod, the top plate, the copper tile, the press nut, the sealing ring, the screw and the handle; With flange and gasket. The utility model is a tool used for pipeline connection under pressure, which can carry out branch pipe connection under the condition of normal production operation without stopping the conveying of the main pipe medium, without reducing the pressure, without dispersing, purging, replacing, etc. The tool is convenient, fast, safe and reliable. It does not affect normal production, is environmentally friendly and energy-saving, has low construction costs and low labor intensity, but is highly technical, so careful arrangements must be made during the operation.

Description

用于管道带压连接的工具Tools for connecting pipes under pressure

技术领域technical field

本实用新型涉及一种用于管道与主线连接时的接口设备,更具体的说,本实用新型是一种用于在线带压开孔设备。The utility model relates to an interface device for connecting a pipeline with a main line, more specifically, the utility model is a device for opening holes with pressure on-line.

背景技术Background technique

目前,国家十分注重节能减排工作,特别是钢铁厂中注重对水、气等工艺管道的合理利用。特别高炉煤气的利用,因此经常对管道进行改扩建工程,在检修工程中经常进行煤气、天然气等管道的接点工作。旧的办法通常是高炉休风、煤气管道主盲板阀关闭、管道进行氮气吹扫、各放散点检验合格后方可进行开孔接点、之后再进行置换送气,既影响正常生产又存在氮气窒息、残余煤气中毒等危险。况且煤气系统比较大、吹扫置换浪费大量燃气和置换的人力物力,排放的燃气影响周边环境。At present, the country attaches great importance to energy conservation and emission reduction, especially the rational use of water, gas and other process pipelines in steel plants. Especially the use of blast furnace gas, so the pipeline is often rebuilt and expanded, and the joint work of gas, natural gas and other pipelines is often carried out in the maintenance project. The old method is usually to shut down the blast furnace, close the main blind plate valve of the gas pipeline, purge the pipeline with nitrogen, and open the holes and contacts after passing the inspection of each emission point, and then replace the gas supply, which not only affects normal production but also has nitrogen suffocation, Residual gas poisoning and other hazards. Moreover, the gas system is relatively large, and a large amount of gas and manpower and material resources are wasted for purging and replacement, and the discharged gas affects the surrounding environment.

实用新型内容Utility model content

为了解决现有技术中存在的问题,本实用新型提供一种用于管道带压连接的工具,克服现有技术中管道接点影响正常生产、存在安全隐患的问题。In order to solve the problems existing in the prior art, the utility model provides a tool for pipeline connection under pressure, which overcomes the problems in the prior art that the joints of the pipeline affect normal production and have potential safety hazards.

本实用新型的技术方案是:一种用于管道带压连接的工具,包括开孔设备和主管焊接接管部分两部分,其中:The technical solution of the utility model is: a tool for pipeline connection under pressure, including two parts: opening equipment and a main pipe welding connection part, wherein:

开孔设备包括钻杆、设置于钻杆顶部的钻头和套刀,起支撑作用的主体,设置于钻杆尾部的扳手以及拉杆、顶板、铜瓦、压母、密封圈、丝杠和板把;The drilling equipment includes the drill pipe, the drill bit and the set of cutters set on the top of the drill pipe, the supporting body, the wrench set at the end of the drill pipe, the pull rod, the top plate, the copper tile, the press nut, the sealing ring, the screw and the plate handle ;

主管焊接接管部分包括接管,接管上设有阀门,阀门和接管之间设有法兰和密封垫。The welded connecting part of the main pipe includes a connecting pipe, a valve is arranged on the connecting pipe, and a flange and a sealing gasket are arranged between the valve and the connecting pipe.

所述开孔设备底座及阀门底部设有支撑部件。The base of the opening device and the bottom of the valve are provided with supporting parts.

