CN111236615A CN202010124560.3A CN202010124560A CN111236615A CN 111236615 A CN111236615 A CN 111236615A CN 202010124560 A CN202010124560 A CN 202010124560A CN 111236615 A CN111236615 A CN 111236615A
Authority
CN
China
Prior art keywords
box body
wall
support column
jacking
lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010124560.3A
Other languages
Chinese (zh)
Inventor
阴光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202010124560.3A priority Critical patent/CN111236615A/en
Publication of CN111236615A publication Critical patent/CN111236615A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明提供了一种顶升平台的支撑结构及顶升平台的顶升方法,该平台包括:支撑柱,其开设有贯通的上空腔和下空腔,上空腔和下空腔之间形成有隔板;上箱体,可沿支撑柱的径向方向移动地容置于上空腔内,上箱体通过第一螺杆可拆卸地安装于墙体,墙体开设有沿竖直方向设置的多个锁孔,上箱体的外部连接有插设于一锁孔中的第一锁块;下箱体,可沿支撑柱的轴向方向移动地容置于下空腔内,下箱体通过第二螺杆可拆卸地安装于墙体,下箱体的外部可伸缩地安装有第二锁块,第二锁块插设于一锁孔中;以及顶升装置,其具有一固定端和一伸缩端,固定端连接于下箱体,伸缩端连接于隔板。本发明解决了超高层建筑无法采用传统的搭设脚手架施工的问题。

Figure 202010124560

The invention provides a support structure for a lifting platform and a lifting method for the lifting platform. The platform includes: a support column, which is provided with a through upper cavity and a lower cavity, and a space between the upper cavity and the lower cavity is formed. The partition plate; the upper box body is accommodated in the upper cavity movably along the radial direction of the support column, the upper box body is detachably installed on the wall body through the first screw rod, and the wall body is provided with multiple A first lock block inserted in a lock hole is connected to the outside of the upper box body; the lower box body is accommodated in the lower cavity movably along the axial direction of the support column, and the lower box body passes The second screw rod is detachably installed on the wall, and the outside of the lower box is retractably installed with a second lock block, the second lock block is inserted in a lock hole; and a jacking device has a fixed end and a The telescopic end, the fixed end is connected to the lower box body, and the telescopic end is connected to the partition. The invention solves the problem that the super high-rise building cannot be constructed with traditional scaffolding.

Figure 202010124560

Description

顶升平台的支撑结构及顶升平台的顶升方法Support structure of jacking platform and jacking method of jacking platform

技术领域technical field

本发明涉及建筑施工技术领域,具体涉及一种顶升平台的支撑结构及顶升平台的顶升方法。The invention relates to the technical field of building construction, in particular to a support structure for a jacking platform and a jacking method for the jacking platform.

背景技术Background technique

混凝土核心筒结构体系,是现代化超高层建筑的一主要结构形式。在超高层建筑的施工中,无法采用传统搭设脚手架进行施工方法,因此,需要一种适用于超高层建筑的施工装置。The concrete core tube structure system is one of the main structural forms of modern super high-rise buildings. In the construction of super high-rise buildings, the traditional construction method of erecting scaffolds cannot be adopted. Therefore, a construction device suitable for super high-rise buildings is required.

发明内容SUMMARY OF THE INVENTION

为克服现有技术所存在的缺陷,现提供一种顶升平台的支撑结构及顶升平台的顶升方法,以解决超高层建筑无法采用传统的搭设脚手架施工的问题。In order to overcome the defects existing in the prior art, a support structure for a jacking platform and a jacking method for the jacking platform are provided to solve the problem that the traditional scaffolding construction cannot be adopted for super high-rise buildings.

为实现上述目的,提供一种顶升平台的支撑结构,包括:In order to achieve the above purpose, a support structure for a jacking platform is provided, including:

用于支撑顶升平台的支撑柱,所述支撑柱开设有贯通所述支撑柱的相对两侧的上空腔和下空腔,所述上空腔和所述下空腔之间形成有隔板;a support column for supporting the jacking platform, the support column is provided with an upper cavity and a lower cavity penetrating through opposite sides of the support column, and a partition is formed between the upper cavity and the lower cavity;

上箱体,可沿所述支撑柱的径向方向移动地容置于所述上空腔内,所述上箱体通过第一螺杆可拆卸地安装于墙体,所述墙体开设有沿竖直方向设置的多个锁孔,所述上箱体的外部连接有插设于一所述锁孔中的第一锁块;The upper box body is movably accommodated in the upper cavity along the radial direction of the support column, the upper box body is detachably installed on the wall body through the first screw rod, and the wall body is provided with vertical a plurality of lock holes arranged in a straight direction, and a first lock block inserted in one of the lock holes is connected to the outside of the upper box;

下箱体,可沿所述支撑柱的轴向方向移动地容置于所述下空腔内,所述下箱体通过第二螺杆可拆卸地安装于所述墙体,所述下箱体的外部可伸缩地安装有第二锁块,所述第二锁块插设于一所述锁孔中;以及The lower box is housed in the lower cavity movably along the axial direction of the support column, the lower box is detachably mounted on the wall through a second screw, and the lower box is detachably mounted on the wall. A second lock block is telescopically installed on the outside of the device, and the second lock block is inserted into one of the lock holes; and

顶升装置,所述顶升装置具有一固定端和一伸缩端,所述固定端连接于所述下箱体,所述伸缩端连接于所述隔板。A jacking device, the jacking device has a fixed end and a telescopic end, the fixed end is connected to the lower box body, and the telescopic end is connected to the partition plate.

