CN111075015A - Socket joint type prefabricated steel-concrete joint - Google Patents

Socket joint type prefabricated steel-concrete joint Download PDF

Info

Publication number
CN111075015A
CN111075015A CN201911288398.2A CN201911288398A CN111075015A CN 111075015 A CN111075015 A CN 111075015A CN 201911288398 A CN201911288398 A CN 201911288398A CN 111075015 A CN111075015 A CN 111075015A
Authority
CN
China
Prior art keywords
concrete
column
steel sleeve
steel
segments
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911288398.2A
Other languages
Chinese (zh)
Inventor
曹大富
孟睿智
曹思琦
王宇航
周雁玲
刘嘉琪
董政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201911288398.2A priority Critical patent/CN111075015A/en
Publication of CN111075015A publication Critical patent/CN111075015A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开一种套接式预制钢‑混凝土节点,结构简单、施工方便。本发明的套接式预制钢‑混凝土节点,包括待连接的上、下混凝土柱节段(2、1)、至少一混凝土梁节段(31、32),还包括柱钢套(4)和至少一梁钢套(51、52);所述上、下混凝土柱节段(2、1)端部相对,松配合套接在柱钢套(4)内,所述梁钢套(5)与柱钢套(4)的外侧面可拆式固定连接,所述混凝土梁节段(3)的端部松配合套装在梁钢套(5);所述上、下混凝土柱节段(2、1)端部与柱钢套(4)之间的缝隙以环氧砂浆密实填充,所述混凝土梁节段(3)端部与梁钢套(5)之间的缝隙以环氧砂浆密实填充。

Figure 201911288398

The invention discloses a socket-type prefabricated steel-concrete joint, which has simple structure and convenient construction. The socketed prefabricated steel-concrete joint of the present invention comprises upper and lower concrete column segments (2, 1) to be connected, at least one concrete beam segment (31, 32), and further comprises a column steel sleeve (4) and At least one beam steel sleeve (51, 52); the ends of the upper and lower concrete column segments (2, 1) are opposite to each other, and are sleeved in the column steel sleeve (4) with a loose fit, and the beam steel sleeve (5) Removably and fixedly connected with the outer side of the column steel sleeve (4), the ends of the concrete beam segments (3) are loosely fitted on the beam steel sleeve (5); the upper and lower concrete column segments (2) 1) The gap between the end and the column steel sleeve (4) is densely filled with epoxy mortar, and the gap between the end of the concrete beam segment (3) and the beam steel sleeve (5) is densely filled with epoxy mortar filling.

Figure 201911288398

Description

Socket joint type prefabricated steel-concrete joint
Technical Field
The invention belongs to the technical field of prefabricated assembled building structure components, and particularly relates to a sleeved prefabricated steel-concrete joint which is simple in structure and convenient to construct.
Background
In recent years, with the rapid development of the economy of China, the scale of infrastructure is always in the forefront of the world, the call for the industrialization of the building industry is higher and higher, and the demand is more and more urgent. The country also has a policy to vigorously develop and popularize the fabricated building, starts with the aspects of land giving links, financial subsidies, preferential tax policies and the like, and encourages developers to develop the fabricated building.
The prefabricated assembly structure system is beneficial to the development of building industrialization, is beneficial to saving resource and energy, reducing construction pollution, and improving the labor production efficiency and quality safety level, and is a hotspot which is widely concerned in recent years.
According to the current research conditions at home and abroad, some problems and limitations exist, and the main problems and limitations are as follows:
1) the existing fabricated reinforced concrete building adopts a concrete or cement slurry pouring mode to connect beam and column joints in construction, the problem of connection of the column joints is easy to occur, namely, the joint error is large due to the size deviation of frame beams and column members, the concrete vibration is difficult due to the small operation space of the joint construction, the performance and the quality are influenced and limited by the on-site construction quality, and the advantages of the fabricated structure are not fully exerted.
2) The node design is comparatively complicated, and the accessory is also comparatively difficult to tear open and trade.
In summary, the prior art has the following problems: the beam column joint structure of the fabricated building is complex and inconvenient to construct.
Disclosure of Invention
The invention aims to provide a socket joint type prefabricated steel-concrete joint which is simple in structure and convenient to construct.
The technical solution for realizing the purpose of the invention is as follows:
a socket joint type prefabricated steel-concrete node comprises upper and lower concrete column sections 1 and 2 to be connected, at least one concrete beam section 31 and 32, a column steel sleeve 4 and at least one beam steel sleeve 51 and 52;
the ends of the upper concrete column section 1 and the lower concrete column section 2 are opposite and are sleeved in the column steel sleeve 4 in a loose fit manner, the beam steel sleeve 5 is detachably and fixedly connected with the outer side surface of the column steel sleeve 4, and the end of the concrete beam section 3 is sleeved in the beam steel sleeve 5 in a loose fit manner;
gaps between the ends of the upper concrete column section 1 and the lower concrete column section 2 and the column steel sleeve 4 are densely filled with epoxy mortar, and gaps between the ends of the concrete beam sections 3 and the beam steel sleeve 5 are densely filled with epoxy mortar.
Compared with the prior art, the invention has the following remarkable advantages:
1. the structure is simple: according to the invention, all main parts are prefabricated in a factory, the beam sections and the column sections are connected by bolts, and a complete node is formed after the bolt connection is finished.
2. The construction is convenient: the beam sections and the column sections are connected by bolts instead of a common cast-in-place mode to complete the joint areas, concrete does not need to be poured during site construction, a concrete vibrating process which is difficult due to small operation space of the joint construction is omitted, steel bar anchoring operation is not needed, and the construction process is simplified.
The invention is described in further detail below with reference to the figures and the detailed description.
Drawings
Fig. 1 is a schematic perspective view of the socket joint type prefabricated steel-concrete joint of the present invention.
Fig. 2 is a schematic diagram of beam column steel sleeve connection.
Fig. 3 is an exploded view of fig. 2.
Fig. 4 is a top view of fig. 2.
Fig. 5 is a sectional structure view of fig. 2.
Fig. 6 is a schematic view of the lower concrete column segment installation.
Fig. 7 is a schematic view of the upper concrete column segment installation.
Fig. 8 is a schematic view of the installation of a single-sided concrete beam segment.
Figure 9 is a schematic illustration of the installation of a double sided concrete beam segment.
In the figure, a lower concrete column section 1, a column upper through hole 11, an upper concrete column section 2, a column upper through hole 21, concrete beam sections 31 and 32, a column steel sleeve 4, a column steel sleeve hole 41, beam steel sleeves 51 and 52, beam steel sleeve flanges 511 and 521 and a high-strength bolt 6.
Detailed Description
As shown in fig. 1 and 2, the socket joint type prefabricated steel-concrete node comprises an upper concrete column section 2, a lower concrete column section 1, at least one concrete beam section 31, 32, a column steel sleeve 4 and at least one beam steel sleeve 51, 52;
the ends of the upper concrete column section 2 and the lower concrete column section 1 are opposite and are sleeved in the column steel sleeve 4 in a loose fit manner, the beam steel sleeve 5 is detachably and fixedly connected with the outer side surface of the column steel sleeve 4, and the end of the concrete beam section 3 is sleeved in the beam steel sleeve 5 in a loose fit manner;
gaps between the ends of the upper concrete column segment 2 and the lower concrete column segment 1 and the column steel sleeve 4 are densely filled with epoxy mortar, and gaps between the ends of the concrete beam segments 3 and the beam steel sleeve 5 are densely filled with epoxy mortar.
As also shown in fig. 1 and 2, preferably, there are two concrete beam segments 31 and 32, which are respectively located at two opposite sides of the column steel jacket 4, and the respective ends of the two concrete beam segments are respectively loosely fitted and sleeved in a beam steel jacket 51 and 52;
