CN204349336U - Overhead-groundwire lifter - Google Patents
Overhead-groundwire lifter Download PDFInfo
- Publication number
- CN204349336U CN204349336U CN201420862159.XU CN201420862159U CN204349336U CN 204349336 U CN204349336 U CN 204349336U CN 201420862159 U CN201420862159 U CN 201420862159U CN 204349336 U CN204349336 U CN 204349336U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- anchor ear
- overhead
- hitch point
- fixed pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种提升装置,尤其涉及一种在架设地线时使用的架空地线提升器。 The utility model relates to a lifting device, in particular to an overhead ground wire lifter used when erecting ground wires.
背景技术 Background technique
输电线路多是架设在室外,在受到风吹时,线路会随风摆动,长期处于微震荡状态,易引起悬垂线夹内的架空地线断股,故需要定期对所在线路停电检修。以往检修时,作业人员是将待换新线肩扛至电杆顶端,随后进行架线。由于在更换高空线路时需要多人协同操作,而电杆顶部空间较小,操作空间也小,故老式的换线方式对作业人员有极大的危险性。 Most of the transmission lines are erected outdoors. When the wind blows, the lines will swing with the wind. They are in a state of micro-vibration for a long time, which may easily cause the overhead ground wires in the suspension clamps to break. In the past, during maintenance, the operator carried the wire to be replaced to the top of the pole, and then set up the wire. Since the replacement of high-altitude lines requires multiple people to cooperate, and the space on the top of the pole is small, the operating space is also small, so the old-fashioned way of changing lines is extremely dangerous to operators.
为解决高空架线问题,现有技术中存在一些提升装置采用高空设置滑轮和拉线的方式,通过拉线的提升对待架新线进行提升。其与电杆相连仅适用抱箍进行套接,但抱箍的装设需要对其紧固螺栓进行定位,适用完毕后还需拆卸抱箍,较为繁琐,尤其是在高空作业时,架设较不便,不易操作。且若抱箍在装设时螺栓松动,则抱箍极易顺电杆向下滑落,从而引发事故。 In order to solve the problem of high-altitude stringing, there are some lifting devices in the prior art that use pulleys and guy wires at high altitudes, and the new wires to be erected are lifted by the lifting of the guy wires. When it is connected with the pole, only the hoop is suitable for socketing, but the installation of the hoop requires positioning of its fastening bolts, and the hoop needs to be disassembled after application, which is cumbersome, especially when working at heights, and it is inconvenient to erect , not easy to operate. And if the bolt is loose when the hoop is installed, the hoop can easily slide down along the electric pole, causing an accident.
发明内容 Contents of the invention
本实用新型的目的在于提出一种可稳固架设在电杆顶部,便于装设,可迅速提升待架地线的架空地线提升器。 The purpose of the utility model is to propose an overhead ground wire lifter which can be stably erected on the top of the electric pole, is convenient for installation, and can quickly lift the ground wire to be erected.
本实用新型的目的是这样实现的:架空地线提升器其是由抱箍,装设在抱箍上的横梁,以及设置在横梁上的悬挂点,和挂接在悬挂点上的定滑轮组成,所述横梁后端与抱箍活络相连,中部搭于抱箍上,前部伸出抱箍,在横梁伸出部上设置有悬挂点,其中一悬挂点与定滑轮相连,在定滑轮上缠绕有安全绳。 The purpose of this utility model is achieved in that the overhead ground wire lifter is composed of a hoop, a crossbeam installed on the hoop, a suspension point arranged on the crossbeam, and a fixed pulley articulated on the suspension point. , the rear end of the beam is flexibly connected with the hoop, the middle part is placed on the hoop, and the front part protrudes from the hoop. Suspension points are arranged on the protruding part of the beam. One of the suspension points is connected with the fixed pulley. On the fixed pulley Wrapped with a safety cord. the
由于实施上述技术方案,本实用新型结构简单,其可稳固的套于电杆顶端,并设置防掉落安全绳,防止掉落砸伤地面人员。安全绳同时用于提升待架地线。在使用过程中可于任意高度进行地线架空作业。本申请操作简便,可有效减少高空作业人员数,为作业人员预留足够的作业空间,提高高空作业的安全系数。 Due to the implementation of the above technical scheme, the utility model has a simple structure, which can be firmly placed on the top of the electric pole, and an anti-falling safety rope is provided to prevent the ground personnel from being injured by falling. The safety rope is also used to lift the ground wire to be erected. During use, ground wire aerial work can be carried out at any height. The application is easy to operate, can effectively reduce the number of workers working at heights, reserve enough work space for workers, and improve the safety factor of working at heights.
