CN111749451A - The method of installing the lower suspended steel structure by pulling the hanging basket by the winch - Google Patents

The method of installing the lower suspended steel structure by pulling the hanging basket by the winch Download PDF

Info

Publication number
CN111749451A
CN111749451A CN202010616683.9A CN202010616683A CN111749451A CN 111749451 A CN111749451 A CN 111749451A CN 202010616683 A CN202010616683 A CN 202010616683A CN 111749451 A CN111749451 A CN 111749451A
Authority
CN
China
Prior art keywords
hanging basket
wire rope
pulley block
hanging
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010616683.9A
Other languages
Chinese (zh)
Inventor
王军
刘明路
何月峰
邱顶宏
蒋国明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Shanghai Steel Structure Technology Co Ltd
Original Assignee
MCC Shanghai Steel Structure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shanghai Steel Structure Technology Co Ltd filed Critical MCC Shanghai Steel Structure Technology Co Ltd
Priority to CN202010616683.9A priority Critical patent/CN111749451A/en
Publication of CN111749451A publication Critical patent/CN111749451A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明具体是通过卷扬机牵吊篮对下悬空钢结构进行安装作业的方法;包括吊篮(1)、卷扬设备(2)、滑轮组(3)、牵引钢丝绳(4)、吊篮限位钢筋(5);其特征是,还包括步骤:将滑轮组(3)与已完成结构稳定牢靠连接,吊篮(1)与牵引钢丝绳(4)通过吊篮限位钢筋(5)进行限位;形成由卷扬设备(2)驱动、滑轮组(3)传动、牵引钢丝绳(4)牵引的吊篮(1)移动的形式,从而实现对下悬空钢结构进行作业的目的。本发明提出了一种高空作业吊篮的操作方式,利用卷扬设备的牵引作用完成作业吊篮的空中移动,减少作业人员的高空移动风险,提高高空作业工效,节约施工走道等临时措施。

Figure 202010616683

The invention specifically relates to a method for installing a lower suspended steel structure by pulling a hanging basket by a hoist; it includes a hanging basket (1), a hoisting device (2), a pulley block (3), a traction wire rope (4), and a hanging basket limit steel bar (5); It is characterized in that, it also includes the steps of: connecting the pulley block (3) with the completed structure stably and firmly, and the gondola (1) and the traction wire rope (4) are limited by the gondola limiting steel bar (5); The hanging basket (1) is driven by the hoisting equipment (2), driven by the pulley block (3) and pulled by the traction wire rope (4) to move, so as to achieve the purpose of operating the lower suspended steel structure. The invention proposes an operation mode of a suspended working basket for high-altitude work, which utilizes the traction effect of a hoisting device to complete the aerial movement of the suspended working basket, reduces the risk of high-altitude movement of operators, improves work efficiency for high-altitude work, and saves temporary measures such as construction walkways.

Figure 202010616683

Description

通过卷扬机牵吊篮对下悬空钢结构进行安装作业的方法The method of installing the lower suspended steel structure by pulling the hanging basket by the winch

技术领域technical field

本发明涉及高空钢结构施工领域,具体是通过卷扬机牵吊篮对下悬空钢结构进行安装作业的方法。The invention relates to the field of high-altitude steel structure construction, in particular to a method for installing a lower suspended steel structure by pulling a hoisting basket through a hoist.

背景技术Background technique

作业吊篮/吊笼作为钢结构高空最常见的作业平台之一,具有制作简单,便于操作,实用性强等特点。但当钢结构安装过程中需调整吊篮位置时,通常是通过人力作用进行高空水平和竖向调整,这样的方式费时费力且存在着高空作业安全风险大的问题。另外,下部悬空钢结构的安装作业尤其是高空连廊结构、悬挑结构以及大跨度厂房主结构下部的吊挂结构,涉及大量的高空作业。在这样的情况下,吊篮的使用即是唯一但又高风险的方法。As one of the most common working platforms for high-altitude steel structures, the working basket/hanging cage has the characteristics of simple production, easy operation and strong practicability. However, when the position of the hanging basket needs to be adjusted during the installation of the steel structure, the horizontal and vertical adjustment at height is usually performed by manpower. In addition, the installation work of the lower suspended steel structure, especially the high-altitude corridor structure, the cantilever structure and the hanging structure of the lower part of the main structure of the large-span workshop, involves a lot of high-altitude operations. In such cases, the use of a gondola is the only but high-risk method.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于克服上述缺陷,提出一种操作方便、安全的通过吊篮进行悬空钢结构施工作业的方法。The purpose of the present invention is to overcome the above-mentioned defects, and to propose a method for carrying out the construction work of the suspended steel structure through the hanging basket, which is convenient and safe to operate.