进一步的,所述墙体埋设有多个预埋锁盒,所述预埋锁盒中形成所述锁孔。Further, a plurality of pre-embedded lock boxes are embedded in the wall, and the lock holes are formed in the pre-embedded lock boxes.

进一步的,所述预埋锁盒的尺寸小于所述墙体的相邻钢筋之间的间距。Further, the size of the embedded lock box is smaller than the spacing between adjacent steel bars of the wall.

进一步的,所述下空腔沿所述支撑柱的轴向方向设置。Further, the lower cavity is arranged along the axial direction of the support column.

进一步的,所述上箱体的远离所述墙体的第一侧伸至所述支撑柱的外部,所述上箱体的第一侧与所述支撑柱之间安装第一千斤顶,所述第一千斤顶沿所述上空腔的轴向方向设置。Further, a first side of the upper box away from the wall extends to the outside of the support column, and a first jack is installed between the first side of the upper box and the support column, The first jack is disposed along the axial direction of the upper cavity.

进一步的,所述下箱体的侧壁形成有穿孔,所述第二锁块滑设于所述穿孔中,所述箱体内安装有用于驱动所述第二锁块的第二千斤顶。Further, a through hole is formed on the side wall of the lower box body, the second lock block is slidably arranged in the through hole, and a second jack for driving the second lock block is installed in the box body.

进一步的,所述第一螺杆的第一端连接于所述上箱体,所述第一螺杆的第二端贯穿于所述墙体,所述第一螺杆的第二端安装有第一禁锢件,所述第一禁锢件抵靠于所述墙体的远离所述支撑柱的一侧。Further, the first end of the first screw is connected to the upper box, the second end of the first screw penetrates through the wall, and the second end of the first screw is installed with a first confinement The first confinement piece abuts against the side of the wall away from the support column.

进一步的,所述上空腔的贯通方向与所述下空腔的贯通方向相同。Further, the penetrating direction of the upper cavity is the same as the penetrating direction of the lower cavity.

进一步的,所述顶升装置为液压千斤顶,所述液压千斤顶沿竖直方向设置。Further, the lifting device is a hydraulic jack, and the hydraulic jack is arranged in a vertical direction.

本发明提供一种顶升平台的顶升方法,包括以下步骤:The present invention provides a lifting method for a lifting platform, comprising the following steps:

拆除上箱体的第一螺杆并对所述上箱体施加朝向支撑柱的远离墙体的一侧的推力,使得所述上箱体脱离所述墙体;removing the first screw rod of the upper box body and applying a thrust to the upper box body toward the side of the support column away from the wall body, so that the upper box body is separated from the wall body;

顶升装置的伸缩端伸出以顶升所述支撑柱的隔板,使得所述支撑柱和所述上箱体上升至待施工工位;The telescopic end of the jacking device extends to jack up the partition plate of the support column, so that the support column and the upper box body are lifted to the work station to be constructed;

在所述上箱体上升到所述待施工工位后,对所述上箱体施加朝向所述墙体的拉力,使得所述第一锁块插设于一所述锁孔中;After the upper box body is raised to the to-be-constructed station, a pulling force is applied to the upper box body toward the wall, so that the first lock block is inserted into one of the lock holes;

将所述第一螺杆安装于所述上箱体和所述墙体,使得所述上箱体锁附于所述墙体;installing the first screw rod on the upper box body and the wall body, so that the upper box body is locked to the wall body;

拆除第二螺杆并收缩所述第二锁块,使得所述下箱体脱离所述墙体;removing the second screw rod and shrinking the second locking block, so that the lower box body is separated from the wall body;

所述顶升装置的固定端收回以提升所述下箱体,使得所述下箱体上升至待施工工位;The fixed end of the jacking device is retracted to lift the lower box body, so that the lower box body is lifted to the work station to be constructed;

在所述下箱体上升到所述待施工工位后,伸出所述第二锁块,使得所述第二锁块插设于一所述锁孔中;After the lower box body is raised to the to-be-constructed station, the second lock block is extended, so that the second lock block is inserted into one of the lock holes;

将所述第二螺杆安装于所述下箱体和所述墙体,使得所述下箱体锁附于所述墙体。The second screw rod is installed on the lower box body and the wall body, so that the lower box body is locked to the wall body.

本发明的有益效果在于,本发明的顶升平台的支撑结构通过在支撑柱内的上空腔和下空腔中分别设置上箱体、下箱体,在下空腔内利用顶升装置连接下箱体和支撑柱,在下箱体锁附于建筑结构或核心筒的墙体时,顶升装置顶升(顶升装置伸长)支撑柱,实现上箱体和支撑柱的爬升,利用顶升装置提升下箱体(顶升装置收缩),进而实现整个支撑结构的自爬升,一方面,避免了超高层建筑无法采用传统的搭设脚手架施工的弊端,另一方面,能利用已浇筑成型的墙体实现自爬升,使得架设于该支撑结构上的顶升平台实现自爬升,适用于高层、超高层建筑结构的施工。此外,本发明的顶升平台的支撑结构利用上箱体、下箱体上的螺杆及锁块配合锁附于墙体上,使得该支撑结构附墙稳固,拆卸快捷,爬升高效且安全性高。The beneficial effect of the present invention is that in the support structure of the jacking platform of the present invention, the upper box body and the lower box body are respectively arranged in the upper cavity and the lower cavity in the support column, and the lower box is connected with the lifting device in the lower cavity. When the lower box is locked to the building structure or the wall of the core tube, the jacking device lifts up (the jacking device extends) the support column to realize the climbing of the upper box and the support column, using the jacking device The lower box is lifted (the jacking device shrinks), so as to realize the self-climbing of the whole support structure. On the one hand, it avoids the disadvantage that the traditional scaffolding construction cannot be used for super high-rise buildings. Self-climbing is realized, so that the jacking platform erected on the support structure can achieve self-climbing, which is suitable for the construction of high-rise and super high-rise building structures. In addition, the support structure of the jacking platform of the present invention utilizes the screws and lock blocks on the upper box and the lower box to cooperate and lock to the wall, so that the support structure is stably attached to the wall, quick in disassembly, efficient in climbing and high in safety .

