[go: up one dir, main page]

CN112321177A - An energy-saving vertical preheater system for active lime calcination - Google Patents

An energy-saving vertical preheater system for active lime calcination Download PDF

Info

Publication number
CN112321177A
CN112321177A CN202011369842.6A CN202011369842A CN112321177A CN 112321177 A CN112321177 A CN 112321177A CN 202011369842 A CN202011369842 A CN 202011369842A CN 112321177 A CN112321177 A CN 112321177A
Authority
CN
China
Prior art keywords
heat exchange
wedge
shaped cavity
rotary kiln
exchange chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011369842.6A
Other languages
Chinese (zh)
Inventor
王继生
范英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chaoyang Heavy Machinery Metallurgical Industry Co ltd
Shaanxi Design & Research Institute Of Building Materials Industry
Original Assignee
Chaoyang Heavy Machinery Metallurgical Industry Co ltd
Shaanxi Design & Research Institute Of Building Materials Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chaoyang Heavy Machinery Metallurgical Industry Co ltd, Shaanxi Design & Research Institute Of Building Materials Industry filed Critical Chaoyang Heavy Machinery Metallurgical Industry Co ltd
Priority to CN202011369842.6A priority Critical patent/CN112321177A/en
Publication of CN112321177A publication Critical patent/CN112321177A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2/00Lime, magnesia or dolomite
    • C04B2/10Preheating, burning calcining or cooling
    • C04B2/12Preheating, burning calcining or cooling in shaft or vertical furnaces

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Furnace Details (AREA)

Abstract

本发明公开了一种用于活性石灰煅烧的节能竖式预热器系统,所述系统由多个竖式预热器呈环形排布,在环形的中心位置设有回转窑;其中,每个预热器的热交换室为圆筒形结构,热交换室的顶部设有下料管和排气管道,下料管与物料仓连通,热交换室底部开口与设在其下方的楔形腔对应布置,楔形腔上开设有卸料口,每个卸料口均与回转窑连通,回转窑煅烧产生的烟气余热通过卸料口进入楔形腔和热交换室对堆积的物料预热,楔形腔上还安装推料装置,用于将预热后的物料推入到回转窑内。本发明通过布置合理的预热室容积与个数,精准控制给料,保持预热室物料的高径比在一个合理范围,从而使回转窑产生的烟气与物料热交换率最大化,以节省能源消耗。

Figure 202011369842

The invention discloses an energy-saving vertical preheater system for calcining active lime. The system consists of a plurality of vertical preheaters arranged in a ring, and a rotary kiln is arranged at the center of the ring; The heat exchange chamber of the preheater is a cylindrical structure. The top of the heat exchange chamber is provided with a feeding pipe and an exhaust pipe. The feeding pipe is communicated with the material bin, and the bottom opening of the heat exchange chamber corresponds to the wedge-shaped cavity located below it. The wedge-shaped cavity is provided with a discharge port, each discharge port is connected to the rotary kiln, and the waste heat of flue gas generated by the calcination of the rotary kiln enters the wedge-shaped cavity and the heat exchange chamber through the discharge port to preheat the accumulated materials, and the wedge-shaped cavity A pushing device is also installed on the top to push the preheated material into the rotary kiln. By arranging a reasonable volume and number of preheating chambers, the invention precisely controls the feeding and keeps the height-diameter ratio of the material in the preheating chamber within a reasonable range, thereby maximizing the heat exchange rate between the flue gas and the material generated by the rotary kiln, and reducing the Save energy consumption.

