CN111677336A - A kind of temporary stair passage device with turnaround on operation floor - Google Patents
A kind of temporary stair passage device with turnaround on operation floor Download PDFInfo
- Publication number
- CN111677336A CN111677336A CN202010628494.3A CN202010628494A CN111677336A CN 111677336 A CN111677336 A CN 111677336A CN 202010628494 A CN202010628494 A CN 202010628494A CN 111677336 A CN111677336 A CN 111677336A
- Authority
- CN
- China
- Prior art keywords
- stair
- frame
- temporary
- stair frame
- thin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G27/00—Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/04—Movable stairways, e.g. of loft ladders which may or may not be concealable or extensible
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
本发明公开了一种操作层可周转临时楼梯通道装置,包括楼梯框架以及薄花纹钢板,所述楼梯框架是由方钢焊接而成的矩形框架结构,在楼梯框架内按一定的间距水平地焊接有一组薄花纹钢板,作为楼梯踏步,在楼梯框架的四个转角处竖直地固定有可伸缩支腿。本发明通过楼梯框架和薄花纹钢板构成了一种操作层可周转临时楼梯通道,并在楼梯框架上下端设置可伸缩支腿,以适应永久楼梯踏步板端部的高度变化。同时,在可伸缩支腿下方设置底座,增大临时楼梯与模板接触面积,减少压力,对支撑模板起到保护作用。本发明可以减少混凝土浇筑前,行走人流对踏步钢筋、模板的破坏,提高踏步成型质量。The invention discloses a temporary stair passage device that can be turned around on an operation floor, comprising a stair frame and a thin patterned steel plate. The stair frame is a rectangular frame structure welded by square steel, which is horizontally welded at a certain interval in the stair frame. There is a set of thin checkered steel plates as stair steps, and retractable legs are fixed vertically at the four corners of the stair frame. The invention constitutes a temporary stair passage with a turnover of the operation layer through the stair frame and the thin pattern steel plate, and sets retractable legs at the upper and lower ends of the stair frame to adapt to the height change of the end of the permanent stair tread. At the same time, a base is set under the retractable outriggers to increase the contact area between the temporary stairs and the formwork, reduce the pressure, and protect the supporting formwork. The invention can reduce the damage of the stepping steel bar and the formwork caused by the pedestrian flow before the concrete is poured, and improve the forming quality of the stepping.
Description
技术领域technical field
本发明涉及一种操作层可周转临时楼梯通道装置,属于建筑结构技术领域。The invention relates to a temporary stair passage device that can be turned around on an operation floor, and belongs to the technical field of building structures.
背景技术Background technique
在一般建筑工程中,楼梯钢筋施工完,直接封闭踏步竖板,然后进行混凝土浇筑。从钢筋绑扎至混凝土浇筑前,过程均无保护措施。楼梯人流量大,行走过程中踩踏楼梯踏步封板或直接踩踏楼梯钢筋,成品保护困难,造成钢筋成型质量差或踏步侧面变形等。In general construction projects, after the steel reinforcement of the stairs is finished, the step risers are directly closed, and then concrete is poured. There are no protective measures in the process from the binding of the steel bars to the concrete pouring. The flow of people on the stairs is large. During the walking process, stepping on the stair step sealing plate or directly stepping on the stair steel bars is difficult to protect the finished product, resulting in poor molding quality of the steel bars or deformation of the side of the steps.
发明内容SUMMARY OF THE INVENTION
针对现有技术中的不足,本发明提供了一种安装方便、成本低、安全可靠的操作层可周转临时楼梯通道装置,以克服现有技术中的不足。Aiming at the deficiencies in the prior art, the present invention provides a temporary stair passage device that is easy to install, low in cost, safe and reliable, and can be turned around on the operation floor, so as to overcome the deficiencies in the prior art.
为了实现上述目的,本发明采用了如下技术方案:一种操作层可周转临时楼梯通道装置,包括楼梯框架以及薄花纹钢板,所述楼梯框架是由方钢焊接而成的矩形框架结构,在楼梯框架内按一定的间距水平地焊接有一组薄花纹钢板,作为楼梯踏步,在楼梯框架的四个转角处竖直地固定有可伸缩支腿。In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a temporary stair passage device that can be turned around on the operation floor, including a stair frame and a thin patterned steel plate, the stair frame is a rectangular frame structure welded by square steel, and the stair A group of thin patterned steel plates are welded horizontally in the frame at certain intervals, which are used as stair steps, and retractable outriggers are vertically fixed at the four corners of the stair frame.
进一步,所述薄花纹钢板的两端与楼梯框架焊接固定,且相邻的薄花纹钢板的两端之间焊接有连接筋。Further, both ends of the thin patterned steel plate are welded and fixed to the stair frame, and connecting ribs are welded between the two ends of the adjacent thin patterned steel plates.