为了达到上述目的,本发明是这样实现的:In order to achieve the above object, the present invention is achieved in this way:

一种通过卷扬机牵吊篮对下悬空钢结构进行安装作业的方法,包括吊篮、卷扬设备、滑轮组、牵引钢丝绳、吊篮限位钢筋、备用吊绳;还包括如下步骤:A method for installing and operating a lower suspended steel structure by pulling a hanging basket by a hoist, comprising a hanging basket, a hoisting device, a pulley block, a traction wire rope, a limit steel bar for the hanging basket, and a spare hanging rope; it also includes the following steps:

步骤1、将滑轮组与已完成结构稳定牢靠连接,卷扬设备设专人同步开关操作,吊篮与牵引钢丝绳通过吊篮限位钢筋进行限位;Step 1. Connect the pulley block to the completed structure stably and firmly. The hoisting equipment is equipped with a special person to operate the synchronous switch, and the gondola and the traction wire rope are limited by the gondola limit steel bars;

步骤2、吊篮同时设置备用吊绳,备用吊绳的两端牢固绑扎在已完成结构的两端;Step 2. A spare sling is also set on the hanging basket, and both ends of the spare sling are firmly tied to both ends of the completed structure;

步骤3、调节备用吊绳长度,当牵引钢丝绳正常工作时,备用吊绳不受力,当牵引钢丝绳因外力作用或破损断裂时,备用吊绳受力起到防护作用,防止吊篮下坠;Step 3. Adjust the length of the spare sling. When the traction wire rope is working normally, the spare sling will not be stressed. When the traction wire rope is broken due to external force or damage, the backup sling will be protected by force to prevent the basket from falling;

步骤4、吊篮的上方主结构应设置生命线,人员在进入吊篮中作业时须挂设安全绳,以形成双重保护;Step 4. A lifeline should be set on the main structure above the gondola, and safety ropes must be hung when personnel work in the gondola to form double protection;

步骤5、通过卷扬设备、滑轮组、牵引钢丝绳将吊篮串联,从而形成由卷扬设备驱动、滑轮组传动、牵引钢丝绳牵引的吊篮移动的形式,从而实现对下悬空钢结构进行作业的目的。Step 5. Connect the hanging baskets in series through the hoisting equipment, the pulley block, and the traction wire rope, so as to form a form of movement of the hanging basket driven by the hoisting equipment, the pulley block transmission, and the traction wire rope, so as to achieve the purpose of operating the lower suspended steel structure.

本发明提出了一种高空作业吊篮的操作方式,其有传统的吊篮与卷扬设备、定向滑轮组组成整体,利用卷扬设备的牵引作用完成作业吊篮的空中移动,减少作业人员的高空移动风险,提高高空作业工效,节约施工走道等临时措施。The invention proposes an operation mode of the hanging basket for high-altitude work, which consists of the traditional hanging basket, the hoisting equipment and the directional pulley block as a whole, and the tractive action of the hoisting equipment is used to complete the aerial movement of the operating hanging basket, thereby reducing the high-altitude operation of the operator. Move risks, improve work efficiency at heights, and save temporary measures such as construction walkways.

附图说明Description of drawings

图1为本方法作业过程示意图一。FIG. 1 is a schematic diagram 1 of the operation process of the method.

图2为本方法作业过程示意图二。FIG. 2 is a second schematic diagram of the operation process of the method.

具体实施方式Detailed ways

以下通过具体实施例进一步说明本发明。The present invention is further illustrated by specific examples below.