Figure 202011369842

Description

Energy-saving vertical preheater system for active lime calcination
Technical Field
The invention belongs to the technical field of active lime production equipment, and particularly relates to an energy-saving vertical preheater system for active lime calcination.
Background
The active lime calcining process comprising three main machines, namely a vertical preheater, a rotary kiln and a vertical cooler, has a dominant position in the lime production industry in China, wherein the preheater is a main device in a rotary kiln limestone calcining process system, limestone is fully preheated in the preheater and has a temperature of about 960 ℃, partial limestone is decomposed and gradually enters the rotary kiln to be calcined to produce active lime, namely the heat exchange effect of the limestone in the preheater directly influences the yield of the active lime, and the method also relates to the full utilization of heat energy and the normal use of subsequent process equipment of the system. Therefore, people generally pay attention to the reasonability of the structure and parameter design of the preheater.
At present, a heat exchange chamber part in a vertical preheater in the prior art is of a square box-shaped structure, the volume of preheated materials is small, a feed bin is connected with a feeding pipe, the feeding is uneven and unsmooth, the heat energy absorption rate is low when the materials are exchanged with reverse hot air flow, equipment is easy to burn out, production is often stopped, and economic loss is caused; meanwhile, a large amount of flue gas waste heat generated when the active lime is produced by the rotary kiln is not recycled, so that a large amount of heat energy is wasted and the environment pollution of dust is caused. Under the national policy of energy conservation and emission reduction, the process and equipment which can reduce the fuel consumption of the rotary kiln and the production cost of the active lime and meet the national environmental protection policy and emission standard are urgently adopted.
In view of the above, the present inventors have devised an energy-saving vertical preheater system for calcining active lime to solve the above technical problems.
Disclosure of Invention
In order to solve the problems in the prior art, the invention aims to provide an energy-saving vertical preheater system for calcining active lime, which effectively utilizes a large amount of flue gas waste heat generated by a rotary kiln by optimizing the height-diameter ratio of the preheater, so that the capacity of a rotary kiln production line is improved, the ton heat consumption of the active lime is reduced, the consumption of raw materials and fuels is reduced, and the CO is reduced2The discharge amount achieves the purposes of energy conservation, emission reduction and cost saving.
The technical problem to be solved by the invention is realized by the following technical scheme: an energy-saving vertical preheater system for calcining active lime is characterized in that a plurality of vertical preheaters are arranged in an annular shape, and a rotary kiln is arranged at the central position of the annular shape;
each vertical preheater comprises a cylindrical heat exchange chamber, a blanking pipe and an exhaust pipeline are arranged at the top of the cylindrical heat exchange chamber, the blanking pipe is communicated with a material bin arranged at the top of the vertical preheater, an opening at the bottom of the cylindrical heat exchange chamber is arranged corresponding to a wedge-shaped cavity arranged below the cylindrical heat exchange chamber, a discharge opening is formed in the wedge-shaped cavity and faces the annular center, each discharge opening is communicated with an inlet of the rotary kiln, and flue gas waste heat generated by calcination of the rotary kiln enters the wedge-shaped cavity and the cylindrical heat exchange chamber through the discharge openings to preheat stacked materials;
and the wedge-shaped cavity is also provided with a material pushing device for pushing the preheated material into the rotary kiln from the discharge opening, and is formed by building refractory material bricks.
Further, a gas distributor is arranged at the joint of the discharge opening and the rotary kiln, and the gas distributor is used for uniformly distributing the flue gas waste heat generated by the calcination of the rotary kiln to each wedge-shaped cavity and each cylindrical heat exchange chamber.
Furthermore, the included angle alpha between the bottom surface of the wedge-shaped cavity and the horizontal plane ranges from 10 degrees to 12 degrees.
Furthermore, the pushing device comprises a push rod, a push head and a hydraulic driving device, the push head is arranged on the bottom surface of the wedge-shaped cavity, the push rod is inserted into a guide hole formed in the wedge-shaped cavity, the inner side end of the push head is connected with the push head, the hydraulic driving device is arranged on the outer side of the wedge-shaped cavity, the output end of the hydraulic driving device is connected with the outer side end of the push rod, and the hydraulic driving device drives the push head to do reciprocating linear motion on the bottom surface of the wedge-shaped cavity through driving the push rod so as to continuously push the preheated materials into the rotary kiln.
Furthermore, the hydraulic driving device comprises a rectangular frame and a hydraulic cylinder, the upper end of the rectangular frame is hinged to the outer wall of the cylindrical heat exchange chamber, the lower end of the rectangular frame is hinged to a piston rod of the hydraulic cylinder, the outer side end of the push rod is hinged to the rectangular frame, the hydraulic cylinder drives the rectangular frame to move, and the rectangular frame pushes the push rod to do linear motion.
Furthermore, the material of the push head is heat-resistant alloy cast steel.
Further, the ratio (H/phi) of the height to the diameter of the effective space inside the cylindrical heat exchange chamber of each vertical preheater ranges from 1.1 to 1.4;
