Building and construction process thereof with hole
One, technical field
The present invention relates to construction work, relate in particular to a kind of building and construction process thereof with hole.
Two, background technology
At present in the job practices of common buildings wall, great majority are to constitute a grouting mold with plane construction template, and set up suitable works in this grouting mold of what, behind reinforcing bar, in this grouting mold, carry out concrete grouting work, after treating hardening of concrete, each can be built form removable, finish the building of a tool plane wall.Above-mentioned form of construction work widespread usage in engineerings such as irrigation canals and ditches, hillside, bridge, mole, anti-ripple piece, yet, because the building surface according to existing this construction techniques construction is to be a burnishing surface, not only outward appearance is ice-cold stiff, and all can't perch on these smooth walls as biologies such as plant, birds, reptile class, fish, therefore the building of this form and meet natural demand, the local ecological habitat of heavy damage, cause ecological the change, and improved necessity is arranged.
Edge this, the novel patent application case in Taiwan just there be No. 82202075, " artificial marine habitat of Wave-dissipating block ", Announcement Number is No. 211832, the artificial marine habitat of Wave-dissipating block that this case discloses mainly becomes multi-direction arrangement and the Wave-dissipating block that is combined into one by several taper cylinders, and around the trunk of Wave-dissipating block artificial marine habitat, suitable several small holes that is drilled with form several depressions.Though above-mentioned Wave-dissipating block can be gone up at building (Wave-dissipating block) by bore mode and produce several holes, but this molding mode is to have following shortcoming: 1, the cave that produces with bore mode is a carefully and neatly done even surface, and be not suitable for some fish formation fish shelter.2, Zuan Kong aperture is limited, can't adapt to the demand of perching of various biologies.3, up to a hundred holes of the essential brill of each Wave-dissipating block, it is very time-consuming, difficult to construct, and does not meet economic benefit.4, only can form round shape cave, the needs of the irregular or regular cave building of can not satisfying the demand.
Three, summary of the invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that existing product exists, and provide a kind of building and construction process thereof with hole, it is with fluids such as filling gas or liquid in the capsule bag in required moulding building hole, make this capsule bag form the bag of a solid, and be embedded in the building of desire grouting, to form grouting mold, after the potting compound sclerosis of grouting mold, dismounting construction template, and draw the fluid of letting out in each capsule bag, obtain building, make object, this job practices with hole by this method with hole, can be applicable to the inwall or the small stream bed in building ditch, river levee, sea walls etc. are located, make on the wall at this place to be formed with the cave that several are irregular or regular shape, for fish, organisms in water such as shrimp perch, or form marine fish shelter etc.; In the time of on being applied in the hillside wall, can form the hole that several can supply birds, reptile class, insect etc. to perch, help and safeguard local natural, ecological in the slope; This building with hole comprises buildings such as draining duct, spilled water hole, culvert, riverbed submerged reef, wall cave; This method is simple, is convenient to construct fast, reduces construction cost, and the method that makes building form the hole has more economic benefit.
The objective of the invention is to realize by following technical scheme.
The present invention has the construction process of the building in hole, it is characterized in that, comprising: the first capsule bag in the required moulding building of preparation hole, and in this capsule bag the fluid of filling gas or liquid, make this capsule bag form a three-dimensional bag; Construct the construction template, to form grouting mold; In grouting mold, carry out the grouting operation of potting compound, after potting compound reaches certain altitude, will be filled with each capsule bag of fluid, according to the precalculated position device in construction grouting mold that template defined; In the formed grouting mold of construction template, carry out the grouting operation of potting compound again; After treating the potting compound sclerosis of grouting mold, dismounting construction template; Each capsule bag of removal is obtained the building with hole.
Aforesaid construction process with the building in hole wherein after sclerosis of the potting compound of grouting mold and the dismounting construction template, draws the fluid of letting out in each capsule bag.
Aforesaid construction process with the building in hole wherein after sclerosis of the potting compound of grouting mold and the dismounting construction template, takes out each capsule bag.
