CN111377350A CN202010298558.8A CN202010298558A CN111377350A CN 111377350 A CN111377350 A CN 111377350A CN 202010298558 A CN202010298558 A CN 202010298558A CN 111377350 A CN111377350 A CN 111377350A
Authority
CN
China
Prior art keywords
planetary stage
boom
assembly
wind power
disassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010298558.8A
Other languages
Chinese (zh)
Other versions
CN111377350B (en
Inventor
罗文振
许军
王福东
秦野
朱泉生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing High Speed Gear Manufacturing Co Ltd
Original Assignee
Nanjing High Speed Gear Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing High Speed Gear Manufacturing Co Ltd filed Critical Nanjing High Speed Gear Manufacturing Co Ltd
Priority to CN202010298558.8A priority Critical patent/CN111377350B/en
Publication of CN111377350A publication Critical patent/CN111377350A/en
Application granted granted Critical
Publication of CN111377350B publication Critical patent/CN111377350B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)

Abstract

本发明涉及风电齿轮箱技术领域,公开一种风电齿轮箱行星级整体拆装工装,包括吊臂组件和连接臂组件。吊臂组件被配置为能够与外部起吊设备连接。连接臂组件包括连接座和连接臂,连接座可转动地安装在吊臂组件上,连接臂可拆卸地固定在连接座上,连接座被配置为能够与风电齿轮箱行星级的止口对接,连接座上设置有第一连接孔,紧固件能够穿过第一连接孔与风电齿轮箱行星级内侧的螺栓孔螺纹连接,连接臂上设置有第二连接孔,紧固件能够穿过第二连接孔与风电齿轮箱行星级外侧的起吊孔螺纹连接。本发明提供的风电齿轮箱行星级整体拆装工装,能够仅对行星级进行整体拆装,简化拆装过程,缩短拆装周期,减少人力物力的使用。

Figure 202010298558

The invention relates to the technical field of wind power gearboxes, and discloses an integral disassembly and assembly tool for a planetary stage of a wind power gearbox, including a boom assembly and a connecting arm assembly. The boom assembly is configured to be connectable to external lifting equipment. The connecting arm assembly includes a connecting seat and a connecting arm, the connecting seat is rotatably mounted on the boom assembly, the connecting arm is detachably fixed on the connecting seat, and the connecting seat is configured to be able to be docked with the stop of the planetary stage of the wind turbine gearbox , the connection seat is provided with a first connection hole, the fastener can pass through the first connection hole to be threadedly connected with the bolt hole on the inner side of the planetary stage of the wind turbine gearbox, and the connection arm is provided with a second connection hole, the fastener can pass through It is threadedly connected with the lifting hole on the outer side of the planetary stage of the wind turbine gearbox through the second connecting hole. The overall disassembly and assembly tool for the planetary stage of the wind power gearbox provided by the invention can only disassemble and assemble the planetary stage as a whole, simplifies the disassembly and assembly process, shortens the disassembly and assembly period, and reduces the use of manpower and material resources.

Figure 202010298558

Description

一种风电齿轮箱行星级整体拆装工装A kind of overall disassembly and assembly tool for wind power gearbox planetary stage

技术领域technical field

本发明涉及风电齿轮箱技术领域,尤其涉及一种风电齿轮箱行星级整体拆装工装。The invention relates to the technical field of wind power gearboxes, in particular to an integral disassembly and assembly tool for a planetary stage of a wind power gearbox.

背景技术Background technique

风电齿轮箱是风力发电的主要设备。目前,风电齿轮箱行星级发生损坏后,由于缺乏专用的拆装工装辅助,所以通常只能将风电齿轮箱整体下塔更换,无法在塔上进行拆卸和更换。而风电齿轮箱整体下塔需要动用较大的地面起吊设备,同时在更换新的行星级后还需重新利用较大的地面起吊设备将风电齿轮箱装回塔上。此种更换方式过程复杂周期长,需要动用较大的人力物力,安全隐患大,同时为了使起吊设备能够平稳停驻需要风机塔筒底部具有较大面积的平整地面。Wind power gearbox is the main equipment for wind power generation. At present, after the planetary stage of the wind power gearbox is damaged, due to the lack of special disassembly and assembly aids, the wind power gearbox can only be removed from the tower as a whole and replaced, and cannot be disassembled and replaced on the tower. The overall lowering of the wind power gearbox requires the use of larger ground lifting equipment. At the same time, after replacing the new planetary stage, it is necessary to reuse the larger ground lifting equipment to install the wind power gearbox back on the tower. This replacement method has a complicated process and a long period of time, requires a large amount of manpower and material resources, and has a large potential safety hazard. At the same time, in order to make the hoisting equipment park smoothly, a large area of flat ground at the bottom of the fan tower is required.

因此,亟需一种新型的风电齿轮箱行星级整体拆装工装以解决上述技术问题。Therefore, there is an urgent need for a new type of overall disassembly and assembly tool for the planetary stage of the wind power gearbox to solve the above technical problems.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种风电齿轮箱行星级整体拆装工装,能够仅对风电齿轮箱的行星级进行整体拆装,简化拆装过程,缩短拆装周期,减少人力物力的使用,降低安全隐患,同时能够减小对平整地面的需求。The purpose of the present invention is to provide an integral disassembly and assembly tool for the planetary stage of the wind power gearbox, which can only disassemble and assemble the planetary stage of the wind power gearbox as a whole, simplifies the disassembly and assembly process, shortens the disassembly and assembly period, and reduces the use of manpower and material resources. Reduce safety hazards, while reducing the need for level ground.

为达上述目的,本发明采用以下技术方案:For achieving the above object, the present invention adopts the following technical solutions:

一种风电齿轮箱行星级整体拆装工装,包括:An integral disassembly and assembly tool for a planetary level of a wind power gearbox, comprising:

吊臂组件,被配置为能够与外部起吊设备连接;a boom assembly, configured to be able to connect with external lifting equipment;

连接臂组件,包括连接座和连接臂,所述连接座可转动地安装在所述吊臂组件上,所述连接臂可拆卸地固定在所述连接座上,所述连接座被配置为能够与风电齿轮箱行星级的止口对接,所述连接座上设置有第一连接孔,紧固件能够穿过所述第一连接孔与所述风电齿轮箱行星级内侧的螺栓孔螺纹连接,所述连接臂上设置有第二连接孔,紧固件能够穿过所述第二连接孔与所述风电齿轮箱行星级外侧的起吊孔螺纹连接。A connecting arm assembly includes a connecting seat and a connecting arm, the connecting seat is rotatably mounted on the boom assembly, the connecting arm is detachably fixed on the connecting seat, and the connecting seat is configured to be able to It is docked with the stop port of the planetary stage of the wind turbine gearbox, the connecting seat is provided with a first connecting hole, and the fastener can pass through the first connecting hole and the bolt hole thread on the inner side of the planetary stage of the wind turbine gearbox. For connection, the connecting arm is provided with a second connecting hole, and the fastener can pass through the second connecting hole and be screwed to the hoisting hole on the outer side of the planetary stage of the wind turbine gearbox.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,多个所述连接臂沿所述连接座的周向均匀分布;和/或As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind turbine gearbox, a plurality of the connecting arms are evenly distributed along the circumferential direction of the connecting seat; and/or

多个所述第一连接孔沿所述连接座的周向均匀分布。The plurality of first connection holes are evenly distributed along the circumferential direction of the connection seat.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述吊臂组件包括吊臂、吊臂轴和连接轴,所述吊臂轴安装在所述吊臂上,所述连接轴与所述吊臂轴可拆卸连接,所述连接座可转动地安装在所述连接轴上。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the boom assembly includes a boom, a boom shaft and a connecting shaft, the boom shaft is mounted on the boom, and the connecting shaft It is detachably connected with the boom shaft, and the connection seat is rotatably mounted on the connection shaft.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述连接座和所述连接轴之间设置有轴承。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, a bearing is provided between the connecting seat and the connecting shaft.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述吊臂组件还包括吊环,所述吊环可拆卸地安装在所述吊臂上,所述吊环被配置为能够与所述外部起吊设备连接。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the boom assembly further includes a hoisting ring, the hoisting ring is detachably mounted on the hoisting arm, and the hoisting ring is configured to be able to connect with the External lifting equipment connection.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述吊臂包括垂直连接的安装部和吊装部,所述吊臂轴安装在所述安装部上,所述吊环安装在所述吊装部上。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the boom includes a vertically connected mounting portion and a lifting portion, the boom shaft is mounted on the mounting portion, and the lifting ring is mounted on the mounting portion. on the hoisting part.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述连接座包括对接部和第一连接部,所述对接部被配置为能够与所述风电齿轮箱行星级的止口对接,所述第一连接孔开设在所述第一连接部上。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the connecting seat includes a docking part and a first connecting part, and the docking part is configured to be able to be connected with the stop of the planetary stage of the wind power gearbox Butt joint, the first connection hole is opened on the first connection part.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述第一连接部上还开设有定位槽,所述连接臂的一端能够插设在所述定位槽中。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, a positioning groove is also formed on the first connecting portion, and one end of the connecting arm can be inserted into the positioning groove.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述连接臂包括固定部和第二连接部,所述固定部可拆卸地固定在所述连接座上,所述第二连接部的延伸方向与所述连接座的转动轴线平行,所述第二连接孔开设在所述第二连接部上。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the connecting arm includes a fixing part and a second connecting part, the fixing part is detachably fixed on the connecting seat, and the second connecting part The extension direction of the connecting portion is parallel to the rotation axis of the connecting seat, and the second connecting hole is opened on the second connecting portion.

作为所述风电齿轮箱行星级整体拆装工装的优选方案,所述吊臂轴通过焊接固定安装在所述吊臂上。As a preferred solution for the overall disassembly and assembly of the planetary stage of the wind power gearbox, the boom shaft is fixedly mounted on the boom by welding.

本发明的有益效果为:The beneficial effects of the present invention are:

本发明提供的风电齿轮箱行星级整体拆装工装,通过在连接座上设置第一连接孔,然后利用紧固件与第一连接孔和行星级内侧的螺栓孔的配合,能够使连接座与行星级固定连接,同时通过在连接臂上设置第二连接孔,然后利用紧固件与第二连接孔和行星级外侧的起吊孔的配合,能够使连接臂与行星级固定连接。当连接座和连接臂均与行星级固定连接好后,通过较小的起吊设备即可将行星级从风电齿轮箱中拉出或将行星级装入风电齿轮箱中,实现对行星级独立的拆装。另外,由于连接座可转动地安装在吊臂组件上,所以在行星级拉出和装入的过程中行星级中的行星轮可以自由旋转,从而能够避免由于斜齿的行星轮与齿圈之间发生干涉而无法拆装的现象发生。本发明提供的风电齿轮箱行星级整体拆装工装,能够仅对行星级进行整体拆装,简化拆装过程,缩短拆装周期,减少人力物力的使用,降低安全隐患,同时由于利用较小的起吊设备即可实现拆装,所以风机塔筒底部仅需较小的平整地面即可保证起吊设备平稳停驻。The overall disassembly and assembly tool for the planetary stage of the wind power gearbox provided by the present invention can make the connection by setting the first connecting hole on the connecting seat, and then using the fastener to cooperate with the first connecting hole and the bolt hole on the inner side of the planetary stage. The seat is fixedly connected to the planetary stage, and at the same time, by setting a second connecting hole on the connecting arm, and then using the fastener to cooperate with the second connecting hole and the hoisting hole outside the planetary stage, the connecting arm and the planetary stage can be fixed. connect. After the connecting seat and the connecting arm are fixedly connected with the planetary stage, the planetary stage can be pulled out from the wind power gearbox or inserted into the wind power gearbox through a small lifting device, so as to realize parallel alignment. Star independent disassembly. In addition, since the connecting seat is rotatably mounted on the boom assembly, the planetary gear in the planetary stage can rotate freely during the process of pulling out and loading the planetary stage, so that the helical gear planetary gear and the ring gear can be avoided due to helical gears. Interference occurs between them and the phenomenon cannot be disassembled. The overall disassembly and assembly tool for the planetary stage of the wind power gearbox provided by the invention can only disassemble and assemble the planetary stage as a whole, simplifies the disassembly and assembly process, shortens the disassembly and assembly period, reduces the use of manpower and material resources, and reduces potential safety hazards. Small lifting equipment can be disassembled and assembled, so the bottom of the fan tower only needs a small level ground to ensure that the lifting equipment can be parked smoothly.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对本发明实施例描述中所需要使用的附图作简单的介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据本发明实施例的内容和这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments of the present invention. Obviously, the drawings in the following description are only some embodiments of the present invention. , for those of ordinary skill in the art, other drawings can also be obtained according to the contents of the embodiments of the present invention and these drawings without creative efforts.

图1是本发明实施例提供的风电齿轮箱行星级整体拆装工装的结构示意图;1 is a schematic structural diagram of an integral disassembly and assembly tool for a planetary stage of a wind power gearbox provided by an embodiment of the present invention;

图2是本发明实施例提供的风电齿轮箱行星级整体拆装工装的剖视图;2 is a cross-sectional view of an integral disassembly and assembly tool for a planetary stage of a wind power gearbox provided by an embodiment of the present invention;

图3是本发明实施例提供的风电齿轮箱行星级整体拆装工装的局部结构示意图。FIG. 3 is a partial structural schematic diagram of an overall disassembly and assembly tool for a planetary stage of a wind power gearbox provided by an embodiment of the present invention.

图中:In the picture:

1-吊臂组件;11-吊臂;111-安装部;112-吊装部;12-吊臂轴;13-连接轴;14-吊环;1- boom assembly; 11- boom; 111- installation part; 112- hoisting part; 12- boom shaft; 13- connecting shaft; 14- lifting ring;

2-连接臂组件;21-连接座;211-第一连接孔;212-对接部;213-第一连接部;214-定位槽;22-连接臂;221-第二连接孔;222-固定部;223-第二连接部;2- connecting arm assembly; 21- connecting seat; 211- first connecting hole; 212- docking part; 213- first connecting part; 214- positioning groove; 22- connecting arm; 221- second connecting hole; 222- fixing part; 223 - the second connecting part;

3-轴承;3-bearing;

4-端盖。4- End caps.

具体实施方式Detailed ways

为使本发明解决的技术问题、采用的技术方案和达到的技术效果更加清楚,下面将结合附图对本发明实施例的技术方案作进一步的详细描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved more clearly, the technical solutions of the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings. Obviously, the described embodiments are only the present invention. Some examples, but not all examples. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative efforts shall fall within the protection scope of the present invention.

在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于描述目的,或者用于区分不同结构或部件,而不能理解为指示或暗示相对重要性。其中,术语“第一位置”和“第二位置”为两个不同的位置。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation or a specific orientation. construction and operation, and therefore should not be construed as limiting the invention. Furthermore, the terms "first," "second," etc. are used for descriptive purposes only or to distinguish between different structures or components, and should not be construed to indicate or imply relative importance. Therein, the terms "first position" and "second position" are two different positions.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense, unless otherwise expressly specified and limited, for example, it may be a fixed connection or a detachable connection Connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

如图1和图2所示,本实施例提供一种风电齿轮箱行星级整体拆装工装,当齿轮箱中的行星级发生损坏后可利用该工装单独对行星级进行整体拆装。具体地,风电齿轮箱行星级整体拆装工装包括吊臂组件1和连接臂组件2,吊臂组件1被配置为能够与外部起吊设备连接。连接臂组件2包括连接座21和连接臂22,连接座21可转动地安装在吊臂组件1上,连接臂22可拆卸地固定在连接座21上,连接座21被配置为能够与风电齿轮箱行星级的止口对接,连接座21上设置有第一连接孔211,紧固件能够穿过第一连接孔211与风电齿轮箱行星级内侧的螺栓孔螺纹连接,连接臂22上设置有第二连接孔221,紧固件能够穿过第二连接孔221与风电齿轮箱行星级外侧的起吊孔螺纹连接。As shown in FIG. 1 and FIG. 2 , this embodiment provides an overall disassembly and assembly tool for the planetary stage of a wind power gearbox. When the planetary stage in the gearbox is damaged, the tooling can be used to disassemble the planetary stage as a whole. . Specifically, the overall disassembly and assembly tool for the planetary stage of the wind power gearbox includes a boom assembly 1 and a connecting arm assembly 2, and the boom assembly 1 is configured to be able to be connected with external lifting equipment. The connecting arm assembly 2 includes a connecting base 21 and a connecting arm 22, the connecting base 21 is rotatably mounted on the boom assembly 1, the connecting arm 22 is detachably fixed on the connecting base 21, and the connecting base 21 is configured to be able to connect with the wind power gear The stop ports of the planetary stage of the gearbox are butted, and the connecting seat 21 is provided with a first connecting hole 211. The fastener can pass through the first connecting hole 211 and be threadedly connected to the bolt hole on the inner side of the planetary stage of the wind turbine gearbox. A second connection hole 221 is provided, and the fastener can pass through the second connection hole 221 to be threadedly connected to the hoisting hole outside the planetary stage of the wind turbine gearbox.

本实施例提供的风电齿轮箱行星级整体拆装工装,通过在连接座21上设置第一连接孔211,然后利用紧固件与第一连接孔211和行星级内侧的螺栓孔的配合,能够使连接座21与行星级固定连接,同时通过在连接臂22上设置第二连接孔221,然后利用紧固件与第二连接孔221和行星级外侧的起吊孔的配合,能够使连接臂22与行星级固定连接。当连接座21和连接臂22均与风电齿轮箱的行星级固定连接好后,通过较小的起吊设备即可将行星级从风电齿轮箱中拉出或将行星级装入风电齿轮箱中,实现对行星级独立的拆装。另外,由于连接座21可转动地安装在吊臂组件1上,所以在行星级拉出和装入的过程中行星级中的行星轮可以自由旋转,从而能够避免由于斜齿的行星轮与齿圈之间发生干涉而无法拆装的现象发生。本实施例提供的风电齿轮箱行星级整体拆装工装,能够仅对行星级进行整体拆装,简化拆装过程,缩短拆装周期,减少人力物力的使用,降低安全隐患,同时由于利用较小的起吊设备即可实现拆装,所以风机塔筒底部仅需较小的平整地面即可保证起吊设备平稳停驻。In the overall disassembly and assembly tool for the planetary stage of the wind turbine gearbox provided in this embodiment, the first connecting hole 211 is provided on the connecting seat 21, and then the fastener is used to fit the first connecting hole 211 and the bolt hole on the inner side of the planetary stage. , the connecting seat 21 can be fixedly connected with the planetary stage, and at the same time, by setting the second connecting hole 221 on the connecting arm 22, and then using the fastener to cooperate with the second connecting hole 221 and the lifting hole on the outer side of the planetary stage, it can be The connecting arm 22 is fixedly connected to the planetary stage. After the connecting base 21 and the connecting arm 22 are fixedly connected with the planetary stage of the wind turbine gearbox, the planetary stage can be pulled out from the wind turbine gearbox or loaded into the wind turbine gear by a small lifting device In the box, the disassembly and assembly of the planetary level can be realized independently. In addition, since the connecting seat 21 is rotatably mounted on the boom assembly 1, the planetary gear in the planetary stage can be freely rotated during the process of pulling out and loading the planetary stage, so that the helical gear planetary gear and the planetary gear can be avoided. The phenomenon that the ring gear interferes and cannot be disassembled occurs. The overall disassembly and assembly tooling for the planetary stage of the wind power gearbox provided in this embodiment can only disassemble and assemble the planetary stage as a whole, simplify the disassembly and assembly process, shorten the disassembly and assembly cycle, reduce the use of manpower and material resources, and reduce potential safety hazards. Small hoisting equipment can be disassembled and assembled, so the bottom of the fan tower only needs a small level ground to ensure that the hoisting equipment can be parked smoothly.

优选地,多个连接臂22沿连接座21的周向均匀分布。通过多个连接臂22的配合有利于保证连接臂22与行星级之间连接的牢固性和稳定性,保证拆装过程的安全性。具体地,在本实施例中,连接臂22的数量为三个。优选地,多个第一连接孔211沿连接座21的周向均匀分布。同理,通过多个第一连接孔211的配合有利于保证连接座21与行星级之间连接的牢固性和稳定性。具体地,在本实施例中,第一连接孔211的数量为三个。优选地,多个连接臂22和多个第一连接孔211沿连接座21的周向交替排列。Preferably, the plurality of connecting arms 22 are evenly distributed along the circumferential direction of the connecting seat 21 . The cooperation of the plurality of connecting arms 22 is beneficial to ensure the firmness and stability of the connection between the connecting arms 22 and the planetary stage, and to ensure the safety of the disassembly and assembly process. Specifically, in this embodiment, the number of the connecting arms 22 is three. Preferably, the plurality of first connection holes 211 are evenly distributed along the circumferential direction of the connection seat 21 . Similarly, the cooperation through the plurality of first connection holes 211 is beneficial to ensure the firmness and stability of the connection between the connection base 21 and the planetary stage. Specifically, in this embodiment, the number of the first connection holes 211 is three. Preferably, the plurality of connecting arms 22 and the plurality of first connecting holes 211 are alternately arranged along the circumferential direction of the connecting seat 21 .

优选地,如图1和图2所示,本实施例提供的吊臂组件1包括吊臂11、吊臂轴12和连接轴13,吊臂轴12安装在吊臂11上,连接轴13与吊臂轴12可拆卸连接,连接座21可转动地安装在连接轴13上。具体地,在本实施例中,吊臂轴12通过焊接固定安装在吊臂11上。在本实施例中,吊臂11上设置有轴孔,先将吊臂轴12穿设在轴孔中,然后通过焊接将吊臂轴12固定在轴孔中。具体地,在本实施例中,吊臂轴12和连接轴13之间通过螺栓连接。Preferably, as shown in FIGS. 1 and 2 , the boom assembly 1 provided in this embodiment includes a boom 11 , a boom shaft 12 and a connecting shaft 13 . The boom shaft 12 is installed on the boom 11 , and the connecting shaft 13 is connected to the boom 11 . The boom shaft 12 is detachably connected, and the connecting seat 21 is rotatably mounted on the connecting shaft 13 . Specifically, in this embodiment, the boom shaft 12 is fixedly mounted on the boom 11 by welding. In this embodiment, the boom 11 is provided with a shaft hole, and the boom shaft 12 is first passed through the shaft hole, and then the boom shaft 12 is fixed in the shaft hole by welding. Specifically, in this embodiment, the boom shaft 12 and the connecting shaft 13 are connected by bolts.

优选地,连接座21和连接轴13之间设置有轴承3,以保证连接座21转动地流畅性和平滑性。具体地,在本实施例中,连接座21和连接轴13之间设置有两个轴承3。为了保证轴承3在连接轴13上位置的精确性,轴承3的内圈和外圈均用轴用挡圈固定。进一步地,本实施例提供的风电齿轮箱行星级整体拆装工装还包括端盖4,端盖4可拆卸地设置在连接轴13的端部,以进一步限制轴承3在连接轴13上的位置。Preferably, a bearing 3 is provided between the connection seat 21 and the connection shaft 13 to ensure the smoothness and smoothness of the rotation of the connection seat 21 . Specifically, in this embodiment, two bearings 3 are disposed between the connecting seat 21 and the connecting shaft 13 . In order to ensure the accuracy of the position of the bearing 3 on the connecting shaft 13 , the inner ring and the outer ring of the bearing 3 are fixed with a shaft retaining ring. Further, the overall disassembly and assembly tool for the planetary stage of the wind power gearbox provided in this embodiment further includes an end cover 4 , and the end cover 4 is detachably arranged at the end of the connecting shaft 13 to further limit the bearing 3 on the connecting shaft 13 . Location.

优选地,如图1和图2所示,本实施例提供的吊臂组件1还包括吊环14,吊环14可拆卸地安装在吊臂11上,吊环14被配置为能够与外部起吊设备连接。通过设置吊环14,可以使吊臂组件1快速地与外部起吊设备连接。Preferably, as shown in FIGS. 1 and 2 , the boom assembly 1 provided in this embodiment further includes a lifting ring 14 , which is detachably mounted on the boom 11 , and is configured to be able to be connected with external lifting equipment. By providing the lifting eye 14, the boom assembly 1 can be quickly connected to external lifting equipment.

具体地,如图1和图2所示,本实施例提供的吊臂11包括垂直连接的安装部111和吊装部112,吊臂轴12安装在安装部111上,吊环14安装在吊装部112上。在本实施例中,吊臂11为空心结构。Specifically, as shown in FIGS. 1 and 2 , the boom 11 provided in this embodiment includes a vertically connected mounting portion 111 and a hoisting portion 112 , the boom shaft 12 is mounted on the mounting portion 111 , and the hoisting ring 14 is mounted on the hoisting portion 112 superior. In this embodiment, the boom 11 is a hollow structure.

优选地,如图3所示,本实施例提供的连接座21包括对接部212和第一连接部213,对接部212被配置为能够与风电齿轮箱行星级的止口对接,第一连接孔211开设在第一连接部213上。通过对接部212与行星级的止口对接,可以起到配合定位的作用。根据不同行星级止口的尺寸,单独更换与止口尺寸相适配的连接座21即可实现对其它不同止口的行星级进行拆装,以提高拆装工装的灵活性和适用范围。Preferably, as shown in FIG. 3 , the connecting seat 21 provided in this embodiment includes a docking portion 212 and a first connecting portion 213 . The docking portion 212 is configured to be able to dock with the stop of the planetary stage of the wind turbine gearbox. The first connection The hole 211 is opened on the first connecting portion 213 . By docking the docking portion 212 with the stop on the planetary level, it can play the role of matching and positioning. According to the size of the spigots of different planetary grades, it is possible to disassemble and assemble other planetary grades of different spigots by simply replacing the connecting seat 21 that matches the size of the spigots, so as to improve the flexibility and application scope of the disassembly and assembly tools. .

优选地,如图3所示,第一连接部213上还开设有定位槽214,连接臂22的一端能够插设在定位槽214中。通过设置定位槽214,有利于保证连接臂22安装位置的精确性,更便于将连接臂22安装在连接座21上。Preferably, as shown in FIG. 3 , a positioning groove 214 is further formed on the first connecting portion 213 , and one end of the connecting arm 22 can be inserted into the positioning groove 214 . By setting the positioning groove 214 , it is beneficial to ensure the accuracy of the installation position of the connecting arm 22 , and it is more convenient to install the connecting arm 22 on the connecting seat 21 .

优选地,如图3所示,连接臂22包括固定部222和第二连接部223,固定部222可拆卸地固定在连接座21上,第二连接部223的延伸方向与连接座21的转动轴线平行,第二连接孔221开设在第二连接部223上。具体地,在本实施例中,固定部222的自由端设置有凸缘,凸缘通过紧固件可拆卸地固定在定位槽214中。Preferably, as shown in FIG. 3 , the connecting arm 22 includes a fixing portion 222 and a second connecting portion 223 . The fixing portion 222 is detachably fixed on the connecting base 21 , and the extension direction of the second connecting portion 223 is related to the rotation of the connecting base 21 . The axes are parallel, and the second connecting hole 221 is opened on the second connecting portion 223 . Specifically, in this embodiment, the free end of the fixing portion 222 is provided with a flange, and the flange is detachably fixed in the positioning groove 214 by a fastener.

注意,上述仅为本发明的较佳实施例及所运用技术原理。本领域技术人员会理解,本发明不限于这里所述的特定实施例,对本领域技术人员来说能够进行各种明显的变化、重新调整和替代而不会脱离本发明的保护范围。因此,虽然通过以上实施例对本发明进行了较为详细的说明,但是本发明不仅仅限于以上实施例,在不脱离本发明构思的情况下,还可以包括更多其他等效实施例,而本发明的范围由所附的权利要求范围决定。Note that the above are only preferred embodiments of the present invention and applied technical principles. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments, and can also include more other equivalent embodiments without departing from the concept of the present invention. The scope is determined by the scope of the appended claims.

Claims (10)

1.一种风电齿轮箱行星级整体拆装工装,其特征在于,包括:1. An integral disassembly and assembly tooling for a planetary stage of a wind power gearbox is characterized in that, comprising: 吊臂组件,被配置为能够与外部起吊设备连接;a boom assembly, configured to be able to connect with external lifting equipment; 连接臂组件,包括连接座和连接臂,所述连接座可转动地安装在所述吊臂组件上,所述连接臂可拆卸地固定在所述连接座上,所述连接座被配置为能够与风电齿轮箱行星级的止口对接,所述连接座上设置有第一连接孔,紧固件能够穿过所述第一连接孔与所述风电齿轮箱行星级内侧的螺栓孔螺纹连接,所述连接臂上设置有第二连接孔,紧固件能够穿过所述第二连接孔与所述风电齿轮箱行星级外侧的起吊孔螺纹连接。A connecting arm assembly includes a connecting seat and a connecting arm, the connecting seat is rotatably mounted on the boom assembly, the connecting arm is detachably fixed on the connecting seat, and the connecting seat is configured to be able to It is docked with the stop port of the planetary stage of the wind turbine gearbox, the connecting seat is provided with a first connecting hole, and the fastener can pass through the first connecting hole and the bolt hole thread on the inner side of the planetary stage of the wind turbine gearbox. For connection, the connecting arm is provided with a second connecting hole, and the fastener can pass through the second connecting hole and be screwed to the hoisting hole on the outer side of the planetary stage of the wind turbine gearbox. 2.根据权利要求1所述的风电齿轮箱行星级整体拆装工装,其特征在于,多个所述连接臂沿所述连接座的周向均匀分布;和/或2. The overall disassembly and assembly tool for a planetary stage of a wind power gearbox according to claim 1, wherein a plurality of the connecting arms are evenly distributed along the circumferential direction of the connecting seat; and/or 多个所述第一连接孔沿所述连接座的周向均匀分布。The plurality of first connection holes are evenly distributed along the circumferential direction of the connection seat. 3.根据权利要求1所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述吊臂组件包括吊臂、吊臂轴和连接轴,所述吊臂轴安装在所述吊臂上,所述连接轴与所述吊臂轴可拆卸连接,所述连接座可转动地安装在所述连接轴上。3 . The overall disassembly and assembly tool for a planetary stage of a wind power gearbox according to claim 1 , wherein the boom assembly comprises a boom, a boom shaft and a connecting shaft, and the boom shaft is installed on the crane. 4 . On the arm, the connecting shaft is detachably connected with the boom shaft, and the connecting seat is rotatably mounted on the connecting shaft. 4.根据权利要求3所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述连接座和所述连接轴之间设置有轴承。4 . The overall disassembly and assembly tool for the planetary stage of a wind power gearbox according to claim 3 , wherein a bearing is provided between the connecting seat and the connecting shaft. 5 . 5.根据权利要求3所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述吊臂组件还包括吊环,所述吊环可拆卸地安装在所述吊臂上,所述吊环被配置为能够与所述外部起吊设备连接。5 . The overall disassembly and assembly tool for the planetary stage of a wind power gearbox according to claim 3 , wherein the boom assembly further comprises a lifting ring, the lifting ring is detachably mounted on the boom, and the lifting ring is detachable. 6 . is configured to be connectable to the external lifting device. 6.根据权利要求5所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述吊臂包括垂直连接的安装部和吊装部,所述吊臂轴安装在所述安装部上,所述吊环安装在所述吊装部上。6 . The overall disassembly and assembly tool for a planetary stage of a wind power gearbox according to claim 5 , wherein the boom comprises a vertically connected mounting portion and a lifting portion, and the boom shaft is mounted on the mounting portion. 7 . , the hoisting ring is installed on the hoisting part. 7.根据权利要求1所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述连接座包括对接部和第一连接部,所述对接部被配置为能够与所述风电齿轮箱行星级的止口对接,所述第一连接孔开设在所述第一连接部上。7 . The overall disassembly and assembly tool for a planetary stage of a wind power gearbox according to claim 1 , wherein the connecting seat comprises a docking part and a first connecting part, and the docking part is configured to be able to connect with the wind power gear. 8 . The stops on the planetary level of the box are butted, and the first connection hole is opened on the first connection part. 8.根据权利要求7所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述第一连接部上还开设有定位槽,所述连接臂的一端能够插设在所述定位槽中。8 . The overall disassembly and assembly tool for a planetary stage of a wind turbine gearbox according to claim 7 , wherein a positioning groove is further opened on the first connecting portion, and one end of the connecting arm can be inserted in the positioning groove. 9 . in the slot. 9.根据权利要求1所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述连接臂包括固定部和第二连接部,所述固定部可拆卸地固定在所述连接座上,所述第二连接部的延伸方向与所述连接座的转动轴线平行,所述第二连接孔开设在所述第二连接部上。9 . The overall disassembly and assembly tool for a planetary stage of a wind turbine gearbox according to claim 1 , wherein the connecting arm comprises a fixing part and a second connecting part, and the fixing part is detachably fixed on the connecting seat. 10 . The extension direction of the second connecting portion is parallel to the rotation axis of the connecting seat, and the second connecting hole is opened on the second connecting portion. 10.根据权利要求3所述的风电齿轮箱行星级整体拆装工装,其特征在于,所述吊臂轴通过焊接固定安装在所述吊臂上。10 . The overall disassembly and assembly tool for a planetary stage of a wind power gearbox according to claim 3 , wherein the boom shaft is fixedly mounted on the boom by welding. 11 .
CN202010298558.8A 2020-04-16 2020-04-16 A wind power gearbox planetary level overall disassembly and assembly tool Active CN111377350B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010298558.8A CN111377350B (en) 2020-04-16 2020-04-16 A wind power gearbox planetary level overall disassembly and assembly tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010298558.8A CN111377350B (en) 2020-04-16 2020-04-16 A wind power gearbox planetary level overall disassembly and assembly tool

Publications (2)

Publication Number Publication Date
CN111377350A true CN111377350A (en) 2020-07-07
CN111377350B CN111377350B (en) 2025-01-28

Family

ID=71214112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010298558.8A Active CN111377350B (en) 2020-04-16 2020-04-16 A wind power gearbox planetary level overall disassembly and assembly tool

Country Status (1)

Country Link
CN (1) CN111377350B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116985075A (en) * 2023-06-30 2023-11-03 北京金风科创风电设备有限公司 Dismounting tool, assembly method and disassembly method of generator and gearbox

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140073477A1 (en) * 2012-09-10 2014-03-13 Charles Van Buchan Fixture, maintenance assembly, and method for maintaining wind turbine gearbox
CN204022264U (en) * 2014-07-22 2014-12-17 林德(中国)叉车有限公司 Drive motor suspender
US20170136469A1 (en) * 2014-06-19 2017-05-18 Sandvik Intellectual Property Ab Horizontal shaft impact crusher hammer lifting device
CN109530751A (en) * 2018-12-28 2019-03-29 南京高速齿轮制造有限公司 Suitable for drilling equipment and its tooling on the tower of wind turbine gearbox
CN212050133U (en) * 2020-04-16 2020-12-01 南京高速齿轮制造有限公司 Wind-powered electricity generation gear box planet level whole dismouting frock

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140073477A1 (en) * 2012-09-10 2014-03-13 Charles Van Buchan Fixture, maintenance assembly, and method for maintaining wind turbine gearbox
US20170136469A1 (en) * 2014-06-19 2017-05-18 Sandvik Intellectual Property Ab Horizontal shaft impact crusher hammer lifting device
CN204022264U (en) * 2014-07-22 2014-12-17 林德(中国)叉车有限公司 Drive motor suspender
CN109530751A (en) * 2018-12-28 2019-03-29 南京高速齿轮制造有限公司 Suitable for drilling equipment and its tooling on the tower of wind turbine gearbox
CN212050133U (en) * 2020-04-16 2020-12-01 南京高速齿轮制造有限公司 Wind-powered electricity generation gear box planet level whole dismouting frock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116985075A (en) * 2023-06-30 2023-11-03 北京金风科创风电设备有限公司 Dismounting tool, assembly method and disassembly method of generator and gearbox

Also Published As

Publication number Publication date
CN111377350B (en) 2025-01-28

Similar Documents

Publication Publication Date Title
CN109231026B (en) Hoisting device for key parts of offshore wind turbine generator
CN116969350B (en) Tower crane equipment, mounting method thereof and control method thereof
CN108821138B (en) Hoisting equipment for key parts of offshore wind turbine generator
CN102838037B (en) Turnover hoisting method for wind turbine main shaft, and apparatus thereof
CN111377350A (en) A kind of overall disassembly and assembly tool for wind power gearbox planetary stage
CN114057085A (en) Outer hanging multi-angle adjustment barring gear
CN205076725U (en) Revolving stage structure and have hoist of wind -powered electricity generation installation ship of this revolving stage structure
CN205099218U (en) Maintenance hoist device and portal slewing crane
CN212050133U (en) Wind-powered electricity generation gear box planet level whole dismouting frock
CN217498518U (en) Electric and manual switchable double-rocker arm holding rod rotary supporting mechanism
CN218293751U (en) Portable fan pole setting mount pad
CN207134952U (en) Turning tooling for wind turbines
CN209367697U (en) A kind of tooling for the replacement of 1.5MW wind power gear case high speed axis system
CN116534704A (en) Flange, pulley trolley and hoisting method for wind turbine tower hoisting
CN210286456U (en) A wind wheel hoisting tool
CN112922546B (en) Power soft slurry umbrella
CN105347100B (en) A kind of assembly type drag-line draw drum
CN218371183U (en) Rotatory hoist of a slice formula tower section of thick bamboo and crane
CN212356190U (en) A super large cylinder hoisting frame device
CN221680562U (en) A hoisting assembly for building construction
CN101774513B (en) Folding extension arm
CN114278842A (en) Zipper-free air rod convenient to assemble and disassemble
CN222163867U (en) Wall bushing positioning structure
CN220317209U (en) Layered tower crane slewing support box structure
CN221116692U (en) Lifting hook system capable of bearing unbalanced sling load

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant