CN111794570A - A prefabricated safety learning experience hall and its installation method - Google Patents
A prefabricated safety learning experience hall and its installation method Download PDFInfo
- Publication number
- CN111794570A CN111794570A CN202010687970.9A CN202010687970A CN111794570A CN 111794570 A CN111794570 A CN 111794570A CN 202010687970 A CN202010687970 A CN 202010687970A CN 111794570 A CN111794570 A CN 111794570A
- Authority
- CN
- China
- Prior art keywords
- interlayer
- floor
- prefabricated
- upright
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 69
- 238000000034 method Methods 0.000 title claims abstract description 59
- 238000010276 construction Methods 0.000 claims abstract description 65
- 238000009435 building construction Methods 0.000 claims abstract description 5
- 239000011229 interlayer Substances 0.000 claims description 269
- 239000010410 layer Substances 0.000 claims description 74
- 230000008093 supporting effect Effects 0.000 claims description 20
- 230000008569 process Effects 0.000 abstract description 20
- 239000000463 material Substances 0.000 abstract description 5
- 239000004566 building material Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 17
- 238000011900 installation process Methods 0.000 description 8
- 238000003780 insertion Methods 0.000 description 6
- 230000037431 insertion Effects 0.000 description 6
- 238000012549 training Methods 0.000 description 6
- 239000011159 matrix material Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000002356 single layer Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 241000935974 Paralichthys dentatus Species 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000019771 cognition Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/08—Hospitals, infirmaries, or the like; Schools; Prisons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
- E04B2/60—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
- E04B2/60—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
- E04B2/62—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members the members being formed of two or more elements in side-by-side relationship
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
- E04F11/025—Stairways having stringers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1812—Details of anchoring to the wall or floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1842—Balusters; Grille-type elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F2011/0203—Miscellaneous features of stairways not otherwise provided for
- E04F2011/0205—Stairways characterised by the use of specific materials for the supporting structure of the treads
- E04F2011/0209—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
技术领域technical field
本发明涉及安全技术领域,特别涉及一种预制装配式安全学习体验馆及其安装方法。The invention relates to the field of safety technology, in particular to a prefabricated safety learning experience hall and an installation method thereof.
背景技术Background technique
目前全国安全生产形势依然严峻,施工现场人员流动性大,文化水平不一,多安全基础知识认知不同。如何进行有效的安全知识培训教育是关键。现有的培训方式大多采用传阅式、背书式和放映式。这种通过学习文件,背诵规则,观看事故影片的培训方式。这些培训方式,大多都是照本宣科,难以获得实际的切身体会,导致施工人员对安全培训的认知依然流于表面。且由于外出务工的建筑工人普遍知识水平比较低,对于书本知识的接收能力较弱,安全意识不是很好;因此关于施工安全教育的问题很难与其进行有效的沟通,这使得工人很容易对学习感到枯燥乏味,不但达不到安全培训的初衷,更影响被培训人员的心理及认知,都认为安全就是一种形式,造成被培训人员都大部分存在侥幸心理或者是表面接受,心理抵触等。At present, the safety production situation across the country is still severe, with large mobility of construction site personnel, different educational levels, and different perceptions of basic safety knowledge. How to carry out effective safety knowledge training and education is the key. Most of the existing training methods use circulation, endorsement and screening. This kind of training method by studying documents, reciting rules and watching accident videos. Most of these training methods are based on the script, and it is difficult to obtain practical experience, which leads to the construction personnel's awareness of safety training is still superficial. And because the construction workers who go out to work generally have a relatively low level of knowledge, their ability to receive book knowledge is weak, and their safety awareness is not very good; therefore, it is difficult to communicate effectively with them about construction safety education, which makes it easy for workers to learn. Feeling boring and boring, not only does not achieve the original intention of safety training, but also affects the psychology and cognition of the trainees. They all think that safety is a form, which causes most of the trainees to have a fluke or superficial acceptance, psychological resistance, etc. .
发明内容SUMMARY OF THE INVENTION
本申请的目的在于克服现有技术中所存在的上述不足,提供一种拆装方便的预制装配式安全学习体验馆;本申请还提供了一种安全学习体验馆的安装方法,用于单层预制装配式学习体验馆的装配;本申请还提供了一种安全学习体验馆的安装方法,用于单层预制装配式学习体验馆的装配,并增设了底层横梁,使得装配而成的安全学习体验馆更加稳固;本申请还提供了一种安全学习体验馆的安装方法,用于两层及以上的多层预制装配式学习体验馆的装配;提供一种安全学习体验馆的安装方法,用于两层及以上的多层预制装配式学习体验馆的装配,采用先竖立设置层间立柱,再吊装层间楼板,使层间立柱、层间横梁和层间楼板同时榫接稳固,形成更加稳定的房屋结构;本申请还提供一种安全学习体验馆的安装方法,用于两层及以上的多层预制装配式学习体验馆的装配,并增设了底层横梁,使得装配而成的安全学习体验馆更加稳固。The purpose of this application is to overcome the above-mentioned deficiencies in the prior art, and to provide a prefabricated prefabricated safety learning experience hall that is easy to disassemble and assemble; Assembly of a prefabricated learning experience hall; the application also provides an installation method of a safe learning experience hall, which is used for the assembly of a single-layer prefabricated learning experience hall, and the bottom beam is added to make the assembled safe learning experience hall. The experience hall is more stable; the application also provides an installation method for a safe learning experience hall, which is used for the assembly of two or more multi-layer prefabricated prefabricated learning experience halls; an installation method for a safe learning experience hall is provided, using For the assembly of multi-storey prefabricated prefabricated learning experience halls with two or more floors, the inter-floor columns are erected first, and then the inter-floor floor slabs are hoisted, so that the inter-floor columns, inter-floor beams and inter-floor floor slabs are mortised and sturdy at the same time, forming a more Stable house structure; the application also provides an installation method for a safe learning experience hall, which is used for the assembly of two or more multi-storey prefabricated prefabricated learning experience halls, and the bottom beam is added to make the assembled safe learning experience hall. The experience hall is more stable.
为了实现上述发明目的,本申请提供了以下技术方案:一种预制装配式安全学习体验馆,包括房屋建筑和设置在所述房屋建筑内且用于设置安全体验项目的至少一个安全体验区;所述房屋建筑包括多个预制件;所述预制件通过榫卯结构拼装成所述房屋建筑;所述安全体验项目为用于施工人员学习施工过程中各项安全知识和进行安全事故体验的设备和/或装置。In order to achieve the above purpose of the invention, the present application provides the following technical solutions: a prefabricated safety learning experience hall, comprising a house building and at least one safety experience area arranged in the house building and used for setting safety experience items; The housing construction includes a plurality of prefabricated parts; the prefabricated parts are assembled into the housing building through a tenon-and-mortise structure; the safety experience items are equipment and equipment for construction personnel to learn various safety knowledge and experience safety accidents during construction. / or device.
在上述技术方案中,采用预制件搭建房屋建筑,无需现场施工,避免了现场施工存在的材料浪费、施工场地环境污染,同时也可以缩短安全学习体验馆的现场施工工期;同时,通过榫卯结构将搭建房屋建筑的预制件连接为一个整体建筑,无需另外使用混凝土浇筑、大量紧固件连接,使其拆装方便,减少在拆装过程中对预制件的损伤,也便于预制件的重复使用;此外,减少紧固件的使用,还可以减少拆装过程中,紧固件的遗失和损坏,影响房屋建筑的现场拆装进度。同时,房屋建筑在使用完成后,可通过分拆成预制件,运输到下一个施工场地或者需要场所,方便运输。In the above technical solution, prefabricated parts are used to build the house building without on-site construction, which avoids material waste and environmental pollution of the construction site in on-site construction, and can also shorten the on-site construction period of the safety learning experience hall; at the same time, through the tenon-and-mortise structure The prefabricated parts for building a house are connected into a whole building, without the need to use concrete pouring and a large number of fasteners to connect, making it easy to disassemble and assemble, reducing the damage to the prefabricated parts during the disassembly and assembly process, and facilitating the reuse of the prefabricated parts. ; In addition, reducing the use of fasteners can also reduce the loss and damage of fasteners in the process of disassembly and assembly, which affects the progress of on-site disassembly and assembly of housing construction. At the same time, after the building is completed, it can be disassembled into prefabricated parts and transported to the next construction site or the place where it is needed, which is convenient for transportation.
进一步地,所述房屋建筑为单层房屋建筑;所述预制件包括多根立柱、多根顶梁、一楼板和多面墙体;所述立柱竖直设置在地面上;所述墙体两端面分别与相邻的两个所述立柱的侧面榫接;所述顶梁两端分别与所述立柱榫接;所述顶梁的下端面与一所述墙体榫接;所述楼板下端面与所述顶梁的上端面榫接和/或通过紧固件连接;至少一所述墙体上设置有门。所述墙体两端与所述立柱榫接,并与所述顶梁榫接,实现立柱、顶梁和墙体连接为一个整体,形成稳定的墙板结构;楼板与墙体和立柱不直接连接,便于楼板的施工和预制。Further, the house building is a single-storey house building; the prefabricated part includes a plurality of uprights, a plurality of top beams, a floor slab and a multifaceted wall; the uprights are vertically arranged on the ground; the two ends of the wall are are respectively mortised with the sides of the two adjacent vertical columns; both ends of the top beam are mortised with the vertical columns respectively; the lower end face of the top beam is mortised with one of the walls; the lower end face of the floor slab It is mortised and/or connected with the upper end face of the top beam and/or through fasteners; at least one of the walls is provided with a door. Both ends of the wall body are mortise-jointed with the upright column and tenon joint with the top beam, so that the upright column, the top beam and the wall body are connected as a whole, forming a stable wall panel structure; the floor slab is not directly connected to the wall body and the upright column. Connection, facilitates the construction and prefabrication of floor slabs.
进一步地,所述预制件还包括底层横梁;所述底层横梁的两端分别与所述立柱榫接;所述底层横梁的上端面设置有用于与所述墙体榫接的底梁榫槽。在安装过程中,底层横梁将分别独立安装的立柱连接为一个整体,提高墙体在插入过程中立柱的稳定性;同时,墙体在安装时嵌入底层横梁中,对墙体形成稳定、均匀的支撑作用,使房屋建筑的承重性和稳定性更好。Further, the prefabricated part further comprises a bottom beam; both ends of the bottom beam are respectively mortise and tenon with the column; the upper end surface of the bottom beam is provided with a bottom beam tenon groove for tenoning with the wall. During the installation process, the bottom beam connects the independently installed columns as a whole, which improves the stability of the column during the insertion process of the wall; at the same time, the wall is embedded in the bottom beam during installation, forming a stable and uniform wall for the wall. The support function makes the building's load-bearing and stability better.