本实用新型的有益效果是:本实用新型用于管道带压连接的工具,能够不停止输送主管介质,不降低压力,不进行放散、吹扫、置换等,保证生产正常运行的情况下进行支管连接。该工艺方便、快捷、安全、可靠,即不影响正常生产,又环保节能,施工费用低、劳动强度低,但技术性强,因此操作过程中要缜密安排。The beneficial effect of the utility model is: the utility model is used for the tool for pipeline connection under pressure, which can not stop conveying the main pipe medium, not reduce the pressure, not carry out dispersal, purging, replacement, etc., and ensure the normal operation of the production. connect. The process is convenient, fast, safe, and reliable. It does not affect normal production, is environmentally friendly and energy-saving, has low construction costs and low labor intensity, but is highly technical, so careful arrangements must be made during the operation.

附图说明Description of drawings

图1是本实用新型用于管道带压连接的工具的开孔设备;Fig. 1 is the opening device of the utility model for the tool of pipeline connection under pressure;

图2是本实用新型用于管道带压连接的工具主管焊接接管结构示意图;Fig. 2 is a structural schematic diagram of the utility model for the welding joint of the main pipe of the tool used for pipeline connection under pressure;

图3是图2中A-A面的剖视图;Fig. 3 is the sectional view of A-A plane among Fig. 2;

其中1-钻头;2-套刀;3-钻杆;4-主体;5-拉杆;6-铜瓦;7-压母;8-密封垫;9-扳手;10-锁母;11-顶尖;12-顶板;13-丝杠;14-扳把;15-主管;16-卡具;17-接管;18-阀门;19-法兰。Among them, 1-drill bit; 2-cutter set; 3-drill pipe; 4-main body; 5-tie rod; 6-copper tile; 12-top plate; 13-screw; 14-wrench; 15-director;

具体实施方式Detailed ways

下面结合附图对本实用新型进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

如图所示,整个在线开口装置分为两部分:开孔设备和主管焊接接管部分。As shown in the figure, the entire online opening device is divided into two parts: the opening equipment and the main pipe welding connection part.

1、开孔设备的组成部件包括:开孔机组成包括:钻头作用为钻孔、定位、带出堵板;套刀起开孔切削作用;钻杆为进给、切削传力部件;主体为刚性连接支撑部件;拉杆和顶板起传力平衡作用;铜瓦起回转支撑作用;压母和密封圈防止漏气;扳手为驱动装置;丝杠和板把起进给作用。如图1。1. The components of the drilling equipment include: the components of the drilling machine include: the drill bit is used for drilling, positioning, and taking out the blocking plate; The supporting parts are rigidly connected; the pull rod and the top plate play the role of force transmission balance; the copper tile plays the role of slewing support; the pressure nut and the sealing ring prevent air leakage; the wrench is the driving device; the screw and the plate handle play the role of feeding. Figure 1.

2、主管焊接接管部分包括:焊接接管和支管管径一致,事先焊接到主管上;开启阀门作用为钻孔后关闭介质,便于后期连接施工根据钻孔设备选择阀门、配套阀门制作接管,保证连接孔相互配套、密封良好、接管长度能保证进刀量。如图2。2. The welded connection part of the main pipe includes: the diameter of the welded pipe and the branch pipe are the same, and it is welded to the main pipe in advance; the function of opening the valve is to close the medium after drilling, which is convenient for the later connection construction. The holes are matched with each other, the seal is good, and the length of the connecting pipe can ensure the amount of cutting. Figure 2.

施工顺序:施工准备-工作平台搭设-接管法兰安装-阀门安装-开孔设备安装-钻孔切削-阀门关闭-开孔设备拆除-法兰盲板安装-工作平台拆除。Construction sequence: construction preparation-working platform erection-connection flange installation-valve installation-opening equipment installation-drilling and cutting-valve closing-opening equipment removal-flange blind plate installation-working platform removal.