进一步,所述可伸缩支腿包括竖直焊接在楼梯框架的四个转角处立柱以及与立柱滑动配合的套筒,在立柱以及套筒上开设有通孔,在通孔内插入有插销。Further, the telescopic outriggers include uprights welded vertically at four corners of the stair frame and sleeves slidably matched with the uprights, the uprights and the sleeves are provided with through holes, and plugs are inserted into the through holes.
更进一步,所述套筒的底部焊接有底座。Furthermore, a base is welded to the bottom of the sleeve.
由于采用了上述技术方案,本发明的具有以下优点:本发明通过楼梯框架和薄花纹钢板构成了一种操作层可周转临时楼梯通道,并在楼梯框架上下端设置可伸缩支腿,以适应永久楼梯踏步板端部的高度变化。同时,在可伸缩支腿下方设置底座,增大临时楼梯与模板接触面积,减少压力,对支撑模板起到保护作用。本发明可以减少混凝土浇筑前,行走人流对踏步钢筋、模板的破坏,提高踏步成型质量。Due to the adoption of the above-mentioned technical solutions, the present invention has the following advantages: the present invention constitutes a temporary stairway with a turnover of the operation layer through the stair frame and the thin patterned steel plate, and the upper and lower ends of the stair frame are provided with retractable legs to adapt to permanent Height change at the end of the stair tread. At the same time, a base is set under the retractable outriggers to increase the contact area between the temporary stairs and the formwork, reduce the pressure, and protect the supporting formwork. The invention can reduce the damage of the stepping steel bar and the formwork caused by the pedestrian flow before the concrete is poured, and improve the forming quality of the stepping.
附图说明Description of drawings
图1是本发明的结构示意图的立体图;Fig. 1 is the perspective view of the structural representation of the present invention;
图2是本发明实施时的结构示意图;Fig. 2 is the structural representation when the present invention is implemented;
图3是本发明的侧面三维图;Fig. 3 is a side three-dimensional view of the present invention;
图4是底座与可伸缩杆件的连接结构示意图;4 is a schematic diagram of the connection structure between the base and the telescopic rod;
图5是可伸缩支腿的连接结构示意图。Figure 5 is a schematic diagram of the connection structure of the telescopic outriggers.
附图标记说明:1-楼梯框架;2-连接筋;3-薄花纹钢板;4-结构支撑模板面;5-底座;6-楼梯结构面;7-套筒;8-插销;9-可伸缩支腿;10-立柱。Description of reference numerals: 1-stair frame; 2-connecting rib; 3-thin checkered steel plate; 4-structural support formwork surface; 5-base; 6-stair structure surface; 7-sleeve; 8-bolt; 9-can Telescopic outriggers; 10-columns.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
本发明的实施例:请参阅图1~5,一种操作层可周转临时楼梯通道装置,包括楼梯框架1以及薄花纹钢板3,所述楼梯框架1是由方钢焊接而成的矩形框架结构,在楼梯框架1内按15cm的间距水平地焊接有一组薄花纹钢板3,作为楼梯踏步,在楼梯框架1的四个转角处竖直地固定有可伸缩支腿9。所述薄花纹钢板3的两端与楼梯框架1焊接固定,且相邻的薄花纹钢板3的两端之间焊接有连接筋2,以提高薄花纹钢板3与楼梯框架1的连接强度,保证行人安全。所述可伸缩支腿9包括竖直焊接在楼梯框架1的四个转角处立柱10以及与立柱10滑动配合的套筒7,在立柱10以及套筒7上开设有通孔,在通孔内插入有插销8。所述套筒7的底部焊接有底座5。Embodiments of the present invention: please refer to FIGS. 1 to 5 , a temporary stair passage device that can be turned around on the operation floor includes a
使用时,首先通过塔吊将操作层可周转临时楼梯通道装置吊运至楼梯结构面6上方,并使可伸缩支腿9下端的底座5支撑在结构支撑模板面4上,然后调整可伸缩支腿9的高度,使薄花纹钢板3与楼梯结构面6保持5cm的距离,这样不仅便于人员上下,而且还能保护楼梯模板及钢筋不受破坏。待浇筑混凝土时,再将其吊走,待下一楼层施工时使用。When in use, firstly, the temporary stairway device that can be turned around on the operation floor is hoisted to the top of the
综上所述,本发明通过楼梯框架1和薄花纹钢板3构成了一种操作层可周转临时楼梯通道,并在楼梯框架1上下端设置可伸缩支腿9,以适应永久楼梯踏步板端部的高度变化。同时,在可伸缩支腿9下方设置底座5,增大临时楼梯与模板接触面积,减少压力,对支撑模板起到保护作用。本发明可以减少混凝土浇筑前,行走人流对踏步钢筋、模板的破坏,提高踏步成型质量。To sum up, the present invention constitutes a temporary stair passageway that can be turned around on the operation floor through the
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010628494.3A CN111677336A (en) | 2020-07-02 | 2020-07-02 | A kind of temporary stair passage device with turnaround on operation floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010628494.3A CN111677336A (en) | 2020-07-02 | 2020-07-02 | A kind of temporary stair passage device with turnaround on operation floor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111677336A true CN111677336A (en) | 2020-09-18 |
Family
ID=72437716
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010628494.3A Pending CN111677336A (en) | 2020-07-02 | 2020-07-02 | A kind of temporary stair passage device with turnaround on operation floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111677336A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112177257A (en) * | 2020-09-30 | 2021-01-05 | 温州源铭振跃科技有限公司 | Bidirectional-use temporary ladder capable of being stored |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205935747U (en) * | 2016-08-09 | 2017-02-08 | 中国建筑第四工程局有限公司 | Outrigger pedestrain passage that can have enough to meet need |