进一步地,所述房屋建筑为包括至少两层楼层的房屋建筑;所述预制件包括多根底层立柱、多根层间立柱、多面墙面板、多根层间横梁、至少一面层间楼板、至少一面顶层楼板和至少一连接相邻两层楼层的楼梯;所述底层立柱竖直设置在地面上,所述底层立柱的上端与所述层间横梁榫接;所述层间立柱两端分别榫接相邻两层的楼层的所述层间横梁;所述墙面板左右两端分别与同一楼层的相邻的两所述底层立柱或所述层间立柱的侧面榫接;所述墙面板的上端均分别与同一楼层的所述层间横梁榫接;位于第二层楼层及其以上楼层的所述墙面板的下端均分别与同一楼层的所述层间楼板榫接;每一所述层间横梁均与同一楼层的所述层间楼板榫接;位于最高楼层的所述层间横梁与所述顶层楼板榫接或者通过紧固件连接;每一所述层间楼板上均对应所述楼梯设置有楼梯空口;底层楼层的至少一所述墙面板设置有门。Further, the house building is a house building comprising at least two floors; the prefabricated part includes a plurality of bottom-floor columns, a plurality of interlayer columns, a plurality of wall panels, a plurality of interlayer beams, at least one floor slab between floors, at least one floor slab A top floor slab and at least one staircase connecting two adjacent floors; the bottom upright column is vertically arranged on the ground, and the upper end of the bottom floor upright column is mortise-jointed with the inter-floor beam; both ends of the inter-floor upright column are mortised Connect the inter-story beams of the floors of two adjacent floors; the left and right ends of the wall panel are respectively mortised with the sides of the two adjacent bottom-floor uprights or the inter-story uprights on the same floor; The upper ends are respectively mortise and tenon with the inter-story beams on the same floor; the lower ends of the wall panels located on the second floor and the floors above are mortise and tenon with the inter-story floor slabs on the same floor respectively; each said floor The inter-story beams on the same floor are all mortise and tenon with the inter-story slabs on the same floor; the inter-story beams on the highest floor are mortise-jointed with the top floor slabs or connected by fasteners; each of the inter-story slabs corresponds to the The staircase is provided with a staircase opening; at least one of the wall panels on the bottom floor is provided with a door.
所述房屋建筑采用多层结构,将安全学习体验项目分别设置在多层楼层中,实现施工人员安全学习体验的分流,便于多个安全学习体验项目的同时进行;同时,房屋建筑采用多层结构,便于增设关于多层建筑施工的安全学习体验项目,使其安全学习体验项目更加全面,也更加符合实际施工情况;此外,房屋建筑采用多层结构,可以减少安全学习体验馆的占地面积,提高施工现场的土地利用率。The housing construction adopts a multi-storey structure, and the safe learning experience items are respectively arranged on the multi-storey floors, so as to realize the diversion of the construction personnel's safe learning experience, and it is convenient for multiple safe learning experience projects to be carried out at the same time; meanwhile, the housing construction adopts a multi-storey structure. , it is convenient to add a safety learning experience project on the construction of multi-storey buildings, so that the safety learning experience project is more comprehensive and more in line with the actual construction situation; in addition, the building adopts a multi-layer structure, which can reduce the area of the safety learning experience hall. Improve the land utilization rate of the construction site.
进一步地,所述楼梯包括至少一个楼梯段,每一所述楼梯段均包括左梯梁、右梯梁和多个踏步板;所述左梯梁和右梯梁一端均连接地面或者较低一层楼层的层间楼板,所述左梯梁和右梯梁另一端均连接较高一层楼层的层间楼板;所述踏步板两端分别与左梯梁和右梯梁可拆卸连接,便于楼梯的安装、拆卸和运输。Further, the stair includes at least one stair section, and each of the stair sections includes a left ladder beam, a right ladder beam and a plurality of step boards; one end of the left ladder beam and the right ladder beam is connected to the ground or a lower one. The other ends of the left ladder beam and the right ladder beam are connected to the interlayer floor slab of the upper floor; Installation, disassembly and transportation of stairs.
进一步地,所述楼梯还包括位于相邻两个所述楼梯段之间的休息平台;所述休息平台下方设置有若干用于支撑所述休息平台的支撑件,用于支撑休息平台,还可以增加楼梯的承重能力。Further, the stair also includes a rest platform located between two adjacent stair sections; a plurality of supports for supporting the rest platform are arranged below the rest platform to support the rest platform, and can also be used for supporting the rest platform. Increase the load-bearing capacity of the stairs.
进一步地,所述休息平台下表面设置有若干个定位杆;所述支撑件包括连接管和支撑座;所述支撑座上设置有支撑杆;所述连接管两端分别设置有所述定位杆和所述支撑杆相匹配的连接孔;所述连接管两端分别通过所述连接孔与所述定位杆和所述支撑杆螺纹连接或者过盈配合。使用时,支撑座与定位杆对应,将定位杆和支撑杆插入连接管两端的连接孔内,或者通过旋转连接管即可实现支撑件支撑休息平台,安装简单快捷。优选地,所述连接管与定位杆和支撑杆螺纹连接,且所述定位杆和支撑杆上的外螺纹螺旋方向一致,旋转连接管即可实现休息平台的高度调整。Further, the lower surface of the rest platform is provided with several positioning rods; the support member includes a connecting pipe and a supporting seat; the supporting seat is provided with a supporting rod; the two ends of the connecting pipe are respectively provided with the positioning rods A connecting hole matched with the support rod; the two ends of the connecting pipe are respectively connected with the positioning rod and the support rod through the connecting hole in a threaded connection or interference fit. When in use, the support seat corresponds to the positioning rod, the positioning rod and the support rod are inserted into the connecting holes at both ends of the connecting pipe, or the support member can support the rest platform by rotating the connecting pipe, and the installation is simple and quick. Preferably, the connecting pipe is threadedly connected to the positioning rod and the supporting rod, and the helical directions of the external threads on the positioning rod and the supporting rod are consistent, and the height of the rest platform can be adjusted by rotating the connecting pipe.
进一步地,所述楼梯还包括护栏,所述护栏与所述楼梯段可拆卸连接。在楼梯两侧和休息平台的边沿均安装护栏,起到安全保护作用。同时,护栏与楼梯段和休息平台均可拆卸连接,便于楼梯的运输。Further, the staircase further includes a guardrail, and the guardrail is detachably connected to the stair section. Guardrails are installed on both sides of the stairs and the edge of the rest platform for safety protection. At the same time, the guardrail can be disassembled and connected to the stair section and the rest platform, which is convenient for the transportation of the stairs.
进一步地,所述层间立柱的一端设置有限位缺口;所述层间横梁的上表面一端设置有与所述层间横梁榫眼位置相对应的层间横梁榫头,所述层间横梁榫头设置有与所述限位缺口相匹配的限位台阶;所述层间楼板对应所述层间立柱设置有榫接通孔,所述层间横梁通过所述层间横梁榫头嵌入所述层间楼板中与所述层间楼板榫接,所述层间立柱一端嵌入所述榫接通孔中与所述层间楼板榫接。Further, one end of the interlayer column is provided with a limiting notch; one end of the upper surface of the interlayer beam is provided with an interlayer beam tenon corresponding to the position of the interlayer beam mortise, and the interlayer beam tenon is provided with There is a limit step matched with the limit gap; the inter-story floor plate is provided with a tenon through hole corresponding to the inter-story column, and the inter-story beam is embedded in the inter-story floor plate through the inter-story beam tenon It is mortised with the inter-story floor slab, and one end of the inter-floor upright column is embedded in the mortise-through hole and mortised with the inter-floor floor slab.
在上述技术方案中,所述层间立柱与所述层间横梁在榫接时,所述限位台阶嵌入限位缺口中,并通过所述榫接通孔将层间立柱和层间横梁的榫接处固定下来,使层间立柱、层间横梁和层间楼板的连接成一个稳定的整体结构,提高整个房屋建筑的稳定性。In the above technical solution, when the interlayer column and the interlayer beam are tenoned, the limit step is embedded in the limit gap, and the interlayer column and the interlayer beam are connected through the tenon hole. The tenon joints are fixed, so that the connection between the inter-story columns, the inter-story beams and the inter-story floor slabs forms a stable overall structure, which improves the stability of the entire building.
进一步地,所述预制件还包括底层梁;所述底层梁的两端分别与所述底层立柱榫接;所述底层梁的上端面设置有用于与所述墙面板榫接的底层梁榫槽。在安装过程中,底层梁将分别独立安装的底层立柱连接为一个整体,提高墙面板在插入过程中底层立柱的稳定性,为房屋建筑的上层楼层打下稳定的底层基础;同时,墙面板在安装时嵌入底层梁中,对墙面板形成稳定、均匀的支撑作用,使房屋建筑的承重性和稳定性更好,使多层房屋建筑的较高楼层稳定性更好。Further, the prefabricated part further includes a bottom beam; both ends of the bottom beam are respectively mortise and tenon with the bottom column; the upper end surface of the bottom beam is provided with a bottom beam tenon groove for tenon connection with the wall panel . During the installation process, the bottom beam connects the bottom columns installed independently as a whole, which improves the stability of the bottom columns during the insertion process of the wall panel and lays a stable bottom foundation for the upper floors of the building; at the same time, the wall panels are installed during the installation. When embedded in the bottom beam, it forms a stable and uniform supporting effect on the wall panel, which makes the load-bearing and stability of the building better, and the stability of the higher floors of the multi-storey building is better.
本发明还公开了一种预制装配式安全学习体验馆的安装方法,用于采用单层房屋建筑的安全学习体验馆的装配,具体包括以下步骤:The invention also discloses an installation method of a prefabricated safety learning experience hall, which is used for the assembly of the safety learning experience hall using a single-storey building, which specifically includes the following steps:
S1:装配房屋建筑;S1: Assembling the house building;
准备预制件,包括多根立柱、多根顶梁、至少一楼板和多面墙体;Prepare prefabricated parts, including multiple columns, multiple top beams, at least one floor slab and multiple walls;
安装所述立柱;installing the column;
在相邻的两根所述立柱之间插入所述墙体;使所述墙体的两端分别与相邻的两根所述立柱榫接,将所述立柱和所述墙体连接成整体;The wall is inserted between the two adjacent vertical columns; the two ends of the wall are respectively tenoned with the two adjacent vertical columns, and the vertical column and the wall are connected as a whole ;
在所述立柱和所述墙体上安装所述顶梁,使得所述立柱与所述顶梁、所述墙体与所述顶梁榫接,并在所述顶梁上覆盖安装所述楼板;The top beam is installed on the column and the wall, so that the column and the top beam, the wall and the top beam are tenoned, and the floor slab is installed on the top beam ;
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目。S2: Divide the building into a plurality of safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在上述安装方法中,采用若干预制件通过榫卯结构搭建拼接成房屋建筑,其搭建过程简单,无需另外使用混凝土等建筑材料;同时也少有紧固件等零件的使用,简化了房屋建筑的搭建工艺和房屋建筑搭建过程中的零部件、材料使用,缩短工期,减少房屋建筑搭建成本,便于安全学习体验馆的快速搭建、拆卸、运输和再次使用。In the above installation method, several prefabricated parts are used to build and spliced into a house building through a tenon-and-mortise structure. The construction process is simple, and there is no need to use additional building materials such as concrete; at the same time, fasteners and other parts are rarely used, which simplifies the construction of the house. The construction process and the use of parts and materials in the process of building construction shorten the construction period, reduce the cost of building construction, and facilitate the rapid construction, disassembly, transportation and reuse of the safe learning experience hall.