1、施工准备1. Construction preparation

带压煤气管道动火作业危险性显而易见,一旦考滤不周极易发生中毒、火灾、爆炸的重大安全事故,因此施工准备要充分细致,特别注重安全措施到位、技术准备充分。The danger of hot work in pressurized gas pipelines is obvious, and major safety accidents such as poisoning, fire, and explosion will easily occur if the filter is not properly checked. Therefore, construction preparations must be sufficient and meticulous, with special attention to safety measures in place and adequate technical preparations.

1)全员明确整个操作的目的,在煤气母管上指定位置开孔、接管。1) All staff shall clarify the purpose of the entire operation, and open holes and connect pipes at designated positions on the gas main pipe.

2)全员明确整个操作的内容,在主管道上焊接接管、开孔,保证整个操作过程人和物的安全。2) All staff shall clarify the content of the entire operation, weld the joints and open holes on the main pipeline to ensure the safety of people and objects during the entire operation.

3)全员明确整个操作的影响及危害性,易发生中毒、火灾、爆炸。周围10米内不能有明火、易燃物。周围40米内拉设警戒绳。3) All staff are aware of the impact and hazards of the entire operation, which are prone to poisoning, fire, and explosion. There should be no open flames or flammable materials within 10 meters around. Set up a cordon within 40 meters around.

4)制定详细的技术方案报有关部门审批,制定应急预案。4) Formulate a detailed technical plan and submit it to relevant departments for approval, and formulate an emergency plan.

5)准备接管、阀门、钻孔专用设备及工具。掌握机具性能及操作方法。5) Prepare connecting pipes, valves, special equipment and tools for drilling. Master the performance and operation method of the machine tool.

6)搭设操作平台及其跑跳。6) Set up the operating platform and its running and jumping.

7)消防器材齐全、水电齐全。7) Complete fire-fighting equipment, water and electricity.

8)接管要在试件上严好口,焊工要持证上岗,对管壁清楚,电流大小合适。8) The connecting pipe must be tightly sealed on the test piece, and the welder must hold a certificate to work, be clear about the pipe wall, and have an appropriate current.

9)建立统一的指挥系统、信息要通畅。9) Establish a unified command system and smooth information.

10)质量控制钻孔、扩孔、焊接、钻孔器操作、焊接后超生波检查。10) Quality control drilling, reaming, welding, drill operation, ultrasonic inspection after welding.

11)进入厂区应遵守厂内规章制度,进入施工现场应佩戴安全帽,手套等防护用具。11) When entering the factory area, you should abide by the rules and regulations of the factory, and you should wear safety helmets, gloves and other protective equipment when entering the construction site.

12)高空作业者必须佩戴安全绳索并佩戴工具袋,递送工具不准抛掷,应用绳索递送,登高作业前应对安全工具(安全绳,脚手板,梯子等)进行检查,确认安全方可使用。12) Workers at heights must wear safety ropes and tool bags. The delivery tools are not allowed to be thrown, and should be delivered with ropes. Safety tools (safety ropes, scaffolding boards, ladders, etc.) should be checked before climbing to ensure that they are safe before use.

13)易燃易爆气体管道施工,应遵守无明火操作,管道钻孔或切割时应带水作业,,并配备灭火器材,有毒有害气体作业应佩戴有效防毒器具。13) In the construction of flammable and explosive gas pipelines, no open flames should be followed. Water should be used when drilling or cutting pipelines, and fire extinguishing equipment should be equipped. Effective anti-virus equipment should be worn for toxic and harmful gas operations.

14)施工设备,工具,材料有序放置,作业区域应设立明显警示标志,以保证甲乙双方及其他人员安全,防止意外伤害。14) The construction equipment, tools, and materials should be placed in an orderly manner, and obvious warning signs should be set up in the operation area to ensure the safety of both parties and other personnel and prevent accidental injuries.

15)对预见的安全隐患进行提前防范,确保施工设备及现场其它运行设备完好。15) Precautions should be taken against foreseeable potential safety hazards to ensure that construction equipment and other operating equipment on site are in good condition.