the two beam steel sleeves 51 and 52 are provided with beam steel sleeve flanges 511 and 521 at the ends close to the column steel sleeve 4, two opposite side surfaces of the column steel sleeve 4 are provided with a plurality of column steel sleeve holes 41 corresponding to screw holes of the beam steel sleeve flanges 511 and 521, and the two beam steel sleeves 51 and 52 are detachably and fixedly connected through a high-strength bolt 6 penetrating through the column steel sleeve hole 41. As shown in fig. 3.
Preferably, the ends of the upper and lower concrete column sections 2, 1 are provided with through holes 21, 11 for high strength bolts 6 to pass through.
The high-strength bolt 6 penetrates through the through holes 21 and 11 at the end parts of the upper concrete column section 2 and the lower concrete column section 1, so that the left concrete beam section and the right concrete beam section are integrally pulled, and the upper concrete column section and the lower concrete column section are integrally pulled with the left concrete beam section and the right concrete beam section, so that the connection is firmer.
The beam steel sleeve flanges 511 and 521 are blind plates with peripheries larger than the peripheries of the beam steel sleeves 51 and 52, and the screw holes are located on the edges of the beam steel sleeve flanges 511 and 521, which exceed the peripheries of the beam steel sleeves 51 and 52.
The basic design concept of the invention is as follows:
the steel structure outside the node can bear certain external force, so that the node has a remarkable reinforcing effect, meanwhile, the axial force, the bending moment and the shearing force of the beam column can be transmitted through the steel sleeve and the high-strength bolt, and the node structure has an action mechanism similar to that of a human joint. The concrete column section, the concrete beam section, the column steel sleeve section and the beam steel sleeve section are all prefabricated in a factory, and bolt holes are reserved in the column and the beam steel sleeve. After the prefabrication and pouring of the concrete beam are finished, the concrete beam is sleeved into a beam steel sleeve, and epoxy mortar is poured into the joint of the end heads for bonding; and reserving a pore channel corresponding to the steel bushing bolt hole on the concrete column, sleeving the concrete column into a column steel bushing after pouring, pouring epoxy mortar into the joint of the end heads for bonding, and connecting the sleeved beam section to the sleeved column section by using a high-strength bolt to penetrate through the pore channel reserved on the column and the bolt hole on the steel bushing so as to finally form the sleeved prefabricated steel-concrete node.
Compared with the prior art, the invention has the advantages of fewer processes, convenient installation, convenient control of each process, better control of construction quality, obvious improvement of the assembly and industrialization degree of a concrete structure, convenient construction, reduction of construction difficulty, improvement of construction speed and production efficiency of buildings, shortening of construction period and reduction of construction cost; if the component is damaged, the component of the node system is convenient to replace, so that the maintenance cost of the structure can be reduced, and the maintenance process is simplified; the node form is also suitable for a wood frame structure system and has similar production and construction procedures. In conclusion, the node structure system can generate good economic benefit when being popularized and applied in the fabricated building.
The construction process of the socket joint type prefabricated steel-concrete joint of the present invention is described in the following with an embodiment.
The upper concrete column section 2, the lower concrete column section 1, the first and second concrete beam sections 31 and 32, the column steel sleeve 4, the first and second beam steel sleeves 51 and 52 are prefabricated in a factory in advance, bolt holes are reserved in the column steel sleeve 4 and the beam steel sleeves 51 and 52 during manufacturing, and bolt holes penetrating through the column body are reserved in corresponding positions of the upper and lower concrete column sections 2 and 1 during manufacturing.
After the prefabricated parts are transported to the site, the prefabricated parts are installed according to the installation process shown in fig. 6 to 9.
Firstly hoisting a column steel sleeve 4, inserting a first concrete column segment 1 into the column steel sleeve 4 from bottom to top, inserting a second concrete column segment into the column steel sleeve 4 from top to bottom, or placing the column steel sleeve 4 on the ground for installation, pouring epoxy mortar into joints for bonding, installing and fixing the first concrete beam segment 31 and the second concrete beam segment 32, respectively inserting the first concrete beam segment 31 and the second concrete beam segment 32 into the beam steel sleeve 5, oppositely placing the first concrete beam segment 31 and the second concrete beam segment 32, pouring epoxy mortar into the joints for bonding, then installing the installed and fixed first concrete beam segment 31 and the installed and fixed second concrete beam segment 32 on the fixed column segment, namely, penetrating a hole reserved on the column segment, a hole reserved on the column steel sleeve 4 and a bolt hole reserved on the beam steel sleeve 5 through a high-strength bolt to install the sleeved and fixed first concrete beam segment 31, the installed and fixed second concrete beam segment 32, The second concrete beam segments 32 are connected to the column segments and to each other, thereby completing the construction of the entire telescopic joint.
The sleeve joint type node assembled by the method can obviously improve the assembly and industrialization degree of a concrete structure, is convenient to construct, reduces the construction difficulty, improves the construction speed and the production efficiency of a building, shortens the construction period and reduces the construction cost; meanwhile, if the component is damaged, the component of the node system is convenient to replace, so that the maintenance cost of the structure can be reduced, and the maintenance process is simplified; the node form is also suitable for a wood frame structure system and has similar production and construction procedures. Therefore, the structure system can produce good economic benefit when being popularized and applied in the assembled building structure.

Claims (4)

1.一种套接式预制钢-混凝土节点,包括待连接的上、下混凝土柱节段(2、1)、至少一混凝土梁节段(31、32),其特征在于:1. A socketed prefabricated steel-concrete joint, comprising upper and lower concrete column segments (2, 1) to be connected, at least one concrete beam segment (31, 32), characterized in that: 还包括柱钢套(4)和至少一梁钢套(51、52);Also includes a column steel sleeve (4) and at least one beam steel sleeve (51, 52); 所述上、下混凝土柱节段(2、1)端部相对,松配合套接在柱钢套(4)内,所述梁钢套(5)与柱钢套(4)的外侧面可拆式固定连接,所述混凝土梁节段(3)的端部松配合套装在梁钢套(5);The ends of the upper and lower concrete column segments (2, 1) are opposite to each other, and the loose fit is sleeved in the column steel sleeve (4). Detachable fixed connection, the ends of the concrete beam segments (3) are loosely fitted over the beam steel sleeves (5); 所述上、下混凝土柱节段(2、1)端部与柱钢套(4)之间的缝隙以环氧砂浆密实填充,所述混凝土梁节段(3)端部与梁钢套(5)之间的缝隙以环氧砂浆密实填充。The gaps between the ends of the upper and lower concrete column segments (2, 1) and the column steel sleeves (4) are densely filled with epoxy mortar, and the ends of the concrete beam segments (3) and the beam steel sleeves (4) are densely filled with epoxy mortar. 5) The gaps between them are densely filled with epoxy mortar. 2.根据权利要求1所述的套接式预制钢-混凝土节点,其特征在于:2. The socketed prefabricated steel-concrete joint according to claim 1, characterized in that: 所述混凝土梁节段(31、32)为两个,分别位于柱钢套(4)相对的两侧,且各自端部分别松配合套装在一梁钢套(51、52)内;The concrete beam segments (31, 32) are two, respectively located on opposite sides of the column steel sleeve (4), and the respective ends are loosely fitted into a beam steel sleeve (51, 52); 两个所述梁钢套(51、52)靠近柱钢套(4)的端部设有梁钢套法兰(511、521),所述柱钢套(4)相对的两侧面设有与梁钢套法兰(511、521)螺孔对应的多个柱钢套孔(41),所述两个梁钢套(51、52)以穿过所述柱钢套孔(41)的高强螺栓(6)可拆式固定连接。The ends of the two beam steel sleeves (51, 52) close to the column steel sleeve (4) are provided with beam steel sleeve flanges (511, 521), and opposite sides of the column steel sleeve (4) are provided with The beam steel sleeve flanges (511, 521) have a plurality of column steel sleeve holes (41) corresponding to the screw holes, and the two beam steel sleeves (51, 52) have high strength passing through the column steel sleeve holes (41). The bolts (6) are detachable and fixed. 3.根据权利要求2所述的套接式预制钢-混凝土节点,其特征在于:3. The socketed prefabricated steel-concrete joint according to claim 2, wherein: 所述上、下混凝土柱节段(2、1)端部均设有供高强螺栓(6)穿过的通孔(21、11)。The ends of the upper and lower concrete column segments (2, 1) are both provided with through holes (21, 11) for the high-strength bolts (6) to pass through. 4.根据权利要求2所述的套接式预制钢-混凝土节点,其特征在于:4. The socketed prefabricated steel-concrete joint according to claim 2, characterized in that: 所述梁钢套法兰(511、521)为周边大于梁钢套(51、52)外周的盲板,所述螺孔位于梁钢套法兰(511、521)超出梁钢套(51、52)外周的各个边上。The beam steel sleeve flanges (511, 521) are blind plates with a periphery larger than the outer circumference of the beam steel sleeves (51, 52), and the screw holes are located at the beam steel sleeve flanges (511, 521) beyond the beam steel sleeves (51, 52). 52) On all sides of the periphery.
CN201911288398.2A 2020-03-02 2020-03-02 Socket joint type prefabricated steel-concrete joint Pending CN111075015A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911288398.2A CN111075015A (en) 2020-03-02 2020-03-02 Socket joint type prefabricated steel-concrete joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911288398.2A CN111075015A (en) 2020-03-02 2020-03-02 Socket joint type prefabricated steel-concrete joint

Publications (1)

Publication Number Publication Date
CN111075015A true CN111075015A (en) 2020-04-28

Family

ID=70314724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911288398.2A Pending CN111075015A (en) 2020-03-02 2020-03-02 Socket joint type prefabricated steel-concrete joint

Country Status (1)

Country Link
CN (1) CN111075015A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719693A (en) * 2020-06-30 2020-09-29 扬州大学 Prestressed fabricated steel-concrete socketed beam-column joint
CN112482563A (en) * 2020-12-03 2021-03-12 仲恺农业工程学院 Assembly type building concrete steel mixed frame structure and assembly method
CN112814150A (en) * 2020-12-30 2021-05-18 南京航空航天大学 Rectangular steel sleeve type connection method for basic magnesium sulfate cement concrete assembled frame nodes
US20240263436A1 (en) * 2021-09-15 2024-08-08 Cscon S.R.L. Prefabricated building structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4905436A (en) * 1988-03-28 1990-03-06 Hitachi Metals, Ltd. Column/beam joint structure
JPH08226170A (en) * 1995-02-20 1996-09-03 Yukihiro Ohata Joint metal fixture
JPH1122006A (en) * 1997-06-27 1999-01-26 Sho Tezuka Method for joining building
CN106284655A (en) * 2016-10-13 2017-01-04 哈尔滨工业大学 Precast concrete beam stud connects node and method of attachment in succession
CN106638955A (en) * 2016-11-25 2017-05-10 沈阳建筑大学 Prefabricated assembly type beam-column steel pipe sleeve connection node
CN109629671A (en) * 2019-01-30 2019-04-16 西安建筑科技大学 A kind of assembled node
CN109930686A (en) * 2019-03-21 2019-06-25 扬州大学 Assembled architecture beam-to-column joint method and node
CN110241919A (en) * 2018-03-10 2019-09-17 北京振兴同创钢结构工程有限公司 A kind of steel beam connecting joint structure
CN110565810A (en) * 2019-10-12 2019-12-13 中铁四局集团第四工程有限公司 Detachable connecting node between beam columns and connecting method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4905436A (en) * 1988-03-28 1990-03-06 Hitachi Metals, Ltd. Column/beam joint structure
JPH08226170A (en) * 1995-02-20 1996-09-03 Yukihiro Ohata Joint metal fixture
JPH1122006A (en) * 1997-06-27 1999-01-26 Sho Tezuka Method for joining building
CN106284655A (en) * 2016-10-13 2017-01-04 哈尔滨工业大学 Precast concrete beam stud connects node and method of attachment in succession
CN106638955A (en) * 2016-11-25 2017-05-10 沈阳建筑大学 Prefabricated assembly type beam-column steel pipe sleeve connection node
CN110241919A (en) * 2018-03-10 2019-09-17 北京振兴同创钢结构工程有限公司 A kind of steel beam connecting joint structure
CN109629671A (en) * 2019-01-30 2019-04-16 西安建筑科技大学 A kind of assembled node
CN109930686A (en) * 2019-03-21 2019-06-25 扬州大学 Assembled architecture beam-to-column joint method and node
CN110565810A (en) * 2019-10-12 2019-12-13 中铁四局集团第四工程有限公司 Detachable connecting node between beam columns and connecting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719693A (en) * 2020-06-30 2020-09-29 扬州大学 Prestressed fabricated steel-concrete socketed beam-column joint
CN112482563A (en) * 2020-12-03 2021-03-12 仲恺农业工程学院 Assembly type building concrete steel mixed frame structure and assembly method
CN112814150A (en) * 2020-12-30 2021-05-18 南京航空航天大学 Rectangular steel sleeve type connection method for basic magnesium sulfate cement concrete assembled frame nodes
US20240263436A1 (en) * 2021-09-15 2024-08-08 Cscon S.R.L. Prefabricated building structure
US12378760B2 (en) * 2021-09-15 2025-08-05 Cscon S.R.L. Prefabricated building structure

Similar Documents

Publication Publication Date Title
CN108049498B (en) Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure
CN111075015A (en) Socket joint type prefabricated steel-concrete joint
CN109881789A (en) A kind of dismountable girder steel-steel core concrete column punching connecting node
CN110397170A (en) Concrete Steel Tube Column-Prefabricated Concrete Composite Beam Prefabricated Building Connection Node
CN108978859A (en) Assembled beam-column connecting node
CN206368422U (en) A kind of assembled beam-column connecting node
CN113737965A (en) Assembled RCS structure beam column connecting piece and RCS structure post
CN108277881A (en) A kind of assembled beam-column connecting node
CN113389268A (en) Assembly type reinforced concrete frame disassembly-free formwork combined connecting system and construction method thereof
CN112962824B (en) A short-leg steel plate shear wall with replaceable energy-dissipating components and its construction method
CN104294920A (en) Joint assembly of U-shaped steel reinforced concrete combined beam and special-shaped concrete-filled steel tube column and manufacturing method of joint assembly
CN207794299U (en) A kind of complete assembled steel reinforced concrete frame structure system
CN116104206A (en) A steel node connecting PEC columns and steel composite beams
CN207727762U (en) Assembled beam-column connecting node
CN209779864U (en) Assembly joint of a reinforced concrete column
CN207092260U (en) A kind of tenon riveting steel structure modularization house
CN109930686A (en) Assembled architecture beam-to-column joint method and node
CN207436257U (en) One kind wears muscle assembly concrete-filled steel tube-H-shaped steel beam joint system
CN114575451B (en) Construction method of assembled reinforced concrete frame
CN114457918B (en) A prefabricated assembled large-span steel column connection structure and its construction method
CN218148854U (en) Assembly type reinforced concrete frame disassembly-free formwork combined connection system
WO2024119671A1 (en) Anti-seismic toughness prefabricated concrete frame structure and construction method therefor
CN115787832A (en) A prefabricated concrete frame rigidly connected with column shoes and beam shoes
CN210194902U (en) A beam-column joint connection form of a prefabricated steel tube bundle concrete wall frame
CN108104274A (en) A kind of assembled steel reinforced concrete short columns

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200428

RJ01 Rejection of invention patent application after publication