本发明还公开了一种预制装配式安全学习体验馆的安装方法,用于采用单层房屋建筑且设置有底层横梁的安全学习体验馆的装配,具体包括以下步骤:The invention also discloses an installation method of a prefabricated safety learning experience hall, which is used for the assembly of a single-storey building and a safety learning experience hall provided with bottom beams, which specifically includes the following steps:
S1:装配房屋建筑;S1: Assembling the house building;
准备预制件,包括多根立柱、多根顶梁、多根底层横梁、至少一楼板和多面墙体;Prepare prefabricated parts, including multiple columns, multiple top beams, multiple bottom beams, at least one floor slab and multiple walls;
安装所述立柱;installing the column;
在相邻的两个所述立柱之间放入所述底层横梁,使得所述底层横梁的两端与相邻的两根所述立柱榫接;Putting the bottom beam between the two adjacent vertical columns, so that the two ends of the bottom beam are tenoned with the two adjacent vertical columns;
在相邻的两根所述立柱之间插入所述墙体,且使所述墙体的下端面与所述底层横梁榫接,所述墙体与相邻的两根所述立柱榫接;将所述立柱和所述墙体连接成整体;Inserting the wall between the two adjacent vertical columns, and making the lower end surface of the wall mortise and tenon with the bottom beam, and the wall and the two adjacent vertical columns mortise; connecting the column and the wall into a whole;
S14:在所述立柱和所述墙体上安装所述顶梁,使所述立柱与所述顶梁、所述墙体与所述顶梁榫接,并在所述顶梁上覆盖安装所述楼板;S14: Install the top beam on the column and the wall, make the column and the top beam, the wall and the top beam tenon, and cover the top beam on the top beam the floor;
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目。S2: Divide the building into a plurality of safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在上述安装方法中,安装立柱之后、安装墙体之前,先在立柱之间插入与立柱榫接的底层横梁,将多根本来分散安装在立柱连接成了一个整体,然后再安装墙体,提高墙体在插入过程中立柱的稳定性;同时,墙体在安装时嵌入底层横梁中,对墙体形成稳定、均匀的支撑作用,使房屋建筑的承重性和稳定性更好。In the above installation method, after installing the columns and before installing the walls, first insert the bottom beams that are mortise-jointed with the columns between the columns, and install the multiple foundations scattered on the columns to form a whole, and then install the walls to improve the The stability of the column during the insertion process of the wall; at the same time, the wall is embedded in the bottom beam during installation, forming a stable and uniform support for the wall, making the load-bearing and stability of the building better.
本发明还公开了一种预制装配式安全学习体验馆的安装方法,用于采用两层及两层以上楼层的房屋建筑的安全学习体验馆的装配,具体包括以下步骤:The invention also discloses an installation method of a prefabricated safety learning experience hall, which is used for the assembly of a safety learning experience hall in a building with two or more floors, which specifically includes the following steps:
S1:装配房屋建筑;S1: Assembling the house building;
准备预制件,包括多根所述底层立柱、多根所述层间立柱、多面所述墙面板、多根所述层间横梁、至少一面所述层间楼板、至少一面所述顶层楼板和至少一连接相邻两层楼层的所述楼梯;Prefabricated parts are prepared, including a plurality of the bottom uprights, a plurality of the interlayer uprights, a plurality of the wall panels, a plurality of the interlayer beams, at least one of the interlayer floor slabs, at least one of the top floor slabs and at least one of the top floor slabs. a said staircase connecting two adjacent floors;
安装所述底层立柱;installing the bottom column;
在相邻的两根所述底层立柱之间插入所述墙面板,所述墙面板与相邻的两根所述底层立柱榫接;将所述底层立柱和所述墙面板连接成整体;The wall panel is inserted between the two adjacent bottom uprights, and the wall panel is tenoned with the two adjacent bottom uprights; the bottom upright and the wallboard are connected as a whole;
在所述底层立柱和所述墙面板上安装所述层间横梁,使所述底层立柱与所述层间横梁、所述墙面板与所述层间横梁榫接,并在所述层间横梁上覆盖安装所述层间楼板;Install the interlayer beam on the bottom column and the wall panel, so that the bottom column and the interlayer beam, the wall panel and the interlayer beam are tenoned, and the interlayer beam Covering and installing the inter-floor floor;
将所述层间立柱穿过所述层间楼板与所述层间横梁榫接,保持所述层间立柱竖直;然后在相邻的所述层间立柱之间插入墙面板,再在所述层间立柱和这一层的所述墙面板上安装所述层间横梁,并在所述层间横梁上覆盖安装所述层间楼板;重复这一步骤,直至所有的层间立柱和层间横梁安装完成,然后在最高层的层间横梁上覆盖安装顶层楼板;The inter-story uprights are mortised through the inter-story floor slabs and the inter-story beams to keep the inter-story uprights vertical; then wall panels are inserted between the adjacent inter-story uprights, and then Install the interlayer beams on the interlayer columns and the wall panels on this layer, and cover and install the interlayer floor slabs on the interlayer beams; repeat this step until all the interlayer columns and layers After the installation of the interlayer beams is completed, the top floor slabs are then installed over the interlayer beams on the highest floor;
安装所述楼梯;installing the staircase;
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目。S2: Divide the building into a plurality of safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
进一步地,安装所述楼梯还包括以下步骤:Further, installing the stairs also includes the following steps:
在较低一层楼层的所述层间楼板上或者地面上安装所述支撑件;然后在支撑件上安装所述休息平台;Install the support on the inter-floor slab or the ground on the lower floor; then install the rest platform on the support;
安装两段所述楼梯段,使一段所述楼梯段一端与较低一层楼层的层间楼板或地面连接、另一端与所述休息平台连接;使另一段所述楼梯段一端与所述休息平台连接、另一端与较高一层楼层的层间楼板连接;然后继续安装所述安全学习体验馆的其他所述预制件。Two sections of the stair sections are installed, so that one end of the stair section of the first section is connected with the inter-floor slab or ground of the lower floor, and the other end is connected with the rest platform; one end of the stair section of the other section is connected with the rest platform The platform is connected, and the other end is connected with the inter-floor slab of the upper floor; then proceed to install other said prefabricated parts of the safe learning experience hall.
本发明还公开了一种预制装配式安全学习体验馆的安装方法,用于采用两层及两层以上楼层的房屋建筑且层间立柱与层间横梁榫接的安全学习体验馆的装配,具体包括以下步骤:The invention also discloses an installation method of a prefabricated safety learning experience pavilion, which is used for the assembly of a safety learning experience pavilion in which a building with two or more floors is adopted, and the inter-floor columns and the inter-floor beams are mortised. Include the following steps:
S1:装配房屋建筑;S1: Assembling the house building;
准备预制件,包括多根所述底层立柱、多根所述层间立柱、多面所述墙面板、多根所述层间横梁、至少一面所述层间楼板、至少一面所述顶层楼板和至少一连接相邻两层楼层的所述楼梯;Prefabricated parts are prepared, including a plurality of the bottom uprights, a plurality of the interlayer uprights, a plurality of the wall panels, a plurality of the interlayer beams, at least one of the interlayer floor slabs, at least one of the top floor slabs and at least one of the top floor slabs. a said staircase connecting two adjacent floors;
安装所述底层立柱;installing the bottom column;
在相邻的两根所述底层立柱之间插入所述墙面板,所述墙面板与相邻的两根所述底层立柱榫接;将所述底层立柱和所述墙面板连接成整体;The wall panel is inserted between the two adjacent bottom uprights, and the wall panel is tenoned with the two adjacent bottom uprights; the bottom upright and the wallboard are connected as a whole;
在所述底层立柱和所述墙面板上安装所述层间横梁,使所述底层立柱与所述层间横梁、所述墙面板与所述层间横梁榫接;将这一楼层的所有所述层间立柱安装在所述层间横梁上,保持每一所述层间横梁的所述限位台阶嵌入对应的所述层间立柱的所述限位缺口,然后吊装所述层间楼板,使所述层间横梁榫头、所述层间立柱设置有所述限位缺口的一端均嵌入所述榫接通孔内;Install the inter-story beam on the bottom-level column and the wall panel, so that the bottom-level column and the inter-story beam, the wall panel and the inter-story beam are mortised; The inter-story columns are installed on the inter-story beams, and the limit steps of each inter-story beam are kept embedded in the corresponding limit gaps of the inter-story columns, and then the inter-story floor slabs are hoisted. Inserting the tenon of the interlayer beam and the end of the interlayer column provided with the limiting notch into the tenon through hole;
在相邻的所述层间立柱之间插入墙面板,再在所述层间立柱和这一层的所述墙面板上安装所述层间横梁,并在所述层间横梁上覆盖安装所述层间楼板;重复这一步骤,直至所有的层间立柱和层间横梁安装完成,然后在最高层的层间横梁上覆盖安装顶层楼板;Insert wall panels between the adjacent interlayer columns, install the interlayer beams on the interlayer columns and the wall panels on this layer, and cover the installation place on the interlayer beams. Repeat this step until all the inter-story columns and inter-story beams are installed, and then cover and install the top floor slab on the inter-story beam on the highest floor;
安装所述楼梯;installing the staircase;
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目。S2: Divide the building into a plurality of safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
本发明还公开了一种预制装配式安全学习体验馆的安装方法,用于采用两层及两层以上楼层的房屋建筑的安全学习体验馆的装配,具体包括以下步骤:The invention also discloses an installation method of a prefabricated safety learning experience hall, which is used for the assembly of a safety learning experience hall in a building with two or more floors, which specifically includes the following steps:
S1:装配房屋建筑;S1: Assembling the house building;
准备预制件,包括多根底层立柱、多根层间立柱、多面墙面板、多根层间横梁、多根底层梁、至少一面层间楼板、至少一面顶层楼板和至少一连接相邻两层楼层的楼梯;Prepare prefabricated parts, including a plurality of ground floor columns, a plurality of interlayer columns, a plurality of wall panels, a plurality of interlayer beams, a plurality of ground floor beams, at least one interlayer floor slab, at least one top floor slab, and at least one connecting two adjacent floors the stairs;
安装所述底层立柱;installing the bottom column;
在相邻的两个所述底层立柱之间放入所述底层梁,使得所述底层梁的两端与相邻的两根所述立柱榫接;然后在相邻的两根所述底层立柱之间插入所述墙面板,使所述墙面板的下端与所述底层梁榫接、所述墙面板与相邻的两根所述底层立柱榫接;将所述底层立柱和所述墙面板连接成整体;Put the bottom beam between the two adjacent bottom uprights, so that the two ends of the bottom beam are tenoned with the two adjacent uprights; then place the two adjacent bottom uprights Insert the wall panel between them, so that the lower end of the wall panel is tenoned with the bottom beam, and the wall panel is tenoned with the two adjacent bottom columns; connected as a whole;
在所述底层立柱和所述墙面板上安装所述层间横梁,使所述底层立柱与所述层间横梁、所述墙面板与所述层间横梁榫接,并在所述层间横梁上覆盖安装所述层间楼板;Install the interlayer beam on the bottom column and the wall panel, so that the bottom column and the interlayer beam, the wall panel and the interlayer beam are tenoned, and the interlayer beam Covering and installing the inter-floor floor;
将所述层间立柱穿过所述层间楼板与所述层间横梁榫接,保持所述层间立柱竖直;然后在相邻的所述层间立柱之间插入墙面板,再在所述层间立柱和这一层的所述墙面板上安装所述层间横梁,并在所述层间横梁上覆盖安装所述层间楼板;重复这一步骤,直至所有的层间立柱和层间横梁安装完成,然后在最高层的层间横梁上覆盖安装顶层楼板;The inter-story uprights are mortised through the inter-story floor slabs and the inter-story beams to keep the inter-story uprights vertical; then wall panels are inserted between the adjacent inter-story uprights, and then Install the interlayer beams on the interlayer columns and the wall panels on this layer, and cover and install the interlayer floor slabs on the interlayer beams; repeat this step until all the interlayer columns and layers After the installation of the interlayer beams is completed, the top floor slabs are then installed over the interlayer beams on the highest floor;
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目。S2: Divide the building into a plurality of safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
与现有技术相比,本发明的具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