2、工作平台的搭设2. Setting up of working platform

搭设平台要保证安全可靠,工作面3X3米,具有维护栏杆、设置安全绳、有跑跳防止发生意外时上下及救助通道。平台上表面距管道中心1000米左右。承重2000KG,保证阀门、开孔设备的安装及操作空间。The platform must be set up to ensure safety and reliability. The working surface is 3X3 meters, with maintenance railings, safety ropes, running and jumping to prevent accidents and rescue passages. The upper surface of the platform is about 1000 meters away from the center of the pipeline. The bearing capacity is 2000KG, ensuring the installation and operation space of valves and opening equipment.

3、接管法兰安装3. Take over flange installation

接管首先根据图一钻孔设备确定长度,在预制管上研好三通口再与主管焊接,焊工持证上岗,不能穿透母材,间断对称焊,焊接里外口。接管符合水平度及端面垂直度要求,焊接完毕后增加加固筋。To take over the pipe, first determine the length according to the drilling equipment in Figure 1, grind the tee port on the prefabricated pipe, and then weld it with the main pipe. The connecting pipe meets the requirements of levelness and verticality of the end face, and reinforcement ribs are added after welding.

4、阀门安装4. Valve installation

阀门安装到接管上,安装的阀门密封性应良好,阀门满足管道的压力要求,接管和阀门一起进行压力试验,试验压力为管道工作压力。阀门和接管之间加密封垫,螺栓和垫连接符合煤气管道的安装要求。(图2中阀门)The valve is installed on the connecting pipe. The sealing performance of the installed valve should be good. The valve meets the pressure requirements of the pipeline. The connecting pipe and the valve are subjected to a pressure test together. The test pressure is the working pressure of the pipeline. A gasket is added between the valve and the pipe, and the bolt and gasket connection meets the installation requirements of the gas pipeline. (Valve in Figure 2)

5、开孔机设备安装到阀门上(图1的主体法兰与图二阀门法兰连接)5. The drilling machine equipment is installed on the valve (the main body flange in Figure 1 is connected to the valve flange in Figure 2)

1)钻孔设备安装前检查设备安全可靠;1) Check the safety and reliability of the drilling equipment before installation;

2)检查设备是否符合钻孔要求所需的形程;2) Check whether the equipment complies with the shape required for the drilling requirements;

3)开孔设备安装首先将钻杆装入主体,然后,把开孔钻的套刀、钻头等连接牢固,并装好密封垫。检查钻杆,应在钻主体内转动灵活,无卡组现象。3) Installation of drilling equipment First, install the drill pipe into the main body, and then firmly connect the drilling kit, drill bit, etc., and install the gasket. Check the drill pipe, it should rotate flexibly in the drill body without jamming.

4)开孔设备的安装支撑点主要由主管和接管来承担,为保证钻孔设备的安装精度,在开孔机底座及阀门底部增加支撑来稳固开孔机;开孔刀具的回转中心线应和管道法兰管道同心,安装后点动以确定同心度是否符合要求,孔刀具与管道内表面不能有卡阻现象。4) The installation support point of the drilling equipment is mainly borne by the main pipe and the connecting pipe. In order to ensure the installation accuracy of the drilling equipment, support is added to the base of the drilling machine and the bottom of the valve to stabilize the drilling machine; the rotation center line of the drilling tool should be It is concentric with the pipe flange pipe, jog after installation to confirm whether the concentricity meets the requirements, and there must be no jamming between the hole cutter and the inner surface of the pipe.

6、钻孔、阀门关闭、钻孔设备拆除6. Drilling, closing of valves, removal of drilling equipment

1)现场钻销的工人应该经过国家规定进行考核,应持证上岗。1) On-site drilling and pinning workers should pass the national assessment and should hold a certificate to work.