| CN205955268U (en) * | 2016-06-27 | 2017-02-15 | 中国建筑一局(集团)有限公司 | Construction is with interim stair step board and stair structure thereof |
| CN206128635U (en) * | 2016-10-24 | 2017-04-26 | 中冶建工集团有限公司 | Transition stair can be dismantled to stair mold and flier |
| CN210239225U (en) * | 2019-06-20 | 2020-04-03 | 深圳市深联钢建筑工程有限公司 | Interim steel construction stair that building engineering used |
| CN212897770U (en) * | 2020-07-02 | 2021-04-06 | 中国建筑第四工程局有限公司 | Temporary stair passage structure with turnover operation layer |
-
2020
- 2020-07-02 CN CN202010628494.3A patent/CN111677336A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN205955268U (en) * | 2016-06-27 | 2017-02-15 | 中国建筑一局(集团)有限公司 | Construction is with interim stair step board and stair structure thereof |
| CN205935747U (en) * | 2016-08-09 | 2017-02-08 | 中国建筑第四工程局有限公司 | Outrigger pedestrain passage that can have enough to meet need |
| CN206128635U (en) * | 2016-10-24 | 2017-04-26 | 中冶建工集团有限公司 | Transition stair can be dismantled to stair mold and flier |
| CN210239225U (en) * | 2019-06-20 | 2020-04-03 | 深圳市深联钢建筑工程有限公司 | Interim steel construction stair that building engineering used |
| CN212897770U (en) * | 2020-07-02 | 2021-04-06 | 中国建筑第四工程局有限公司 | Temporary stair passage structure with turnover operation layer |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112177257A (en) * | 2020-09-30 | 2021-01-05 | 温州源铭振跃科技有限公司 | Bidirectional-use temporary ladder capable of being stored |
| CN112177257B (en) * | 2020-09-30 | 2021-12-07 | 温州源铭振跃科技有限公司 | Bidirectional-use temporary ladder capable of being stored |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106400951B (en) | A method for simultaneous construction of horizontal and vertical structures of super high-rise buildings | |
| CN103206074B (en) | Elevator shaft template construction method, platform and support | |
| CA2745001C (en) | A means of stripping concrete formwork from a concrete surface | |
| CA2697398A1 (en) | A means of stripping concrete formwork from a concrete surface | |
| CN209482712U (en) | An electric climbing formwork device for building construction | |
| CN113293694B (en) | Turnover formwork frame structure for efficient pier body construction and construction process | |
| CN212897770U (en) | Temporary stair passage structure with turnover operation layer | |
| CN111677336A (en) | A kind of temporary stair passage device with turnaround on operation floor | |
| CN206784884U (en) | Curved-surface building climbing device | |
| CN206267519U (en) | A kind of light engine position hydraulic climbing die block system | |
| CN220394299U (en) | Novel hydraulic climbing formwork overhanging operation platform | |
| CN106193586A (en) | Elevator Telescopic folding Integral lifting core | |
| CN213979843U (en) | Prefabricated staircase safety operation platform of assembled structure | |
| CN208201662U (en) | High pier bridge pier shaft reinforcing bar binding operation protective frame | |
| CN209828014U (en) | Telescopic support and telescopic escape device assembly | |
| CN206128636U (en) | Detachable stair formwork of flier | |
| CN206128635U (en) | Transition stair can be dismantled to stair mold and flier | |
| CN217924754U (en) | Adjustable stair room high-altitude operation operating platform | |
| CN221143715U (en) | Temporary stair operation platform for assembled building construction | |
| CN207348787U (en) | One kind maintenance cat ladder platform | |
| CN223317516U (en) | A self-climbing protection platform for vertical cross-operation of super-high-rise core tubes | |
| CN221590350U (en) | Be applied to multi-functional operation platform of stair room of prefabricated formula scissors stair | |
| CN222614789U (en) | Scaffold with height capable of being adjusted rapidly | |
| CN206220484U (en) | A kind of template suspension centre spandrel girder of steel platform | |
| CN219839973U (en) | Combined operation safety protection platform for climbing formwork outer vertical face of bridge engineering bridge pier |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200918 |