本申请公开了一种预制装配式安全学习体验馆,采用若干预制件榫接而成,极大程度上的缩减了现场施工的步骤和施工材料的准备,避免了现场施工存在的材料浪费、施工场地环境污染,同时也可以缩短安全学习体验馆的现场施工工期;同时,通过榫卯结构将搭建房屋建筑的预制件连接为一个整体建筑,无需另外使用混凝土浇筑、大量紧固件连接,使其拆装方便,减少在拆装过程中对预制件的损伤,也便于预制件的重复使用;此外,减少紧固件的使用,还可以减少拆装过程中,紧固件的遗失和损坏,影响房屋建筑的现场拆装进度。同时,房屋建筑在使用完成后,可通过分拆成预制件,运输到下一个施工场地或者需要场所,方便运输和预制件的重复使用、安全学习体验馆的再次安装。本申请公开的体验馆的预制件还增加了底层横梁或底层梁,提高体验馆的整体性和稳定性,同时也便于体验馆安装过程中墙体或墙面板的安装;本申请公开的多层楼层房屋结构的体验馆的层间立柱上还设置有与层间横梁榫接的限位缺口,使层间立柱、层间横梁和层间楼板榫接为一体,相互牵引限制,提高房屋建筑的整体性和稳定性,使其更加稳固,承重和抗恶劣天气能力更强;本申请公开的多层楼层房屋结构的体验馆还设置有可拆卸的楼梯,采用可拆卸结构楼梯,便于楼梯的安装和运输;还可以实现楼梯可调。本申请还公开了多种预制装配式安全学习体验馆的安装方法,采用若干预制件通过榫卯结构搭建拼接成房屋建筑,其搭建过程简单,无需另外使用混凝土等建筑材料;同时也少有紧固件等零件的使用,简化了房屋建筑的搭建工艺和房屋建筑搭建过程中的零部件、材料使用,缩短工期,减少房屋建筑搭建成本,便于安全学习体验馆的快速搭建、拆卸、运输和再次使用。The present application discloses a prefabricated safety learning experience hall, which is formed by mortising several prefabricated parts, which greatly reduces the steps of on-site construction and the preparation of construction materials, and avoids the waste of materials and the construction of on-site construction. The site environment is polluted, and at the same time, the construction period of the safety learning experience hall can be shortened; at the same time, the prefabricated parts for building the house are connected into a whole building through the tenon-and-mortise structure, and there is no need to use additional concrete pouring and a large number of fasteners to connect it. Easy disassembly and assembly, reduce damage to prefabricated parts during disassembly and assembly, and facilitate the reuse of prefabricated parts; in addition, reducing the use of fasteners can also reduce the loss and damage of fasteners during disassembly and assembly. On-site dismantling progress of house construction. At the same time, after the building is completed, it can be disassembled into prefabricated parts and transported to the next construction site or required place, which is convenient for transportation, reuse of prefabricated parts, and re-installation of the safe learning experience hall. The prefabricated parts of the experience pavilion disclosed in the present application also add bottom beams or bottom beams to improve the integrity and stability of the experience pavilion, and also facilitate the installation of walls or wall panels during the installation process of the experience pavilion; The inter-story columns of the experience hall of the floor house structure are also provided with limit gaps connected with inter-story beams, so that the inter-story columns, inter-story beams and inter-story floor slabs are mortised into one, and the mutual traction is limited, improving the building's performance. Integrity and stability make it more stable, with stronger load-bearing and anti-bad weather capabilities; the experience hall of the multi-storey house structure disclosed in the present application is also provided with a detachable staircase, which adopts a detachable structural staircase to facilitate the installation of the staircase and transportation; also can realize the adjustable stairs. The application also discloses a variety of installation methods for prefabricated safety learning experience halls. Several prefabricated parts are used to build and spliced into a house building through a tenon-and-mortise structure. The construction process is simple, and no additional building materials such as concrete are required; The use of firmware and other parts simplifies the construction process of house construction and the use of parts and materials in the process of house construction, shortens the construction period, reduces the cost of house construction, and facilitates the rapid construction, disassembly, transportation and re-installation of the safe learning experience hall. use.
附图说明Description of drawings
图1为本发明一些实施例中公开的单层的一种预制装配式安全学习体验馆的立体图;1 is a perspective view of a single-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图2为本发明一些实施例中公开的一种预制装配式安全学习体验馆的立柱的结构示意图;2 is a schematic structural diagram of a column of a prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图3为本发明一些实施例中公开的一种预制装配式安全学习体验馆的底层横梁的结构示意图;3 is a schematic structural diagram of a bottom beam of a prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图4、5为本发明一些实施例公开的一种预制装配式安全学习体验馆的顶梁的结构示意图分开写;两个视图方向不同4 and 5 are the structural schematic diagrams of the top beam of a prefabricated safety learning experience hall disclosed by some embodiments of the present invention; the two views are in different directions.
图6为本发明一些实施例公开的一种预制装配式安全学习体验馆的立柱和底层横梁的安装结构示意图;6 is a schematic diagram of the installation structure of a column and a bottom beam of a prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图7为本发明一些实施例公开的一种预制装配式安全学习体验馆的墙体的安装示意图;7 is a schematic diagram of the installation of a wall of a prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图8为本发明一些实施例公开的一种预制装配式安全学习体验馆的顶梁的安装示意图;图;Figure 8 is a schematic diagram of the installation of the top beam of a prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention; Figure;
图9为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的立体图;9 is a perspective view of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图10、11为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的层间横梁的结构示意图;分开写Figures 10 and 11 are schematic structural diagrams of interlayer beams of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention; written separately
图12为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的层间立柱的结构示意图;12 is a schematic structural diagram of an interlayer column of a multi-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图13为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的部分楼梯的结构示意图;13 is a schematic structural diagram of a part of stairs of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图14为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的楼梯的分解图;14 is an exploded view of a staircase of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图15为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的休息平台的结构示意图;15 is a schematic structural diagram of a rest platform of a multi-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图16为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的支撑件和休息平台的安装示意图;16 is a schematic diagram of the installation of the support and the rest platform of a multi-layer prefabricated prefabricated safe learning experience hall disclosed in some embodiments of the present invention;
图17为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的楼梯段和休息平台的安装示意图;17 is a schematic diagram of the installation of a staircase section and a rest platform of a multi-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图18为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的底层立柱和底层梁的安装结构示意图;18 is a schematic diagram of the installation structure of the bottom column and the bottom beam of a multi-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图19为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的墙面板的安装示意图;19 is a schematic diagram of the installation of a multi-layer prefabricated wall panel of a prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图20为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的底层楼层的结构示意图;20 is a schematic structural diagram of the bottom floor of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图21为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的层间立柱的安装示意图;Figure 21 is a schematic diagram of the installation of the interlayer columns of a multi-layer prefabricated prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图22为本发明一些实施例中公开的多层的一种预制装配式安全学习体验馆的第二层楼层的安装示意图;22 is a schematic diagram of the installation of the second floor of a multi-layer prefabricated safety learning experience hall disclosed in some embodiments of the present invention;
图中标记:11-立柱,111-立柱榫头,112-立柱榫槽,12-底层横梁,121-底层横梁榫槽,13-墙体,131-门,132-窗户,14-顶梁,141-锁紧螺栓,142-顶梁榫眼,143-顶梁榫槽,144-顶梁榫头,15-楼板,21-底层立柱,22-层间立柱;221-层间立柱榫头,222-层间立柱缺口,23-底层梁,24-层间楼板,241-榫接通孔;242-楼梯空口,25-层间横梁,251-层间横梁榫头,2511-限位台阶,252-层间横梁榫眼,253-层间横梁榫槽,26-墙面板,27-顶层楼板,28-楼梯,281-楼梯段,2811-左梯梁,2812-右梯梁,2813-踏步板,282-休息平台,2821-定位杆,283-支撑件,2831-支撑座,2832-支撑杆,2833-连接管,284-护栏,2841-栏杆,2842-扶手,29-临时支撑杆。Marked in the figure: 11-column, 111-column tenon, 112-column tongue and groove, 12-ground beam, 121-ground beam tongue and groove, 13-wall, 131-door, 132-window, 14-top beam, 141 - Locking bolts, 142- Top beam mortise, 143- Top beam tenon, 144- Top beam tenon, 15- Floor, 21- Ground floor column, 22- Inter-story column; 221- Inter-story column tenon, 222- Floor Column gap, 23-ground beam, 24-floor slab, 241-mortise hole; 242-stair opening, 25-interfloor beam, 251-interfloor beam tenon, 2511-limiting step, 252-interfloor Beam mortise, 253- Inter-story beam tongue and groove, 26- Wall panel, 27- Top floor, 28- Stair, 281- Stair run, 2811- Left ladder beam, 2812- Right ladder beam, 2813- Tread plate, 282- Rest platform, 2821-positioning rod, 283-support piece, 2831-support seat, 2832-support rod, 2833-connecting pipe, 284-guardrail, 2841-railing, 2842-handrail, 29-temporary support rod.
具体实施方式Detailed ways
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be construed that the scope of the above-mentioned subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
本申请文件中所提及中安全体验项目包括安全知识宣传讲解、平衡木体验、安全帽撞击体验、正确着装展示、劳保用品展示、安全鞋撞击体验、消防用品演示体验、墙体倾倒体验、钢丝绳演示体验、综合用电体验、现场急救体验、移动平台倾倒体验、护栏倾倒体验、负重体验、高空走道体验、爬梯演示体验、安全带使用体验、洞口坠落体验等安全体验项目中的多种或者全部,还可以根据需要增加其他安全体验项目或者减少其中的某些安全体验项目。The safety experience items mentioned in this application document include safety knowledge propaganda and explanation, balance beam experience, helmet impact experience, correct dress display, labor protection equipment display, safety shoe impact experience, fire equipment demonstration experience, wall dumping experience, wire rope demonstration Experience, comprehensive electricity use experience, on-site first aid experience, mobile platform dumping experience, guardrail dumping experience, weight-bearing experience, high-altitude walkway experience, ladder-climbing demonstration experience, seat belt use experience, hole falling experience, etc. Other security experience items may also be added or some of them may be decreased as required.
所述房屋建筑内部空间即为整体的安全体验区域,其安全体验区域可被分为多个安全体验区,并根据设置的安全体验项目不同被设定为平衡木体验区、安全帽撞击体验区、正确着装展示区、劳保用品展示区、安全鞋撞击区、消防用品演示体验区、墙体倾倒体验区、钢丝绳演示体验区、综合用电体验区、现场急救体验区、移动平台倾倒体验区、护栏倾倒体验区、高空走道体验区、负重体验区、爬梯演示体验区和安全带使用体验、洞口坠落体验区等。The interior space of the building is the overall safety experience area, and the safety experience area can be divided into multiple safety experience areas, which are set as balance beam experience areas, helmet impact experience areas, and safety experience areas according to different safety experience items. Correct dress display area, labor protection equipment display area, safety shoe impact area, fire protection equipment demonstration experience area, wall dumping experience area, wire rope demonstration experience area, comprehensive electricity experience area, on-site first aid experience area, mobile platform dumping experience area, guardrail Dumping experience area, high-altitude walkway experience area, weight-bearing experience area, ladder-climbing demonstration experience area, seat belt use experience, hole fall experience area, etc.