wherein, the height (H) refers to the effective stacking height of the material layer in the cylindrical heat exchange chamber; the diameter (phi) means that the effective cross-sectional area of the cylindrical heat exchange chamber is converted into the area of a corresponding circle, and then the corresponding diameter is obtained.
Furthermore, the system is mainly formed by uniformly distributing 12 vertical preheaters in a 360-degree annular mode.
Compared with the prior art, the invention has the beneficial effects that:
1. the energy-saving vertical preheater system for active lime calcination maintains the height-diameter ratio of the preheating chambers by designing reasonable volumes and numbers of the preheating chambers and accurately controlling feeding through the control system, so that the heat exchange efficiency is maximized. Specifically this system is 360 annular arrangements by 12 vertical preheater, lime stone in the lime stone feed bin at vertical preheater top gets into the cylinder heat exchange chamber that the preheater corresponds through 12 unloading pipes, every cylinder heat exchange chamber lower part is equipped with a set of hydraulic pressure blevile of push that is opened by control system is automatic, the lime stone carries out the heat exchange with the flue gas in the preheater, the heat temperature that the lime stone absorbed hot waste gas rises, the lime stone that preheats, promote through every pushing head, get into the rotary kiln through the discharge opening and calcine, simultaneously the rotary kiln calcine the flue gas waste heat that produces after with the lime stone heat exchange in the preheating chamber, exhaust into the atmosphere through dust collector purification after the temperature reduces, realize energy-concerving and environment-protective purpose. Compared with a square box-shaped heat exchange chamber, the cylindrical heat exchange chamber has the advantages of large volume, high heat exchange rate, good material fluidity, uniform material accumulation, high heat energy absorption rate when the material exchanges with reverse hot air flow, simplicity and convenience in building refractory materials and easiness in maintenance.
2. The invention relates to an energy-saving vertical preheater system for active lime calcination, wherein a gas distributor is arranged at the joint of a discharge opening and a rotary kiln, and the gas distributor can ensure that residual heat energy of flue gas generated by the rotary kiln calcination uniformly enters each wedge-shaped cavity and each cylindrical heat exchange chamber, thereby realizing the efficient preheating and partial decomposition of blocky limestone in a stacking state.
3. According to the energy-saving vertical preheater system for calcining the active lime, the limestone material bin is connected with the vertical preheater through the long material pipe, so that the material sealing effect on the negative-pressure preheating chamber is realized, the cold air is prevented from entering, and the heat efficiency of the system is improved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an energy-saving vertical preheater system according to the present invention;
FIG. 2 is a front view of the energy saving vertical preheater system of the present invention;
fig. 3 is a sectional view a-a in fig. 2.
In the figure: 1. a vertical preheater; 2. a rotary kiln; 3. a gas distributor; 4. a material pushing device; 11. a cylindrical heat exchange chamber; 12. a discharging pipe; 13. an exhaust duct; 14. a wedge-shaped cavity; 15. a discharge opening; 41. a push rod; 42. pushing the head; 43. a hydraulic drive device; 431. a rectangular frame; 432. and a hydraulic cylinder.
Detailed Description
In order that the objects, aspects and advantages of the invention will become more apparent, the invention will be described by way of example only, and in connection with the accompanying drawings. It is to be understood that such description is merely illustrative and not restrictive of the scope of the invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Example (b): referring to fig. 1 to 3, an energy-saving vertical preheater system for calcining active lime is provided, wherein a plurality of vertical preheaters 1 are arranged in an annular shape, and a rotary kiln 2 is arranged at the central position of the annular shape. Each vertical preheater 1 comprises a cylindrical heat exchange chamber 11, a discharging pipe 12 and an exhaust pipeline 13 are arranged at the top of the cylindrical heat exchange chamber 11, a tail gas purification device can be installed on the exhaust pipeline 13, the discharging pipe 12 is communicated with a material bin arranged at the top of the vertical preheater 1, preferably, the discharging pipe 12 is connected with a limestone material bin through a long material pipe, so that the material sealing effect on the negative-pressure preheating chamber is realized, the cold air is prevented from entering, and the heat efficiency of the system is improved.
The bottom opening of the cylindrical heat exchange chamber 11 is arranged corresponding to a wedge-shaped cavity 14 arranged below the cylindrical heat exchange chamber 11, discharge openings 15 are formed in the wedge-shaped cavity 14 and face the annular center, each discharge opening 15 is communicated with an inlet of the rotary kiln 2 through a discharge chute, and flue gas waste heat generated by calcination of the rotary kiln 2 enters the wedge-shaped cavity 14 and the cylindrical heat exchange chamber 11 through the discharge openings 15 to preheat accumulated materials.
