CN111608325A - Shear key installation structure and installation method - Google Patents
Shear key installation structure and installation method Download PDFInfo
- Publication number
- CN111608325A CN111608325A CN202010624232.XA CN202010624232A CN111608325A CN 111608325 A CN111608325 A CN 111608325A CN 202010624232 A CN202010624232 A CN 202010624232A CN 111608325 A CN111608325 A CN 111608325A
- Authority
- CN
- China
- Prior art keywords
- shear key
- column
- installation
- shear
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Foundations (AREA)
Abstract
本申请提出一种抗剪键的安装结构及安装方法,抗剪键的安装结构包括柱子、柱脚底板、柱脚螺栓、抗剪键预留孔、基础短柱、抗剪键;所述柱脚底板固定连接到所述柱子,所述柱脚螺栓预埋于所述基础短柱,所述柱脚底板连接到所述柱脚螺栓,所抗剪键预留孔形成于所述基础短柱,所述抗剪键容纳于所述抗剪键预留孔并且凸出于所述抗剪键预留孔的开口,所述柱脚底板设置有安装孔,所述抗剪键穿过所述安装孔而伸入所述柱子。通过抗剪键插入柱脚底板,而无需提前将抗剪键焊接在柱脚底板下面,使模块化建筑的有效使用高度可以较高,并且模块化建筑在工厂中组装时,由柱脚底板支撑模块化建筑,避免预先焊接的抗剪键用于支撑模块化建筑难以保持稳定的问题。
The present application proposes an installation structure and an installation method for a shear key. The installation structure for a shear key includes a column, a column base plate, a stud bolt, a reserved hole for the shear key, a short foundation column, and a shear key; the column The foot bottom plate is fixedly connected to the column, the stud bolt is pre-buried in the foundation short column, the column foot bottom plate is connected to the stud bolt, and the shear key reserved hole is formed in the foundation short column , the shear key is accommodated in the reserved hole for the shear key and protrudes from the opening of the reserved hole for the shear key, the bottom plate of the column foot is provided with a mounting hole, and the shear key passes through the Mounting holes extend into the post. The shear key is inserted into the column base plate without welding the shear key under the column base plate in advance, so that the effective use height of the modular building can be higher, and when the modular building is assembled in the factory, it is supported by the column base plate Modular buildings, avoiding the problem that pre-welded shear keys used to support modular buildings are difficult to maintain stability.
Description
技术领域technical field
本申请涉及一种建筑用件,具体涉及一种抗剪键的安装结构及安装方法。The present application relates to a building piece, in particular to an installation structure and an installation method of a shear key.
背景技术Background technique
《钢结构设计标准》中明确规定,外露式柱脚螺栓不宜用于承受柱脚底部的水平反力,此水平反力由底板与混凝土基础间的摩擦力承受或者设置抗剪键来承受。另外柱脚螺栓受剪切力破坏发生在混凝土基础中,不易发现且通常难以采取加固措施。因此钢结构抗剪键的设计在整个钢结构设计中非常重要。抗剪键通常用较厚的槽钢或工字钢垂直焊接在柱脚底面的水平钢板上,并埋在基础内预留的抗剪槽中,一般用微膨胀混凝土二次浇灌。The "Standards for Design of Steel Structures" clearly stipulates that the exposed stud bolts should not be used to bear the horizontal reaction force at the bottom of the column foot. This horizontal reaction force is borne by the friction between the bottom plate and the concrete foundation or by setting shear keys. In addition, the shear failure of the stud bolts occurs in the concrete foundation, which is not easy to find and usually difficult to take reinforcement measures. Therefore, the design of the steel structure shear key is very important in the whole steel structure design. The shear key is usually welded vertically to the horizontal steel plate on the bottom surface of the column foot with a thicker channel steel or I-beam, and is buried in the shear groove reserved in the foundation. Generally, micro-expansion concrete is used for secondary pouring.
对于单独构件(例如柱)预先焊接抗剪键的安装方式,抗剪键的长度一般不会有什么影响。但是对于模块化建筑,由于运输的原因,在模块化建筑的整体高度受到限制的情况下,预先焊接的抗剪键影响模块化建筑的有效使用高度。由于抗剪键尺寸相对比较小,有的甚至是角钢或者焊接十字型。在模块化建筑在工厂中组装时,预焊接的抗剪键难以稳定支撑整个模块化建筑,还需要额外的支撑结构来保证整体结构稳定。For installations where individual components (eg columns) are pre-welded shear keys, the length of the shear keys generally does not matter. But for the modular building, the pre-welded shear key affects the effective use height of the modular building when the overall height of the modular building is limited due to transportation reasons. Due to the relatively small size of the shear key, some are even angle steel or welded cross. When the modular building is assembled in the factory, it is difficult for the pre-welded shear keys to stably support the entire modular building, and additional support structures are required to ensure the overall structural stability.
