CN111137702A CN202010138620.7A CN202010138620A CN111137702A CN 111137702 A CN111137702 A CN 111137702A CN 202010138620 A CN202010138620 A CN 202010138620A CN 111137702 A CN111137702 A CN 111137702A
Authority
CN
China
Prior art keywords
alumina
super
chute
fresh
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010138620.7A
Other languages
Chinese (zh)
Other versions
CN111137702B (en
Inventor
杨青辰
王尚元
班允刚
刘总兵
李扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University Engineering and Research Institute Co Ltd
Original Assignee
Northeastern University Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University Engineering and Research Institute Co Ltd filed Critical Northeastern University Engineering and Research Institute Co Ltd
Priority to CN202010138620.7A priority Critical patent/CN111137702B/en
Publication of CN111137702A publication Critical patent/CN111137702A/en
Application granted granted Critical
Publication of CN111137702B publication Critical patent/CN111137702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/24Unloading land vehicles
    • B65G67/32Unloading land vehicles using fixed tipping installations
    • B65G67/48Vehicle tipplers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/04Conveying materials in bulk pneumatically through pipes or tubes; Air slides
    • B65G53/16Gas pressure systems operating with fluidisation of the materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/36Arrangements of containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/40Feeding or discharging devices
    • B65G53/44Endless conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/12Sieving bulk materials during loading or unloading
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/18Preventing escape of dust
    • B65G69/185Preventing escape of dust by means of non-sealed systems
    • B65G69/186Preventing escape of dust by means of non-sealed systems with aspiration means
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • C25C3/14Devices for feeding or crust breaking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Intermediate Stations On Conveyors (AREA)
  • Electrolytic Production Of Metals (AREA)

Abstract

A fresh alumina conveying system for an electrolytic aluminum plant and a using method thereof comprise an alumina transport vehicle, a hydraulic plate turnover unloader, an alumina buffer hopper, a dust collection cover, a dust removal system, a manual gate valve, an electric gate valve, a first super-dense phase conveying chute, a second super-dense phase conveying chute, a first high-pressure centrifugal fan, a second high-pressure centrifugal fan, a first air supply pipeline, a third high-pressure centrifugal fan, a fourth high-pressure centrifugal fan, a second air supply pipeline, a third super-dense phase conveying chute, a fourth super-dense phase conveying chute, a first bucket type lifter, a second bucket lifter, a bucket lifter blanking pipeline, an alumina bin top material distribution system and a fresh alumina bin, and the conveying system not only meets the alumina conveying requirements after the electrolytic bath and the electrolytic subareas are enlarged, but also improves the mechanical automation level of the system and the labor productivity, the capital investment and the operation cost of the system and the dust emission of the alumina storage and transportation system are reduced, and the working environment is improved.

Description

Fresh alumina conveying system for electrolytic aluminum plant and using method
Technical Field
The invention belongs to the technical field of material conveying of electrolytic aluminum plants, and particularly relates to a fresh aluminum oxide conveying system for an electrolytic aluminum plant and a using method thereof.
Background
At present, the NEUI600 kA-grade large-capacity aluminum electrolysis cell technology which is put into operation and popularized has obvious technical and economic advantages and becomes the first choice technology of a newly-built electrolytic aluminum series.
At the same time, to improve the overall economics of the electrolysis series, the capacity of individual electrolysis zones has increased from 7 to 10 ten thousand tons per year to 20 to 25 ten thousand tons per year. After the capacity of the electrolysis subarea is increased, the demand of fresh alumina serving as a raw material for producing the electrolytic aluminum is increased from 300-1060-1320-t/d. The fresh alumina conveying system mainly comprises a feeding system and a conveying system, and mainly comprises the following components:
1. fresh alumina feeding system
Currently, commercially available alumina is typically introduced into the plant in the form of bagged material and stored in alumina warehouses. Fresh alumina is mainly fed by adopting a bag charging mode, namely, a charging platform is arranged in an alumina warehouse, bagged alumina is transported to the charging platform through a crown block, and a hopper is added after bag opening. The main problems that exist are:
(1) the feeding capacity of a single set of system is low, and is usually 40-50 t/h;
(2) the mechanization and automation level is low, and the labor productivity is low;
(3) the packaging bag is difficult to recycle, which causes a great deal of economic loss;
(4) the operation environment where the bag-opening operator is located is dangerous and has high dust concentration.
2. Fresh alumina conveying system
At present, fresh alumina is conveyed mainly by dilute phase conveying, concentrated phase conveying, super concentrated phase conveying, belt conveying and the like, and has the following defects:
(1) the dilute phase conveying system has insufficient conveying capacity, high operation energy consumption and large abrasion to alumina;
(2) the conveying capacity of the concentrated phase conveying system is insufficient, and the operation energy consumption is high;
(3) the conveying capacity of the existing ultra-concentrated phase conveying system is insufficient;
(4) air cushion belt conveyor systems are costly.
In view of the major problems with the above systems, there is a need to develop a new fresh alumina delivery system for use in an electrolytic aluminum plant.
Disclosure of Invention
Aiming at the defects of the prior system, the invention provides a fresh alumina conveying system for an electrolytic aluminum plant, which comprises a plurality of hydraulic plate-turning unloader, wherein the hydraulic plate-turning unloader is used for lifting an alumina transport vehicle stopped on the hydraulic plate-turning unloader and rotating a certain angle to unload alumina in a carriage of the alumina transport vehicle into an alumina buffer hopper, the hydraulic plate-turning unloader is arranged at one side of the alumina buffer hopper, a dust collecting cover is arranged above the alumina buffer hopper, the hydraulic plate-turning unloader is arranged corresponding to the opening end of the dust collecting cover, dust-containing flue gas generated in the unloading process is collected by the dust collecting cover, the dust-containing flue gas is purified and then emptied by a bag-type dust remover arranged at the rear side of the dust collecting cover, a plurality of discharge ports are arranged at the bottom of the alumina buffer hopper, and manual gate valves and electric gate valves are sequentially arranged at the discharge ports, the manual gate valve is used for controlling the conveying speed of the alumina, the electric gate valve is used for controlling the opening of an alumina conveying channel, the feed opening is connected with a plurality of super-concentrated phase conveying chute groups, each super-concentrated phase conveying chute group is simultaneously connected with a plurality of bucket elevators, the alumina conveyed by the bucket elevators is discharged into the alumina bin top distribution system through the bucket elevators, and the alumina is stored in the fresh alumina bin through the alumina bin top distribution system.
Super dense phase carries chute group includes two high-pressure centrifugal fan, two air feed pipelines and two super dense phase and carries the chute, and two super dense phase carry the chute to set up in carrying the vestibule, one of them super dense phase carries chute one end and is connected with the feed opening, and the other end passes through the adapter and is connected with another super dense phase and carries chute one end, and its other end is connected with bucket elevator, one of them high-pressure centrifugal fan carries the chute air feed, another for one of them super dense phase through one of them air feed pipeline high-pressure centrifugal fan carries the chute air feed for another super dense phase through another air feed pipeline.