本申请文件的实施例中,所述预制件均采用轻钢和彩钢板材预制而成,使得房屋具有可靠、耐用、防潮、防水、防台、防腐蚀、方便修建拆卸的技术效果。同时预制件中采用轻钢作为原材料之一,还可以降低预制件的质量,便于房屋建筑的拆装和运输。In the examples of this application document, the prefabricated parts are all prefabricated from light steel and color steel sheets, so that the house has the technical effects of being reliable, durable, moisture-proof, waterproof, typhoon-proof, anti-corrosion, and convenient for construction and disassembly. At the same time, light steel is used as one of the raw materials in the prefabricated parts, which can also reduce the quality of the prefabricated parts and facilitate the disassembly and transportation of housing construction.
实施例1Example 1
本实施例提供的一种预制装配式安全学习体验馆,参阅图1,包括房屋建筑和设置在所述房屋建筑内的至少一个安全体验区;所述房屋建筑为单层房屋建筑;所述预制件包括多根立柱11、多根顶梁14、一楼板15和多面墙体13;所述立柱11竖直设置在地面上;所述墙体13两端面分别与相邻的两个所述立柱11的侧面榫接;所述顶梁14两端分别与所述立柱11榫接;所述顶梁14的下端面与一所述墙体13榫接;所述楼板15下端面与所述顶梁14的上端面榫接和/或通过紧固件连接;至少一所述墙体13上设置有门131。A prefabricated prefabricated safety learning experience hall provided in this embodiment, referring to FIG. 1 , includes a house building and at least one safety experience area set in the house building; the house building is a single-storey house building; the prefabricated building The components include a plurality of
所述立柱11均包括柱体和至少两个设置在所述柱体一端的立柱榫头111;所述柱体的侧面上均设置有至少两个位于不同侧面的立柱榫槽112;所述楼板15下端面设置有沿所述楼板15边沿延伸的楼板15榫槽;所述顶梁14下端面均设置有与所述墙体13榫接的顶梁榫槽143;所述顶梁14两端均设置有与所述立柱榫头111匹配的顶梁榫眼142;所述顶梁14上端面设置有与所述楼板15榫槽匹配的顶梁14榫条,或者所述顶梁14上端面嵌入所述楼板15榫槽内与所述楼板15榫接。所述墙体13左右两端面均设置有与所述立柱榫槽112匹配的第一墙体13榫条,或所述墙体13两端均嵌入所述立柱榫槽112内与所述立柱11榫接;所述墙体13上端面设置有与所述顶梁榫槽143匹配的第二墙体13榫条,或所述墙体13上端面嵌入所述顶梁榫槽143内与所述顶梁14榫接。Each of the
参阅图2,每一所述立柱11的柱体上设置有两个立柱榫头111,分别为第一立柱榫头111和第二立柱榫头111;参阅图4,所述顶梁14为“[”型,其包括腹板段和分别位于腹板段的两端的第一弯折部和第二弯折部;所述顶梁榫眼142设置在所述第一弯折部和第二弯折部远离所述腹板段的一端,使得所述立柱榫头111可嵌入顶梁榫眼142中,实现顶梁14和立柱11的榫接;所述顶梁榫槽143与顶梁榫槽143同侧设置,当立柱榫头111嵌入顶梁榫眼142中时,所述墙体13或者墙体13上设置有的第二墙体13榫条也正好嵌入顶梁榫槽143中。优选地,所述墙体13直接嵌入顶梁榫槽143中,简化墙体13预制件的结构,便于拆装。所述顶梁14的第一弯折部和第二弯折部分别与两个相邻立柱11的立柱榫头111榫接;使得整个房屋结构的墙面连接成一个整体,提高房屋建筑结构的稳定性。Referring to FIG. 2 , two
所述楼板15的长宽均大于所述立柱11围成的空间面积,使楼板15可以覆盖安装在顶梁14上,并通过顶梁14的顶梁14榫条嵌入楼板15榫槽中实现顶梁14和楼板15的榫接,完成整个房屋建筑的搭建。The length and width of the
需要说明的是,所述立柱11通过基础底座安装在地面或者基础坑基中,所述基础底座与立柱11可固定连接为一体,也可以通过螺钉或者榫卯结构可拆卸连接。立柱11与所述基础底座榫接可通过以下结构实现:It should be noted that the
立柱11的下端设置有立柱11榫眼,所述基础底座上设置有底座榫头,通过底座榫头嵌入立柱11榫眼,即可实现立柱11和基础底座的榫接。The lower end of the
在一些实施例中,参阅图5,所述楼板15与顶梁14还可以采用若干锁紧螺栓141或者其他紧固件进行连接。In some embodiments, referring to FIG. 5 , the
在一些实施例中,所述楼板15与顶梁14采用顶梁榫条和楼板15榫槽榫接后,还增加了若干锁紧螺栓141或者其他紧固件进行紧固,增加楼板15和顶梁14连接的稳定性,使整个房屋建筑稳定性更强。In some embodiments, after the
上述安全学习体验馆通过以下方法安装:The above safety learning experience hall is installed by the following methods:
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根立柱11、多根顶梁14、至少一楼板15和多面墙体13;S11: prepare prefabricated parts, including
S12:在地面或者基础坑中安装预制的独立的基础底座,并在基础底座上安装所述立柱11;S12: Install a prefabricated independent foundation base in the ground or foundation pit, and install the
S13:在相邻的两根所述立柱11之间插入所述墙体13;使所述墙体13的两端分别与相邻的两根所述立柱11榫接,所述墙体13的下端面压在所述基础底座的表面,将所述立柱11和所述墙体13连接成整体;S13: Insert the
S14:在所述立柱11和所述墙体13上安装所述顶梁14,使得所述立柱11与所述顶梁14、所述墙体13与所述顶梁14榫接,并在所述顶梁14上覆盖安装所述楼板15;S14: Install the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在一些实施例中,步骤S14中,所述楼板15与所述顶梁14还可以通过螺栓等紧固件加固:即在楼板15上对应顶梁14等距设置有若干定位孔,所述顶梁14上对应定位孔设置有若干螺杆;安装过程中,螺杆与定位孔对应,即可实现楼板15的定位;同时螺杆穿过定位孔后用螺母锁紧固定,即可实现楼板15与顶梁14的连接加固;同时,所述螺栓与楼板15之间还设置有橡胶密封垫,可实现螺杆与定位孔安装处的密封连接,避免漏水。In some embodiments, in step S14, the
实施例2Example 2
在实施例1的基础上,本实施例在所述房屋建筑内也设置有墙板和顶梁14,通过立柱11、墙板和顶梁14形成的墙面将房屋建筑内部分割成两个或者两个以上的房屋空间,将多个安全体验项目设置在不同的房屋空间内,减少多组施工人员进行安全体验过程中的相互干扰。On the basis of Embodiment 1, this embodiment is also provided with wall panels and
需要说明的,所述立柱11包括柱体一端设置有三个立柱榫头111且柱体侧面设置有三个位于不同侧面的立柱榫槽112的第一立柱、柱体一端设置有两个立柱榫头111且柱体侧面设置有两个位于不同侧面的立柱榫槽112的第二立柱;若所述房屋建筑被分割为呈矩阵排列的四个及以上的房屋空间,则所述立柱11还包括柱体一端设置有四个立柱榫头111且柱体侧面设置有四个位于不同侧面的立柱榫槽112的第三立柱。所述第二立柱又分为转角立柱和连接立柱;所述转角立柱通常设置在房屋建筑的转角;所述连接立柱通常用于连接两个呈180°或接近180°的墙体13;所述转角立柱的两个立柱榫槽112位于所述转角立柱的柱体的相邻侧面上;所述连接立柱的两个立柱榫槽112设置在所述连接立柱的柱体的两个相互对应的侧面上。位于所述房屋建筑内的墙体13上均设置有门131,便于施工人员通过,也便于安全体验项目的设备的安装和拆卸。房屋建筑的建筑顶可采用一个整体预制的楼板15,也可以采用多个预制的楼板15拼装而成;采用多个楼板15拼装成建筑顶时,楼板15之间的缝隙可通过防水胶进行密封粘接,避免楼板15之间的缝隙漏水。It should be noted that the
上述安全学习体验馆的安装方法如下:The installation method of the above safety learning experience hall is as follows:
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根立柱11、多根顶梁14、至少一楼板15、多面墙体13;所述立柱11包括第一立柱和第二立柱;S11: prepare prefabricated parts, including a plurality of
S12:基础坑基开挖夯实到位后,放入预制的基础底座,将基础底座固定在地面上;并将所述第一立柱、第二立柱安装在基础底座上,所述转角立柱设置在房屋建筑的转角处;所述第一立柱和连接立柱设置在两根转角立柱之间;同时,第一立柱设置在两根连接立柱之间;S12: After the foundation pit foundation is excavated and compacted in place, put in the prefabricated foundation base, and fix the foundation base on the ground; and install the first column and the second column on the foundation base, and the corner column is arranged on the house At the corner of the building; the first column and the connecting column are arranged between two corner columns; at the same time, the first column is arranged between the two connecting columns;
S13:在相邻的两根所述立柱11之间均插入所述墙体13,使得墙体13的下端贴在所述基础底座的上表面,使所述第二立柱与设在第二立柱之间的所述墙体13连成的整体形成房屋建筑的外墙面;所述第一立柱与设置在第一立柱之间的墙体13形成墙面将房屋建筑内部分割为多个房屋空间;S13: Insert the
S14:在所有所述立柱11和所有所述墙体13上安装所述顶梁14,并在所述顶梁14上覆盖安装所述楼板15或者板块;S14: Install the top beams 14 on all the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在一些实施例中,所述安全学习体验馆的房屋建筑被分割成呈矩阵排列的四个及以上数量的房屋空间时,所使用的立柱11还包括第三立柱。第三立柱设置在房屋建筑内部,立柱11的四周都榫接有墙体13,且上端通过第三立柱的立柱榫头111均榫接有顶梁14,其他结构和安装方法与上述实施例的房屋结构和安装方法基本相同,因此不再一一详述。In some embodiments, when the building of the safe learning experience hall is divided into four or more housing spaces arranged in a matrix, the used
所述房屋建筑内设置有多个房屋空间时,墙体13对楼板15可以起到支撑作用,使房屋建筑的稳定性更好。楼板15采用多个板块拼装而成时,虽然破坏了楼板15的整体性,但预制运输更加简单,也降低了楼板15吊装过程中的难度,降低房屋建筑的装配难度;同时也便于二次转运。When a plurality of house spaces are arranged in the house building, the
本实施例其他部分与实施例1基本相同,不再一一详述。Other parts of this embodiment are basically the same as those of Embodiment 1, and will not be described in detail.
实施例3Example 3
在上述实施例1或2的基础上,本实施例的预制件还包括底层横梁12;参阅图3,所述底层横梁12的两端分别与所述立柱11榫接;所述底层横梁12的上端面设置有用于与所述墙体13榫接的底层榫槽121。所述墙体13在安装在两个相邻的立柱11之间时,下端与底层横梁12通过底层榫槽121榫接,使墙体13四周分别与立柱11、底层横梁12和顶梁14均形成榫接,实现稳固的房屋建筑墙面整体结构。On the basis of the above-mentioned Embodiment 1 or 2, the prefabricated part of this embodiment further includes a
当所述房屋建筑设置有底层横梁12时,参阅图6~9,该安全学习体验馆的安装方法如下:When the building is provided with the
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根立柱11、多根顶梁14、多根底层横梁12、至少一楼板15和多面墙体13;S11: prepare prefabricated parts, including
S12:基础坑基开挖夯实到位后,放入预制的独立的基础底座,并在基础底座上安装所述立柱11;S12: After the foundation pit foundation is excavated and compacted in place, a prefabricated independent foundation base is placed, and the
S13:在相邻的两个所述立柱11之间放入所述底层横梁12,使得所述底层横梁12的两端与相邻的两根所述立柱11榫接;S13: Put the
S13:在相邻的两根所述立柱11之间插入所述墙体13,且使所述墙体13的下端面与所述底层横梁12榫接,所述墙体13与相邻的两根所述立柱11榫接;将所述立柱11和所述墙体13连接成整体;S13: Insert the
S14:在所述立柱11和所述墙体13上安装所述顶梁14,使所述立柱11与所述顶梁14、所述墙体13与所述顶梁14榫接,并在所述顶梁14上覆盖安装所述楼板15;S14: Install the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
本实施例其他部分与实施例1或2基本相同,不再一一详述。Other parts of this embodiment are basically the same as those of Embodiment 1 or 2, and will not be described in detail.