发明内容SUMMARY OF THE INVENTION
为了解决抗剪键预先焊接安装对模块化建筑的有效使用高度的影响,以及预先焊接的抗剪键对于模块化建筑组装过程中对于模块化建筑的稳定性的影响,本申请公开了一种抗剪键的安装结构及安装方式。In order to solve the influence of pre-welded installation of shear keys on the effective use height of modular buildings, and the influence of pre-welded shear keys on the stability of modular buildings during the assembly process of modular buildings, the present application discloses a Scissor key installation structure and installation method.
本申请提供一种抗剪键的安装结构,其包括柱子、柱脚底板、柱脚螺栓、抗剪键预留孔、基础短柱、抗剪键;The application provides an installation structure for a shear key, which includes a column, a bottom plate of a column foot, a stud bolt, a reserved hole for the shear key, a foundation short column, and a shear key;
所述柱脚底板固定连接到所述柱子,所述柱脚螺栓预埋于所述基础短柱,所述柱脚底板连接到所述柱脚螺栓,所抗剪键预留孔形成于所述基础短柱,所述抗剪键容纳于所述抗剪键预留孔并且凸出于所述抗剪键预留孔的开口,所述柱脚底板设置有安装孔,所述抗剪键穿过所述安装孔而伸入所述柱子。The column foot bottom plate is fixedly connected to the column, the stud bolt is pre-buried in the short foundation column, the column foot bottom plate is connected to the stud bolt, and the shear key reserved hole is formed in the The foundation short column, the shear key is accommodated in the reserved hole for the shear key and protrudes from the opening of the reserved hole for the shear key, the bottom plate of the column foot is provided with a mounting hole, and the shear key passes through the hole. into the post through the mounting hole.
优选地,所述安装结构还包括支撑件,所述支撑件设置于所述抗剪键的下方,由所述支撑件支撑所述抗剪键。Preferably, the installation structure further includes a support member, the support member is disposed below the shear key, and the shear key is supported by the support member.
优选地,所述支撑件的顶面的面积小于所述抗剪键的底面的面积,所述抗剪键的底面部分地与所述支撑件接触。Preferably, the area of the top surface of the support is smaller than the area of the bottom surface of the shear key, and the bottom surface of the shear key is partially in contact with the support.
优选地,所述安装结构还包括螺母,通过所述螺母使所述柱脚底板连接于所述柱脚螺栓,所述螺母包括上螺母和下螺母,所述上螺母和所述下螺母分别位于所述柱脚底板的上下两侧。Preferably, the mounting structure further includes a nut, through which the stud base plate is connected to the stud bolt, the nut includes an upper nut and a lower nut, and the upper nut and the lower nut are respectively located at The upper and lower sides of the column base bottom plate.
优选地,所述基础短柱的顶面与所述柱脚底板之间具有二次灌浆的灌浆料。Preferably, there is a secondary grouting grouting material between the top surface of the short foundation column and the bottom plate of the column foot.
优选地,所述抗剪键预留孔内具有二次灌浆的灌浆料,通过二次灌浆将抗剪键固定到所述抗剪键预留孔。Preferably, the reserved hole for the shear key has a grouting material for secondary grouting, and the shear key is fixed to the reserved hole for the shear key through the secondary grouting.
优选地,所述抗剪键为立方柱状,所述安装孔为矩形孔,所述抗剪键预留孔为矩形孔。Preferably, the shear key is in the shape of a cubic column, the installation hole is a rectangular hole, and the reserved hole for the shear key is a rectangular hole.
优选地,所述安装孔的尺寸大于所述抗剪键的尺寸。Preferably, the size of the mounting hole is larger than the size of the shear key.
本申请还提出一种抗剪键的安装方法,其用于实现上述技术方案中任意一项所述的抗剪键安装结构,该抗剪键安装方法包括:The present application also proposes a method for installing a shear key, which is used to implement the shear key installation structure described in any one of the above technical solutions, and the shear key installation method includes:
在模块化建筑安装现场将所述抗剪键放置在所述抗剪键预留孔内,将所述柱脚底板安装于所述基础短柱时,使所述抗剪键插入所述安装孔。The shear key is placed in the reserved hole for the shear key at the installation site of the modular building, and the shear key is inserted into the installation hole when the column base plate is installed on the short foundation column .
优选地,所述基础短柱为工厂预制的或安装现场预浇注的混凝土或钢筋混凝土柱体,Preferably, the short foundation column is a concrete or reinforced concrete column prefabricated in the factory or pre-cast on the installation site,
在模块化建筑安装现场将灌浆料灌入所述抗剪键预留孔以及所述柱脚底板与所述基础短柱的顶面之间的空隙,使放入所述抗剪键预留孔的所述抗剪键固定。At the installation site of the modular building, the grouting material is poured into the reserved hole for shear keys and the gap between the bottom plate of the column foot and the top surface of the short foundation column, so that the reserved holes for shear keys are inserted. The shear key is fixed.
通过抗剪键插入柱脚底板,而无需提前将抗剪键焊接在柱脚底板下面,使模块化建筑的有效使用高度可以较高,并且模块化建筑在工厂中组装时,由柱脚底板支撑整个模块化建筑,避免了预先焊接的抗剪键用于支撑模块化建筑难以保持稳定的问题。The shear key is inserted into the column base plate without welding the shear key under the column base plate in advance, so that the effective use height of the modular building can be higher, and when the modular building is assembled in the factory, it is supported by the column base plate The whole modular building avoids the problem that the pre-welded shear key used to support the modular building is difficult to maintain stability.
附图说明Description of drawings
图1为本申请提供的抗剪键的安装结构的示意图。FIG. 1 is a schematic diagram of the installation structure of the shear key provided by the application.
具体实施方式Detailed ways
下面参照附图描述本申请的示例性实施方式。应当理解,这些具体的说明仅用于示教本领域技术人员如何实施本申请,而不用于穷举本申请的所有可行的方式,也不用于限制申请的范围。Exemplary embodiments of the present application are described below with reference to the accompanying drawings. It should be understood that these specific descriptions are only used to teach those skilled in the art how to implement the application, and are not used to exhaust all possible ways of the application, nor to limit the scope of the application.
如图1所示,本申请提供了一种抗剪键的安装结构,该抗剪键的安装结构包括,柱子1、柱脚底板2、柱脚螺栓3、螺母4、抗剪键预留孔5、基础短柱6、抗剪键7、支撑件8。As shown in FIG. 1 , the present application provides a shear key installation structure. The shear key installation structure includes a
柱子1可以为柱状,例如可以由方管柱制成。柱脚底板2连接于柱子1的下端柱子1与柱脚底板2可以通过例如焊接的方式固定连接。柱脚底板2设置有安装孔21,安装孔21可以形成为与抗剪键7相同或相似的形状,例如抗剪键7为立方柱状,安装孔21为矩形孔。安装孔21的尺寸可以略大于抗剪键7的尺寸,使抗剪键7可以在一定的位置误差范围内插入安装孔21,例如安装孔21的边长比抗剪键7的对应的边长大4毫米。The
基础短柱6可以表示现场预浇注,或者在柱子1与柱脚底板2运抵现场之前就已经在工厂预先浇筑完成的混凝土短柱或钢筋混凝土短柱。基础短柱6的尺寸根据柱子1及柱脚底板2的尺寸确定,例如柱子1的尺寸是200×200mm,那么基础短柱6的尺寸可以为600×600mm。基础短柱6预留有抗剪键预留孔5,抗剪键预留孔5的尺寸大于抗剪键7的尺寸,抗剪键预留孔5可以是矩形孔。The foundation stub 6 may represent a pre-cast on site, or a concrete stub or reinforced concrete stub that has been pre-cast in the factory before the
柱脚螺栓3预埋在基础短柱6中,柱脚螺栓3由基础短柱6的顶面向上延伸,柱脚螺栓3穿过柱脚底板2,柱脚底板2通过螺母4连接到柱脚螺栓3。The
螺母4包括柱脚螺栓3的上下螺母,螺母4用于将柱脚底板2连接于柱脚螺栓3。通过旋转下螺母可以对柱脚底板2进行调平和标高,调平和标高完成后旋紧上螺母使柱脚底板2固定连接于柱脚螺栓3。The nut 4 includes upper and lower nuts of the
支撑件8位于抗剪键预留孔5的底部和抗剪键7之间,支撑件8不突出于抗剪键预留孔5的开口,支撑件8用于支撑抗剪键7。支撑件8的顶面的面积小于抗剪键7的底面的面积,使抗剪键7的底面部分地与支撑件8接触。通过支撑件8使抗剪键7与预制的基础短柱6的(抗剪键预留孔5的)底部留有空隙,使用二次灌浆的灌浆料填充到抗剪键7的下方的这些空隙,二次灌浆的灌浆料可以在固化后固定抗剪键7。通过支撑件8使灌浆料可以填充到抗剪键7的下方,避免抗剪键7和预制的基础短柱6直接接触形成空隙。支撑件8可以是钢构件。The
柱脚底板2和基础短柱6之间间隔有用于二次灌浆的空间,A表示柱脚底板2与基础短柱6(基础顶面)预留的二层灌浆厚度,该厚度A优选地不小于50mm。B表示支撑件8在与柱脚底板2垂直的方向上的尺寸,例如为50mm。There is space for secondary grouting between the
本申请还提供用于上述抗剪键的安装结构的抗剪键的安装方法,其可以包括下面描述的步骤。The present application also provides an installation method of a shear key used in the above-mentioned shear key installation structure, which may include the steps described below.
制作基础短柱6,并且在基础短柱6预留抗剪键预留孔5,抗剪键预留孔5用于容纳抗剪键7。The foundation short column 6 is made, and the shear key reserved
将支撑件8放置在抗剪键预留孔5内。Place the
将抗剪键7放置在抗剪键预留孔5内,抗剪键7压在支撑件8上,抗剪键7凸出于基础短柱6的顶面。The
将模块化建筑吊起来到预定位置,使模块化建筑的柱脚底板2的安装孔21与抗剪键7对准,模块化建筑高度下降,使抗剪键7插入安装孔21。The modular building is hoisted to a predetermined position, the mounting
柱脚底板2由螺母4的下螺母支撑,通过螺母4的下螺母的高度调节柱脚底板2的水平及标高,调整到位后拧紧螺母4的上螺母以固定柱脚底板2。The
向柱脚底板2与基础短柱6顶面的空隙和抗剪键预留孔5灌入灌浆料,并进行养护,灌浆料固化后使埋入抗剪键预留孔5的抗剪键7被固定。Fill in the grouting material into the gap between the
尽管已经参照示例性实施方式说明了本申请,但是应当理解,本申请不限于所公开的示例性实施方式。本领域技术人员可以在本申请的教导下对上述实施方式做出各种变形和改变,而不脱离本申请的范围。While the application has been described with reference to exemplary embodiments, it is to be understood that the application is not limited to the disclosed exemplary embodiments. Those skilled in the art can make various modifications and changes to the above-mentioned embodiments under the teaching of the present application, without departing from the scope of the present application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010624232.XA CN111608325A (en) | 2020-07-01 | 2020-07-01 | Shear key installation structure and installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010624232.XA CN111608325A (en) | 2020-07-01 | 2020-07-01 | Shear key installation structure and installation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111608325A true CN111608325A (en) | 2020-09-01 |
Family
ID=72197264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010624232.XA Pending CN111608325A (en) | 2020-07-01 | 2020-07-01 | Shear key installation structure and installation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111608325A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113089500A (en) * | 2021-05-18 | 2021-07-09 | 中国建筑股份有限公司 | Socket type connecting structure based on T-shaped groove and construction method thereof |
| CN113789850A (en) * | 2021-09-22 | 2021-12-14 | 杭萧钢构(广东)有限公司 | Shear resistant structure and manufacturing method |
| CN113914350A (en) * | 2021-10-26 | 2022-01-11 | 中交第四航务工程勘察设计院有限公司 | Prefabricated concrete foundation structure and installation method thereof |
| CN114439245A (en) * | 2022-02-25 | 2022-05-06 | 上海奉贤建设发展(集团)有限公司 | Intelligent integral construction method for member large-span portal rigid frame |
| CN115162615A (en) * | 2022-06-21 | 2022-10-11 | 中交一公局集团有限公司 | Steel construction installation column foot mounting structure |
| CN115680120A (en) * | 2022-11-08 | 2023-02-03 | 吉林建筑大学 | Structure and method for improving shear bearing capacity of steel column base connecting node |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013241729A (en) * | 2012-05-17 | 2013-12-05 | Okabe Co Ltd | Junction structure of concrete and steel frame |
| CN206554254U (en) * | 2017-03-09 | 2017-10-13 | 王生贵 | A kind of hinged column base structure of Steel Portal Frames |
| CN207110110U (en) * | 2017-06-20 | 2018-03-16 | 济南市人防建筑设计研究院有限责任公司 | Build pre-buried wall |
| CN208472754U (en) * | 2018-06-22 | 2019-02-05 | 大唐环境产业集团股份有限公司 | A kind of steel suspension column facilitating installation |
| CN110258610A (en) * | 2019-06-27 | 2019-09-20 | 上海建筑设计研究院有限公司 | Foot joint for modular architectural |
| CN212715649U (en) * | 2020-07-01 | 2021-03-16 | 上海森松制药设备工程有限公司 | Mounting structure of shear key |
-
2020
- 2020-07-01 CN CN202010624232.XA patent/CN111608325A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013241729A (en) * | 2012-05-17 | 2013-12-05 | Okabe Co Ltd | Junction structure of concrete and steel frame |
| CN206554254U (en) * | 2017-03-09 | 2017-10-13 | 王生贵 | A kind of hinged column base structure of Steel Portal Frames |
| CN207110110U (en) * | 2017-06-20 | 2018-03-16 | 济南市人防建筑设计研究院有限责任公司 | Build pre-buried wall |
| CN208472754U (en) * | 2018-06-22 | 2019-02-05 | 大唐环境产业集团股份有限公司 | A kind of steel suspension column facilitating installation |