附图说明:本实用新型的具体结构由以下的附图和实施例给出: Description of drawings: the concrete structure of the present utility model is provided by following accompanying drawing and embodiment:
图1是架空地线提升器结构示意图。 Figure 1 is a schematic diagram of the structure of the overhead ground wire lifter.
图例:1、右支板,2、左支板,3、预留悬挂环,4、定位绳,5、前支板,6、后支板,7、安全绳,8、定滑轮,9、悬挂环,10、支撑板,11、横梁,12、抱箍。 Legend: 1. Right support board, 2. Left support board, 3. Reserved suspension ring, 4. Positioning rope, 5. Front support board, 6. Rear support board, 7. Safety rope, 8. Fixed pulley, 9. Suspension ring, 10, support plate, 11, beam, 12, hoop.
具体实施方式: Detailed ways:
本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。 The utility model is not limited by the following examples, and the specific implementation manner can be determined according to the technical scheme of the utility model and actual conditions.
实施例:如图1所示,架空地线提升器其是由抱箍12,装设在抱箍12上的横梁11,以及设置在横梁11上的悬挂点,和挂接在悬挂点上的定滑轮8组成。所述横梁11后端与抱箍12活络相连,中部搭于抱箍12上,前部伸出抱箍12,在横梁11伸出部上设置有悬挂点。其中一悬挂点与定滑轮8相连,在定滑轮8上缠绕有安全绳7。与抱箍12搭接处的横梁11下端设置有支撑板10,在抱箍12闭合时,支撑板10卡接于抱箍12外圆周处。 Embodiment: As shown in Figure 1, the overhead ground wire lifter is composed of a hoop 12, a crossbeam 11 installed on the hoop 12, a suspension point arranged on the crossbeam 11, and a suspension hooked on the suspension point. Fixed pulley 8 forms. The rear end of the crossbeam 11 is flexibly connected with the hoop 12, the middle part is placed on the hoop 12, the front part stretches out from the hoop 12, and a suspension point is arranged on the extension of the crossbeam 11. One of the suspension points links to each other with fixed pulley 8, and safety rope 7 is wound on fixed pulley 8. A support plate 10 is provided at the lower end of the crossbeam 11 overlapping with the hoop 12 , and the support plate 10 is clipped to the outer circumference of the hoop 12 when the hoop 12 is closed.
所述悬挂点分别设置在横梁11的最前端,前端和中部的左右两侧。对应的所述四个悬挂点包括前、后、左、右支板5、6、2、1,以及前、后支板5、6上端固定的预留悬挂环3,和左、右支板2、1上端固定的悬挂环9。 The suspension points are respectively arranged at the front end of the crossbeam 11, the left and right sides of the front end and the middle part. The corresponding four suspension points include front, rear, left and right support plates 5, 6, 2, 1, and the reserved suspension ring 3 fixed at the upper ends of the front and rear support plates 5, 6, and the left and right support plates 2,1 the suspension ring 9 that upper end is fixed.
所述前、后支板5、6间的横梁11上系有定位绳4,定位绳4用于在高空作业时绑扎架空地线。也可将架空地线直接担于前、后支板5、6或左、右支板2、1间。 The beam 11 between the front and rear support plates 5 and 6 is tied with a positioning rope 4, and the positioning rope 4 is used for binding overhead ground wires when working at heights. Also the overhead ground wire can be directly carried between the front and rear support plates 5,6 or the left and right support plates 2,1.
在为防止高空意外横梁11倒翻,在横梁11与抱箍12搭接处可设置锁闭装置,例如:在横梁11处开有螺孔,抱箍12内壁或外壁上固定螺帽,通过螺栓和螺帽的旋接,即可将横梁11与抱箍12完全固定。 In order to prevent the accidental crossbeam 11 from turning over at a high altitude, a locking device can be provided at the overlap between the crossbeam 11 and the hoop 12, for example: a screw hole is opened at the crossbeam 11, and a nut is fixed on the inner or outer wall of the hoop 12, and the bolt The crossbeam 11 and the hoop 12 can be completely fixed by screwing with the nut.