2)带压施工,所以施工过程中应了解管道内介质的燃点,以控制施工过程中产生的切削热;2) Construction under pressure, so the ignition point of the medium in the pipeline should be known during the construction process to control the cutting heat generated during the construction process;

3)将阀门完全开启,通过钻体注水孔,将接管、阀门和钻体注满水,这样做起到冷却润滑作用,更重要的是使焦炉煤气与空气隔离,避免发生燃烧起火隐患。3) Fully open the valve, and fill the connecting pipe, valve and drill body with water through the water injection hole of the drill body. This will play a cooling and lubricating role, and more importantly, isolate the coke oven gas from the air to avoid potential fire hazards.

4)开孔作业人员随身携带有毒气体报警器,随时对作业环境进行检测,发现跑漏现象及时作出正当处理,如遇紧急情况迅速通过安全逃生路线撤离现场,保障人身安全。4) Drilling operators carry toxic gas alarms with them, and check the working environment at any time, and take proper measures in time when leakage is found. In case of emergency, quickly evacuate the scene through the safe escape route to ensure personal safety.

5)驱动钻杆顺时针旋转,同时旋转进刀丝杆,顶着钻杆缓慢进刀,待完全钻透后,被切下的管壁圆片进入套刀,钻孔工作完成。5) Drive the drill pipe to rotate clockwise, and at the same time rotate the feed screw, and slowly feed the knife against the drill pipe. After complete drilling, the cut pipe wall disc enters the set of cutters, and the drilling work is completed.

6)切削过程因加工面为弧面,切削过程为断续切削方式,因此刀具接触加工面的力度必须均匀,以免打刀,断续加工的好处加工过程就有刀具降温的性能;6) During the cutting process, because the processing surface is a curved surface, the cutting process is an intermittent cutting method, so the force of the tool contacting the processing surface must be uniform to avoid hitting the knife. The benefit of intermittent processing is that the tool can cool down during the process;

7)将钻杆拉出,使套刀拉出钻主体,关闭阀门,卸下开孔钻,即完成钻孔作业。7) Pull out the drill pipe, pull out the set cutter from the main body of the drill, close the valve, remove the hole drill, and complete the drilling operation.

8)设备拆除过程中首先拆除刀具,然后对设备进行拆除;8) During the dismantling process of the equipment, the cutter is first removed, and then the equipment is dismantled;

7、增加盲板防止泄露、拆除工作平台。7. Add a blind plate to prevent leakage and remove the working platform.

以上参照附图和实施例,对本实用新型进行了示意性描述,该描述没有限制性。本领域的普通技术人员应能理解,在实际应用中,本实用新型中各部件的设置方式均可能发生某些改变,而其他人员在其启示下也可能做出多种形式的相似设计。需要指出的是,只要不脱离本实用新型的设计宗旨,所有显而易见的改变及其相似设计,均包含在本实用新型的保护范围之内。The utility model has been schematically described above with reference to the accompanying drawings and embodiments, and the description is not limiting. Those of ordinary skill in the art should understand that in practical applications, some changes may occur in the arrangement of the components in the present invention, and other people may also make various forms of similar designs under their inspiration. It should be pointed out that, as long as they do not deviate from the design purpose of the present utility model, all obvious changes and similar designs are included in the protection scope of the present utility model.

Claims (2)

1.一种用于管道带压连接的工具,其特征在于,包括开孔设备和主管焊接接管部分两部分,其中:1. A tool for pipeline connection under pressure, characterized in that it includes two parts: a hole opening device and a main pipe welding connection part, wherein: 开孔设备包括钻杆、设置于钻杆顶部的钻头和套刀,起支撑作用的主体,设置于钻杆尾部的扳手以及拉杆、顶板、铜瓦、压母、密封圈、丝杠和板把;The drilling equipment includes the drill pipe, the drill bit and the set of cutters set on the top of the drill pipe, the supporting body, the wrench set at the end of the drill pipe, the pull rod, the top plate, the copper tile, the press nut, the sealing ring, the screw and the plate handle ; 主管焊接接管部分包括接管,接管上设有阀门,阀门和接管之间设有法兰和密封垫。The welded connecting part of the main pipe includes a connecting pipe, a valve is arranged on the connecting pipe, and a flange and a sealing gasket are arranged between the valve and the connecting pipe. 2.根据权利要求1所述用于管道带压连接的工具,其特征在于,所述开孔设备底座及阀门底部设有支撑部件。2. The tool for connecting pipelines under pressure according to claim 1, characterized in that, the base of the opening device and the bottom of the valve are provided with supporting parts.
CN201520080347.1U 2015-02-04 2015-02-04 For the instrument of pipe pressurized connection Expired - Lifetime CN204477569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520080347.1U CN204477569U (en) 2015-02-04 2015-02-04 For the instrument of pipe pressurized connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520080347.1U CN204477569U (en) 2015-02-04 2015-02-04 For the instrument of pipe pressurized connection