如图1、图2所示,一种通过卷扬机牵吊篮对下悬空钢结构进行安装作业的方法,包括吊篮1、卷扬设备2、滑轮组3、牵引钢丝绳4、吊篮限位钢筋5、备用吊绳6;还包括如下步骤:As shown in Figures 1 and 2, a method for installing a lower suspended steel structure by pulling a hanging basket by a hoist includes a hanging basket 1, a hoisting device 2, a pulley block 3, a traction wire rope 4, and a hanging basket limit steel bar 5 , the spare hanging rope 6; also includes the following steps:

步骤1、将滑轮组3与已完成结构稳定牢靠连接,卷扬设备2设专人同步开关操作,吊篮1与牵引钢丝绳4通过吊篮限位钢筋5进行限位;Step 1. Connect the pulley block 3 to the completed structure stably and firmly. The hoisting equipment 2 is equipped with a special person to operate the synchronous switch, and the gondola 1 and the traction wire rope 4 are limited by the gondola limit steel bar 5;

步骤2、吊篮1同时设置备用吊绳6,备用吊绳6的两端牢固绑扎在已完成结构的两端;Step 2. A spare hanging rope 6 is also set on the hanging basket 1, and both ends of the spare hanging rope 6 are firmly tied to the two ends of the completed structure;

步骤3、调节备用吊绳长度,当牵引钢丝绳正常工作时,备用吊绳不受力,当牵引钢丝绳因外力作用或破损断裂时,备用吊绳受力起到防护作用,防止吊篮1下坠;Step 3. Adjust the length of the spare sling. When the traction wire rope is working normally, the spare sling will not be stressed. When the traction wire rope is broken due to external force or damage, the backup sling will be protected by force to prevent the gondola 1 from falling;

步骤4、吊篮1的上方主结构应设置生命线,人员在进入吊篮1中作业时须挂设安全绳,以形成双重保护;Step 4. The upper main structure of the gondola 1 should be provided with a lifeline, and personnel must hang a safety rope when entering the gondola 1 to work to form double protection;

步骤5、通过卷扬设备2、滑轮组3、牵引钢丝绳4将吊篮1串联,从而形成由卷扬设备2驱动、滑轮组3传动、牵引钢丝绳4牵引的吊篮1移动的形式,从而实现对下悬空钢结构进行作业的目的。Step 5. Connect the gondolas 1 in series through the hoisting equipment 2, the pulley block 3 and the traction wire rope 4, so as to form a moving form of the gondola 1 driven by the hoisting equipment 2, driven by the pulley block 3, and pulled by the traction wire rope 4, so as to realize the downward movement. The purpose of working on suspended steel structures.

本发明提出了一种高空作业吊篮的操作方式,其有传统的吊篮与卷扬设备、定向滑轮组组成整体,利用卷扬设备的牵引作用完成作业吊篮的空中移动,减少作业人员的高空移动风险,提高高空作业工效,节约施工走道等临时措施。The invention proposes an operation mode of the hanging basket for high-altitude work, which consists of the traditional hanging basket, the hoisting equipment and the directional pulley block as a whole, and the tractive action of the hoisting equipment is used to complete the aerial movement of the operating hanging basket, thereby reducing the high-altitude operation of the operator. Move risks, improve work efficiency at heights, and save temporary measures such as construction walkways.

Claims (1)

1. A method for installing a lower suspended steel structure by pulling a hanging basket through a winch comprises the hanging basket (1), a hoisting device (2), a pulley block (3), a traction steel wire rope (4), hanging basket limiting steel bars (5) and a standby lifting rope (6); the method is characterized by further comprising the following steps:
step 1, stably and firmly connecting a pulley block (3) with a finished structure, arranging a specially-assigned person for synchronous switching operation on a hoisting device (2), and limiting a hanging basket (1) and a traction steel wire rope (4) through hanging basket limiting steel bars (5);
step 2, arranging a spare lifting rope (6) at the same time on the hanging basket (1), and firmly binding two ends of the spare lifting rope (6) at two ends of the finished structure;
step 3, adjusting the length of the standby lifting rope, wherein the standby lifting rope is not stressed when the traction steel wire rope works normally, and the standby lifting rope is stressed to play a protective role when the traction steel wire rope is broken due to external force or damage, so that the hanging basket (1) is prevented from falling;
step 4, arranging a life line on a main structure above the hanging basket (1), and hanging a safety rope when a person enters the hanging basket (1) for operation so as to form double protection;
and 5, serially connecting the hanging baskets (1) through the hoisting equipment (2), the pulley block (3) and the traction steel wire rope (4), so that the hanging baskets (1) driven by the hoisting equipment (2), transmitted by the pulley block (3) and pulled by the traction steel wire rope (4) move, and the purpose of operating the lower suspended steel structure is achieved.
CN202010616683.9A 2020-06-30 2020-06-30 The method of installing the lower suspended steel structure by pulling the hanging basket by the winch Pending CN111749451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010616683.9A CN111749451A (en) 2020-06-30 2020-06-30 The method of installing the lower suspended steel structure by pulling the hanging basket by the winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010616683.9A CN111749451A (en) 2020-06-30 2020-06-30 The method of installing the lower suspended steel structure by pulling the hanging basket by the winch

Publications (1)

Publication Number Publication Date
CN111749451A true CN111749451A (en) 2020-10-09

Family

ID=72678328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010616683.9A Pending CN111749451A (en) 2020-06-30 2020-06-30 The method of installing the lower suspended steel structure by pulling the hanging basket by the winch

Country Status (1)

Country Link
CN (1) CN111749451A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
CN202518908U (en) * 2012-05-02 2012-11-07 黄仕安 Steel wire rope traction system
CN203755638U (en) * 2014-01-26 2014-08-06 中铁建工集团有限公司 Suspending slippage type high-altitude inverted oblique plane operation hanging basket
CN204301973U (en) * 2014-09-18 2015-04-29 河南省中能建筑工程质量检测有限公司 Cradle safety lock checkout gear
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN109372243A (en) * 2018-11-20 2019-02-22 中国三冶集团有限公司 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
CN202518908U (en) * 2012-05-02 2012-11-07 黄仕安 Steel wire rope traction system
CN203755638U (en) * 2014-01-26 2014-08-06 中铁建工集团有限公司 Suspending slippage type high-altitude inverted oblique plane operation hanging basket
CN204301973U (en) * 2014-09-18 2015-04-29 河南省中能建筑工程质量检测有限公司 Cradle safety lock checkout gear
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device
CN106836109A (en) * 2017-03-14 2017-06-13 辽宁华三建设工程技术有限公司 A kind of hanging building foot guard repairing treatment suspension platform device
CN109372243A (en) * 2018-11-20 2019-02-22 中国三冶集团有限公司 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Similar Documents

Publication Publication Date Title
CN107055347B (en) A kind of Tower crane disassembly structures and methods of high-rise installation
CN109173113A (en) Falling proof device and its hanging method based on unmanned plane suspension
CN201040150Y (en) High building emergency escaping rescue device
CN105226560B (en) A kind of crossing frame and its construction method
CN203699606U (en) Lifter and iron tower
CN109610922A (en) A typical terrain tower assembly construction equipment
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN102518335A (en) Crane lifting and operation platform comprehensive equipment
CN205429566U (en) Crossing structure
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN203128099U (en) Slipping type pipeline lifting device
CN205114902U (en) Device of demolising that attaches wall pull rod of high void tower formula hoist
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
CN211971577U (en) Tower crane system
CN214456164U (en) Hanging bar frame for steel plate loading and unloading vehicle
CN205369033U (en) Gallows formula bridge tool car
JP5841929B2 (en) How to change the main rope of the elevator
CN111749451A (en) The method of installing the lower suspended steel structure by pulling the hanging basket by the winch
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN110668294B (en) Machine-room-less elevator dismantling method
CN203874306U (en) Rescue vehicle for climbing building
TW201604119A (en) Double safety lift cage structure
CN103879860A (en) Device special for elevator installation
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN212893340U (en) A safe elevating gear for housing construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201009

RJ01 Rejection of invention patent application after publication