实施例4Example 4
本实施例提供的一种预制装配式安全学习体验馆,包括房屋建筑和设置在所述房屋建筑内的多个安全体验项目;所述房屋建筑为包括至少两层楼层的房屋建筑;所述预制件包括多根底层立柱21、多根层间立柱22、多面墙面板26、多根层间横梁25、至少一面层间楼板24、至少一面顶层楼板27和至少一连接相邻两层楼层的楼梯28;所述底层立柱21竖直设置在地面上,所述底层立柱21的上端与所述层间横梁25榫接;所述层间立柱22两端分别榫接相邻两层的楼层的所述层间横梁25;所述墙面板26左右两端分别与同一楼层的相邻的两所述底层立柱21或所述层间立柱22的侧面榫接;所述墙面板26的上端均分别与同一楼层的所述层间横梁25榫接;位于第二层楼层及其以上楼层的所述墙面板26的下端均分别与同一楼层的所述层间楼板24榫接;每一所述层间横梁25均与同一楼层的所述层间楼板24榫接;位于最高楼层的所述层间横梁25与所述顶层楼板27榫接或者通过紧固件连接;每一所述层间楼板24上均对应所述楼梯28设置有楼梯空口242,用于安装楼梯28和人员通行;底层楼层的至少一所述墙面板26设置有门131。A prefabricated safety learning experience hall provided by this embodiment includes a house building and a plurality of safety experience items arranged in the house building; the house building is a house building including at least two floors; the prefabricated building The components include a plurality of
所述底层立柱21的一端均设置有至少两个底层立柱榫头,用于榫接底层楼层的层间横梁25;所述底层立柱21的侧面设置有两个至少位于不同侧面的底层立柱榫槽,用于榫接位于底层楼层的墙面板26;所述层间立柱22的一端设置有用于榫接所述层间横梁25的层间立柱22榫眼,另一端设置有至少两个用于榫接所述层间横梁25的层间立柱榫头221;所述层间立柱22的侧面设置有至少两个位于不同侧面的层间立柱榫槽,用于与所述墙面板26榫接。One end of the
所述层间横梁25的下表面两端设置有与所述底层立柱榫头/所述层间立柱榫头221匹配的层间横梁榫眼252,用于榫接底层立柱21/层间立柱22;参阅图11,所述层间横梁25的下表面还设置有层间横梁榫槽253,用于榫接墙面板26。所述层间横梁25的上表面一端设置有与所述层间横梁榫眼252位置相对应的层间横梁榫头251,所述层间横梁榫头251与所述层间立柱榫眼匹配;所述层间横梁榫头251嵌入层间楼板24的榫接通孔241,并嵌入较高一层楼层的层间立柱22的层间立柱22榫眼,形成成一个完整的榫头,形成层间横梁25、层间立柱22和层间楼板24连接为一体的榫卯结构。Both ends of the lower surface of the
所述墙面板26的左右两端面均设置有与所述底层立柱榫槽/所述层间立柱榫槽112匹配的第一墙面板榫条,或所述墙面板26两端均嵌入所述立柱榫槽内与所述底层立柱榫槽/所述层间立柱22榫接;所述墙面板26上端面设置有与所述层间横梁榫槽253匹配的第二墙面板榫条,或所述墙面板26上端嵌入所述层间横梁榫槽253内与所述层间横梁25榫接。即所述墙面板26可以直接嵌入底层立柱21的底层立柱榫槽中或者嵌入层间立柱22的层间立柱榫槽中,直接嵌入层间横梁榫槽253中,形成榫卯结构;也可以通过设置在墙面板26侧面上的第一墙面板榫条和第二墙面板榫条与底层立柱21/层间立柱22和层间横梁25榫接。The left and right end surfaces of the
所述层间楼板24对应所述层间横梁榫头251设置有榫接通孔241,所述层间横梁25通过所述层间横梁榫头251嵌入所述层间楼板24中与所述层间楼板24榫接,所述层间立柱22通过将设置有所述层间立柱22榫眼的一端嵌入所述榫接通孔241中与所述层间楼板24榫接;所述层间楼板24上表面设置有层间楼板榫槽;所述墙面板26下端面设置有与所述层间楼板榫槽匹配的第三墙面板榫条,或所述墙面板26下端嵌入所述层间楼板榫槽内与所述层间楼板24榫接;所述顶层楼板27下端面设置有与所述层间横梁榫头251相匹配的顶层楼板榫眼。The
需要说明的是,每一所述榫接通孔241与两个层间横梁榫头251和一根层间立柱22的一端拼接形成的结构过盈配合,使较低一层楼层的层间横梁25、较高一层楼层的层间立柱22和两层楼层之间的楼板15连接为一体,使房屋建筑稳定。该楼层的墙面板26下端与层间楼板24榫接,上端与层间横梁25榫接,两端分别与层间立柱22榫接,层间立柱22之间又通过层间横梁25连接为一个整体,使房屋建筑的第二层及以上楼层也榫接成整体,形成稳定的建筑结构。It should be noted that each of the tenon-through
优选地,所述层间横梁榫头251嵌入所述层间立柱榫眼后的连接缝位于所述层间楼板24的榫接通孔241内,使榫接通孔241的内侧壁对层间横梁榫头251和层间立柱22的连接处形成密封隐藏,并从四周对层间横梁25和层间立柱22的榫接处进行限位固定,起到更好的榫接固定效果。Preferably, the connecting seam after the
所述楼梯28为预制成型的预制件或者采用若干踏步板2813、梯梁在施工现场拼接组装而成的装配件。The
当所述楼梯28为预制成型的楼梯28预制件时,包括左梯梁2811、右梯梁2812和多个踏步板2813;所述左梯梁2811和右梯梁2812相互平行,每一踏步板2813两端均均匀的固定连接在第一横梁和第二横梁的内侧面,且所有踏步板2813均相互平行,形成楼梯28结构。左梯梁2811和右梯梁2812的两端均设置有连接台,左梯梁2811和右梯梁2812均通过连接台与较低一层楼层的层间楼板24或者地面、与较高一层楼层的层间楼板24连接。左梯梁2811和右梯梁2812与较高一层楼层的层间楼板24的连接可通过紧固件或通过若干螺钉固定在层间楼板24上的固定座实现;左梯梁2811和右梯梁2812与较低一层的层间楼板24或者地面可通过紧固件或者通过若干螺钉固定在地面或者层间楼板24上的固定座实现,左梯梁2811和右梯梁2812与层间楼板24和地面的连接方式优选为通过固定座来实现,便于层间楼板24的快速安装,且通过固定座来实现左梯梁2811和右梯梁2812与层间楼板24的安装时,房屋建筑拆卸时,固定座可以不拆卸,随着层间楼板24的拆卸、运输、安装而实现固定座的运输、安装,省略的房屋建筑预制件二次使用时固定座安装的步骤,同时也便于楼梯28再次安装时的定位。When the
优选地,所述左梯梁2811和右梯梁2812用于连接层间楼板24的连接台的端面设置有与楼间层板厚度配合的卡槽,使第一横梁和第二横梁用于连接楼间层板的连接台可与楼间层板卡接,然后再通过紧固件或者固定座固定即可,该结构便于楼梯28的安装,使楼梯28在固定时无需另外使用人工或者支架来辅助支撑。Preferably, the end surface of the connecting platform used for connecting the
上述安全学习体验馆的安装方法如下:The installation method of the above safety learning experience hall is as follows:
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根底层立柱21、多根层间立柱22、多面墙面板26、多根层间横梁25、至少一面层间楼板24、至少一面顶层楼板27和至少一连接相邻两层楼层的楼梯28;S11: Prepare prefabricated parts, including a plurality of bottom-
S12:基础坑基开挖夯实到位后,放入预制的独立的基础底座和所述底层立柱21;S12: After the foundation pit foundation is excavated and compacted in place, put into the prefabricated independent foundation base and the
S13:在相邻的两根所述底层立柱21之间插入所述墙面板26,所述墙面板26与相邻的两根所述底层立柱21榫接;将所述底层立柱21和所述墙面板26连接成整体;S13: Insert the
S14:在所述底层立柱21和所述墙面板26上安装所述层间横梁25,使所述底层立柱21与所述层间横梁25、所述墙面板26与所述层间横梁25榫接,并在所述层间横梁25上覆盖安装所述层间楼板24,使层间横梁25的层间横梁榫头251嵌入所述层间楼板24的榫接通孔241内;S14: Install the
S15:安装连接较低一层楼层和较高一层楼层的楼梯28;将层间立柱22嵌入榫接通孔241内,并使得层间横梁榫头251嵌入层间立柱22榫眼中,使层间立柱22与层间横梁榫头251紧密贴合,使层间立柱22竖直固定;然后在相邻的层间立柱22之间插入墙面板26,再在层间立柱22和这一层的墙面板26上安装层间横梁25,并在层间横梁25上覆盖安装层间楼板24;S15: Install the
S16:重复步骤S15,直至所有的层间立柱22和层间横梁25安装完成,然后在最高层的层间横梁25上覆盖安装顶层楼板27;S16: Repeat step S15 until all the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
所述楼梯28可选择在顶层楼板27都已经覆盖安装完成之后再从底层楼层依次向上安装;也可以每安装一层楼层的底层立杆或者层间立杆后,即安装这一楼层的楼梯28;也可以采用如上述安装方法所公开的每安装完一层楼层之后,即安装这一楼层的楼梯28。优选为每安装完成一层楼层后,即安装这一楼层的楼梯28,便于施工人员通过楼梯28到较高一层楼层进行施工工作。The
实施例5Example 5
在实施例4的基础上,本实施例的所述楼梯28采用若干踏步板2813、左梯梁2811、右梯梁2812在施工现场拼接组装而成的装配件,即踏步板2813与左梯梁2811和右梯梁2812均为可拆卸连接,便于楼梯28的拆卸运输。在这些实施例中,所述左梯梁2811和右梯梁2812的一侧面均对应所述踏步板2813设置有均匀分布且相互平行的踏板槽;每一所述踏步板2813两端均通过所述踏板槽与所述左横梁和所述右横梁拼接。所述左梯梁2811和右梯梁2812的结构以及与层间楼板24、地面的安装方式与实施例4基本相同,因此不再一一详述。On the basis of Embodiment 4, the
本实施例其他部分与实施例4基本相同,不再一一详述。Other parts of this embodiment are basically the same as those of Embodiment 4, and will not be described in detail.