Aforesaid construction process with the building in hole, wherein the potting compound in the grouting mold is concrete or resin.
Aforesaid construction process with the building in hole, the fluid that wherein is filled in the capsule bag is a water.
Aforesaid construction process with the building in hole is filled in wherein that fluid is an air in the capsule bag.
The present invention has the construction process of the building in hole, it is characterized in that, the first capsule bag in the required moulding building of preparation hole, and in this capsule bag the fluid of filling gas or liquid, make this capsule bag form a three-dimensional bag; Construct the construction template and form grouting mold; In grouting mold, carry out the grouting operation of potting compound, after potting compound reaches certain altitude, will be filled with each capsule bag of fluid, according to the precalculated position device in construction grouting mold that template defined; In the formed grouting mold of construction template, carry out the grouting operation of potting compound again; After treating the potting compound sclerosis of grouting mold, dismounting construction template; Draw the fluid of letting out in each capsule bag, obtain building with hole.
Aforesaid construction process with the building in hole, wherein the capsule bag no longer occupies on this building the capsule bag by the mode of natural decomposition, weathering, corrosion, and has further enlarged the hole.
The present invention has the construction process of the building in hole, it is characterized in that, fluid with filling gas or liquid in the capsule bag in required moulding building hole, make this capsule bag form a three-dimensional bag, and be embedded in the building of desire grouting and form grouting mold, after the potting compound sclerosis of grouting mold, draw the fluid of letting out in each capsule bag, obtain building with hole.
The present invention has the building in hole, it comprise have spilled water hole, the building in culvert, riverbed submerged reef, wall cave.
The invention has the beneficial effects as follows: the method that building of the present invention forms the hole comprises: first step is the capsule bag of the required moulding building of preparation hole shape earlier, and in this capsule bag fluid such as filling gas or liquid, make this capsule bag form the bag of a solid; Second step is for constructing the construction template, to form grouting mold; Third step will be filled with each capsule bag of fluid for carry out potting compound grouting operation in grouting mold after potting compound reaches certain altitude, according to the precalculated position device in the construction grouting mold that template defined; The 4th step is for carrying out the grouting operation of potting compound in the grouting mold that forms in the construction template; The 5th step is after treating the potting compound sclerosis of grouting mold, again dismounting construction template; The 6th step can obtain a building with hole for leaking the fluid in each capsule bag or taking out this capsule bag; With fluids such as filling gas or liquid in the capsule bag in required moulding building hole, make this capsule bag form the bag of a solid, and be embedded in the building of desire grouting, to form grouting mold, after the potting compound sclerosis of grouting mold, dismounting construction template, and draw the fluid of letting out in each capsule bag, obtain building, make object, this job practices with hole by this method with hole, can be applicable to the inwall or the small stream bed in building ditch, river levee, sea walls etc. are located, make on the wall at this place to be formed with the cave that several are irregular or regular shape, for fish, organisms in water such as shrimp perch, or form marine fish shelter etc.; In the time of on being applied in the hillside wall, can form the hole that several can supply birds, reptile class, insect etc. to perch, help and safeguard local natural, ecological in the slope; The hole comprises draining duct, spilled water hole, culvert, riverbed submerged reef, wall cave etc.; This method is simple, is convenient to construct fast, reduces construction cost, and the method that makes building form the hole has more economic benefit.
Four, description of drawings
Fig. 1 is the first embodiment schematic diagram of capsule bag of the present invention, and is applied among Fig. 6.
Fig. 2 is the second embodiment schematic diagram of capsule bag of the present invention, and is applied among Fig. 8.
Fig. 3 is the 3rd embodiment schematic diagram of capsule bag of the present invention, and is applied among Fig. 8.
Fig. 4 is the 4th embodiment schematic diagram of capsule bag of the present invention, and is applied among Fig. 8.
Fig. 5 is the 5th embodiment schematic diagram of capsule bag of the present invention, and is applied among Fig. 7.
Fig. 6 is applied to riverbed submerged reef construction operation schematic flow sheet for capsule bag first embodiment of the present invention.
The riverbed submerged reef building schematic diagram that Fig. 7 finishes for the present invention.
Fig. 8 is that the present invention is in order to construct the schematic diagram as hillside retaining wall wall.
Fig. 9 finishes the hillside retaining wall wall schematic diagram in tool hole for the present invention.
Figure 10 constructs the schematic diagram of culvert building for the present invention.
The culvert building schematic diagram that Figure 11 finishes for the present invention.
The architectural perspective schematic diagram of the riverbed submerged reef that Figure 12 finishes for the present invention.
The hillside retaining wall architectural perspective schematic diagram that Figure 13 finishes for the present invention.
Number in the figure explanation: 1 capsule bag, 11 charging connectors, 2 construction templates, 20 grouting mold, 3 potting compounds, 4 buildings, 41 holes, 411 spilled water holes, 412 culverts, 413 riverbed submerged reefs, 414 wall caves.
Five, the specific embodiment
See also shown in Figure 6, the present invention forms the method in hole relevant for a kind of building and with the constructed construction object with hole of this method, the method that this building forms the hole comprises: first step is the capsule bag 1 of the required moulding building of preparation hole shape earlier, and in this capsule bag 1 fluid such as filling gas or liquid, make this capsule bag 1 form a three-dimensional bag, can occupy certain space; Second step is constructed construction template 2, to form grouting mold 20, shown in the A step among Fig. 6; Third step carries out the grouting operation of potting compound 3 in grouting mold 20, when potting compound 3 reaches certain altitude, shown in the B step among Fig. 6 after, will be filled with each capsule bag 1 of fluid, be seated in the grouting mold 20 that construction template 2 defined according to the precalculated position; The 4th step is carried out the grouting operation of potting compound 3 again in construction template 2 formed grouting mold 20, shown in the C step among Fig. 6; After the 5th step is treated potting compound 3 sclerosis of grouting mold 20, dismounting construction template 2; The 6th step is leaked the fluid in each capsule bag 1 or is taken out this capsule bag 1, can obtain a building 4 with hole 41, shown in the D step among Fig. 6.In the above-mentioned grouting work flow of carrying out, the potting compound 3 in the grouting mold that is filled in 20 be concrete, resin or foaming thing etc., the present invention is not limited.
Extremely shown in Figure 5 as Fig. 1, the applied capsule bag 1 of the present invention, can adopt plastic cement, but rubber or other material recyclable or natural decomposition are made, (can be air at the filling fluid, water or the like fluid) after, be a stereo structure bag, because when grouting, the pressure of potting compound 3 can produce extruding to the capsule bag 1 that is filled with fluid (for example air or do not cram liquid), make capsule bag 1 produce irregular or regular crimp, after treating potting compound 3 sclerosis, be the hole 41 that irregular capsule bag 1 promptly constitutes the irregular or regular shape of tool in the building, meet fish to become, shrimp, birds, biogenic accumulations such as reptile class, the place of growth needs.
Fig. 1 is to shown in Figure 5 for another example, and the applied capsule bag 1 of the present invention can be made various rule or irregular shape, and wherein capsule bag 1 as shown in Figure 1 is for being applied in riverbed submerged reef 413 shown in Figure 6; Fig. 2 and capsule bag shown in Figure 31 are for being applied in the wall cave 414 of Fig. 8 and retaining wall shown in Figure 9; Capsule bag shown in Figure 41 is for being applied in the spilled water hole 411 of Fig. 8 and retaining wall shown in Figure 9; Capsule bag 1 shown in Figure 5 is for being applied in the riverbed submerged reef 413 of retaining wall shown in Figure 7; Certainly can also make other various difform capsule bags 1, to be useful in various place; The present invention will not limit.
Capsule bag 1 shown in the present can be the three-dimensional bag of a spheroidal, cylindrical, polygon, irregular or regular shape behind the filling fluid, the present invention after to this capsule bag 1 filling fluid the shape that forms and will not limiting.In addition, the material of capsule bag 1 does not limit yet, for example: and tough and tensile rubber material (for example making the material of football), or with the employed rubber material of tire (the employed tire of tubeless); At the charging connector 11 that installs additional with the rubber for tire material as tire, conveniently inflate again.Owing to can bear the lorry of several tons of weights after the general tire inflation, adopt the capsule bag 1 of the made mold forming of rubber for tire material can bear great concrete pressure too.In order to make capsule bag 1 can be fixed on preposition, be beneficial to grouting, can be on capsule bag 1 one-body molded several retainer rings 12.Bury when putting, the available iron silk passes the retainer ring 12 of capsule bag 1, solid goes up fixingly at reinforcing bar (not shown) and retainer ring 12 tied up, and, makes charging connector 11 unlikely being embedded in the grouting up with charging connector 11 or outwardly.Moreover capsule bag 1 inside also can pour into liquid, for example: and water, oil (as hydraulic oil), or other liquid, can bear great grouting pressure equally.In order to make capsule bag 1 after grouting is dry, be easy to peel off from concrete, can be at the appearance of capsule bag 1 apply grease in advance, the construction formwork oil used of building or building for example can make capsule bag 1 change places from concrete light and peel off, and take out in hole 41, reuses again.Moreover, also can adopt the capsule bag 1 of inflation back larger volume to be embedded in the grouting of lower position, the capsule bag 1 of larger volume is diminished to original desired setting volume because of being subjected to big pressure after grouting.
In the job practices that the present invention uses, when potting compound 3 (as concrete) sclerosis, just capsule bag 1 can be taken out, or the fluid that is loaded in the capsule bag 1 outwards drawn let out, make the hole 41 that forms hollow out on the building, certainly also can be after removing construction template 2, not with artificial taking-up capsule bag 1, and capsule bag 1 is no longer occupied on this building, and further enlarged hole 41 by the mode of natural decomposition, weathering, corrosion.
The present invention is according to above-mentioned job practices, can be applicable to as Fig. 6, Fig. 7, riverbed submerged reef (or irrigation canals and ditches) shown in Figure 12, or as Fig. 8, hillside retaining wall shown in Figure 9; Figure 10, Figure 11, culvert shown in Figure 13, but the present invention does not limit its application category.
In the job practices of the present invention, as Figure 10, shown in Figure 11, the two ends contact of this capsule bag 1 is 2 of both sides construction templates, to be in the milk in this 2 of template of two constructions, and treat its sclerosis and removal capsule bag 1 or with behind the outside venting of the fluid in the capsule bag 1, form a culvert 412 that connects in the both sides of this building, have culvert pipe to be applied in, on the building of culvert function.
Building provided by the present invention forms the method in hole, be with fluids such as filling gas or liquid in the capsule bag 1 in required moulding building hole, make capsule bag 1 form a three-dimensional bag, and be embedded in the building 4 of desire grouting, to form grouting mold 20, after the potting compound sclerosis of grouting mold 20, draw the fluid of letting out in each capsule bag 1, obtaining building with hole 41, and the object with hole 41 that can make up by this method.Hole 41 can comprise: the hole of spilled water hole 411, culvert 412, riverbed submerged reef 413, wall cave 414 etc. or other different shape.
Disclosed building forms the method in hole and with the constructed object with hole of this method, has the following advantages, and has industry development value thereby show the present invention.1, capsule bag of the present invention is with low cost, during the filling fluid, does not become tabular, and light weight is easy to collection, transportation.2, capsule bag of the present invention can be reused, and is with low cost.3, the present invention constructs simple and easyly, quick, can reduce construction cost.4, the present invention can form irregular or regular hole, with the habitat that more meets the occurring in nature biology or the needs of plant growth environment.5, the object with hole that the present invention is constructed can be at marine formation fish shelter, and then constitutes artificial fish farm, develops in order to fishery.6, the present invention can be applicable on the various buildings, for example: constructions such as retaining wall, irrigation canals and ditches, Wave-dissipating block, range of application is very extensive.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment did.