The hydraulic plate turnover car unloader is mutually standby; a plurality of the super concentrated phase conveying chute groups are mutually standby; the bucket elevators are mutually standby.
The height of the super concentrated phase conveying chute group is 300-1000 mm, the width of the super concentrated phase conveying chute group is 300-1000 mm, the conveying gradient of the super concentrated phase conveying chute group is 0-10%, and the conveying capacity is 200-500 t/h; the length of the single-section chute is 2.5 m.
The air supply coefficient of the high-pressure centrifugal fan is 1.2-1.8 m3/(m2Min) and the air supply pressure is 4000-15000 Pa.
The diameter of air supply pipeline is 200 ~ 600mm, the pipe wall thickness is 2 ~ 5mm, and air supply pipeline adopts Q235B carbon steel to make.
The lifting weight of the hydraulic plate turnover unloader is 70-200 t; the tipping angle of the hydraulic tipping platform unloader is as follows: 0 degree to 50 degrees; the single lifting time of the hydraulic plate turnover unloader is 5-15 min; the discharging capacity is 50-300 t/h.
The lifting height of the bucket elevator is 5-60 m, and the lifting capacity is 30-500 t/h.
The collection efficiency of the dust collection cover is 92-98%, and the dust removal efficiency of the bag-type dust remover is 92-99%; the volume of the alumina buffer hopper is 1-20 m3(ii) a The length of the valves of the manual gate valve and the electric gate valve is 100-300 mm, and the diameter of the valves is 100-600 mm.
The clear height of the conveying corridor is more than 2.5m, and the width of the conveying corridor is more than 2 m.
A method of using a fresh alumina delivery system for an electrolytic aluminum plant comprising the steps of:
step 1, a driver drives an alumina transport vehicle to a hydraulic turning plate unloading machine, the alumina transport vehicle is fixed through a hydraulic baffle on the hydraulic turning plate unloading machine, wheels of the alumina transport vehicle are clamped, then the hydraulic turning plate unloading machine is started, a discharging platform of the hydraulic turning plate unloading machine is lifted to a set angle and stops tipping, alumina slides out from a carriage of the alumina transport vehicle, enters an alumina buffer hopper after passing through a separating screen arranged at the top of the alumina buffer hopper, the discharging platform of the hydraulic turning plate unloading machine falls back and resets after all fresh alumina in the alumina transport vehicle is unloaded, the hydraulic baffle resets, and the driver drives the vehicle away to complete an unloading period; collecting raised dust generated in the unloading process by a dust collection cover, then entering a bag-type dust collector through a dust collection pipeline for treatment, and emptying the treated flue gas reaching the standard;
step 2, during normal work, the alumina in the alumina buffer hopper enters one of the super-concentrated phase conveying chute groups after passing through the feed opening, the manual gate valve and the electric gate valve, the alumina is conveyed to the inlet of a bucket elevator through the super-concentrated phase conveying chute group, and the bucket elevator works to lift the alumina and convey the alumina into an alumina bin through a feeding pipe; in special cases, a plurality of dense phase conveying chute groups work simultaneously to convey alumina, the alumina is conveyed to inlets of a plurality of bucket elevators through the super dense phase conveying chute groups simultaneously, the bucket elevators work simultaneously to lift the alumina, and the alumina is conveyed into an alumina bin through a discharging pipe.
The invention has the beneficial effects that:
1. the invention provides a fresh alumina conveying system for an electrolytic aluminum plant, which can meet the material conveying requirement after large-scale electrolysis of an electrolytic cell and an electrolysis subarea and effectively improve the overall process technical level of electrolytic aluminum.
2. A hydraulic plate turnover unloader is adopted as main equipment for alumina unloading, and the feeding capacity of the single-set system is improved from 40-50t/h to 100-150 t/h; the hydraulic plate turnover unloading machine is adopted as main equipment for alumina unloading, and the working time of the system is reduced from 24h to 16h by improving the mechanization and automation level of the system; the investment of main body unloading equipment and a bag-type dust collector is reduced, and the ton aluminum investment of an electrolytic aluminum plant can be reduced by 1%; the mechanization and automation level of the system is improved, the operation and maintenance personnel are reduced, the labor productivity of an electrolytic aluminum plant can be improved by 6 percent, and the production cost of electrolytic aluminum is reduced by 9.6 yuan/t-Al; the energy consumption of the system is reduced, and the ton aluminum energy consumption of the system is reduced by 0.48 kW.h/t-Al on a same scale; the bag breaking loss of the aluminum oxide packaging bag in the unloading process is avoided, and the production cost of electrolytic aluminum is reduced by 26.7 yuan/t-Al; the dust emission generated in the feeding process of the system is reduced by 73 percent; the work safety of operators is improved by reducing the overhead operation of the operators, the working environment of the operators is improved by reducing the bag dismantling operation of the operators, the green index of the system is improved, and the main technical and economic indexes of the fresh alumina storage and transportation system are improved.
3. The system of the invention cancels a hook bridge crane in the existing feeding system, adopts a hydraulic plate turnover unloader as main equipment for alumina unloading, reduces the civil engineering investment of the system and can reduce the ton aluminum investment of an electrolytic aluminum plant by 0.8 percent.
4. The dust collection cover is used for collecting the raised dust generated in the unloading process, the collection efficiency of the dust-containing gas is more than 97 percent, and the efficiency is improved by 1 to 2 percent compared with the efficiency of the original system.
5. The working capacity of the bag-type dust collector provided by the invention is 250003H, the concentration of dust in the treated flue gas is less
5mg/Nm3
6. The system adopts the super concentrated phase conveying chute as main equipment for conveying the system, and the conveying capacity of the single system is improved from 40-50t/h to 200-300 t/h.
Drawings
FIG. 1 is a top plan view of a fresh alumina delivery system for an aluminum electrolysis plant according to the present invention;
FIG. 2 is an enlarged schematic view at F of a top view I of a fresh alumina delivery system for use in an electrolytic aluminum plant according to the present invention;
FIG. 3 is a second top plan view of a fresh alumina delivery system for use in an electrolytic aluminum plant in accordance with the present invention;
FIG. 4 is an elevational view of a fresh alumina delivery system for an electrolytic aluminum plant of the present invention;
FIG. 5 is an elevational view of a fresh alumina delivery system for an aluminum electrolysis plant of the present invention;
FIG. 6 is a third elevation view of a fresh alumina delivery system for use in an electrolytic aluminum plant of the present invention;
the method comprises the following steps of 1-an alumina transport vehicle, 2-a hydraulic plate turnover unloader, 3-an alumina buffer hopper, 4-a dust collection cover, 5-a bag-type dust remover, 6-a manual gate valve, 7-an electric gate valve, 8-a first super-dense phase conveying chute, 9-a second super-dense phase conveying chute, 10-a first high-pressure centrifugal fan, 11-a second high-pressure centrifugal fan, 12-a first air supply pipeline, 13-a third high-pressure centrifugal fan, 14-a fourth high-pressure centrifugal fan, 15-a second air supply pipeline, 16-a third super-dense phase conveying chute, 17-a fourth super-dense phase conveying chute, 18-a first bucket elevator, 19-a second bucket elevator, 20-a bucket elevator discharging pipeline, 21-an alumina bin top distributing system and 22-a fresh alumina bin.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1 to 6, a fresh alumina conveying system for an electrolytic aluminum plant comprises two hydraulic flap unloader 2, two super dense phase conveying chute sets and two bucket elevators, wherein the two super dense phase conveying chute sets are respectively a first super dense phase conveying chute set and a second super dense phase conveying chute set, the two bucket elevators are respectively a first bucket elevator 18 and a second bucket elevator 19, the unloading system of the hydraulic flap unloader 2 eliminates a crown block, the capital investment and the operating cost of the system are reduced, the hydraulic flap unloader 2 is used for lifting and rotating the alumina carrier 1 stopped thereon by a certain angle to unload the alumina in the alumina carrier 1 into the alumina buffer hopper 3, the hydraulic flap unloader 2 is arranged at one side of the alumina buffer hopper 3, a dust collection cover 4 is arranged above the alumina buffer hopper 3, the hydraulic plate turnover unloader 2 is arranged at the opening end of a dust collection cover 4, dust-containing smoke generated in the unloading process is collected through the dust collection cover 4, the dust-containing smoke is purified and then exhausted through a bag-type dust collector 5 arranged at the rear side of the dust collection cover 4, two feed openings are arranged at the bottom of an alumina buffer hopper 3, a manual gate valve 6 and an electric gate valve 7 are sequentially arranged on each feed opening, the manual gate valve 6 is used for controlling the conveying speed of alumina, the electric gate valve 7 is used for controlling the opening of an alumina conveying channel, one feed opening is connected with a first super-concentrated phase conveying chute group, the other feed opening is connected with a second super-concentrated phase conveying chute group, the first super-concentrated phase conveying chute group and the second super-concentrated phase conveying chute group are simultaneously connected with a first bucket elevator 18 and a second bucket elevator 19, alumina conveyed by the first bucket elevator 18 or the second bucket elevator 19 is unloaded to the top of an alumina bin through a bucket elevator discharge pipeline 20 The material system stores alumina in a fresh alumina bin 22 through a material distribution system 21 at the top of the alumina bin.
The first super concentrated phase conveying chute group comprises a first high-pressure centrifugal fan 10, a third high-pressure centrifugal fan 13, a first super concentrated phase conveying chute 8 and a fourth super concentrated phase conveying chute 17; first super dense phase carries chute 8 one end to be connected with one of them feed opening, and first super dense phase carries the chute 8 other end to pass through adapter and the super dense phase of fourth and carries chute 17 one end to be connected, and the super dense phase of fourth carries chute 17 to be connected with first bucket elevator 18 and second bucket elevator 19 simultaneously, first high pressure centrifugal fan 10 carries chute 8 air feed for first super dense phase through first air feed pipeline 12, third high pressure centrifugal fan 13 carries chute 17 air feed for the super dense phase of fourth through second air feed pipeline 15.
The second super dense phase conveying chute group comprises a second high-pressure centrifugal fan 11, a fourth high-pressure centrifugal fan 14, a second super dense phase conveying chute 9 and a third super dense phase conveying chute 16, one end of the second super dense phase conveying chute 9 is connected with another feed opening, the other end of the second super dense phase conveying chute 9 is connected with one end of the third super dense phase conveying chute 16 through an adapter, the third super dense phase conveying chute 16 is simultaneously connected with a first bucket type lifting machine 18 and a second bucket type lifting machine 19, the second high-pressure centrifugal fan 11 supplies air for the second super dense phase conveying chute 9 through a first air supply pipeline 12, and the fourth high-pressure centrifugal fan 14 also supplies air for the third super dense phase conveying chute 16 through a second air supply pipeline 15.
During normal production, the first super concentrated phase conveying chute group or the second super concentrated phase conveying chute group does not work at the same time and are mutually standby; under special conditions, the first super-concentrated phase conveying chute group and the second super-concentrated phase conveying chute group work simultaneously; the first bucket elevator 18 and the second bucket elevator 19 do not work at the same time and are mutually standby; in special cases, the first bucket elevator 18 and the second bucket elevator 19 work simultaneously; during normal production, the first high-pressure centrifugal fan 10 and the second high-pressure centrifugal fan 11 do not work at the same time, and 2 are mutually standby; under special conditions, the first high-pressure centrifugal fan 10 and the second high-pressure centrifugal fan 11 work simultaneously; during normal production, the third high-pressure centrifugal fan 13 and the fourth high-pressure centrifugal fan 14 do not work at the same time, and 2 are mutually standby; in special cases, the third high-pressure centrifugal fan 13 and the fourth high-pressure centrifugal fan 14 may also be operated simultaneously.
The height of the first super-concentrated phase conveying chute 8, the second super-concentrated phase conveying chute 9, the third super-concentrated phase conveying chute 16 and the fourth super-concentrated phase conveying chute 17 is 586mm, the width of the first super-concentrated phase conveying chute is 500mm, the conveying gradient of the first super-concentrated phase conveying chute 8, the second super-concentrated phase conveying chute 9, the third super-concentrated phase conveying chute 16 and the fourth super-concentrated phase conveying chute 17 is 0.7%, and the conveying capacity is 250 t/h; the length of the single-section chute is 2.5 m.
The air supply coefficients of the first high-pressure centrifugal fan 10, the second high-pressure centrifugal fan 11, the third high-pressure centrifugal fan 13 and the fourth high-pressure centrifugal fan 14 are 1.5m3/(m2Min), the air supply pressure is 11596 Pa.
The diameter of the first air supply pipeline 12 and the diameter of the second air supply pipeline 15 are 400mm, the wall thickness of the first air supply pipeline 12 and the wall thickness of the second air supply pipeline 15 are 3mm, and the first air supply pipeline 12 and the second air supply pipeline 15 are both made of Q235B carbon steel.
The lifting weight of the hydraulic plate-turning unloader 2 is 100 t; the tipping angle of the hydraulic tipping platform unloader 2 is as follows: 0 degree to 50 degrees; the single lifting time of the hydraulic plate turnover unloader 2 is 8 min; the discharge capacity is 150 t/h.
The lifting height of the first bucket elevator 18 and the second bucket elevator 19 is 41.8m, and the lifting capacity is 300 t/h.
The collection efficiency of the dust collection cover 4 is 97%, and the dust removal efficiency of the bag-type dust remover 5 is 99%; the volume of the alumina buffer hopper 3 is 10m3(ii) a The length of the valves of the manual gate valve 6 and the electric gate valve 7 is 200mm, and the diameter of the valves is 300 mm.
A method of using a fresh alumina delivery system for an electrolytic aluminum plant comprising the steps of:
step 1, a driver drives an alumina transport vehicle 1 to a hydraulic turning plate unloader 2, the alumina transport vehicle is fixed through a hydraulic baffle on the hydraulic turning plate unloader 2, then the hydraulic turning plate unloader 2 is started, a discharging platform of the hydraulic turning plate unloader 2 stops tipping after being lifted to a set angle, alumina slides out from a carriage of the alumina transport vehicle 1, enters an alumina buffer hopper 3 after passing through a spacer sieve arranged at the top of the alumina buffer hopper 3, the discharging platform of the hydraulic turning plate unloader 2 falls back and resets after all fresh alumina in the alumina transport vehicle 1 is discharged, the hydraulic baffle resets, and the driver drives the vehicle away to complete an unloading period; the raised dust generated in the unloading process is collected by the dust collection cover 4 and then enters the bag-type dust collector 5 through the dust collection pipeline for treatment, and the treated flue gas reaching the standard is emptied;
step 2, the alumina in the alumina buffer hopper 3 passes through the feed opening, the manual gate valve 6 and the electric gate valve 7 and then enters the first super-dense phase conveying chute 8 or the second super-dense phase conveying chute 9, and when the normal operation is carried out, when alumina enters the first hyperconcentration phase conveying chute 8, the second hyperconcentration phase conveying chute 9 does not work at the moment, the alumina passing through the first hyperconcentration phase conveying chute 8 enters the fourth hyperconcentration phase conveying chute 17, the alumina is simultaneously conveyed to the inlets of a first bucket elevator 18 and a second bucket elevator 19 through a fourth super dense phase conveying chute 17, the first bucket elevator 18 or the second bucket elevator 19 works to lift the alumina, and is conveyed into the alumina bin through a feeding pipe, at the moment, a first high-pressure centrifugal fan 10 supplies air to a first super-dense phase conveying chute 8 through a first air supply pipeline 12, and a third high-pressure centrifugal fan 13 supplies air to a fourth super-dense phase conveying chute 17 through a second air supply pipeline 15; when alumina enters the second hyper-dense phase conveying chute 9, the first hyper-dense phase conveying chute 8 does not work at this moment, the alumina passing through the second hyper-dense phase conveying chute 9 enters the third hyper-dense phase conveying chute 16, the alumina is simultaneously conveyed to the inlets of the first bucket elevator 18 and the second bucket elevator 19 through the third hyper-dense phase conveying chute 16, the first bucket elevator 18 or the second bucket elevator 19 works to lift the alumina and conveys the alumina into an alumina bin through a discharging pipe, at this moment, the second high-pressure centrifugal fan 11 supplies air to the second hyper-dense phase conveying chute 9 through the first air supply pipeline 12, and the fourth high-pressure centrifugal fan 14 also supplies air to the third hyper-dense phase conveying chute 16 through the second air supply pipeline 15; under special conditions, the first super-concentrated phase conveying chute 8 and the second super-concentrated phase conveying chute 9 work simultaneously to convey alumina, the alumina is conveyed into a fourth super-concentrated phase conveying chute 17 and a third super-concentrated phase conveying chute 16 through the first super-concentrated phase conveying chute 8 and the second super-concentrated phase conveying chute 9, the alumina is conveyed into inlets of a first bucket elevator 18 and a second bucket elevator 19 through the fourth super-concentrated phase conveying chute 17 and the third super-concentrated phase conveying chute 16 simultaneously, the first bucket elevator 18 and the second bucket elevator 19 work simultaneously to lift the alumina and convey the alumina into an alumina bin through a blanking pipe, at the moment, the first high-pressure centrifugal fan 10 and the second high-pressure centrifugal fan supply air to the first super-concentrated phase conveying chute 8 and the second super-concentrated phase conveying chute 9 through a first air supply pipeline 12 simultaneously, the third high-pressure centrifugal fan 13 and the fourth high-pressure centrifugal fan supply air to the fourth super-concentrated phase conveying chute 17 and the third super-concentrated phase conveying chute 9 through a second air supply pipeline 15 simultaneously The tank 16 is supplied with gas.

Claims (10)

1. A fresh alumina conveying system for an electrolytic aluminum plant is characterized by comprising a plurality of hydraulic plate-turning unloader machines, wherein the hydraulic plate-turning unloader machines are arranged on one side of an alumina buffer hopper, a dust collection cover is arranged above the alumina buffer hopper, the hydraulic plate-turning unloader machines are arranged corresponding to the opening end of the dust collection cover, dust-containing flue gas is purified and treated by a bag-type dust collector arranged on the rear side of the dust collection cover and then is emptied, a plurality of feed openings are arranged at the bottom of the alumina buffer hopper, manual gate valves and electric gate valves are sequentially arranged at the feed openings and are used for controlling the conveying speed of alumina, the electric gate valves are used for controlling the opening of an alumina conveying channel, the feed openings are connected with a plurality of super-concentrated phase conveying chute groups, each super-concentrated phase conveying chute group is simultaneously connected with a plurality of bucket elevators, and alumina conveyed by the bucket elevators is discharged into an alumina bin top cloth system through a feed pipeline of the bucket elevators, alumina is stored in a fresh alumina bin through an alumina bin top distribution system.
2. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 1, wherein: super dense phase carries chute group includes two high-pressure centrifugal fan, two air feed pipelines and two super dense phase and carries the chute, and two super dense phase carry the chute to set up in carrying the vestibule, carry the vestibule net height > 2.5m, and the width > 2m, one of them super dense phase and carry chute one end and be connected with the feed opening, and the other end passes through the adapter and is connected with another super dense phase and carry chute one end, and its other end is connected with bucket elevator, one of them high-pressure centrifugal fan carries the chute air feed for one of them super dense phase through one of them air feed pipeline, another high-pressure centrifugal fan carries the chute air feed for another super dense phase through another air feed pipeline.
3. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 2, wherein: the height of the super concentrated phase conveying chute group is 300-1000 mm, the width of the super concentrated phase conveying chute group is 300-1000 mm, the conveying gradient of the super concentrated phase conveying chute group is 0-10%, and the conveying capacity is 200-500 t/h; the length of the single-section ultra-concentrated phase conveying chute is 2.5 m.
4. According to claimA fresh alumina delivery system for an electrolytic aluminum plant as recited in claim 2, wherein: the air supply coefficient of the high-pressure centrifugal fan is 1.2-1.8 m3/(m2Min) and the air supply pressure is 4000-15000 Pa.
5. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 2, wherein: the diameter of air supply pipeline is 200 ~ 600mm, the pipe wall thickness is 2 ~ 5mm, and air supply pipeline adopts Q235B carbon steel to make.
6. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 1, wherein: the hydraulic plate turnover car unloader is mutually standby; a plurality of the super concentrated phase conveying chute groups are mutually standby; the bucket elevators are mutually standby.
7. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 1, wherein: the lifting weight of the hydraulic plate turnover unloader is 70-200 t; the tipping angle of the hydraulic tipping platform unloader is as follows: 0 degree to 50 degrees; the single lifting time of the hydraulic plate turnover unloader is 5-15 min; the discharging capacity is 50-300 t/h.
8. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 1, wherein: the lifting height of the bucket elevator is 5-60 m, and the lifting capacity is 30-500 t/h.
9. A fresh alumina delivery system for an electrolytic aluminum plant according to claim 1, wherein: the collection efficiency of the dust collection cover is 92-98%, and the dust removal efficiency of the bag-type dust remover is 92-99%; the volume of the alumina buffer hopper is 1-20 m3(ii) a The length of the valves of the manual gate valve and the electric gate valve is 100-300 mm, and the diameter of the valves is 100-600 mm.
10. The use method of the fresh alumina conveying system for the electrolytic aluminum plant based on claim 1 is characterized by comprising the following steps:
step 1, a driver drives an alumina transport vehicle to a hydraulic turning plate unloading machine, the alumina transport vehicle is fixed through a hydraulic baffle on the hydraulic turning plate unloading machine, wheels of the alumina transport vehicle are clamped, then the hydraulic turning plate unloading machine is started, a discharging platform of the hydraulic turning plate unloading machine is lifted to a set angle and stops tipping, alumina slides out from a carriage of the alumina transport vehicle, enters an alumina buffer hopper after passing through a separating screen arranged at the top of the alumina buffer hopper, the discharging platform of the hydraulic turning plate unloading machine falls back and resets after all fresh alumina in the alumina transport vehicle is unloaded, the hydraulic baffle resets, and the driver drives the vehicle away to complete an unloading period; collecting raised dust generated in the unloading process by a dust collection cover, then entering a bag-type dust collector through a dust collection pipeline for treatment, and emptying the treated flue gas reaching the standard;
step 2, during normal work, the alumina in the alumina buffer hopper enters one of the super-concentrated phase conveying chute groups after passing through the feed opening, the manual gate valve and the electric gate valve, the alumina is conveyed to the inlet of a bucket elevator through the super-concentrated phase conveying chute group, and the bucket elevator works to lift the alumina and convey the alumina into an alumina bin through a feeding pipe; in special cases, a plurality of dense phase conveying chute groups work simultaneously to convey alumina, the alumina is conveyed to inlets of a plurality of bucket elevators through the super dense phase conveying chute groups simultaneously, the bucket elevators work simultaneously to lift the alumina, and the alumina is conveyed into an alumina bin through a discharging pipe.
CN202010138620.7A 2020-03-03 2020-03-03 Fresh alumina conveying system for electrolytic aluminum plant and use method Active CN111137702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010138620.7A CN111137702B (en) 2020-03-03 2020-03-03 Fresh alumina conveying system for electrolytic aluminum plant and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010138620.7A CN111137702B (en) 2020-03-03 2020-03-03 Fresh alumina conveying system for electrolytic aluminum plant and use method

Publications (2)

Publication Number Publication Date
CN111137702A true CN111137702A (en) 2020-05-12
CN111137702B CN111137702B (en) 2024-10-01

Family

ID=70528242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010138620.7A Active CN111137702B (en) 2020-03-03 2020-03-03 Fresh alumina conveying system for electrolytic aluminum plant and use method

Country Status (1)

Country Link
CN (1) CN111137702B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113479589A (en) * 2021-07-22 2021-10-08 贵州顺安机电设备有限公司 Train tank car alumina powder unloading and conveying method and conveying device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202808961U (en) * 2012-07-20 2013-03-20 中国铝业股份有限公司 Synchronous transfer control device for fluorinated alumina concentrated phases
CN202967552U (en) * 2012-07-20 2013-06-05 中国铝业股份有限公司 Delivery pressure balance and dust collection device for ultra-concentrated-phase aluminum oxide
CN204022962U (en) * 2014-06-20 2014-12-17 甘肃东兴铝业有限公司 Alumina ultra-dense phase conveying chute device
CN107352273A (en) * 2017-07-03 2017-11-17 聊城信源集团有限公司 A kind of aluminum oxide Transmission system and its transmission method
CN211920226U (en) * 2020-03-03 2020-11-13 东北大学设计研究院(有限公司) Fresh alumina conveying system for electrolytic aluminum plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202808961U (en) * 2012-07-20 2013-03-20 中国铝业股份有限公司 Synchronous transfer control device for fluorinated alumina concentrated phases
CN202967552U (en) * 2012-07-20 2013-06-05 中国铝业股份有限公司 Delivery pressure balance and dust collection device for ultra-concentrated-phase aluminum oxide
CN204022962U (en) * 2014-06-20 2014-12-17 甘肃东兴铝业有限公司 Alumina ultra-dense phase conveying chute device
CN107352273A (en) * 2017-07-03 2017-11-17 聊城信源集团有限公司 A kind of aluminum oxide Transmission system and its transmission method
CN211920226U (en) * 2020-03-03 2020-11-13 东北大学设计研究院(有限公司) Fresh alumina conveying system for electrolytic aluminum plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113479589A (en) * 2021-07-22 2021-10-08 贵州顺安机电设备有限公司 Train tank car alumina powder unloading and conveying method and conveying device

Also Published As

Publication number Publication date
CN111137702B (en) 2024-10-01

Similar Documents

Publication Publication Date Title
CN103388046B (en) Pneumatic transmission method for dry dedusting of fine ash in converter gas
CN109019079B (en) Material conveying system
CN101133139A (en) Red hot coke handling equipment and its handling method
CN211920226U (en) Fresh alumina conveying system for electrolytic aluminum plant
CN111137702A (en) Fresh alumina conveying system for electrolytic aluminum plant and using method
CN108974948B (en) Pneumatic conveying device for recycling nitrogen
CN101698493A (en) Alumina conveying system and method
CN215827878U (en) Three-dimensional discharging system of carbide pot and carbide pot material pouring system based on multi-pot overturning
CN209798137U (en) Double-bin crown block feeding system for electrolytic aluminum production
CN212440613U (en) New burnt supplementary system of active burnt gas cleaning technology
CN113772427B (en) Combined vehicle-mounted pneumatic conveying device for bulk material conveying
JP2010132913A (en) Method for carrying red-hot coke
CN215515859U (en) Non-amino desulfurization device
CN219429150U (en) Conveying device for broken electrolyte dust removal system of aluminum electrolysis anode assembly workshop
CN113213182A (en) Three-dimensional discharging system of carbide pot
CN218931045U (en) Powder continuous unloading device
CN222410280U (en) Discharging and dedusting system for bin
CN214361741U (en) Intensive broken electrolyte feeding system for electrolytic aluminum production
CN215666031U (en) Discharging and loading system for cooked material warehouse
CN206407469U (en) A kind of aluminium hydroxide warehousing system
CN213595196U (en) Bucket type grain elevator
CN219341038U (en) Cement bulk loading equipment
CN223073487U (en) Bulk cargo unloading loading attachment
CN218808540U (en) Steel slag aggregate aging warehouse
CN115593982A (en) Be applied to dust shaker at harbour

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant