[go: up one dir, main page]

CN1683613B - After spinning producing process for short distance hollow 3-D curved short fiber - Google Patents

After spinning producing process for short distance hollow 3-D curved short fiber Download PDF

Info

Publication number
CN1683613B
CN1683613B CN 200410033682 CN200410033682A CN1683613B CN 1683613 B CN1683613 B CN 1683613B CN 200410033682 CN200410033682 CN 200410033682 CN 200410033682 A CN200410033682 A CN 200410033682A CN 1683613 B CN1683613 B CN 1683613B
Authority
CN
China
Prior art keywords
machine
short fiber
reverse
fiber
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200410033682
Other languages
Chinese (zh)
Other versions
CN1683613A (en
Inventor
洪振宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Meisi Billion Environmental Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410033682 priority Critical patent/CN1683613B/en
Publication of CN1683613A publication Critical patent/CN1683613A/en
Application granted granted Critical
Publication of CN1683613B publication Critical patent/CN1683613B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Yarns And Mechanical Finishing Of Yarns Or Ropes (AREA)

Abstract

The present invention provides short stroke after-spinning production process for hollow 3D curved short fiber and belongs to the field of chemical fiber production process and equipment technology. Compared with available technology, the present invention has short technological path, reduced number of equipment, smaller shop area, lower heat consumption and transmission energy consumption and thus raised competition predominance.

Description

Spinning process behind the short distance hollow three-dimensional crimp short fiber
Technical field:
The present invention relates to spinning process technical field behind the hollow three-dimensional crimp short fiber.
Background technology:
The present invention is a spinning process behind the short distance hollow three-dimensional crimp short fiber.The existing technology that is used for spinning behind the hollow three-dimensional crimp short fiber production all adopts water-bath, twice heating of steam; Three drawing machines, twice stretching.Again through folded silk machine; Get into crimping machine; The tension force arrangement; Refueling water; Cut off; Forward get into the technology of relaxation heat setting.It is long that prior art processes exists route, and board is many; Shortcomings such as energy consumption is high, labour intensity is big.And destroyed the three-dimensional crimp effect.The forward end to end arrangement of cutting machine and relaxation heat setting machine has more increased process route length; Cause capital construction, cost of equipment to strengthen.
Summary of the invention:
The objective of the invention is:
1, under the situation of guaranteeing the curling effect of hollow three-dimensional crimp short fiber, reduces board quantity to greatest extent; Reach the purpose that reduces cost of equipment.
2, under the situation of guaranteeing the curling effect of hollow three-dimensional crimp short fiber, shortened process length reaches the purpose that reduces capital cost to greatest extent.
3, under the situation of guaranteeing the curling effect of hollow three-dimensional crimp short fiber, reducing the heat energy transmission to greatest extent can consume, and reaches the purpose of energy-conserving and environment-protective.
Technical scheme of the present invention is such:
With endless tow through first, second, speed difference one-off drawing between two drawing machines reaches the fiber orientation degree, draw ratio is controlled between 2.3~3.6, and forms the best three-dimensional crimp effect of diving; Being controlled between 65~95 ℃ of water bath solution temperature; Add a thread guide at the rear in two drawing machine exits, so that the elimination of tensile stress; Cut off a section equipment: tension bracket, tensioner, refueling water machine, traction machine, cutting machine be placed on the platform and after move; Between below the over top of relaxation heat setting machine and the platform bottom, establish the single-revolution foraminous conveyer, short fiber is heated drying in the reverse course of conveying of fiber; The below of reverse foraminous conveyer discharging opening is provided with a pendulum silk machine short fiber is evenly put neat entering relaxation heat setting machine intensive drying typing.
What more than introduce is to spin the production technology scheme behind the short distance hollow three-dimensional crimp short fiber of the present invention.
Description of drawings:
Accompanying drawing 1 is the prior art processes flow process, and accompanying drawing 2 is technical matters flow process contrast sketch map of the present invention
1, endless tow 2, creel 3, guiding machine 4, immersion cell
5, a drawing machine 6, water bath 7, two drawing machines 8, steam chest
9, three drawing machines 10, a folded silk machine 11, crimping machine 12, tension bracket
13, tensioner 14, refueling water machine 15, traction machine 16, cutting machine
17, pendulum silk machine 18, relaxation heat setting machine 19, platform 20, foraminous conveyer
21, heat-insulation layer 22, thread guide
The specific embodiment:
Design philosophy key of the present invention is: described is that endless tow 1 is reached the fiber orientation degree through one, two, two drawing machine 5, speed difference one-off drawing between 7, and forms the best three-dimensional crimp effect of diving; The control of 6 water bath solution temperatures is most important; A drawing machine 9, steam chest 8, crimping machine 11, folded silk machine 10 have been reduced; Rear in two drawing machines, 7 exits adds a thread guide 22, so that the elimination of tensile stress; Cut off a section equipment: tension bracket 12, tensioner 13, refueling water machine 14, traction machine 15, cutting machine 16 be placed on the platform 19 and after move; Between below the over top of relaxation heat setting machine 18 and platform 19 bottoms, set up single-revolution foraminous conveyer 20, short fiber is heated drying in the reverse course of conveying of fiber; The below of reverse foraminous conveyer 20 discharging openings is provided with a pendulum silk machine 17 short fiber is evenly put neat entering relaxation heat setting machine 18 intensive dryings typing.
Design philosophy key of the present invention is: described is that draw ratio with back spinning filament bundle 1 is controlled between 2.3~3.6.
Design philosophy key of the present invention is: described is that the solution temperature in the water bath is controlled between 65~95 ℃.
Design philosophy key of the present invention is: described is endless tow 1 reverse resilience after thread guide 22 can prevent to stretch, so that tensile stress is eliminated.
Design philosophy key of the present invention is: described is with moving behind the cut-out section equipment, and cutting machine 16 moves to the top of relaxation heat setting machine 18 tail discharging openings, and the short fiber after cutting machine 16 cuts off can be fallen on the reverse foraminous conveyer 20.
Design philosophy key of the present invention is: described is around reverse foraminous conveyer 20, to be provided with heat-insulation layer 21, and short fiber is heated drying in the reverse course of conveying of fiber; The below of reverse foraminous conveyer 20 discharging openings is provided with a pendulum silk machine 17, and short fiber is evenly put neat entering relaxation heat setting machine 18 intensive dryings typing.

Claims (3)

1. spinning process behind the short distance hollow three-dimensional crimp short fiber; It is characterized in that: endless tow (1) is reached required fiber orientation degree through the speed difference one-off drawing between first, second two drawing machines (5,7); Draw ratio is controlled between 2.3~3.6, and reaches the latent effect of three-dimensional crimp; Water bath (6) solution temperature is controlled between 65~95 ℃; Rear in second drawing machine (7) exit adds a thread guide (22), so that the elimination of tensile stress; Cutting off section equipment comprises: tension bracket (12), tensioner (13), refueling water machine (14), traction machine (15), cutting machine (16); This cut-out section equipment is placed on and moves after platform (19) is gone up also; Between the below of the over top of relaxation heat setting machine (18) and platform (19) bottom, establish a reverse foraminous conveyer (20), short fiber is heated drying in the reverse course of conveying of fiber; The below of reverse foraminous conveyer (20) discharging opening is provided with a pendulum silk machine (17) short fiber is evenly put the typing of neat entering relaxation heat setting machine (18) intensive drying.
2. spinning process behind the short distance hollow three-dimensional crimp short fiber according to claim 1; It is characterized in that: will move behind the section of the cut-out equipment; Cutting machine (16) moves to the top of relaxation heat setting machine (18) tail discharging opening, and the short fiber after cutting machine (16) cuts off can be fallen on the reverse foraminous conveyer (20).
3. spinning process behind the short distance hollow three-dimensional crimp short fiber according to claim 1 is characterized in that: around reverse foraminous conveyer (20), be provided with heat-insulation layer (21), short fiber is heated drying in the reverse course of conveying of fiber; The below of reverse foraminous conveyer (20) discharging opening is provided with a pendulum silk machine (17), and short fiber is evenly put the typing of neat entering relaxation heat setting machine (18) intensive drying.
CN 200410033682 2004-04-16 2004-04-16 After spinning producing process for short distance hollow 3-D curved short fiber Expired - Fee Related CN1683613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410033682 CN1683613B (en) 2004-04-16 2004-04-16 After spinning producing process for short distance hollow 3-D curved short fiber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410033682 CN1683613B (en) 2004-04-16 2004-04-16 After spinning producing process for short distance hollow 3-D curved short fiber

Publications (2)

Publication Number Publication Date
CN1683613A CN1683613A (en) 2005-10-19
CN1683613B true CN1683613B (en) 2012-07-04

Family

ID=35263100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410033682 Expired - Fee Related CN1683613B (en) 2004-04-16 2004-04-16 After spinning producing process for short distance hollow 3-D curved short fiber

Country Status (1)

Country Link
CN (1) CN1683613B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5585052A (en) * 1994-08-10 1996-12-17 The Dow Chemical Company Process for the preparation of polybenzazole staple fiber
CN1344820A (en) * 2001-11-19 2002-04-17 慈溪市大成经营公司 Production process of polyester/polyester composite hot-melt short fiber
CN1417390A (en) * 2002-12-10 2003-05-14 扬州广瑞毛绒有限责任公司 Production process of nine-pore hollow 3D crimped short Dacron staple

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5585052A (en) * 1994-08-10 1996-12-17 The Dow Chemical Company Process for the preparation of polybenzazole staple fiber
CN1344820A (en) * 2001-11-19 2002-04-17 慈溪市大成经营公司 Production process of polyester/polyester composite hot-melt short fiber
CN1417390A (en) * 2002-12-10 2003-05-14 扬州广瑞毛绒有限责任公司 Production process of nine-pore hollow 3D crimped short Dacron staple

Also Published As

Publication number Publication date
CN1683613A (en) 2005-10-19

Similar Documents

Publication Publication Date Title
CN102471936B (en) Method for melt-spinning, drawing and winding multifilaments and apparatus for carrying out the method
CN101798720B (en) Aramid fiber III on-line thermal treating process and device thereof
CN101443490B (en) Method and apparatus for pulling off and drawing a multifilament thread
CN1104268A (en) Method and apparatus for producing polyester fiber
CN106167922A (en) Mixed filament manufactures device
CN205223429U (en) Divide warm area multichannel online heat treatment device
KR860006584A (en) High strength polyamide fiber and its preparation
CN103255653A (en) Dyeing process and dyeing apparatus for collagen fiber regenerated leather
CN1683613B (en) After spinning producing process for short distance hollow 3-D curved short fiber
CN103849947B (en) The preparation method of the fine-denier porous silk of a kind of polyamide fibre delustring FDY
CN110177906A (en) For manufacturing the device and method of polychromatic yarn
CN207537628U (en) A kind of twister of spinning frame
RU2005112708A (en) METHOD FOR PRODUCING HIGH STRENGTH POLYPROPYLENE FIBERS
CN107109704A (en) Method and apparatus for producing multifilament yarn
GB1187532A (en) Yarn Texturing apparatus and method
CN100390333C (en) Process and apparatus for manufacturing vinylon filament
CN114262946A (en) Drafting method for producing ultra-high molecular weight polyethylene fibers
CN106906562A (en) The production technology of high-tension leather base cloth
JP5984929B2 (en) Method and apparatus for manufacturing HMLS yarn
CN103849950B (en) A kind of preparation method of polyamide fibre half light POY porous yarn
KR102263320B1 (en) Monofilament Yarn Manufacturing System and Method
US3410940A (en) Mist spinning process
CN107513788A (en) A kind of beautiful composite filament of fat or thin pleasure and its preparation technology
CZ103298A3 (en) The method of wet spinning, drawing and winding the multifilament yarn and the apparatus for performing the method
CN116065252A (en) High-shrinkage thermal acrylic fiber and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Hong Zhenning

Document name: Notice of extension

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HEBEI LONGJUNHE ENVIRONMENTAL PROTECTION TECHNOLOG

Free format text: FORMER OWNER: HONG ZHENNING

Effective date: 20150604

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 101100 TONGZHOU, BEIJING TO: 062550 CANGZHOU, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150604

Address after: 062550 Hebei City, Cangzhou, Beijing East Road, Economic Development Zone on the north side of the administrative committee

Patentee after: Hebei dragon and Environmental Protection Technology Co., Ltd.

Address before: 101100 Beijing city Tongzhou District Tonghui Road No. 33 Building No. 222

Patentee before: Hong Zhenning

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170214

Address after: 062550 Hebei Technology Development Zone on the north side of the Renqiu (east side of Beijing open circuit)

Patentee after: Hebei Meisi billion Environmental Technology Co. Ltd.

Address before: 062550 Hebei City, Cangzhou, Beijing East Road, Economic Development Zone on the north side of the administrative committee

Patentee before: Hebei dragon and Environmental Protection Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20180416