Publications (1)

Publication Number Publication Date
CN204477569U true CN204477569U (en) 2015-07-15

Family

ID=53633360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520080347.1U Expired - Lifetime CN204477569U (en) 2015-02-04 2015-02-04 For the instrument of pipe pressurized connection

Country Status (1)

Country Link
CN (1) CN204477569U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653929A (en) * 2015-02-04 2015-05-27 天津二十冶建设有限公司 Tool used for connecting pipelines under pressure and use method
CN106051353A (en) * 2016-07-17 2016-10-26 杨越 Integrally-perforated saddle-shaped clamp pipeline connector fitting for unmanned ship
CN110359533A (en) * 2019-06-26 2019-10-22 山东科技大学 Exempt from termination of pumping emergency drainage ancillary equipment and its application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653929A (en) * 2015-02-04 2015-05-27 天津二十冶建设有限公司 Tool used for connecting pipelines under pressure and use method
CN106051353A (en) * 2016-07-17 2016-10-26 杨越 Integrally-perforated saddle-shaped clamp pipeline connector fitting for unmanned ship
CN110359533A (en) * 2019-06-26 2019-10-22 山东科技大学 Exempt from termination of pumping emergency drainage ancillary equipment and its application method

Similar Documents

Publication Publication Date Title
CN103016893B (en) Hot tapping plugging construction method of long natural gas delivery pipeline
CN204477569U (en) For the instrument of pipe pressurized connection
CN105987253A (en) Oil-gas pipeline blocking system and method
CN107063009A (en) A kind of micro- blasting technology that shakes of subway two-wire longspan tunnel
CN206230053U (en) Punching device under pressure
CN101144557A (en) Gas pipe under-pressure leakage-plugging method
CN109506071A (en) A kind of online plugging method of fuel gas transportation pipeline
CN106812550A (en) A kind of fully-mechanized mining working crosses the method that major fault prevents and treats Period of Coal Seam Spontaneous Combustion
CN104653929A (en) Tool used for connecting pipelines under pressure and use method
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
CN116021228A (en) Method for repairing central area of cutter head of shield tunneling machine
CN111569529A (en) Method for rapidly processing faults of dry quenching discharge device
CN202576455U (en) Opening device at tuyere of blast furnace hot air bustle pipe
CN220693591U (en) Mining explosion-proof controller
CN206988683U (en) A kind of explosion-proof pipe plugging erecting device
CN203500772U (en) Leaking stopping device of gas pipeline drainer horn mouth
RU2198340C1 (en) Method of repair of main pipe lines
CN111894657A (en) Gas treatment method
CN206487984U (en) The temporary block apparatus of gathering line cryogenic freezing
CN206552864U (en) The device of air separation column pearlife is removed in maintenance
CN211572832U (en) Consolidate iron tower device with high bearing capacity
CN205371933U (en) Take gas to repair gas piping device
CN202348180U (en) Drilling four-precaution packaged technology device for coal mine
CN201778498U (en) Safe escape device for super-high-rise building core wall construction
CN206572139U (en) A kind of community's gas pipeline lost circulation plug

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150715

CX01 Expiry of patent term