| CN110258610A (en) * | 2019-06-27 | 2019-09-20 | 上海建筑设计研究院有限公司 | Foot joint for modular architectural |
| CN212715649U (en) * | 2020-07-01 | 2021-03-16 | 上海森松制药设备工程有限公司 | Mounting structure of shear key |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113089500A (en) * | 2021-05-18 | 2021-07-09 | 中国建筑股份有限公司 | Socket type connecting structure based on T-shaped groove and construction method thereof |
| CN113089500B (en) * | 2021-05-18 | 2022-05-24 | 中国建筑股份有限公司 | A socket-and-socket connection structure based on T-shaped groove and its construction method |
| CN113789850A (en) * | 2021-09-22 | 2021-12-14 | 杭萧钢构(广东)有限公司 | Shear resistant structure and manufacturing method |
| CN113789850B (en) * | 2021-09-22 | 2023-03-10 | 杭萧钢构(广东)有限公司 | Manufacturing method of shear-resistant structure |
| CN113914350A (en) * | 2021-10-26 | 2022-01-11 | 中交第四航务工程勘察设计院有限公司 | Prefabricated concrete foundation structure and installation method thereof |
| CN114439245A (en) * | 2022-02-25 | 2022-05-06 | 上海奉贤建设发展(集团)有限公司 | Intelligent integral construction method for member large-span portal rigid frame |
| CN115162615A (en) * | 2022-06-21 | 2022-10-11 | 中交一公局集团有限公司 | Steel construction installation column foot mounting structure |
| CN115680120A (en) * | 2022-11-08 | 2023-02-03 | 吉林建筑大学 | Structure and method for improving shear bearing capacity of steel column base connecting node |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111608325A (en) | Shear key installation structure and installation method | |
| US8365485B2 (en) | Method and apparatus for setting support columns within a foundation | |
| CN108005401A (en) | A kind of support and change method of the column of existing frame structure base isolation reinforcement | |
| JP2007527971A (en) | How to set up a tower | |
| CN107724559B (en) | Seismic isolation and reinforcement construction process of existing buildings | |
| US20080016805A1 (en) | Truss lock floor systems and related methods and apparatus | |
| JPH09100503A (en) | Connecting jig of precast concrete slab | |
| CN212715649U (en) | Mounting structure of shear key | |
| JP7320712B2 (en) | CONTAINER CONNECTION STRUCTURE, CONTAINER AND CONTAINER CONNECTION METHOD | |
| CN220504566U (en) | Unloading platform of cantilever steel beam on top of concrete column | |
| JP2011190607A (en) | Bearing apparatus coping with height adjustment | |
| CN116427543B (en) | A steel-concrete assembled petrochemical pipe gallery structure | |
| KR100346960B1 (en) | An apparatus and method for anchoring steel column to concrete | |
| CN216130352U (en) | Steel construction exposed rigid connection column base | |
| KR20210007502A (en) | Construction method for upper equipment basis drying system of steel frame grill girder in remodeling place | |
| CN216665082U (en) | Leveling device for prefabricated floor slab | |
| CN216860140U (en) | Length-adjustable steel pedestal for precast beam construction | |
| CN112227530B (en) | Connecting system and connecting method for precast concrete superposed foundation and steel column | |
| CN115807508A (en) | Construction method and joints of building steel structure column foot installation foundation | |
| CN106638650B (en) | Fabricated concrete foundation structure | |
| CN116104101B (en) | Prestressed support system for foundation pit and construction method thereof | |
| JP7611346B1 (en) | Pile foundation structure, construction method of pile foundation structure | |
| CN213952534U (en) | Tool type template device for grouting and plugging hand hole of PC wall of prefabricated building structure | |
| CN220486422U (en) | Temporary pile sealing structure for anchor rod static pressure pile | |
| JP7492073B1 (en) | Equipment stand construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200901 |