附图说明Description of drawings

图1为本发明实施例的顶升平台的支撑结构的结构示意图。FIG. 1 is a schematic structural diagram of a support structure of a jacking platform according to an embodiment of the present invention.

图2为本发明实施例的顶升平台的支撑结构的分解结构示意图。FIG. 2 is a schematic diagram of an exploded structure of a support structure of a jacking platform according to an embodiment of the present invention.

图3为本发明实施例的顶升平台的支撑结构的安装状态示意图。FIG. 3 is a schematic diagram of the installation state of the support structure of the jacking platform according to the embodiment of the present invention.

图4为本发明实施例的顶升平台的支撑结构的立体视图。4 is a perspective view of a support structure of a jacking platform according to an embodiment of the present invention.

图5至图10为本发明实施例的顶升平台的顶升方法的示意图。5 to 10 are schematic diagrams of a jacking method for a jacking platform according to an embodiment of the present invention.

具体实施方式Detailed ways

以下通过特定的具体实例说明本发明的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本发明的其他优点与功效。本发明还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本发明的精神下进行各种修饰或改变。The embodiments of the present invention are described below through specific specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention.

图1为本发明实施例的顶升平台的支撑结构的结构示意图、图2为本发明实施例的顶升平台的支撑结构的分解结构示意图、图3为本发明实施例的顶升平台的支撑结构的安装状态示意图、图4为本发明实施例的顶升平台的支撑结构的立体视图。FIG. 1 is a schematic structural diagram of a support structure of a jacking platform according to an embodiment of the present invention, FIG. 2 is a schematic diagram of an exploded structure of a supporting structure of a jacking platform according to an embodiment of the present invention, and FIG. 3 is a support structure of the jacking platform according to an embodiment of the present invention. Schematic diagram of the installation state of the structure, and FIG. 4 is a perspective view of the support structure of the jacking platform according to the embodiment of the present invention.

参照图1至图5所示,本发明提供了一种顶升平台的支撑结构,包括:支撑柱1、上箱体2、下箱体3和顶升装置4。Referring to FIGS. 1 to 5 , the present invention provides a support structure for a jacking platform, including: a support column 1 , an upper box 2 , a lower box 3 and a jacking device 4 .

支撑柱1用于支撑顶升平台。在本实施例中,顶升平台的支腿安装于支撑柱1的顶部。支撑柱1开设有上空腔a和下空腔b。上空腔a和下空腔b之间形成有隔板11。上空腔a和下空腔b分别贯通支撑柱1的相对两侧,即支撑柱的靠近墙体的第一侧和支撑柱的远离墙体的第二侧。上空腔a的贯通方向,与下空腔b的贯通方向相同。The support column 1 is used to support the jacking platform. In this embodiment, the legs of the jacking platform are installed on the top of the support column 1 . The support column 1 is provided with an upper cavity a and a lower cavity b. A partition 11 is formed between the upper cavity a and the lower cavity b. The upper cavity a and the lower cavity b respectively pass through opposite sides of the support column 1 , namely the first side of the support column close to the wall and the second side of the support column away from the wall. The penetrating direction of the upper cavity a is the same as the penetrating direction of the lower cavity b.

上箱体2容置于上空腔a内,并且上箱体2可沿支撑柱1的径向方向移动。上箱体2的面向墙体的一侧通过第一螺杆21可拆卸地安装于墙体5。第一螺杆将上箱体锁附于墙体的侧面上。墙体5开设有沿竖直方向设置的多个锁孔50。上箱体2的外部连接有第一锁块22。第一锁块为钢牛腿。第一锁块插设于一锁孔50中的第一锁块22以为上箱体提供支撑力,进而使得上箱体牢靠的锁固于墙体上。The upper case body 2 is accommodated in the upper cavity a, and the upper case body 2 can move along the radial direction of the support column 1 . The side of the upper box body 2 facing the wall body is detachably mounted on the wall body 5 through the first screw 21 . The first screw locks the upper box to the side of the wall. The wall 5 is provided with a plurality of locking holes 50 arranged in the vertical direction. A first lock block 22 is connected to the outside of the upper box body 2 . The first lock block is a steel corbel. The first lock block 22 inserted in a lock hole 50 provides a supporting force for the upper box body, so that the upper box body is firmly locked on the wall.

下箱体3容置于支撑柱的下空腔b内,并且下箱体3可沿支撑柱1的轴向方向移动地。下箱体3通过第二螺杆31可拆卸地安装于墙体5。下箱体3的外部可伸缩地安装有第二锁块32。第二锁块32插设于一锁孔50中,以为下箱体提供支撑力,进而使得下箱体牢靠的锁固于墙体上。The lower case body 3 is accommodated in the lower cavity b of the support column, and the lower case body 3 is movable along the axial direction of the support column 1 . The lower box 3 is detachably mounted on the wall 5 through the second screw 31 . A second locking block 32 is installed telescopically on the outside of the lower case 3 . The second locking block 32 is inserted into a locking hole 50 to provide a supporting force for the lower case, so that the lower case is securely locked on the wall.