实施例6Example 6
在实施例4或5的基础上,参阅图13,所述楼梯28还包括位于相邻两个所述楼梯段281之间的休息平台282;所述休息平台282下方设置有若干用于支撑所述休息平台282的支撑件283,用于支撑休息平台282,还可以增加楼梯28的承重能力。所述支撑件283与休息平台282可拆卸连接。On the basis of Embodiment 4 or 5, referring to FIG. 13 , the
所述楼梯28的具体安装方法为:在较低一层楼层的所述层间楼板24上或者地面上安装所述支撑件283;然后在支撑件283上安装所述休息平台282;安装两段所述楼梯段281,使一段所述楼梯段281一端与较低一层楼层的层间楼板24或地面连接、另一端与所述休息平台282连接,使另一段所述楼梯段281一端与所述休息平台282连接、另一端与较高一层楼层的层间楼板24连接;然后继续安装所述安全学习体验馆的其他所述预制件。The specific installation method of the
需要说明的是,安装两段楼梯段281,一般采用先安装下部的一楼梯段281,然后再安装上部的一楼梯段281,安装上部的楼梯段281时,在上部的楼梯段281下方安装一临时支撑杆29支撑上部的楼梯段281,使其保持稳定,以便于安装。It should be noted that, to install two
需要说明的是,所述支撑件283可采用一体式结构或者可拼装结构。当支撑件283采用可拼装结构时,其具体结构可采用:参阅图16,支撑件283包括连接杆和固定连接在连接杆两端的安装座,两个安装座上均设置有多个安装孔;支撑件283分别通过两个安装座与休息平台282和层间楼板24/地面可拆卸连接,实现休息平台282的安装和拆卸。It should be noted that, the
参阅图14、17,所述支撑件283也可以采用连接管2833和支撑座2831组合而成的可拆卸结构,其具体结构如下:参阅图15,所述休息平台282的下表面设置有若干个定位杆2821;所述支撑件283包括连接管2833和支撑座2831;所述支撑座2831上设置有支撑杆2832;所述连接管2833两端分别设置有所述定位杆2821和所述支撑杆2832相匹配的连接孔;所述连接管2833两端分别通过所述连接孔与所述定位杆2821和所述支撑杆2832螺纹连接或者过盈配合。使用时,支撑座2831与定位杆2821对应,将定位杆2821和支撑杆2832插入连接管2833两端的连接孔内,或者通过旋转连接管2833即可实现支撑件283支撑休息平台282,安装简单快捷。优选地,所述连接管2833与定位杆2821和支撑杆2832螺纹连接,且所述定位杆2821和支撑杆2832上的外螺纹螺旋方向一致,旋转连接管2833即可实现休息平台282的高度调整。安装过程中,对应较高一楼层的层间楼板24的楼梯空口242,先将支撑座2831安装在地面或者较低一楼层的层间楼板24上,然后通过支撑杆2832安装连接管2833,再将休息平台282下方的定位杆2821嵌入到连接管2833内即可实现休息平台282的安装,该安装过程简单方便快捷。Referring to FIGS. 14 and 17 , the
优选地,当支撑杆2832和定位杆2821均与连接管2833螺纹连接时,在休息平台282安装时,可通过旋转连接管2833,即可调整休息平台282的高度,实现楼梯28高度的微调,适宜因为预制件的尺寸误差导致的楼梯28与上下层楼层之间的连接不是非常贴合的情况。Preferably, when the
优选地,所述护栏284与所述楼梯段281可拆卸连接;左梯梁2811、右梯梁2812和休息平台282的边沿上均设置有若干用于连接护栏284的插接孔。在楼梯28两侧和休息平台282的边沿均安装护栏284,起到安全保护作用。同时,护栏284与楼梯段281和休息平台282均可拆卸连接,便于楼梯28的运输。所述护栏284可以为预制的一体式结构也可以为现场装配的可拆卸式结构。当所述护栏284为可拆卸式结构是,所述护栏284包括多根栏杆2841和扶手2842。所述扶手2842上也设置有若干与栏杆2841过盈配合或者螺纹连接的插孔,便于栏杆2841的插入或者旋入。所述护栏284优选为可拆卸式结构,便于现场的装配。Preferably, the
本实施例其他部分与实施例4或5基本相同,不再一一详述。Other parts of this embodiment are basically the same as those of Embodiment 4 or 5, and will not be described in detail.
实施例7Example 7
在实施例4~6任一实施例的基础上,本实施例在所述房屋建筑的每一层楼层内也设置有墙面板26和层间横梁25,通过底层立柱21和层间立柱22、墙面板26和层间横梁25形成的墙面将房屋建筑的每一层楼层内部均分割成两个或者两个以上的房屋空间,将多个安全体验项目设置在不同的房屋空间内,减少多组施工人员进行安全体验过程中的相互干扰。On the basis of any one of Embodiments 4 to 6, in this embodiment,
与实施例2基本相同的是,所述底层立柱21和层间立柱22均设置有包括柱体一端设置有三个榫头且柱体侧面设置有三个位于不同侧面的榫槽的第一底层立柱和第一层间立柱、柱体一端设置有两个榫头且柱体侧面设置有两个位于不同侧面的榫槽的第二底层立柱和第二层间立柱;若所述房屋建筑被分割为呈矩阵排列的四个及以上的房屋空间,则所述底层立柱21和层间立柱22还包括柱体一端设置有四个榫头且柱体侧面设置有四个位于不同侧面的榫槽的第三底层立柱和第三层间立柱。所述第二底层立柱和第二层间立柱又根据安装位置的不同分别分为转角底层立柱、连接底层立柱、转角层间立柱和连接层间立柱;所述转角底层立柱和转角层间立柱通常都设置在房屋建筑的转角;所述连接底层立柱和连接层间立柱通常都用于连接两个呈180°或接近180°的墙面板26;所述转角底层立柱和转角层间立柱均是两个榫槽位于其柱体相邻侧面上;所述连接底层立柱和连接层间立柱的两个榫槽均是设置在柱体的两个相互对应的侧面上。位于所述房屋建筑内的墙面板26上均设置有门131,便于施工人员通过,也便于安全体验项目的设备的安装和拆卸。房屋建筑的层间楼板24和顶层楼板27可采用一个整体预制的楼层板,也可以采用多个预制的楼板块拼装而成;采用多个楼板块拼装时,楼板块之间的缝隙可通过防水胶进行密封粘接,避免楼板块之间的缝隙漏水。Basically the same as Embodiment 2, the
参阅图18-22,上述安全学习体验馆的安装方法如下:Referring to Figure 18-22, the installation method of the above safety learning experience hall is as follows:
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根底层立柱21、多根层间立柱22、多面墙面板26、多根层间横梁25、至少一面层间楼板24、至少一面顶层楼板27和至少一连接相邻两层楼层的楼梯28;S11: Prepare prefabricated parts, including a plurality of bottom-
S12:基础坑基开挖夯实到位后,放入预制的基础底座,将基础底座固定在地面上;并将所述第一底层立柱、第二底层立柱安装在基础底座上,所述转角底层立柱设置的转角处;所述第一底层立柱和连接底层立柱设置在两根转角底层立柱之间;同时,第一底层立柱设置在两根连接底层立柱之间;S12: After the foundation pit foundation is excavated and compacted in place, put the prefabricated foundation base, and fix the foundation base on the ground; and install the first bottom column and the second bottom column on the foundation base, and the corner bottom column The provided corner; the first bottom column and the connecting bottom column are arranged between two corner bottom columns; at the same time, the first bottom column is arranged between the two connecting bottom columns;
S13:在相邻的两根所述底层立柱21之间均插入所述墙面板26,使得墙面板26的下端贴在所述基础底座的上表面,使所述第二底层立柱与设在第二底层立柱之间的所述墙面板26连成的整体形成房屋建筑的外墙面;所述第一底层立柱与设置在第一底层立柱之间的墙面板26形成墙面将房屋建筑内部分割为多个房屋空间;S13: Insert the
S14:在所述底层立柱21和所述墙面板26上安装所述层间横梁25,使所述底层立柱21与所述层间横梁25、所述墙面板26与所述层间横梁25榫接,并在所述层间横梁25上覆盖安装所述层间楼板24或者楼板块,使层间横梁25的层间横梁榫头251嵌入所述层间楼板24的榫接通孔241内;S14: Install the
S15:安装连接较低一层楼层和较高一层楼层的楼梯28;将第一层间立柱和第二层间立柱一对一嵌入榫接通孔241内,并使得层间横梁榫头251嵌入层间立柱22榫眼中,使层间立柱22与层间横梁榫头251紧密贴合,使层间立柱22竖直固定,所述转角层间立柱设置的转角处;所述第一层间立柱和连接层间立柱设置在两根转角层间立柱之间;同时,第一层间立柱设置在两根层间底层立柱21之间;然后在相邻的层间立柱22之间插入墙面板26,再在层间立柱22和这一层的墙面板26上安装层间横梁25,并在层间横梁25上覆盖安装层间楼板24或者楼板块;S15: Install the
S16:重复步骤S15,直至所有的层间立柱22和层间横梁25安装完成,然后在最高层的层间横梁25上覆盖安装顶层楼板27或者楼板块;S16: Repeat step S15 until all the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在一些实施例中,所述安全学习体验馆的房屋建筑被分割成呈矩阵排列的四个及以上数量的房屋空间时,所使用的底层立柱21和层间立柱22还包括第三底层立柱和第三层间立柱。第三底层立柱和第三层间立柱均设置在房屋建筑内部,第三底层立柱和第三层间立柱的四周都榫接有墙面板26,且上端都榫接层间横梁25,其他结构和安装方法与上述实施例的房屋结构和安装方法基本相同,因此不再一一详述。In some embodiments, when the building of the safe learning experience hall is divided into four or more house spaces arranged in a matrix, the used
所述房屋建筑内设置有多个房屋空间时,墙体13对楼板15可以起到支撑作用,使房屋建筑的稳定性更好。层间楼板24和顶层楼板27采用多个楼板块拼装而成时,虽然破坏了层间楼板24和顶层楼板27的整体性,但预制运输更加简单,也降低了层间楼板24和顶层楼板27吊装过程中的难度,降低房屋建筑的装配难度;同时也便于二次转运。When a plurality of house spaces are arranged in the house building, the
实施例8Example 8
在实施例4~7任一实施例的基础上,本实施例所述层间立柱22的一端设置有限位缺口222;所述层间横梁25的上表面一端设置有与所述层间横梁榫眼252位置相对应的层间横梁榫头251,参阅图10、图12,所述层间横梁榫头251设置有与所述限位缺口222相匹配的限位台阶2511;所述层间楼板24对应所述层间立柱22设置有榫接通孔241,所述层间横梁25通过所述层间横梁榫头251嵌入所述层间楼板24中与所述层间楼板24榫接,所述层间立柱22一端嵌入所述榫接通孔241中与所述层间楼板24榫接。On the basis of any one of Embodiments 4 to 7, one end of the
需要说明的是,所述限位缺口222设置在所述层间立柱22远离所述层间立柱榫头221的一端的侧壁上,其向所述层间立柱22的柱体凹陷为“Π”型或者接近“Π”型,使层间横梁榫头251设置的限位台阶2511可以嵌入其中,形成榫卯结构。房屋建筑安装过程中,所述层间横梁榫头251的限位台阶2511与所述限位缺口222相互契合,并通过所述层间楼板24的榫接通孔241将二者榫接状态固定下来,使层间立柱22不仅受到层间楼板24从四周的限位作用,还受到层间横梁25从下方的限位,使房屋建筑的上下楼层被连接为一个整体,提高房屋建筑的稳定性。It should be noted that the limiting
其具体的安装方法如下:The specific installation method is as follows:
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根所述底层立柱21、多根所述层间立柱22、多面所述墙面板26、多根所述层间横梁25、至少一面所述层间楼板24、至少一面所述顶层楼板27和至少一连接相邻两层楼层的所述楼梯28;S11: Prepare a prefabricated part, including a plurality of the bottom-
S12:安装所述底层立柱21;S12: Install the
S13:在相邻的两根所述底层立柱21之间插入所述墙面板26,所述墙面板26与相邻的两根所述底层立柱21榫接;将所述底层立柱21和所述墙面板26连接成整体;S13: Insert the
S14:在所述底层立柱21和所述墙面板26上安装所述层间横梁25,使所述底层立柱21与所述层间横梁25、所述墙面板26与所述层间横梁25榫接;将这一楼层的所有所述层间立柱22安装在所述层间横梁25上,保持每一所述层间横梁25的所述限位台阶2511嵌入对应的所述层间立柱22的所述限位缺口222,然后吊装所述层间楼板24,使所述层间横梁榫头251、所述层间立柱22设置有所述限位缺口222的一端均嵌入所述榫接通孔241内;S14: Install the
S15:在相邻的所述层间立柱22之间插入墙面板26,再在所述层间立柱22和这一层的所述墙面板26上安装所述层间横梁25,并在所述层间横梁25上覆盖安装所述层间楼板24;重复这一步骤,直至所有的层间立柱22和层间横梁25安装完成,然后在最高层的层间横梁25上覆盖安装顶层楼板27;S15:
S16:安装所述楼梯28;S16: Install the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
在上述在所述层间楼板24吊装过程中中,可对与所述层间横梁25榫接的所述层间立柱22提供临时辅助支撑,使其在层间楼板24吊装过程中保持竖直或接近竖直。当所述层间楼板24吊装至这一楼层的所有层间立柱22均嵌入所述层间楼板24的榫接通孔241中后,即可松开所述层间立柱22的临时辅助支撑,继续下放该层间楼板24即可。In the above-mentioned hoisting process of the
所述临时辅助支撑可以为人力支撑,也可以采用临时支撑架、临时支撑绳进行临时支撑。The temporary auxiliary support can be manual support, or a temporary support frame and a temporary support rope can be used for temporary support.
本实施例其他部分与实施例4~7任一实施例基本相同,不再一一详述。The other parts of this embodiment are basically the same as any of the embodiments 4 to 7, and will not be described in detail.
实施例9Example 9
在实施例4~8任一实施例的基础上,本实施例的预制件还包括底层梁23;所述底层梁23的两端分别与所述底层立柱21榫接;所述底层梁23的上端面设置有用于与所述墙面板26榫接的底层梁榫槽。在安装过程中,底层梁23将分别独立安装的底层立柱21连接为一个整体,提高墙面板26在插入过程中底层立柱21的稳定性,为房屋建筑的上层楼层打下稳定的底层基础;同时,墙面板26在安装时嵌入底层梁23中,对墙面板26形成稳定、均匀的支撑作用,使房屋建筑的承重性和稳定性更好,使多层房屋建筑的较高楼层稳定性更好。On the basis of any of Embodiments 4 to 8, the prefab in this embodiment further includes a
当所述房屋建筑设置有底层梁23时,该安全学习体验馆的安装方法如下:When the house building is provided with the
S1:装配房屋建筑;S1: Assembling the house building;
S11:准备预制件,包括多根所述底层立柱21、多根所述层间立柱22、多面所述墙面板26、多根所述层间横梁25、多根所述底层梁23、至少一面所述层间楼板24、至少一面所述顶层楼板27和至少一连接相邻两层楼层的所述楼梯28;S11: Prepare prefabricated parts, including a plurality of the bottom-
S12:安装所述底层立柱21;S12: Install the
S13:在相邻的两个所述底层立柱21之间放入所述底层梁23,使得所述底层梁23的两端与相邻的两根所述底层立柱21榫接;然后在相邻的两根所述底层立柱21之间插入所述墙面板26,使所述墙面板26的下端与所述底层梁23榫接、所述墙面板26与相邻的两根所述底层立柱21榫接;将所述底层立柱21和所述墙面板26连接成整体;S13: Put the
S14:在所述底层立柱21和所述墙面板26上安装所述层间横梁25,使所述底层立柱21与所述层间横梁25、所述墙面板26与所述层间横梁25榫接,并在所述层间横梁25上覆盖安装所述层间楼板24;S14: Install the
S15:将所述层间立柱22穿过所述层间楼板24与所述层间横梁25榫接,保持所述层间立柱22竖直;然后在相邻的所述层间立柱22之间插入墙面板26,再在所述层间立柱22和这一层的所述墙面板26上安装所述层间横梁25,并在所述层间横梁25上覆盖安装所述层间楼板24;重复这一步骤,直至所有的层间立柱22和层间横梁25安装完成,然后在最高层的层间横梁25上覆盖安装顶层楼板27;S15: Pass the
S2:将所述房屋建筑分为多个安全体验区,并在所述安全体验区内设置用于施工安全体验的安全体验项目,即可。S2: Divide the building into multiple safety experience areas, and set safety experience items for construction safety experience in the safety experience areas.
本实施例其他部分与实施例4~8任一实施例基本相同,不再一一详述。The other parts of this embodiment are basically the same as any of the embodiments 4 to 8, and will not be described in detail.
实施例10Example 10
在实施例1~9的基础上,本实施例的墙体13或者墙面板26上设置有可开合的窗户132,用于房屋建筑内部通风。On the basis of Embodiments 1 to 9, the
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.
Claims (16)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010687970.9A CN111794570A (en) | 2020-07-16 | 2020-07-16 | A prefabricated safety learning experience hall and its installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010687970.9A CN111794570A (en) | 2020-07-16 | 2020-07-16 | A prefabricated safety learning experience hall and its installation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111794570A true CN111794570A (en) | 2020-10-20 |
Family
ID=72807352
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010687970.9A Pending CN111794570A (en) | 2020-07-16 | 2020-07-16 | A prefabricated safety learning experience hall and its installation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111794570A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112900634A (en) * | 2021-03-11 | 2021-06-04 | 四川兆硕建筑工程有限公司 | Prefabricated house building structure and construction method thereof |
| CN115075395A (en) * | 2022-04-27 | 2022-09-20 | 同济大学 | Modular rapid assembling system composed of 3D printing plate and light keel |
| CN115142554A (en) * | 2022-07-27 | 2022-10-04 | 青岛理工大学 | Repeatedly-detachable housing building module system |
| CN115306040A (en) * | 2022-08-24 | 2022-11-08 | 高松 | Assembled modularization house of mortise and tenon joint structure |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010020110A1 (en) * | 2008-08-19 | 2010-02-25 | 茂地(上海)建筑工程咨询有限公司 | Composed building and construction method thereof |
| CN204850283U (en) * | 2015-06-15 | 2015-12-09 | 珠海丽日帐篷有限公司 | Covering or awning on a car, boat, etc. room stair and covering or awning on a car, boat, etc. room |
| CN105332417A (en) * | 2015-12-04 | 2016-02-17 | 武汉理工大学 | Method for constructing prefabricated steel frame composite structure with concrete wrapped outside |
| CN105908841A (en) * | 2016-06-17 | 2016-08-31 | 浙江越宫钢结构有限公司 | Prefabricated house convenient and rapid to assemble and disassemble and capable of being recycled |
| CN207110291U (en) * | 2017-08-21 | 2018-03-16 | 陈欣扬 | The external straight stair of the special assembly type of container house |
| CN212453808U (en) * | 2020-07-16 | 2021-02-02 | 中铁二局集团有限公司 | A prefabricated safety learning experience hall |
-
2020
- 2020-07-16 CN CN202010687970.9A patent/CN111794570A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010020110A1 (en) * | 2008-08-19 | 2010-02-25 | 茂地(上海)建筑工程咨询有限公司 | Composed building and construction method thereof |
| CN204850283U (en) * | 2015-06-15 | 2015-12-09 | 珠海丽日帐篷有限公司 | Covering or awning on a car, boat, etc. room stair and covering or awning on a car, boat, etc. room |
| CN105332417A (en) * | 2015-12-04 | 2016-02-17 | 武汉理工大学 | Method for constructing prefabricated steel frame composite structure with concrete wrapped outside |
| CN105908841A (en) * | 2016-06-17 | 2016-08-31 | 浙江越宫钢结构有限公司 | Prefabricated house convenient and rapid to assemble and disassemble and capable of being recycled |
| CN207110291U (en) * | 2017-08-21 | 2018-03-16 | 陈欣扬 | The external straight stair of the special assembly type of container house |
| CN212453808U (en) * | 2020-07-16 | 2021-02-02 | 中铁二局集团有限公司 | A prefabricated safety learning experience hall |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112900634A (en) * | 2021-03-11 | 2021-06-04 | 四川兆硕建筑工程有限公司 | Prefabricated house building structure and construction method thereof |
| CN112900634B (en) * | 2021-03-11 | 2022-03-29 | 四川兆硕建筑工程有限公司 | Prefabricated house building structure and construction method thereof |
| CN115075395A (en) * | 2022-04-27 | 2022-09-20 | 同济大学 | Modular rapid assembling system composed of 3D printing plate and light keel |
| CN115142554A (en) * | 2022-07-27 | 2022-10-04 | 青岛理工大学 | Repeatedly-detachable housing building module system |
| CN115142554B (en) * | 2022-07-27 | 2023-12-19 | 青岛理工大学 | Housing building module system capable of being repeatedly disassembled and assembled |
| CN115306040A (en) * | 2022-08-24 | 2022-11-08 | 高松 | Assembled modularization house of mortise and tenon joint structure |
| CN115306040B (en) * | 2022-08-24 | 2024-02-02 | 高松 | Mortise and tenon structure assembled modular house |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111794570A (en) | A prefabricated safety learning experience hall and its installation method | |
| US6625937B1 (en) | Modular building and method of construction | |
| US6427403B1 (en) | Fiber reinforced plastic (FRP) composite structural system for decks, docks, boardwalks, walkways, spa decks, hot tub decks and gazebos and components therefore and method of making same | |
| US9988806B2 (en) | Relocatable habitat unit | |
| US6178714B1 (en) | Modular temporary building | |
| US6662520B1 (en) | Sub-rigid fast-form barrier system | |
| US6516574B1 (en) | Modular stairway system, method for erecting stairway and kit therefor | |
| US7051488B2 (en) | Sub-rigid fast-form barrier system | |
| US4882883A (en) | Architectural modular system | |
| US5323573A (en) | Building structure and method of erecting it | |
| CN212453808U (en) | A prefabricated safety learning experience hall | |
| EP0038800A1 (en) | Skeleton-frame system for the erection of building constructions. | |
| WO2020237285A1 (en) | Modular pod | |
| CA2299604A1 (en) | Modular stairway system, method for erecting stairway and kit therefor | |
| CN109750746A (en) | Prefabricated assembled light house | |
| ZA200505336B (en) | Vertical alignment and levelling of modular building units | |
| AU2007330481A1 (en) | Modular building for deployment in disaster regions | |
| CN107578691A (en) | A frame structure construction training model for prefabricated building teaching | |
| US1910264A (en) | Building construction | |
| CN205637640U (en) | Color plate housing of canopy is prevented from area pounding | |
| US11203865B2 (en) | Beam and bolting construction system and method | |
| US3535834A (en) | Prefabricated building | |
| WO2002010529A1 (en) | Prefabricated building | |
| CN220909252U (en) | Assembled cat ladder device | |
| CN212897246U (en) | Assembled stair |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |