[go: up one dir, main page]

CN112862242A - A production overall process acceptance tool for transformer substation capital construction engineering - Google Patents

A production overall process acceptance tool for transformer substation capital construction engineering Download PDF

Info

Publication number
CN112862242A
CN112862242A CN202011620573.6A CN202011620573A CN112862242A CN 112862242 A CN112862242 A CN 112862242A CN 202011620573 A CN202011620573 A CN 202011620573A CN 112862242 A CN112862242 A CN 112862242A
Authority
CN
China
Prior art keywords
acceptance
data
module
unit
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011620573.6A
Other languages
Chinese (zh)
Inventor
刘志鹏
陈思哲
张曼
郑丹
俞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Original Assignee
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch of State Grid Hubei Electric Power Co Ltd filed Critical Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Priority to CN202011620573.6A priority Critical patent/CN112862242A/en
Publication of CN112862242A publication Critical patent/CN112862242A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process
    • G06F11/1464Management of the backup or restore process for networked environments
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/242Query formulation
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/51Indexing; Data structures therefor; Storage structures
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/50Information retrieval; Database structures therefor; File system structures therefor of still image data
    • G06F16/58Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
    • G06F16/583Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using metadata automatically derived from the content
    • G06F16/5846Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using metadata automatically derived from the content using extracted text
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/64Protecting data integrity, e.g. using checksums, certificates or signatures
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Computational Linguistics (AREA)
  • Software Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Probability & Statistics with Applications (AREA)
  • Library & Information Science (AREA)
  • Mathematical Physics (AREA)
  • Computer Security & Cryptography (AREA)
  • Fuzzy Systems (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Bioethics (AREA)
  • Computer Hardware Design (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了用于变电站基建工程的生产全过程验收工具,属于工程验收工具技术领域,其包括数据监控上传单元,所述数据监控上传单元的输出端与信息采集单元的输入端电连接,所述信息采集单元的输出端通过数据分类管理单元与中央控制单元的输入端电连接。本发明通过设置中央控制单元、数据监控上传单元、检验对比反馈模块、评测分析模块和项目管理评估单元,该验收工具将实现工程现场验收各检验项目质量评定的自动化和无纸化,避免了由于验收材料丢失、数据丢失和数据判别错误等原因,造成的工程验收质量评定的不准确、不真实,同时也便于今后对设备的维护和管理,减少保护误动或拒动,提升了变电站二次设备工程验收与管理的科学水平。

Figure 202011620573

The invention discloses a production whole-process acceptance tool for a substation infrastructure project, belonging to the technical field of engineering acceptance tools. The invention comprises a data monitoring and uploading unit, an output end of the data monitoring and uploading unit is electrically connected with an input end of an information acquisition unit, and the The output end of the information collection unit is electrically connected with the input end of the central control unit through the data classification management unit. By setting a central control unit, a data monitoring and uploading unit, an inspection and comparison feedback module, an evaluation and analysis module and a project management evaluation unit, the acceptance tool will realize the automation and paperless quality evaluation of each inspection item in the project site acceptance, and avoid the problems caused by Loss of acceptance materials, data loss and data identification errors, etc., lead to inaccurate and untrue project acceptance quality assessment, and also facilitate the maintenance and management of equipment in the future, reduce protection misoperation or refusal to operate, and improve the secondary substation. The scientific level of equipment engineering acceptance and management.

Figure 202011620573

Description

A production overall process acceptance tool for transformer substation capital construction engineering
Technical Field
The invention belongs to the technical field of engineering acceptance tools, and particularly relates to an acceptance tool for the whole production process of transformer substation infrastructure engineering.
Background
The power grid company obtains certain research achievements on the acceptance management of the secondary equipment of the transformer substation, a set of relatively mature engineering acceptance management methods for the secondary equipment of the transformer substation is formed, but an effective management tool is lacked at present to implement the engineering acceptance management method, the engineering on-site acceptance is an important link for transferring construction investment achievements into production or use, and is also a key link for comprehensively examining investment benefits, examining design and construction quality, and the method plays an important role in promoting the timely production of construction projects, exerting investment effects and summarizing construction experience, and the current main mode for the on-site acceptance management of the secondary equipment of the transformer substation of the company is as follows: before acceptance, printing a large number of paper acceptance forms or evaluation forms; in the process of acceptance, an acceptance person judges the qualification of the inspection items according to the memory or on-site browsing of the paper evaluation form, then manually fills an acceptance form, and records the acceptance problem; and after the inspection project acceptance of each time is finished, the acceptance personnel sign, and then the acceptance flow is passed to complete the acceptance of each inspection project of the secondary equipment project of the transformer substation.
Due to the lack of effective on-site acceptance and decision-making aid tools, the secondary equipment engineering of the transformer substation is still disordered on-site acceptance, and great hidden dangers exist, such as the fact that on-site acceptance data cannot be stored, quality problems exist in acceptance data of various inspection projects, on-site acceptance progress and acceptance problems cannot follow up, acceptance forms or data are lost due to the fact that the service of primary acceptance personnel is complicated due to the fact that the time span among the inspection projects of acceptance is large, acceptance judgment errors are caused due to the fact that multiple acceptance personnel are subjected to multiple acceptance details, on-site inspection is not performed according to the acceptance criteria, on-site acceptance risk point inspection omission and random inspection are not performed and the whole acceptance is directly put into operation, and the like, and the problems can cause protection misoperation or rejection after the commissioning of equipment, and can cause the expansion of fault influence, and serious persons can cause issue, supply and supply for operation, The damage of the main equipment of the power utilization, which may cause the collapse of the power grid and the occurrence of large-area power failure accidents, needs a whole-process acceptance tool for the infrastructure construction of the transformer substation to solve the problems.
Disclosure of Invention
Technical problem to be solved
In order to overcome the defects of the prior art, the invention provides an acceptance tool for the whole production process of the transformer substation infrastructure project, and solves the problems that acceptance forms or data are lost due to the complicated service of basic-level acceptance personnel as the time span between the accepted inspection projects is larger, acceptance and judgment errors are caused due to the error memory of multiple acceptance personnel for acceptance details, the field inspection is not carried out according to the acceptance standard, the field acceptance risk point inspection is omitted, the spot inspection is not carried out, and the complete acceptance is not carried out but the direct operation is carried out.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a production overall process acceptance tool for transformer substation infrastructure engineering, upload the unit including data monitoring, the output of unit is uploaded in data monitoring is connected with the input electricity of information acquisition unit, the output of information acquisition unit passes through data classification management unit and is connected with central control unit's input electricity, central control unit's output is connected with the input electricity of transferring the inquiry unit, the output of transferring the inquiry unit passes through data screening module and is connected with the input electricity of inspection contrast feedback module, data screening module and the two-way electricity of data repository are connected, inspection contrast feedback module is connected with expert user terminal's input electricity.
The output end of the expert user terminal is electrically connected with the input end of the project management evaluation unit through the evaluation analysis module, the input end and the output end of the project management evaluation unit are respectively and electrically connected with the output end of the central control unit and the input end of the report automatic generation module, the output end of the central control unit is respectively and electrically connected with the input ends of the chart generation module and the data backup cloud storage module, and the input end of the data backup cloud storage module is electrically connected with the output end of the chart generation module.
As a further scheme of the invention: the data monitoring and uploading unit comprises online monitoring and offline monitoring, a mobile internet technology and a digital signature technology can be used, digital signatures and field photos can be uploaded immediately, the information acquisition unit comprises a dynamic information acquisition module and a static information acquisition module, data information can be uploaded in an online mode and an offline mode, and the information acquisition unit can effectively extract relevant data and conduct subsequent processing.
As a further scheme of the invention: the data classification management unit can classify and integrate various data information acquired by the information acquisition unit, the data classification management unit uploads the inspection results and photos of the classified data information to the mobile client, and managers can check the inspection results and photos fed back on site at the first time through the PC management terminal, so that the transparency of on-site acceptance is improved.
As a further scheme of the invention: the calling and inquiring unit comprises a keyword searching module, a voice recognition searching module and an image-text recognition searching module, and the acceptance personnel can inquire or call related acceptance standard data in real time in a keyword, voice recognition and image-text recognition mode to assist the acceptance personnel in checking and distinguishing.
As a further scheme of the invention: the data screening module can screen the data information inquired or called by the calling inquiry unit, and classify and plan various different data information, so that the checking personnel can inquire or call the checking standard data quickly.
As a further scheme of the invention: and the inspection comparison feedback module automatically compares and judges data input in real time by each inspection item in an inspection site when receiving the data information of the calling and inquiring unit, and transmits the data information after comparison and judgment to the expert user terminal to help site judgment.
As a further scheme of the invention: the chart generation module can generate a gantt chart and a visual statistical analysis chart.
Gantt chart: the Gantt chart can be generated by recording the acceptance condition of each inspection project in real time, related personnel can conveniently know the accepted project content and the acceptance result of each inspection project, know that other inspection contents are left in each inspection project to be accepted, evaluate the working progress, form a visual schedule, check the project progress plan, master the acceptance progress condition of the acceptance project team at any time and adjust the acceptance progress.
Visual statistical analysis chart: the acceptance personnel can save the acceptance results of all the inspection projects in real time, the related data can automatically form a visual statistical analysis chart, and the acceptance personnel are assisted to analyze the acceptance results.
As a further scheme of the invention: the project management and evaluation unit comprises an acceptance risk point management and control module and a collaborative management module.
A cooperative management module: the evaluation and analysis module transmits the data information to the collaborative management module, so that the state of the inspection project can be mastered at any time, the visual and controllable capabilities of the inspection project are improved, project plans are formulated, existing project resources are coordinated and distributed, a good project implementation combination is obtained through the collaborative management module in a plurality of inspection project collaborative management modes, the coordination and coordination of the upper-level and lower-level work in each inspection project are ensured, and conflicts and contradictions among the inspection projects can be coordinated.
Acceptance risk point management and control module: the evaluation analysis module transmits the data information to the acceptance risk point management and control module, can provide a new project acceptance risk point reminding function, reminds field acceptance personnel to pay attention to the new project acceptance risk point when examining each project, and ensures that the project acceptance meets the requirements of national policies and laws and regulations.
As a further scheme of the invention: the data backup cloud storage module can be used for archiving all items of acceptance data information transmitted by the central control unit in a cloud storage mode, so that data loss is prevented, and searching and management of historical data are facilitated.
(III) advantageous effects
Compared with the prior art, the invention has the beneficial effects that:
1. the invention realizes instant uploading of digital signatures and field photos by arranging a central control unit, a data monitoring and uploading unit, a communication unit, an inspection comparison feedback module, an evaluation analysis module and a project management evaluation unit, wherein the data monitoring and uploading unit can use mobile internet technology and digital signature technology to upload inspection results and photos of classified data information to a mobile client, a manager can check the inspection results and photos fed back from the field at the first time through a PC management terminal, the transparency of field inspection is improved, the inspection comparison feedback module automatically compares and judges data recorded in real time for each inspection project in the inspection field when receiving and calling data information of the query unit, and transmits the compared and judged data information to an expert user terminal to help field judgment, and the judged data information of the expert user terminal is transmitted to the project management evaluation unit through the evaluation analysis module, the collaborative management module in the project management evaluation unit can master the state of the inspection project at any time, improve the visual and controllable capability of the inspection project, collaboratively formulate a project plan, coordinate and distribute the existing project resources and obtain a good project implementation combination through the collaborative management module under a collaborative management mode of a plurality of inspection projects, ensure the coordination and coordination of the superior and inferior works in each inspection project, and the acceptance risk point control module in the project management evaluation unit can provide a new project acceptance risk point reminding function to remind field acceptance personnel to pay attention to new project acceptance risk points when inspecting each project, ensure that the project acceptance meets the requirements of national policies and laws and regulations, so that the acceptance tool can realize the automation and paperless quality evaluation of the inspection projects inspected on the engineering field, and avoid the reasons of loss of acceptance materials, data loss, data judgment errors and the like, the assessment of the project acceptance quality is inaccurate and unreal, and meanwhile, the maintenance and the management of equipment in the future are facilitated, the protection misoperation or the rejection are reduced, and the scientific level of the project acceptance and the management of the secondary equipment of the transformer substation is improved;
2. by arranging the central control unit, the report automatic generation module, the data screening module, the calling query unit and the data backup cloud storage module, when the checking data information is queried by the calling query unit, the checking personnel can query or call the relevant checking standard data in real time in a keyword, voice recognition and image-text recognition mode to assist the checking personnel to check and judge, meanwhile, the data screening module can screen the data information queried or called by the calling query unit in the query process and classify and plan different data information, so that the checking personnel can conveniently and rapidly query or call the checking standard data, the checking data information is transmitted to the data backup cloud storage module by the central control unit, and the data backup cloud storage module can store the data in a cloud storage mode, data loss is prevented, searching management of historical data is facilitated, and therefore the level of acceptance management is further improved.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention;
in the figure: the system comprises a data monitoring and uploading unit 1, an information acquisition unit 2, a data classification management unit 3, a central control unit 4, a project management evaluation unit 5, an automatic report generation module 6, an inspection and comparison feedback module 7, a data screening module 8, a calling and inquiring unit 9, a data repository 10, an expert user terminal 11, an evaluation and analysis module 12, a communication unit 13, a chart generation module 14 and a data backup cloud storage module 15.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in the figure, the present invention provides a technical solution: a production overall process acceptance tool for transformer substation infrastructure project, upload unit 1 including data monitoring, unit 1's output is uploaded in data monitoring and information acquisition unit 2's input electricity is connected, information acquisition unit 2's output passes through data classification management unit 3 and central control unit 4's input electricity is connected, central control unit 4's output is connected with the input electricity of transferring inquiry unit 9, the output of transferring inquiry unit 9 is connected with the input electricity of inspection contrast feedback module 7 through data screening module 8, data screening module 8 is connected with data repository 10 both-way electricity, inspection contrast feedback module 7 is connected with expert user terminal 11's input electricity.
The output end of the expert user terminal 11 is electrically connected with the input end of the project management evaluation unit 5 through the evaluation analysis module 12, the input end and the output end of the project management evaluation unit 5 are respectively and electrically connected with the output end of the central control unit 4 and the input end of the report automatic generation module 6, the output end of the central control unit 4 is respectively and electrically connected with the input ends of the chart generation module 14 and the data backup cloud storage module 15, and the input end of the data backup cloud storage module 15 is electrically connected with the output end of the chart generation module 14.
The data monitoring uploading unit 1 comprises online monitoring and offline monitoring, a mobile internet technology and a digital signature technology can be used, digital signatures and field photos can be uploaded instantly, the information acquisition unit 2 comprises a dynamic information acquisition module and a static information acquisition module, data information can be uploaded in an online mode and an offline mode, the information acquisition unit 2 can effectively extract relevant data and perform subsequent processing, the data classification management unit 3 can classify and integrate various data information acquired by the information acquisition unit 2, the data classification management unit 3 uploads inspection results and photos of classified data information to a mobile client, a manager can check inspection results and photos fed back from a field at the first time through a PC management terminal, the transparency of field inspection is improved, and the calling and inquiring unit 9 comprises a keyword searching module, The voice recognition searching module and the image-text recognition searching module, the acceptance personnel can inquire or call the relevant acceptance standard data in real time by the key words, the voice recognition and the image-text recognition, the acceptance personnel can be assisted to carry out the inspection and the judgment, the data screening module 8 can screen the data information inquired or called by the calling inquiry unit 9, the classification planning is carried out on various different data information, the acceptance personnel can conveniently and rapidly inquire or call the acceptance standard data, the inspection contrast feedback module 7 can automatically contrast and judge the data input in real time by each inspection item in the acceptance site when receiving the data information called by the calling inquiry unit 9, and transmit the data information which is contrasted and judged to the expert user terminal 11 to help the site judgment, the data backup cloud storage module 15 can archive all the acceptance data information transmitted by the central control unit 4 by the cloud storage mode, data loss is prevented and searching management of historical data is facilitated.
Chart generation module 14 may generate a gantt chart and a visual statistical analysis chart.
Gantt chart: the Gantt chart can be generated by recording the acceptance condition of each inspection project in real time, related personnel can conveniently know the accepted project content and the acceptance result of each inspection project, know that other inspection contents are left in each inspection project to be accepted, evaluate the working progress, form a visual schedule, check the project progress plan, master the acceptance progress condition of the acceptance project team at any time and adjust the acceptance progress.
Visual statistical analysis chart: the acceptance personnel can save the acceptance results of all the inspection projects in real time, the related data can automatically form a visual statistical analysis chart, and the acceptance personnel are assisted to analyze the acceptance results.
The project management and evaluation unit 5 comprises an acceptance risk point management and control module and a collaborative management module.
A cooperative management module: the evaluation and analysis module 12 transmits the data information to the collaborative management module, so that the state of the inspection project can be mastered at any time, the visual and controllable capabilities of the inspection project are improved, project plans are formulated, existing project resources are coordinated and distributed, good project implementation combinations are obtained through the collaborative management module in a collaborative management mode of a plurality of inspection projects, the coordination and coordination of the upper-level and lower-level work in each inspection project are ensured, and conflicts and contradictions among the inspection projects can be coordinated.
Acceptance risk point management and control module: the evaluation analysis module 12 transmits the data information to the acceptance risk point management and control module, can provide a new project acceptance risk point reminding function, and reminds field acceptance personnel to pay attention to the new project acceptance risk point when examining each project, so as to ensure that the project acceptance meets the requirements of national policies and laws and regulations.
By arranging the central control unit 4, the data monitoring and uploading unit 1, the communication unit 13, the inspection and comparison feedback module 7, the evaluation and analysis module 12 and the project management and evaluation unit 5, the data monitoring and uploading unit 1 can use the mobile internet technology and the digital signature technology to realize the instant uploading of digital signatures and field photos and upload the inspection results and photos of classified data information to the mobile client, managers can check the inspection results and photos fed back from the field through the PC management terminal at the first time, the transparency of the field inspection is improved, the inspection and comparison feedback module 7 automatically compares and judges the data recorded in each inspection project in the inspection field in real time when receiving and calling the data information of the query unit 9, and transmits the compared and judged data information to the expert user terminal 11 to help the field judgment, the judgment data information of the expert user terminal 11 is transmitted to the project management evaluation unit 5 through the evaluation analysis module 12, the collaborative management module in the project management evaluation unit 5 can master the inspection project state at any time, the visual and controllable capability of the inspection project is improved, project plans, coordination and distribution of the existing project resources and acquisition of good project implementation combination are cooperatively formulated through the collaborative management module under a plurality of inspection project collaborative management modes, the coordination and coordination of the upper and lower level work in each inspection project are ensured, the acceptance risk point management and control module in the project management evaluation unit 5 can provide a new project acceptance risk point reminding function to remind field acceptance personnel to pay attention to new project acceptance risk points when inspecting each project, the project acceptance is ensured to meet the requirements of national policies and laws, and the acceptance tool can realize the automation and paperless quality evaluation of each inspection project acceptance of the engineering field, the method avoids the inaccuracy and the unreality of engineering acceptance quality evaluation caused by loss of acceptance materials, data loss, data discrimination errors and the like, is convenient for maintenance and management of equipment in the future, reduces protection misoperation or refusal, and improves the scientific level of engineering acceptance and management of secondary equipment of the transformer substation.
By arranging the central control unit 4, the report automatic generation module 6, the data screening module 8, the calling query unit 9 and the data backup cloud storage module 15, when the query unit 9 is called to query the acceptance data information, the acceptance personnel can query or call the relevant acceptance standard data in real time in a keyword, voice recognition and image-text recognition mode to assist the acceptance personnel in checking and judging, meanwhile, the data screening module 8 can screen the data information queried or called by the calling query unit 9 in the query process, classify and plan various different data information, so that the acceptance personnel can query or call the acceptance standard data quickly, each item of data information to be checked and accepted is transmitted to the data backup cloud storage module 15 through the central control unit 4, and the data backup cloud storage module 15 can store the data in a cloud storage mode, data loss is prevented, searching management of historical data is facilitated, and therefore the level of acceptance management is further improved.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (9)

1.用于变电站基建工程的生产全过程验收工具,包括数据监控上传单元(1),其特征在于:所述数据监控上传单元(1)的输出端与信息采集单元(2)的输入端电连接,所述信息采集单元(2)的输出端通过数据分类管理单元(3)与中央控制单元(4)的输入端电连接,所述中央控制单元(4)的输出端与调用查询单元(9)的输入端电连接,所述调用查询单元(9)的输出端通过数据筛选模块(8)与检验对比反馈模块(7)的输入端电连接,所述数据筛选模块(8)与数据储存库(10)双向电连接,所述检验对比反馈模块(7)与专家用户终端(11)的输入端电连接;1. An acceptance tool for the entire production process of a substation infrastructure project, comprising a data monitoring and uploading unit (1), characterized in that: an output terminal of the data monitoring and uploading unit (1) is electrically connected to an input terminal of the information acquisition unit (2). connected, the output end of the information collection unit (2) is electrically connected to the input end of the central control unit (4) through the data classification management unit (3), and the output end of the central control unit (4) is connected to the calling query unit ( 9) is electrically connected to the input end, the output end of the calling query unit (9) is electrically connected to the input end of the inspection and contrast feedback module (7) through the data screening module (8), and the data screening module (8) is connected to the data The storage library (10) is electrically connected in both directions, and the inspection and comparison feedback module (7) is electrically connected with the input end of the expert user terminal (11); 所述专家用户终端(11)的输出端通过评测分析模块(12)与项目管理评估单元(5)的输入端电连接,所述项目管理评估单元(5)的输入端和输出端分别与中央控制单元(4)的输出端和报告自动生成模块(6)的输入端电连接,所述中央控制单元(4)的输出端分别与图表生成模块(14)和数据备份云储存模块(15)的输入端电连接,所述数据备份云储存模块(15)的输入端与图表生成模块(14)的输出端电连接。The output end of the expert user terminal (11) is electrically connected to the input end of the project management evaluation unit (5) through the evaluation and analysis module (12), and the input end and the output end of the project management evaluation unit (5) are respectively connected to the central The output end of the control unit (4) is electrically connected to the input end of the report automatic generation module (6), and the output end of the central control unit (4) is respectively connected with the chart generation module (14) and the data backup cloud storage module (15) The input end of the data backup cloud storage module (15) is electrically connected with the output end of the graph generation module (14). 2.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述数据监控上传单元(1)包括在线监控和离线监控,可使用移动互联网技术和数字签名技术,实现数字签名和现场照片即时上传,且信息采集单元(2)包括动态信息采集模块和静态信息采集模块,可通过在线和离线两种方式对数据信息进行上传,保证信息采集单元(2)可有效提取相关数据并进行后续处理。2. The production whole process acceptance tool for substation infrastructure project according to claim 1, characterized in that: the data monitoring and uploading unit (1) comprises online monitoring and offline monitoring, and can use mobile Internet technology and digital signature technology , realize the real-time upload of digital signatures and on-site photos, and the information collection unit (2) includes a dynamic information collection module and a static information collection module, which can upload data information in two ways, online and offline, to ensure that the information collection unit (2) can be Efficient extraction of relevant data and subsequent processing. 3.根据权利要求2所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述数据分类管理单元(3)可将信息采集单元(2)采集的各项数据信息进行分类整合,数据分类管理单元(3)将分类数据信息的检验结果和照片上传至移动客户端,管理人员通过PC管理终端能够第一时间查看到现场反馈的检查结果和照片,提高了现场验收的透明度。3. The whole production process acceptance tool for substation infrastructure project according to claim 2, characterized in that: the data classification management unit (3) can classify various data information collected by the information collection unit (2) Integration, the data classification management unit (3) uploads the inspection results and photos of the classified data information to the mobile client, and the management personnel can view the inspection results and photos of the on-site feedback at the first time through the PC management terminal, which improves the transparency of on-site acceptance. . 4.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述调用查询单元(9)包括关键词查找模块、语音识别查找模块和图文识别查找模块,验收人员可通过关键词、语音识别和图文识别的方式实时查询或调用相关验收标准数据,辅助验收人员进行检验判别。4. the production whole process acceptance tool for substation infrastructure project according to claim 1, is characterized in that: described calling query unit (9) comprises keyword search module, speech recognition search module and graphic recognition search module, Acceptance personnel can query or call relevant acceptance standard data in real time through keyword, speech recognition and graphic recognition to assist acceptance personnel in inspection and judgment. 5.根据权利要求4所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述数据筛选模块(8)可对调用查询单元(9)所查询或调用的数据信息进行筛选处理,对各项不同的数据信息进行分类规划,便于验收人员快速进行查询或调用验收标准数据。5. The whole production process acceptance tool for substation infrastructure project according to claim 4, characterized in that: the data screening module (8) can screen the data information queried or invoked by the invoking query unit (9) Processing, classifying and planning various data information, so that the acceptance personnel can quickly query or call the acceptance standard data. 6.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述检验对比反馈模块(7)在接收调用查询单元(9)的数据信息时,对验收现场的中各个检验项目实时录入的数据进行自动对比和判别,并且将完成对比和判别的数据信息传递至专家用户终端(11),帮助现场判断。6. The whole production process acceptance tool for substation infrastructure project according to claim 1, characterized in that: when the inspection and comparison feedback module (7) receives the data information of the calling query unit (9), it checks the acceptance site The real-time input data of each inspection item in the system is automatically compared and discriminated, and the data information of the completed comparison and discrimination is transmitted to the expert user terminal (11) to help on-site judgment. 7.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述图表生成模块(14)可生成甘特图和可视化统计分析图;7. The whole production process acceptance tool for substation infrastructure project according to claim 1, characterized in that: the chart generation module (14) can generate a Gantt chart and a visual statistical analysis chart; 甘特图:实时记录各检验项目的验收情况可生成甘特图,相关人员可便利地了解每一项检验项目已验收的项目内容及验收结果,并了解每一项检验项目剩下其他检验内容要验收,并可评估工作进度,形成可视化时间表,可查看项目进度计划并随时掌握验收项目团队验收进展情况,并可以验收进度进行调整;Gantt Chart: Real-time recording of the acceptance status of each inspection item can generate a Gantt chart, relevant personnel can easily understand the content of each inspection item that has been accepted and the acceptance result, and understand the remaining inspection content of each inspection item To accept and evaluate the work progress, form a visual timetable, check the project progress plan and keep abreast of the acceptance progress of the acceptance project team, and adjust the acceptance progress; 可视化统计分析图:验收人员可实时保存各检验项目的验收结果,相关的数据,可自动形成可视化统计分析图,辅助验收人员对验收结果进行分析。Visual statistical analysis chart: The acceptance personnel can save the acceptance results of each inspection item in real time, and the relevant data can automatically form a visual statistical analysis chart to assist the acceptance personnel to analyze the acceptance results. 8.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述项目管理评估单元(5)包括验收风险点管控模块和协同管理模块;8. The whole production process acceptance tool for substation infrastructure project according to claim 1, characterized in that: the project management evaluation unit (5) comprises an acceptance risk point control module and a collaborative management module; 协同管理模块:评测分析模块(12)将数据信息传递至协同管理模块中,可随时掌握检验项目状态,提升检验项目的可视和可控能力,通过协同管理模块在多个检验项目协同管理模式下,协同制定项目计划、协调和分配现有项目资源、获取良好项目实施组合,保证每个检验项目内部上下级工作的配合与协调,又能够协调各检验项目之间的冲突与矛盾;Collaborative management module: The evaluation and analysis module (12) transmits data information to the collaborative management module, so that the status of the inspection items can be grasped at any time, and the visibility and controllability of the inspection items can be improved. To coordinate and allocate existing project resources, obtain a good project implementation portfolio, ensure the cooperation and coordination of the work of the subordinates and subordinates within each inspection project, and coordinate the conflicts and contradictions between the inspection projects; 验收风险点管控模块:评测分析模块(12)将数据信息传递至验收风险点管控模块中,可提供新项目验收风险点提醒功能,提醒现场验收人员在检验各项目时,注意新的项目验收风险点,保证项目验收符合国家政策和法律法规的要求。Acceptance risk point control module: The evaluation and analysis module (12) transmits data information to the acceptance risk point control module, and can provide a new project acceptance risk point reminder function to remind on-site acceptance personnel to pay attention to new project acceptance risks when inspecting each project To ensure that the project acceptance meets the requirements of national policies and laws and regulations. 9.根据权利要求1所述的用于变电站基建工程的生产全过程验收工具,其特征在于:所述数据备份云储存模块(15)可将中央控制单元(4)传递的各项验收数据信息通过云储存方式进行存档,防止数据丢失且便于对历史数据进行查找管理。9. The whole production process acceptance tool for substation infrastructure project according to claim 1, characterized in that: the data backup cloud storage module (15) can store various acceptance data information transmitted by the central control unit (4) Archiving through cloud storage prevents data loss and facilitates search and management of historical data.
CN202011620573.6A 2020-12-30 2020-12-30 A production overall process acceptance tool for transformer substation capital construction engineering Pending CN112862242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011620573.6A CN112862242A (en) 2020-12-30 2020-12-30 A production overall process acceptance tool for transformer substation capital construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011620573.6A CN112862242A (en) 2020-12-30 2020-12-30 A production overall process acceptance tool for transformer substation capital construction engineering

Publications (1)

Publication Number Publication Date
CN112862242A true CN112862242A (en) 2021-05-28

Family

ID=75999056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011620573.6A Pending CN112862242A (en) 2020-12-30 2020-12-30 A production overall process acceptance tool for transformer substation capital construction engineering

Country Status (1)

Country Link
CN (1) CN112862242A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114693193A (en) * 2022-06-02 2022-07-01 中国人民解放军海军工程大学 Equipment scientific research project risk factor evaluation system and method
CN114822592A (en) * 2022-06-27 2022-07-29 山东登远信息科技有限公司 Substation signal acceptance method and system based on voice recognition
CN119475483A (en) * 2024-09-26 2025-02-18 上海宝冶集团有限公司 A method of controlling progress using three graphs and one curve
CN119475483B (en) * 2024-09-26 2025-10-14 上海宝冶集团有限公司 A method of controlling progress using three graphs and one curve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140249877A1 (en) * 2012-12-04 2014-09-04 Hugh Hull Worker self-management system and method
CN207115482U (en) * 2017-08-01 2018-03-16 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control system
CN109325724A (en) * 2017-07-31 2019-02-12 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control method and system
CN109658067A (en) * 2018-12-20 2019-04-19 山东晟光电力设备安装工程有限公司 A kind of power engineering project control platform and system
CN111179112A (en) * 2019-12-09 2020-05-19 国网浙江省电力有限公司丽水供电公司 A substation operation and maintenance assistance and risk management and control system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140249877A1 (en) * 2012-12-04 2014-09-04 Hugh Hull Worker self-management system and method
CN109325724A (en) * 2017-07-31 2019-02-12 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control method and system
CN207115482U (en) * 2017-08-01 2018-03-16 广东电网有限责任公司佛山供电局 Power engineering project quality in site receipt control system
CN109658067A (en) * 2018-12-20 2019-04-19 山东晟光电力设备安装工程有限公司 A kind of power engineering project control platform and system
CN111179112A (en) * 2019-12-09 2020-05-19 国网浙江省电力有限公司丽水供电公司 A substation operation and maintenance assistance and risk management and control system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114693193A (en) * 2022-06-02 2022-07-01 中国人民解放军海军工程大学 Equipment scientific research project risk factor evaluation system and method
CN114822592A (en) * 2022-06-27 2022-07-29 山东登远信息科技有限公司 Substation signal acceptance method and system based on voice recognition
CN114822592B (en) * 2022-06-27 2022-09-09 山东登远信息科技有限公司 Substation signal acceptance method and system based on voice recognition
CN119475483A (en) * 2024-09-26 2025-02-18 上海宝冶集团有限公司 A method of controlling progress using three graphs and one curve
CN119475483B (en) * 2024-09-26 2025-10-14 上海宝冶集团有限公司 A method of controlling progress using three graphs and one curve

Similar Documents

Publication Publication Date Title
CN104361419B (en) Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification
CN113450065B (en) Production operation management system and method for wind power plant
CN106557991B (en) Voltage monitoring data platform
CN115879664A (en) Intelligent operation and maintenance system and method based on industrial Internet
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
CN201359698Y (en) Automatic control system of large steel pipe production workshop
CN111210108A (en) A performance management and control model of power material supply chain
CN105574593B (en) Track state static inspection and control system and method based on cloud computing and big data
CN105869074A (en) A technical supervision system for grid-connected power plants
CN111507635A (en) An intelligent mobile operation system and method for substation transportation inspection based on power Internet of things
CN106600240A (en) Power grid regulation and control and operation management system of power supply enterprise based on big data lean assistance
CN112505604B (en) A monitoring system for on-site evaluation process of measurement standards
CN103617509A (en) Cloud computation-based power system simulation data management method
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN110826981A (en) Transmission tower construction progress control system and method based on Internet of things
CN112862242A (en) A production overall process acceptance tool for transformer substation capital construction engineering
CN105260843A (en) Power supply stoppage information analyzing system
CN116596177A (en) A production management system for intelligent supervision
CN108694512A (en) A system and method for power grid cost analysis data deepening processing
CN115907542B (en) Knowledge graph-based substation secondary equipment digital evaluation method and system
CN116910139A (en) Distribution network engineering uninterrupted operation construction cost data management system
CN112801809A (en) Salt and salt chemical industry intelligent manufacturing integrated management system
CN115994187A (en) Hidden danger link type full-period safety management method and system based on distributed collaboration
CN115759977A (en) Link automation operation and maintenance system based on data center
CN110378802A (en) A kind of water power fortune inspection management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210528