顶升装置4具有一固定端和一伸缩端。顶升装置4的固定端连接于下箱体3,顶升装置4的伸缩端连接于隔板11。顶升装置4驱动或顶升支撑柱的隔板,使得下箱体与支撑柱产生沿支撑柱1的轴向方向的相对移动。The jacking device 4 has a fixed end and a telescopic end. The fixed end of the jacking device 4 is connected to the lower box 3 , and the telescopic end of the jacking device 4 is connected to the partition plate 11 . The jacking device 4 drives or lifts the partition of the support column, so that the lower box and the support column move relative to each other along the axial direction of the support column 1 .

本发明的顶升平台的支撑结构通过在支撑柱内的上空腔和下空腔中分别设置上箱体、下箱体,在下空腔内利用顶升装置连接下箱体和支撑柱,在下箱体锁附于建筑结构或核心筒的墙体时,顶升装置顶升(顶升装置伸长)支撑柱,实现上箱体和支撑柱的爬升,利用顶升装置提升下箱体(顶升装置收缩),进而实现整个支撑结构的自爬升,一方面,避免了超高层建筑无法采用传统的搭设脚手架施工的弊端,另一方面,能利用已浇筑成型的墙体实现自爬升,使得架设于该支撑结构上的顶升平台实现自爬升,适用于高层、超高层建筑结构的施工。此外,本发明的顶升平台的支撑结构利用上箱体、下箱体上的螺杆及锁块配合锁附于墙体上,使得该支撑结构附墙稳固,拆卸快捷,爬升高效且安全性高。In the support structure of the jacking platform of the present invention, the upper box body and the lower box body are respectively arranged in the upper cavity and the lower cavity in the support column, and the lower box body and the support column are connected by a jacking device in the lower cavity, and the lower box body is connected with the support column. When the body is locked to the wall of the building structure or the core tube, the jacking device lifts up (the jacking device extends) the support column to realize the climbing of the upper box and the support column, and the lower box is lifted by the jacking device (lifting up). On the one hand, it avoids the disadvantage that the traditional scaffolding construction cannot be used for super high-rise buildings; The jacking platform on the supporting structure realizes self-climbing and is suitable for the construction of high-rise and super high-rise building structures. In addition, the support structure of the jacking platform of the present invention utilizes the screws and lock blocks on the upper box body and the lower box body to cooperate and lock to the wall body, so that the support structure is stably attached to the wall, the disassembly is quick, the climbing efficiency is high, and the safety is high. .

在本实施例中,墙体5埋设有多个预埋锁盒51。预埋锁盒51中形成锁孔50。进一步的,预埋锁盒为钢盒、塑料盒,预埋锁盒安装于模板上,使得预埋锁盒准确、精确定位,避免预埋锁盒与上箱体的第一锁块、下箱体的第二锁块发生错位,不能锁止的情况。In this embodiment, a plurality of pre-embedded lock boxes 51 are embedded in the wall 5 . A lock hole 50 is formed in the pre-embedded lock box 51 . Further, the pre-embedded lock box is a steel box or a plastic box. The pre-embedded lock box is installed on the template, so that the pre-embedded lock box can be positioned accurately and precisely, avoiding the pre-embedded lock box and the first lock block of the upper box and the lower box. The second lock block of the body is dislocated and cannot be locked.

作为一种较佳的实施防水,预埋锁盒51的尺寸小于所墙体5的相邻钢筋之间的间距,预埋锁盒51采用小型且其尺寸小于墙体的钢筋间距,对于墙体的钢筋无影响和损坏,确保建筑结构的稳固。As a preferred implementation of waterproofing, the size of the embedded lock box 51 is smaller than the spacing between the adjacent steel bars of the wall 5. The embedded lock box 51 is small and its size is smaller than the spacing between the steel bars of the wall. The steel bars are not affected or damaged, ensuring the stability of the building structure.

在本实施例中,下空腔b呈条形,其沿支撑柱1的轴向方向设置。进一步的,上箱体的横截面的尺寸及形状,与上空腔的截面尺寸及形状相适配。下箱体的横截面的尺寸小于下空腔的横截面的尺寸。In this embodiment, the lower cavity b is in the shape of a bar, which is arranged along the axial direction of the support column 1 . Further, the size and shape of the cross-section of the upper case body are adapted to the size and shape of the cross-section of the upper cavity. The size of the cross section of the lower case is smaller than the size of the cross section of the lower cavity.

作为一种较佳的实施方式,支撑柱、上箱体和下箱体分别为钢结构,如桁架钢结构、格构柱钢结构等。As a preferred embodiment, the support column, the upper box body and the lower box body are respectively steel structures, such as truss steel structures, lattice column steel structures and the like.

在本实施例中,上箱体的长度大于支撑柱的直径,上箱体2的远离墙体5的第一侧伸至支撑柱1的外部,上箱体2的第一侧与支撑柱1之间安装第一千斤顶23。第一千斤顶23沿上空腔a的轴向方向设置。第一千斤顶23驱动上箱体沿支撑柱1的径向方向移动。在拆除第一螺杆后,第一千斤顶驱动上箱体朝向支撑柱的远离腔体的一侧移动,使得上箱体的第一锁块脱离墙体的锁孔。In this embodiment, the length of the upper box body is greater than the diameter of the support column, the first side of the upper box body 2 away from the wall 5 extends to the outside of the support column 1 , and the first side of the upper box body 2 is connected to the support column 1 . Install the first jack 23 in between. The first jack 23 is provided along the axial direction of the upper cavity a. The first jack 23 drives the upper box to move in the radial direction of the support column 1 . After the first screw is removed, the first jack drives the upper box to move toward the side of the support column away from the cavity, so that the first lock block of the upper box is separated from the lock hole of the wall.

作为一种较佳的实施方式,下箱体3的侧壁形成有穿孔。第二锁块32滑设于穿孔中。箱体内安装有用于驱动第二锁块32的第二千斤顶33。在上箱体脱离墙体、上升至下一个待施工工位并重新锁附于墙体后,拆除第二螺杆,第二千斤顶朝向支撑柱的远离墙体的一侧驱动第二锁块脱离墙体的锁孔。As a preferred embodiment, the side wall of the lower box body 3 is formed with perforations. The second locking block 32 is slidably arranged in the through hole. A second jack 33 for driving the second lock block 32 is installed in the box. After the upper box is detached from the wall, rises to the next station to be constructed, and is re-locked to the wall, the second screw is removed, and the second jack drives the second lock block toward the side of the support column away from the wall Get out of the keyhole in the wall.

第一螺杆21的第一端连接于上箱体2。第一螺杆21的第二端贯穿于墙体5。第一螺杆21的第二端安装有第一禁锢件。第一禁锢件抵靠于墙体5的远离支撑柱1的一侧。第一禁锢件为螺母。第一螺杆21的第一端贯穿上箱体的侧壁,第一螺杆的第一端螺合有第二禁锢件。第二禁锢件抵靠于上箱体的侧壁的内侧。第二禁锢件为螺母。The first end of the first screw 21 is connected to the upper case 2 . The second end of the first screw 21 penetrates through the wall 5 . The second end of the first screw 21 is installed with a first restraining member. The first restraining member abuts against the side of the wall 5 away from the support column 1 . The first restraining member is a nut. The first end of the first screw 21 penetrates through the side wall of the upper box body, and the first end of the first screw is screwed with a second confinement member. The second restraining member abuts against the inner side of the side wall of the upper box. The second restraining member is a nut.

第二螺杆与墙体、下箱体的连接方式相同,在此不再赘述。The connection between the second screw rod and the wall body and the lower box body is the same, which will not be repeated here.

在本实施例中,顶升装置4为液压千斤顶,液压千斤顶沿竖直方向设置。In this embodiment, the jacking device 4 is a hydraulic jack, and the hydraulic jack is arranged along the vertical direction.

图5至图10为本发明实施例的顶升平台的顶升方法的示意图。5 to 10 are schematic diagrams of a jacking method for a jacking platform according to an embodiment of the present invention.

另一方面,结合图1至图10所示,本发明提供一种顶升平台的顶升方法,包括以下步骤:On the other hand, with reference to FIG. 1 to FIG. 10 , the present invention provides a lifting method for lifting a platform, including the following steps:

S1:参阅图5和图6所示,拆除上箱体2的第一螺杆21并对上箱体2施加朝向支撑柱1的远离墙体5的一侧的推力,使得上箱体2脱离墙体5。S1: Referring to FIG. 5 and FIG. 6, remove the first screw 21 of the upper box 2 and apply a thrust to the upper box 2 toward the side of the support column 1 away from the wall 5, so that the upper box 2 is separated from the wall body 5.

在建筑结构施工中,参阅图3所示,将容置于支撑柱的上空腔的上箱体通过第一螺杆锁附于墙体上,通过第一锁块插设于墙体的锁孔中;将容置于支撑柱的下空腔的下箱体通过第二螺杆锁附于墙体上,通过第二锁块插设于墙体的锁孔中,以完成本发明的顶升平台的支撑结构首次安装。In the construction of the building structure, as shown in FIG. 3 , the upper box body accommodated in the upper cavity of the support column is locked and attached to the wall body through the first screw rod, and inserted into the lock hole of the wall body through the first lock block ; The lower box body accommodated in the lower cavity of the support column is locked and attached to the wall body through the second screw rod, and inserted into the lock hole of the wall body through the second lock block, so as to complete the lifting platform of the present invention. The support structure is installed for the first time.

在后续需要爬升时,继续参阅图5和图6所示,先拆除第一螺杆,再开启第一千斤顶对上箱体施加朝向支撑柱的远离墙体的一侧的推力,使得第一锁块脱离锁块,进而完成上箱体与墙体的分离动作。When subsequent climbing is required, continue to refer to Figures 5 and 6, first remove the first screw, and then open the first jack to apply a thrust to the upper box toward the side of the support column away from the wall, so that the first The lock block is separated from the lock block, thereby completing the separation action of the upper box body and the wall body.

S2:参阅图7所示,顶升装置4的伸缩端伸出以顶升支撑柱1的隔板11,使得支撑柱1和上箱体2上升至待施工工位。S2: Referring to FIG. 7 , the telescopic end of the jacking device 4 is extended to lift the partition 11 of the support column 1, so that the support column 1 and the upper box 2 are lifted to the work station to be constructed.

在完成上箱体与墙体的分离动作后,启动顶升装置4,顶升装置的伸缩端伸出以顶升支撑柱1的隔板11,使得支撑柱1和上箱体2上升至待施工工位。After the separation action of the upper box body and the wall body is completed, the jacking device 4 is activated, and the telescopic end of the jacking device extends to lift the partition 11 of the support column 1, so that the support column 1 and the upper box body 2 are lifted to the waiting position. construction station.

S3:在上箱体2上升到待施工工位后,对上箱体2施加朝向墙体5的拉力,使得第一锁块22插设于一锁孔50中。S3 : After the upper box body 2 is raised to the station to be constructed, a pulling force is applied to the upper box body 2 toward the wall body 5 , so that the first lock block 22 is inserted into a lock hole 50 .

具体的,在上箱体2上升到待施工工位后,对上箱体2的第一千斤顶对上箱体施加朝向墙体5的拉力,使得第一锁块22插设于一锁孔50中。Specifically, after the upper box body 2 is raised to the station to be constructed, the first jack of the upper box body 2 exerts a pulling force towards the wall body 5 on the upper box body, so that the first lock block 22 is inserted into a lock in hole 50.

S4:参阅图8所示,将第一螺杆21安装于上箱体2和墙体5,使得上箱体2锁附于墙体5。S4 : Referring to FIG. 8 , install the first screw rod 21 on the upper box body 2 and the wall body 5 , so that the upper box body 2 is locked to the wall body 5 .

将拆除的第一螺杆重新安装于上箱体和墙体上,使得上箱体锁附于墙体上。Reinstall the removed first screw rod on the upper box body and the wall body, so that the upper box body is locked on the wall body.

S5:参阅图9所示,拆除第二螺杆31并收缩第二锁块32,使得下箱体3脱离墙体5。S5 : Referring to FIG. 9 , remove the second screw 31 and shrink the second locking block 32 , so that the lower box 3 is separated from the wall 5 .

先拆除下箱体和墙体的第二螺杆,再启动下箱体的第二千斤顶,将插设于锁孔中的第二锁块脱离锁孔,使得下箱体与墙体完全分离。First remove the second screw of the lower box and the wall, then start the second jack of the lower box, and remove the second lock block inserted in the lock hole from the lock hole, so that the lower box and the wall are completely separated .

S6:参阅图10所示,顶升装置4的固定端收回以提升下箱体3,使得下箱体3上升至待施工工位。S6: Referring to FIG. 10, the fixed end of the jacking device 4 is retracted to lift the lower box 3, so that the lower box 3 is lifted to the work station to be constructed.

在下箱体与墙体分离后,启动顶升装置,由于上箱体和支撑柱已锁固于墙体,顶升装置的固定收缩以向上提升下箱体至待施工工位。After the lower box is separated from the wall, the jacking device is activated. Since the upper box and the support column are locked to the wall, the fixing of the jacking device shrinks to lift the lower box upward to the work station to be constructed.

S7:继续参阅图10所示,在下箱体3上升到待施工工位后,伸出第二锁块32,使得第二锁块32插设于一锁孔50中。S7: Continuing to refer to FIG. 10 , after the lower box 3 is raised to the work station to be constructed, the second lock block 32 is extended so that the second lock block 32 is inserted into a lock hole 50 .

当下箱体上升至待施工工位后,启动下箱体的第二千斤顶,第二千斤顶将第二锁块伸出并插设于墙体的锁孔中。After the lower box body rises to the station to be constructed, the second jack of the lower box body is activated, and the second jack extends the second lock block and inserts it into the lock hole of the wall body.

S8:继续参阅图10所示,将拆除的第二螺杆31安装于下箱体3和墙体5,使得下箱体3锁附于墙体5。S8 : Continue to refer to FIG. 10 , install the removed second screw 31 on the lower box 3 and the wall 5 , so that the lower box 3 is locked to the wall 5 .

在步骤7的同时,将拆除的第二螺杆31重新安装于下箱体3和墙体5,使得下箱体3锁附于墙体5。At the same time as step 7 , reinstall the removed second screw 31 on the lower box 3 and the wall 5 , so that the lower box 3 is locked to the wall 5 .

至此,本发明的顶升平台的支撑结构完成一个自爬升动作。So far, the support structure of the jacking platform of the present invention has completed a self-climbing action.

需要说明的是,本说明书所附图式所绘示的结构、比例、大小等,均仅用以配合说明书所揭示的内容,以供熟悉此技术的人士了解与阅读,并非用以限定本发明可实施的限定条件,故不具技术上的实质意义,任何结构的修饰、比例关系的改变或大小的调整,在不影响本发明所能产生的功效及所能达成的目的下,均应仍落在本发明所揭示的技术内容得能涵盖的范围内。同时,本说明书中所引用的如“上”、“下”、“左”、“右”、“中间”及“一”等的用语,亦仅为便于叙述的明了,而非用以限定本发明可实施的范围,其相对关系的改变或调整,在无实质变更技术内容下,当亦视为本发明可实施的范畴。It should be noted that the structures, proportions, sizes, etc. shown in the drawings attached in this specification are only used to cooperate with the contents disclosed in the specification, so as to be understood and read by those who are familiar with the technology, and are not intended to limit the present invention. The limited conditions that can be implemented have no technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the present invention without affecting the effect and the purpose that the present invention can achieve. It is within the scope that the technical content disclosed in the present invention can cover. At the same time, the terms such as "up", "down", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and clarity, and are not used to limit this specification. The implementable scope of the invention, and the change or adjustment of the relative relationship thereof, shall also be regarded as the implementable scope of the present invention without substantially changing the technical content.

以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various modifications to the present invention according to the above description. Therefore, some details in the embodiments should not be construed to limit the present invention, and the present invention will be protected by the scope defined by the appended claims.

Claims (10)

1.一种顶升平台的支撑结构,其特征在于,包括:1. a support structure of a jacking platform, is characterized in that, comprises: 用于支撑顶升平台的支撑柱,所述支撑柱开设有贯通所述支撑柱的相对两侧的上空腔和下空腔,所述上空腔和所述下空腔之间形成有隔板;a support column for supporting the jacking platform, the support column is provided with an upper cavity and a lower cavity penetrating through opposite sides of the support column, and a partition is formed between the upper cavity and the lower cavity; 上箱体,可沿所述支撑柱的径向方向移动地容置于所述上空腔内,所述上箱体通过第一螺杆可拆卸地安装于墙体,所述墙体开设有沿竖直方向设置的多个锁孔,所述上箱体的外部连接有插设于一所述锁孔中的第一锁块;The upper box body is movably accommodated in the upper cavity along the radial direction of the support column, the upper box body is detachably installed on the wall body through the first screw rod, and the wall body is provided with vertical a plurality of lock holes arranged in a straight direction, and a first lock block inserted in one of the lock holes is connected to the outside of the upper box; 下箱体,可沿所述支撑柱的轴向方向移动地容置于所述下空腔内,所述下箱体通过第二螺杆可拆卸地安装于所述墙体,所述下箱体的外部可伸缩地安装有第二锁块,所述第二锁块插设于一所述锁孔中;以及The lower box is housed in the lower cavity movably along the axial direction of the support column, the lower box is detachably mounted on the wall through a second screw, and the lower box is detachably mounted on the wall. A second lock block is telescopically installed on the outside of the device, and the second lock block is inserted into one of the lock holes; and 顶升装置,所述顶升装置具有一固定端和一伸缩端,所述固定端连接于所述下箱体,所述伸缩端连接于所述隔板。A jacking device, the jacking device has a fixed end and a telescopic end, the fixed end is connected to the lower box body, and the telescopic end is connected to the partition plate. 2.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述墙体埋设有多个预埋锁盒,所述预埋锁盒中形成所述锁孔。2 . The support structure for a jacking platform according to claim 1 , wherein a plurality of pre-embedded lock boxes are embedded in the wall, and the lock holes are formed in the pre-embedded lock boxes. 3 . 3.根据权利要求2所述的顶升平台的支撑结构,其特征在于,所述预埋锁盒的尺寸小于所述墙体的相邻钢筋之间的间距。3 . The support structure for a jacking platform according to claim 2 , wherein the size of the embedded lock box is smaller than the spacing between adjacent steel bars of the wall. 4 . 4.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述下空腔沿所述支撑柱的轴向方向设置。4 . The support structure for a jacking platform according to claim 1 , wherein the lower cavity is disposed along the axial direction of the support column. 5 . 5.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述上箱体的远离所述墙体的第一侧伸至所述支撑柱的外部,所述上箱体的第一侧与所述支撑柱之间安装第一千斤顶,所述第一千斤顶沿所述上空腔的轴向方向设置。5 . The support structure for a jacking platform according to claim 1 , wherein the first side of the upper box away from the wall extends to the outside of the support column, and the upper box has a support structure. 6 . A first jack is installed between the first side and the support column, and the first jack is arranged along the axial direction of the upper cavity. 6.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述下箱体的侧壁形成有穿孔,所述第二锁块滑设于所述穿孔中,所述箱体内安装有用于驱动所述第二锁块的第二千斤顶。6 . The support structure for a jacking platform according to claim 1 , wherein the side wall of the lower box body is formed with a perforation, and the second lock block is slidably arranged in the perforation, and inside the box A second jack for driving the second lock block is installed. 7.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述第一螺杆的第一端连接于所述上箱体,所述第一螺杆的第二端贯穿于所述墙体,所述第一螺杆的第二端安装有第一禁锢件,所述第一禁锢件抵靠于所述墙体的远离所述支撑柱的一侧。7. The support structure of claim 1, wherein the first end of the first screw is connected to the upper case, and the second end of the first screw penetrates through the A wall, the second end of the first screw rod is installed with a first restraining piece, the first restraining piece abuts against a side of the wall away from the support column. 8.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述上空腔的贯通方向与所述下空腔的贯通方向相同。8 . The support structure for a jacking platform according to claim 1 , wherein the penetrating direction of the upper cavity is the same as the penetrating direction of the lower cavity. 9 . 9.根据权利要求1所述的顶升平台的支撑结构,其特征在于,所述顶升装置为液压千斤顶,所述液压千斤顶沿竖直方向设置。9 . The support structure for a jacking platform according to claim 1 , wherein the jacking device is a hydraulic jack, and the hydraulic jack is arranged in a vertical direction. 10 . 10.一种如权利要求1~9中的任意一项所述的顶升平台的支撑结构的顶升平台的顶升方法,其特征在于,包括以下步骤:10. A method for jacking up a platform of a support structure of a jacking platform as claimed in any one of claims 1 to 9, wherein the method comprises the following steps: 拆除上箱体的第一螺杆并对所述上箱体施加朝向支撑柱的远离墙体的一侧的推力,使得所述上箱体脱离所述墙体;removing the first screw rod of the upper box body and applying a thrust to the upper box body toward the side of the support column away from the wall body, so that the upper box body is separated from the wall body; 顶升装置的伸缩端伸出以顶升所述支撑柱的隔板,使得所述支撑柱和所述上箱体上升至待施工工位;The telescopic end of the jacking device extends to jack up the partition plate of the support column, so that the support column and the upper box body are lifted to the work station to be constructed; 在所述上箱体上升到所述待施工工位后,对所述上箱体施加朝向所述墙体的拉力,使得所述第一锁块插设于一所述锁孔中;After the upper box body is raised to the to-be-constructed station, a pulling force is applied to the upper box body toward the wall, so that the first lock block is inserted into one of the lock holes; 将所述第一螺杆安装于所述上箱体和所述墙体,使得所述上箱体锁附于所述墙体;installing the first screw rod on the upper box body and the wall body, so that the upper box body is locked to the wall body; 拆除第二螺杆并收缩所述第二锁块,使得所述下箱体脱离所述墙体;removing the second screw rod and shrinking the second locking block, so that the lower box body is separated from the wall body; 所述顶升装置的固定端收回以提升所述下箱体,使得所述下箱体上升至待施工工位;The fixed end of the jacking device is retracted to lift the lower box body, so that the lower box body is lifted to the work station to be constructed; 在所述下箱体上升到所述待施工工位后,伸出所述第二锁块,使得所述第二锁块插设于一所述锁孔中;After the lower box body is raised to the to-be-constructed station, the second lock block is extended, so that the second lock block is inserted into one of the lock holes; 将所述第二螺杆安装于所述下箱体和所述墙体,使得所述下箱体锁附于所述墙体。The second screw rod is installed on the lower box body and the wall body, so that the lower box body is locked to the wall body.
CN202010124560.3A 2020-02-27 2020-02-27 Supporting structure of jacking platform and jacking method of jacking platform Pending CN111236615A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010124560.3A CN111236615A (en) 2020-02-27 2020-02-27 Supporting structure of jacking platform and jacking method of jacking platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010124560.3A CN111236615A (en) 2020-02-27 2020-02-27 Supporting structure of jacking platform and jacking method of jacking platform

Publications (1)

Publication Number Publication Date
CN111236615A true CN111236615A (en) 2020-06-05

Family

ID=70871533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010124560.3A Pending CN111236615A (en) 2020-02-27 2020-02-27 Supporting structure of jacking platform and jacking method of jacking platform

Country Status (1)

Country Link
CN (1) CN111236615A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113620212A (en) * 2021-07-22 2021-11-09 厦门安科科技有限公司 Jacking mechanism
CN114961218A (en) * 2022-06-28 2022-08-30 贵州建工集团第一建筑工程有限责任公司 Construction method for lifting two climbing frames and removing formwork support frame at structural change position

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1894478A (en) * 2003-11-27 2007-01-10 乌尔玛结构&包装合作社 Climbing system generally used for formboard, scaffold and load
US20090173574A1 (en) * 2006-06-06 2009-07-09 Heinz Hobmeier Guide shoe and climbing system for use in the building sector
KR20090129574A (en) * 2008-06-13 2009-12-17 (주) 코시노인터네셔널 Elevating and lowering platform and method of movement
CN102071798A (en) * 2011-01-30 2011-05-25 中建三局建设工程股份有限公司 Hydraulic climbing system for wall-attached support frame
CN202017335U (en) * 2011-04-18 2011-10-26 南通一建集团有限公司 Hydraulic mutual-climbing type lifting scaffold
CN106894622A (en) * 2017-03-08 2017-06-27 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN107299755A (en) * 2017-07-14 2017-10-27 四川华西集团有限公司 The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved
CN212002177U (en) * 2020-02-27 2020-11-24 中国建筑第八工程局有限公司 Self-climbing supporting equipment of jacking platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1894478A (en) * 2003-11-27 2007-01-10 乌尔玛结构&包装合作社 Climbing system generally used for formboard, scaffold and load
US20090173574A1 (en) * 2006-06-06 2009-07-09 Heinz Hobmeier Guide shoe and climbing system for use in the building sector
KR20090129574A (en) * 2008-06-13 2009-12-17 (주) 코시노인터네셔널 Elevating and lowering platform and method of movement
CN102071798A (en) * 2011-01-30 2011-05-25 中建三局建设工程股份有限公司 Hydraulic climbing system for wall-attached support frame
CN202017335U (en) * 2011-04-18 2011-10-26 南通一建集团有限公司 Hydraulic mutual-climbing type lifting scaffold
CN106894622A (en) * 2017-03-08 2017-06-27 上海建工集团股份有限公司 Saddle climbing type bilayer rectangle truss module plateform system and its construction method
CN107299755A (en) * 2017-07-14 2017-10-27 四川华西集团有限公司 The hydraulic lifting steel platform of outer mould bases and the overall and local jacking of steel platform can be achieved
CN212002177U (en) * 2020-02-27 2020-11-24 中国建筑第八工程局有限公司 Self-climbing supporting equipment of jacking platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113620212A (en) * 2021-07-22 2021-11-09 厦门安科科技有限公司 Jacking mechanism
CN114961218A (en) * 2022-06-28 2022-08-30 贵州建工集团第一建筑工程有限责任公司 Construction method for lifting two climbing frames and removing formwork support frame at structural change position

Similar Documents

Publication Publication Date Title
CN106150087B (en) A kind of combined frame column template and its construction method
CN111236615A (en) Supporting structure of jacking platform and jacking method of jacking platform
CN115233819B (en) Assembled lacing wire steel pipe concrete connection structure
CN105965672A (en) Integrated formwork for assembly type shear wall form structure
CN105507580A (en) Integral lifting type formwork device for an elevator shaft
CN114508231B (en) Quick combination construction method for I-steel component
JP2016108875A (en) Demolition system and demolition method
CN203834934U (en) Constructional column template erecting structure
CN114197860B (en) Double-layer climbing formwork system for rapid construction and climbing formwork construction method
KR101213276B1 (en) System form combined with exterior insulation installation, and construction method thereof
CN212002177U (en) Self-climbing supporting equipment of jacking platform
CN204983661U (en) Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm
KR101969434B1 (en) Connecting unit for gang form and construction method using the same
JP7364105B2 (en) Position adjustment device and method for adjusting the position of the structure pillar
CN116517329A (en) Construction method for retaining original building wall
CN117027412A (en) Construction method of frame structure
CN113931484B (en) Supporting structure for floor construction and installation
JP2003097092A (en) Constructing apparatus and method for tower-like structure
CN117569607A (en) Super high-rise adduction variable-section climbing frame construction method
CN215291543U (en) Temporary supporting device for binding steel bars
KR101345542B1 (en) In post climbing system and method thereof
CN210482970U (en) Extension formula elevartor shaft construction operation protection platform
JP3893368B2 (en) Steel panels for beams and walls, and beam and wall construction methods using the same
CN209244097U (en) A prefabricated hollow column
JPH10115084A (en) Suspending device for working scaffold, and constructing method for structure using the device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605

RJ01 Rejection of invention patent application after publication