使用时,在地面根据电杆圆周大致调节抱箍12圆周,作业人员携带本申请至电杆上端,随后将抱箍12套于电杆顶部,直至横梁11与电杆上端顶触,抱箍12定位。随后将定滑轮8悬挂在横梁11上的任意悬挂点上,通过定位绳4将架空地线悬挂,此时定位绳4受向下拉力,则横梁11同时受向下拉力,由于抱箍12套接在电杆处,故本申请整体在受力状态下不易由电杆上松脱。随后检查悬垂线夹内的架空地线是否断股,作业人员根据实际情况对架空地线进行检修。安全绳7不仅仅防止本申请由高空掉落,同时也可做为输送待架新线使用。将待架新线绑于安全绳7上,地面人员通过拉动安全绳7,逐渐将待架新线拉至高空。拉至指定位置后,由高空作业人员通过定位绳4将其捆绑定位,以待它用。 When in use, the circumference of the hoop 12 is roughly adjusted on the ground according to the circumference of the pole, and the operator carries the application to the upper end of the pole, and then puts the hoop 12 on the top of the pole until the crossbeam 11 touches the upper end of the pole, and the hoop 12 position. Then the fixed pulley 8 is suspended on any suspension point on the crossbeam 11, and the overhead ground wire is suspended by the positioning rope 4. At this time, the positioning rope 4 is subjected to a downward pull, and the crossbeam 11 is simultaneously subjected to a downward pull. Connected to the electric pole, so the application as a whole is not easy to loosen from the electric pole under the stressed state. Then check whether the overhead ground wire in the suspension clamp is broken, and the operator overhauls the overhead ground wire according to the actual situation. The safety rope 7 not only prevents the application from falling from a high altitude, but also can be used as a new line for conveying and waiting for a frame. Tie the new line to be erected on the safety rope 7, and the ground personnel will gradually pull the new thread to be erected to a high altitude by pulling the safety rope 7. After being pulled to the specified position, it is bound and positioned by the positioning rope 4 by the personnel working at heights for other use.
以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要技术特征,来满足不同情况的需要。 The above technical features constitute the best embodiment of the utility model, which has strong adaptability and best implementation effect, and non-essential technical features can be increased or decreased according to actual needs to meet the needs of different situations.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420862159.XU CN204349336U (en) | 2014-12-31 | 2014-12-31 | Overhead-groundwire lifter |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420862159.XU CN204349336U (en) | 2014-12-31 | 2014-12-31 | Overhead-groundwire lifter |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204349336U true CN204349336U (en) | 2015-05-20 |
Family
ID=53232579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420862159.XU Expired - Lifetime CN204349336U (en) | 2014-12-31 | 2014-12-31 | Overhead-groundwire lifter |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204349336U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104505771A (en) * | 2014-12-31 | 2015-04-08 | 国家电网公司 | Overhead ground wire lifter |
| CN105071296A (en) * | 2015-09-08 | 2015-11-18 | 国家电网公司 | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device |
| CN111355185A (en) * | 2020-03-06 | 2020-06-30 | 广东电网有限责任公司 | Transmission line straight pole overhead earth wire overhauls support |
-
2014
- 2014-12-31 CN CN201420862159.XU patent/CN204349336U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104505771A (en) * | 2014-12-31 | 2015-04-08 | 国家电网公司 | Overhead ground wire lifter |
| CN105071296A (en) * | 2015-09-08 | 2015-11-18 | 国家电网公司 | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device |
| CN111355185A (en) * | 2020-03-06 | 2020-06-30 | 广东电网有限责任公司 | Transmission line straight pole overhead earth wire overhauls support |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102359303B (en) | UHV ordinary line iron tower assembly method | |
| CN204762466U (en) | Watermelon rattan support | |
| CN204349336U (en) | Overhead-groundwire lifter | |
| CN103269036A (en) | Tension cross arm hoist | |
| CN209844409U (en) | Hoisting frame for power transmission line | |
| CN204118585U (en) | An auxiliary support device for installing a cross arm | |
| CN202550405U (en) | Special ladder for maintenance of strain insulator | |
| CN203998746U (en) | Portable suspension installation | |
| CN106229889A (en) | A kind of transmission line of electricity lifting device for aerial wires | |
| CN205114843U (en) | Prefabricated post hoist device with unhook function | |
| US20130259609A1 (en) | Truss lifter and stabilizer | |
| CN205222518U (en) | Outdoor equipment hoisting accessory | |
| CN203289011U (en) | Tension cross arm hoisting device | |
| CN204569267U (en) | Equipment unit dismounting is with hanging pull tool | |
| CN105790160A (en) | Movable binding ring lifting mechanism | |
| CN105293301A (en) | Windproof tower crane | |
| CN104505771A (en) | Overhead ground wire lifter | |
| CN205104835U (en) | A auxiliary device for power line erects | |
| CN107558793B (en) | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof | |
| CN107585695A (en) | A kind of hoist engine rope guide | |
| CN106300128B (en) | One kind changes double bundle conductor conductor spacer and puies forward the Line tool and application method | |
| CN103174323A (en) | Multifunctional hoisting support frame | |
| CN205489269U (en) | Overhead earth wire hoisting device for high tension transmission line | |
| CN205429592U (en) | Tunnel cabling hoisting device | |
| CN205104846U (en) | A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150520 |