Preferably, a gas distributor 3 is installed at the junction of the discharge opening 15 and the rotary kiln 2, and the gas distributor 3 is used to uniformly distribute the preheated exhaust gas generated by the calcination of the rotary kiln 2 to each of the wedge-shaped cavities 14 and the cylindrical heat exchange chamber 11 so as to accelerate the decomposition of limestone by high temperature, based on the principle that CaCO3 (limestone) is decomposed to generate CaO (activated lime) + CO (carbon monoxide) under high temperature environment2×) @. On one hand, the preheating temperature in the vertical preheater is increased, so that the massive limestone is efficiently preheated and partially and quickly decomposed in an accumulation state; on the other hand, after the preheated waste gas generated by the calcination of the rotary kiln is exchanged with limestone in a heat exchange way, the temperature is reduced, the waste gas is conveniently purified by a purifying device on an exhaust pipeline and then is exhausted into the atmosphere, the ton heat consumption of the active lime is reduced, and the original energy is savedConsumption of fuel and fuel.
The wedge-shaped cavity 14 is also provided with a material pushing device 4 for pushing the preheated material into the rotary kiln 2 from the discharge opening 15, the preferred included angle alpha between the bottom surface of the wedge-shaped cavity 14 and the horizontal plane is 10-12 degrees so as to discharge the material by utilizing the labor-saving characteristic of the inclined plane, and the wedge-shaped cavity 14 is formed by bricking refractory materials.
Specifically, as shown in fig. 2 and 3, the pushing device 4 includes a pushing rod 41, a pushing head 42 and a hydraulic driving device 43, wherein the pushing head 42 is disposed on the bottom surface of the wedge-shaped cavity 14, preferably, the pushing head 42 is made of heat-resistant alloy cast steel material to ensure normal operation under a high temperature condition of about 1000 ℃, the pushing rod 41 is inserted into a guide hole formed in the wedge-shaped cavity 14, and the inner end of the pushing rod is connected to the pushing head 42, the hydraulic driving device 43 is mounted on the outer side of the wedge-shaped cavity 14, and the output end of the hydraulic driving device is connected to the outer end of the pushing rod 41, and the hydraulic driving device 43 drives the pushing head 42 to perform reciprocating linear motion on the bottom inclined surface of the wedge-shaped cavity 14 by driving the pushing rod 41, so as to continuously push the preheated.
The hydraulic driving device 43 comprises a rectangular frame 431 and a hydraulic cylinder 432, the upper end of the rectangular frame 431 is hinged with the outer wall of the cylindrical heat exchange chamber 11, the lower end of the rectangular frame 431 is hinged with the end part of a piston rod of the hydraulic cylinder 432, the outer side end of the push rod 41 is hinged with the middle part of the rectangular frame 431, the hydraulic cylinder 432 drives the rectangular frame 431 to move, and the rectangular frame 431 pushes the push rod 41 to move linearly.
Through inventor's experiment, the lime stone is after fully preheating in the preheater, and the temperature can reach about 950 ℃, and partial lime stone decomposes, and in the research and development process of equipment, research and development personnel carry out the heat transfer principle of heat exchange to the hot flue gas about 1150 ℃ and the indoor material of cylinder heat exchange, adjusts the height to radius ratio of traditional preheater, specifically is: when the ratio (H/phi) of the height of an effective space inside a cylindrical heat exchange chamber 11 of the vertical preheater to the diameter is controlled to be 1.1-1.4, the heat convection efficiency is highest, wherein the height (H) refers to the effective accumulation height of a material layer inside the cylindrical heat exchange chamber 11; the diameter (phi) means that the effective cross-sectional area of the cylindrical heat exchange chamber 11 is converted into the area of the corresponding circle, and then the corresponding diameter is obtained.
The system is mainly formed by uniformly distributing 12 vertical preheaters 1 in a 360-degree annular manner. The pushing action period and the pushing amount of the push rod are accurately controlled by a computer (or a PLC), and the height-diameter ratio range of the cylindrical preheating chamber is kept between 1.1 and 1.4, so that the heat exchange efficiency is maximized, and the purposes of energy conservation and emission reduction are achieved.
Through the arrangement, the periodical operation of static preheating of the branch chamber under the premise of the maximum decomposition rate of the limestone is realized.
After the improvement of the existing system, the utilization rate of the waste heat of the rotary kiln is obviously improved, the yield and the quality of the active lime are improved, the capacity is improved, and the heat consumption per ton of the active lime is reduced. The following economic benefits are obtained:
(1) the yield of the vertical preheater before improvement is 600t/d per day and 20 ten thousand tons per year.
(2) After the vertical preheater is improved, the yield is 800t/d per day, 26.7 ten thousand tons per year and 6.7 ten thousand tons per year.
(3) According to the heat consumption reduction of 20%, the coal consumption per ton of lime is reduced by about 44Kg, the lime cost is reduced by about 22 yuan, and the annual energy is saved by about 587.4 ten thousand yuan.
(4) According to the sale price of 380 yuan per ton of lime, the cost of 230 yuan per ton of lime, the pure profit of 125 yuan and the new profit of 837.5 ten thousand yuan per year.
(5) The annual benefit is integrated with 1424.9 ten thousand yuan.
Therefore, the improved energy-saving vertical preheater system obviously improves the economic benefit of enterprises and is beneficial to other enterprises to popularize the technology.
The foregoing is a more detailed description of the invention in connection with specific preferred embodiments and it is not intended that the invention be limited to these specific details. For those skilled in the art to which the invention pertains, several simple deductions or substitutions can be made without departing from the spirit of the invention, and all shall be considered as belonging to the protection scope of the invention.

Claims (8)

1.一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述系统由多个竖式预热器(1)呈环形排布,在环形的中心位置设置有回转窑(2);1. An energy-saving vertical preheater system for active lime calcination, characterized in that: the system is arranged in a ring shape by a plurality of vertical preheaters (1), and a rotary kiln is provided at the center of the ring (2); 其中,每个所述竖式预热器(1)包括圆筒形热交换室(11),所述圆筒形热交换室(11)的顶部设置有下料管(12)和排气管道(13),所述下料管(12)与设置在竖式预热器顶部物料仓连通,所述圆筒形热交换室(11)底部开口与设置在圆筒形热交换室(11)下方的楔形腔(14)对应布置,所述楔形腔(14)上、朝向环形中心位置处开设有卸料口(15),每个卸料口(15)均与回转窑(2)的入口连通,回转窑(2)煅烧产生的烟气余热通过卸料口(15)进入楔形腔(14)和圆筒形热交换室(11)对堆积的物料预热;Wherein, each of the vertical preheaters (1) includes a cylindrical heat exchange chamber (11), and the top of the cylindrical heat exchange chamber (11) is provided with a feeding pipe (12) and an exhaust pipe (13), the feeding pipe (12) is communicated with the material silo arranged at the top of the vertical preheater, and the bottom opening of the cylindrical heat exchange chamber (11) is connected to the opening at the bottom of the cylindrical heat exchange chamber (11) The lower wedge-shaped cavity (14) is arranged correspondingly, and the wedge-shaped cavity (14) is provided with discharge openings (15) at the central position of the ring, and each discharge opening (15) is connected to the inlet of the rotary kiln (2). connected, the flue gas waste heat generated by the calcination of the rotary kiln (2) enters the wedge-shaped cavity (14) and the cylindrical heat exchange chamber (11) through the discharge port (15) to preheat the accumulated materials; 所述楔形腔(14)上还安装推料装置(4),用于将预热后的物料从卸料口(15)推入到回转窑(2)内,所述楔形腔(14)采用耐火材料砖砌而成。A pushing device (4) is also installed on the wedge-shaped cavity (14) for pushing the preheated material from the discharge port (15) into the rotary kiln (2). Made of refractory bricks. 2.根据权利要求1所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述卸料口(15)与回转窑(2)连接处安装有气体分配器(3),所述气体分配器(3)用于将回转窑(2)煅烧产生的烟气余热均匀地分配给每个楔形腔(14)和圆筒形热交换室(11)。2. An energy-saving vertical preheater system for calcining active lime according to claim 1, characterized in that: a gas distributor is installed at the connection between the discharge port (15) and the rotary kiln (2). (3), the gas distributor (3) is used for evenly distributing the flue gas waste heat generated by the calcination of the rotary kiln (2) to each wedge-shaped cavity (14) and the cylindrical heat exchange chamber (11). 3.根据权利要求1所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述楔形腔(14)的底面与水平面夹角(α)范围为10°~12°。3. An energy-saving vertical preheater system for calcining active lime according to claim 1, characterized in that: the angle (α) between the bottom surface of the wedge-shaped cavity (14) and the horizontal plane ranges from 10° to 10°. 12°. 4.根据权利要求1~3任一项所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述推料装置(4)包括推杆(41)、推头(42)及液压驱动装置(43),所述推头(42)设置于楔形腔(14)的底面上,所述推杆(41)插设于楔形腔(14)上开设的导向孔内、且内侧端与推头(42)连接,所述液压驱动装置(43)安装在所述楔形腔(14)的外侧、且输出端与推杆(41)的外侧端连接,所述液压驱动装置(43)通过驱动推杆(41)带动推头(42)在楔形腔(14)的底面上作往复直线运动,用于将预热后的物料不断的推入到回转窑(2)内。4. An energy-saving vertical preheater system for calcining active lime according to any one of claims 1 to 3, characterized in that: the pushing device (4) comprises a push rod (41), a pusher A head (42) and a hydraulic drive device (43), the push head (42) is arranged on the bottom surface of the wedge-shaped cavity (14), and the push rod (41) is inserted into a guide hole opened on the wedge-shaped cavity (14) The inner and inner ends are connected with the push head (42), the hydraulic drive device (43) is installed on the outer side of the wedge-shaped cavity (14), and the output end is connected with the outer end of the push rod (41). The driving device (43) drives the pusher (42) to reciprocate linearly on the bottom surface of the wedge-shaped cavity (14) by driving the push rod (41), so as to continuously push the preheated material into the rotary kiln (2) Inside. 5.根据权利要求4所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述液压驱动装置(43)包括矩形架(431)和液压缸(432),所述矩形架(431)的上端与圆筒形热交换室(11)外壁铰接,下端与液压缸(432)的活塞杆铰接,所述推杆(41)的外侧端与矩形架(431)铰接,所述液压缸(432)驱动矩形架(431)运动,所述矩形架(431)推动推杆(41)作直线运动。5. An energy-saving vertical preheater system for calcining active lime according to claim 4, characterized in that: the hydraulic drive device (43) comprises a rectangular frame (431) and a hydraulic cylinder (432), The upper end of the rectangular frame (431) is hinged with the outer wall of the cylindrical heat exchange chamber (11), the lower end is hinged with the piston rod of the hydraulic cylinder (432), and the outer end of the push rod (41) is connected with the rectangular frame (431) Hinged, the hydraulic cylinder (432) drives the rectangular frame (431) to move, and the rectangular frame (431) pushes the push rod (41) to move linearly. 6.根据权利要求4所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述推头(42)材质为耐热合金铸钢。6 . The energy-saving vertical preheater system for calcining active lime according to claim 4 , wherein the pusher ( 42 ) is made of heat-resistant alloy cast steel. 7 . 7.根据权利要求1~3任一项所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:每个所述竖式预热器圆筒形热交换室(11)内部有效空间的高度与直径比值(H/φ)范围为1.1~1.4;7. The energy-saving vertical preheater system for calcining active lime according to any one of claims 1 to 3, wherein each of the vertical preheater cylindrical heat exchange chambers ( 11) The height-to-diameter ratio (H/φ) of the internal effective space ranges from 1.1 to 1.4; 其中,高度(H)指圆筒形热交换室(11)内部物料层有效堆积的高度;直径(φ)指圆筒形热交换室(11)有效截面面积折算为对应圆面积,再求出对应直径。Among them, the height (H) refers to the height of the effective accumulation of material layers in the cylindrical heat exchange chamber (11); the diameter (φ) refers to the effective cross-sectional area of the cylindrical heat exchange chamber (11) converted into the corresponding circle area, and then obtained corresponding diameter. 8.根据权利要求1~3任一项所述的一种用于活性石灰煅烧的节能竖式预热器系统,其特征在于:所述系统主要由12个竖式预热器(1)呈360°环形均布而成。8. The energy-saving vertical preheater system for calcining active lime according to any one of claims 1 to 3, characterized in that the system is mainly composed of 12 vertical preheaters (1) in the form of 12 vertical preheaters (1). 360° circular uniform distribution.
CN202011369842.6A 2020-11-30 2020-11-30 An energy-saving vertical preheater system for active lime calcination Pending CN112321177A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011369842.6A CN112321177A (en) 2020-11-30 2020-11-30 An energy-saving vertical preheater system for active lime calcination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011369842.6A CN112321177A (en) 2020-11-30 2020-11-30 An energy-saving vertical preheater system for active lime calcination

Publications (1)

Publication Number Publication Date
CN112321177A true CN112321177A (en) 2021-02-05

Family

ID=74309122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011369842.6A Pending CN112321177A (en) 2020-11-30 2020-11-30 An energy-saving vertical preheater system for active lime calcination

Country Status (1)

Country Link
CN (1) CN112321177A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115355723A (en) * 2022-10-21 2022-11-18 中航超能(苏州)科技有限公司 Lime stone rotary kiln preheating device
CN116199434A (en) * 2023-04-27 2023-06-02 淄博志华环保科技有限公司 Preheating tower for calcium oxide production

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050069832A1 (en) * 2003-09-30 2005-03-31 Townsend John P. Method and apparatus for preheating particulate material
CN201892430U (en) * 2010-12-10 2011-07-06 苏根华 Novel energy-saving and environmentally-friendly vertical preheater with twelve push heads
CN205580223U (en) * 2016-05-04 2016-09-14 吉安鑫泰科技股份有限公司 Roasting kiln flue gas cooling heat exchange device
CN213739210U (en) * 2020-11-30 2021-07-20 陕西省建筑材料工业设计研究院 Energy-saving vertical preheater system for active lime calcination

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050069832A1 (en) * 2003-09-30 2005-03-31 Townsend John P. Method and apparatus for preheating particulate material
CN201892430U (en) * 2010-12-10 2011-07-06 苏根华 Novel energy-saving and environmentally-friendly vertical preheater with twelve push heads
CN205580223U (en) * 2016-05-04 2016-09-14 吉安鑫泰科技股份有限公司 Roasting kiln flue gas cooling heat exchange device
CN213739210U (en) * 2020-11-30 2021-07-20 陕西省建筑材料工业设计研究院 Energy-saving vertical preheater system for active lime calcination

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
化学工业部基本建设司&中国五环化学工程总公司编: "化工压力容器设计技术问答", 31 March 1993, pages: 257 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115355723A (en) * 2022-10-21 2022-11-18 中航超能(苏州)科技有限公司 Lime stone rotary kiln preheating device
CN116199434A (en) * 2023-04-27 2023-06-02 淄博志华环保科技有限公司 Preheating tower for calcium oxide production

Similar Documents

Publication Publication Date Title
CN111747663B (en) A device and process method for preparing light-burned magnesium oxide by suspension calcination
CN105698524B (en) Heat accumulating type multistage heating rotary kiln device
CN108759459A (en) Lithium ion battery material microwave radiation technology dynamic continuous calcining equipment and method for calcinating
CN213739210U (en) Energy-saving vertical preheater system for active lime calcination
CN206160700U (en) Burning furnace is forged to mineral powder spiral
CN102219402A (en) Method and device for calcining materials
CN112321177A (en) An energy-saving vertical preheater system for active lime calcination
CN201555453U (en) A kind of energy-saving brick and the rotary kiln lining structure formed by it
CN112229205A (en) Active lime calcining system
CN105036574A (en) Energy-saving environment-friendly lime shaft kiln
CN102992660B (en) Low-heat value fuel lime kiln
CN203007146U (en) Beam type heat accumulation lime kiln
CN217005377U (en) Vertical annular preheating calcining kiln and rotary kiln calcining system for two-stage calcining
CN201463541U (en) Boiling and calcining furnace
CN206300500U (en) A kind of material-strewing device of high efficiency dispersion granular material
CN105330179B (en) Box burner shaft kiln
CN204265644U (en) Heat storage type lime rotary kiln
CN207865944U (en) A kind of energy-saving cement rotary kiln
CN203474654U (en) Heat storage type rotary kiln
CN211367425U (en) Three-chamber shaft kiln
CN213865975U (en) Energy-saving preheater with hydraulic pushing head device
CN201116834Y (en) A vertical magnesium reduction furnace with high-temperature air and low-oxygen combustion
CN216404224U (en) Double-chamber kiln channel ventilation device
CN207391289U (en) A kind of multilayer multiple arch shaft furnace
CN2506874Y (en) High-efficient environment protection pipe type boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210205

RJ01 Rejection of invention patent application after publication