[go: up one dir, main page]

CN115534220A - Floating mechanism of injection mold - Google Patents

Floating mechanism of injection mold Download PDF

Info

Publication number
CN115534220A
CN115534220A CN202210020248.9A CN202210020248A CN115534220A CN 115534220 A CN115534220 A CN 115534220A CN 202210020248 A CN202210020248 A CN 202210020248A CN 115534220 A CN115534220 A CN 115534220A
Authority
CN
China
Prior art keywords
guide
guide rail
floating
buoyancy
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210020248.9A
Other languages
Chinese (zh)
Inventor
张兴安
李剑峰
李炳
陈俊坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yimo Steel Mold Hardware Shenzhen Co ltd
Original Assignee
Yimo Steel Mold Hardware Shenzhen Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yimo Steel Mold Hardware Shenzhen Co ltd filed Critical Yimo Steel Mold Hardware Shenzhen Co ltd
Priority to CN202210020248.9A priority Critical patent/CN115534220A/en
Publication of CN115534220A publication Critical patent/CN115534220A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/1756Handling of moulds or mould parts, e.g. mould exchanging means

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

本发明提供了一种注塑模具的浮升机构,包括浮升导轨、导向块、限位块、浮升垫板,流水线上的待加工模具进入注塑模具的浮升机构时,待加工模具首先沿着浮升导轨方向进入,限位块、浮升导轨对待加工模具进行第一次位置校正,下落时导向块对待加工模具进行第二次位置校正,使待加工模具精准落入浮升导轨上进行配合加工,加工完成之后再由浮升机构送回流水线,进行下一工序,这种浮升机构精准配合自动化生产,省去了手工移动搬运和位置校正,以提高生产效率。

Figure 202210020248

The invention provides a floating mechanism of an injection mold, which includes a floating guide rail, a guide block, a limit block, and a floating pad. When a mold to be processed on the assembly line enters the floating mechanism of the injection mold, the mold to be processed first moves Enter in the direction of the floating guide rail, the limit block and the floating guide rail perform the first position correction of the mold to be processed, and the guide block performs the second position correction of the mold to be processed when it falls, so that the mold to be processed falls accurately on the floating guide rail for processing Cooperating with processing, after the processing is completed, the floating mechanism is sent back to the assembly line for the next process. This floating mechanism precisely cooperates with automatic production, eliminating the need for manual movement and position correction to improve production efficiency.

Figure 202210020248

Description

一种注塑模具的浮升机构A lifting mechanism for an injection mold

技术领域technical field

本发明涉及注塑领域,特别涉及一种注塑模具的浮升机构。The invention relates to the field of injection molding, in particular to a lifting mechanism of an injection mold.

背景技术Background technique

在现在的注塑生产中,依然保留着半机器半人工的工作模式,工人手动从流水线取出模具放在注塑设备里进行注塑,然后再完成倒模,人工操作由于工人水平的高低,可能会出现尺寸不合格的情况,检查成品和半成品又会耗费人力,针对传统的半人工生产模式,有必要设计一款能够精准快速的注塑辅助设备,匹配自动化的生产模式,以提高生产效率。In the current injection molding production, the half-machine and half-manual working mode is still retained. The workers manually take out the mold from the assembly line and place it in the injection molding equipment for injection molding, and then complete the reverse mold. Due to the level of the workers, the manual operation may have dimensions. In the case of unqualified products, checking the finished and semi-finished products will consume manpower. For the traditional semi-manual production mode, it is necessary to design an injection molding auxiliary equipment that can be accurate and fast, and match the automated production mode to improve production efficiency.

发明内容Contents of the invention

为克服上述的技术问题,本发明提供了一种注塑模具的浮升机构。In order to overcome the above technical problems, the present invention provides a lifting mechanism for an injection mold.

本发明提供了一种注塑模具的浮升机构,技术方案如下:The invention provides a floating mechanism of an injection mold, and the technical scheme is as follows:

一种注塑模具的浮升机构,包括浮升台、导向座和气缸;A lifting mechanism for an injection mold, comprising a lifting platform, a guide seat and a cylinder;

所述浮升台包括浮升导轨、浮升垫板。The buoyancy platform includes a buoyancy guide rail and a buoyancy backing plate.

优选地,所述浮升台包括限位块,所述限位块安装于所述浮升垫板上。Preferably, the buoyancy platform includes a limit block, and the limit block is installed on the buoyancy pad.

优选地,所述浮升台包括导向块,所述导向块安装于所述导向座上,所述导向块设有斜面,斜面滑向所述浮升导轨的方向。Preferably, the buoyancy platform includes a guide block, the guide block is installed on the guide seat, the guide block is provided with a slope, and the slope slides toward the direction of the buoyancy guide rail.

优选地,所述导向座包括导向座外壳和导向座内壳,所述导向槽设置于所述导向座外壳和所述导向座内壳之间。Preferably, the guide seat includes a guide seat outer shell and a guide seat inner shell, and the guide groove is arranged between the guide seat outer shell and the guide seat inner shell.

优选地,所述浮升垫板上设有凹槽,所述浮升导轨可固定于凹槽中。Preferably, a groove is provided on the buoyancy pad, and the buoyancy guide rail can be fixed in the groove.

优选地,所述浮升导轨包括第一浮升导轨和第二浮升导轨,所述第一浮升导轨和所述第二浮升导轨相互平行。Preferably, the buoyant guide rail includes a first buoyant guide rail and a second buoyant guide rail, and the first buoyant guide rail and the second buoyant guide rail are parallel to each other.

有益效果Beneficial effect

与现有技术相比,本发明提供的一种注塑模具的浮升机构,具有以下优点:Compared with the prior art, the lifting mechanism of an injection mold provided by the present invention has the following advantages:

1、所述限位块通过固定的连接,突出的凸面与待加工模具卡接,让流水线送入的待加工模具水平方向精准进入浮升机构内,减少误差。1. The limit block is fixedly connected, and the protruding convex surface is clamped with the mold to be processed, so that the mold to be processed fed into the assembly line can accurately enter the floating mechanism in the horizontal direction, reducing errors.

2、在待加工模具下降过程中,通过所述导向块的斜面调整垂直方向,精准落入浮升机构内,进一步减少误差。2. During the descending process of the mold to be processed, adjust the vertical direction through the slope of the guide block, and accurately fall into the lifting mechanism to further reduce the error.

3、所述限位块、所述浮升导轨和所述导向块采用外置连接的方式,便于维护更换。3. The limit block, the lifting guide rail and the guide block are connected externally, which is convenient for maintenance and replacement.

4、通过所述气缸的升降功能以及所述导向块、所述限位块,所述浮升导轨的引导,实现待加工模具与流水线的精准对接,使得待加工模具可以匹配自动化生产的要求,再通过所述气缸的升降功能将模具送回流水线上,进行下一工序的加工,全程省去人工的校准以及高度配合自动化生产,大大降低人工成本,使生产效率得到提高。4. Through the lifting function of the cylinder and the guidance of the guide block, the limit block and the lifting guide rail, the precise docking of the mold to be processed and the assembly line is realized, so that the mold to be processed can match the requirements of automatic production, Then, the mold is sent back to the assembly line through the lifting function of the cylinder to carry out the processing of the next process, which saves manual calibration and highly cooperates with automatic production in the whole process, greatly reduces labor costs and improves production efficiency.

附图说明Description of drawings

图1是本发明第一实施例提供的一种注塑模具的浮升机构的外观示意图。Fig. 1 is a schematic view of the appearance of a lifting mechanism of an injection mold provided by the first embodiment of the present invention.

图2是本发明第一实施例提供的一种注塑模具的浮升机构的升降工作状态示意图。Fig. 2 is a schematic diagram of the lifting and lowering working state of the floating mechanism of an injection mold provided by the first embodiment of the present invention.

图3是本发明第一实施例提供的一种注塑模具的浮升机构的送入待加工模具的工作状态示意图。Fig. 3 is a schematic diagram of the working state of the lifting mechanism of an injection mold provided in the first embodiment of the present invention when it is fed into the mold to be processed.

附图标记说明:Explanation of reference signs:

1、浮升台;11、限位块;111、第一限位块;112、第二限位块;113、第三限位块;114、第四限位块;12、导向块;121、第一导向块;122、第二导向块;13、浮升导轨;131、第一浮升导轨;132、第二浮升导轨;14、浮升垫板;141、第一浮升垫板;142、第二浮升垫板;15、导向座;2、气缸。1, floating platform; 11, limit block; 111, first limit block; 112, second limit block; 113, third limit block; 114, fourth limit block; 12, guide block; 121 1, the first guide block; 122, the second guide block; 13, the buoyant guide rail; 131, the first buoyant guide rail; 132, the second buoyant guide rail; 14, the buoyant backing plate; 141, the first buoyant backing plate ; 142, the second floating backing plate; 15, the guide seat; 2, the cylinder.

具体实施方式detailed description

为了使本发明的目的,技术方案及优点更加清楚明白,以下结合附图及实施实例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于 限定本发明。In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the accompanying drawings and implementation examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的。It should be noted that when an element is referred to as being “fixed” to another element, it can be directly on the other element or there can also be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and similar expressions are used herein for purposes of illustration only.

在现在的注塑生产中,依然保留着半机器半人工的工作模式,工人手动从流水线取出模具放在注塑设备里进行注塑,然后再完成倒模,人工操作由于工人水平的高低,可能会出现尺寸不合格的情况,检查成品和半成品又会耗费人力,针对传统的半人工生产模式,有必要设计一款能够精准快速的注塑辅助设备,匹配自动化的生产模式,以提高生产效率。In the current injection molding production, the half-machine and half-manual working mode is still retained. The workers manually take out the mold from the assembly line and place it in the injection molding equipment for injection molding, and then complete the reverse mold. Due to the level of the workers, the manual operation may have dimensions. In the case of unqualified products, checking the finished and semi-finished products will consume manpower. For the traditional semi-manual production mode, it is necessary to design an injection molding auxiliary equipment that can be accurate and fast, and match the automated production mode to improve production efficiency.

鉴于此,本发明提供了一种注塑模具的浮升机构,以克服上述的技术问题。In view of this, the present invention provides a lifting mechanism of an injection mold to overcome the above-mentioned technical problems.

本发明第一实施例提供了一种注塑模具的浮升机构,包括浮升台1、限位块11、第一限位块111、第二限位块112、第三限位块113、第四限位块114、导向块12、第一导向块121、第二导向块122、浮升导轨13、第一浮升导轨131、第二浮升导轨132、浮升垫板14、第一浮升垫板141、第二浮升垫板142、导向座15、气缸2、待加工模具3。The first embodiment of the present invention provides a floating mechanism for an injection mold, including a floating platform 1, a limit block 11, a first limit block 111, a second limit block 112, a third limit block 113, a Four limit block 114, guide block 12, first guide block 121, second guide block 122, buoyancy guide rail 13, first buoyancy guide rail 131, second buoyancy guide rail 132, buoyancy backing plate 14, first buoyancy guide rail Lifting backing plate 141, the second floating backing plate 142, guide seat 15, cylinder 2, mold 3 to be processed.

请结合参阅图1和图2,所述导向座15设有导向槽151,所述浮升垫板14设置于所述导向槽151中。Please refer to FIG. 1 and FIG. 2 in conjunction, the guide seat 15 is provided with a guide groove 151 , and the buoyancy pad 14 is disposed in the guide groove 151 .

具体地,所述浮升导轨13与所述浮升垫板14连接,所述浮升导轨13包括第一浮升导轨131和第二浮升导轨132,所述浮升垫板14包括第一浮升垫板141和所述浮升垫板142,所述第一浮升垫板141和所述第二浮升垫板142分别设置于前后两端,所述第一浮升垫板141和所述第二浮升垫板142相互平行,所述第一浮升垫板141和所述第二浮升垫板142上设有凹槽,所述第一浮升导轨131和所述第二浮升导轨132的一端连接在所述第一浮升垫板141的凹槽上,所述第一浮升导轨131和所述第二浮升导轨132的另一端连接在所述第二浮升垫板142的凹槽上。Specifically, the buoyancy guide rail 13 is connected to the buoyancy pad 14, the buoyancy guide rail 13 includes a first buoyancy guide rail 131 and a second buoyancy guide rail 132, and the buoyancy pad 14 includes a first The buoyant backing plate 141 and the buoyant backing plate 142, the first buoyant backing plate 141 and the second buoyant backing plate 142 are arranged at the front and rear ends respectively, the first buoyant backing plate 141 and the second buoyant backing plate 142 The second buoyant pads 142 are parallel to each other, the first buoyant pad 141 and the second buoyant pad 142 are provided with grooves, the first buoyant guide rail 131 and the second buoyant rail 131 One end of the buoyancy guide rail 132 is connected to the groove of the first buoyancy backing plate 141, and the other ends of the first buoyancy guide rail 131 and the second buoyancy guide rail 132 are connected to the second buoyancy guide rail 132. on the groove of the backing plate 142.

具体地,所述第一浮升导轨131和所述第二浮升导轨132相互平行,且与流水线输送方向一致,这样的设计便于与流水线以及所述待加工模具3对接,完成后续自动化加工的工序。Specifically, the first lifting guide rail 131 and the second lifting guide rail 132 are parallel to each other and consistent with the conveying direction of the assembly line. This design is convenient for docking with the assembly line and the mold 3 to be processed, and completes the subsequent automatic processing. process.

进一步地,所述浮升导轨13通过螺纹连接的方式与所述浮升垫板14连接,这种连接方式结构简单、连接可靠、装拆方便,便于后期的维护。Further, the buoyant guide rail 13 is connected to the buoyant backing plate 14 through a threaded connection, which is simple in structure, reliable in connection, convenient in assembly and disassembly, and convenient for later maintenance.

可以理解,所述浮升导轨13与所述浮升垫板14的连接可以是螺纹连接、卡扣连接或铰链连接的任意一种可拆卸连接方式。It can be understood that the connection between the buoyancy guide rail 13 and the buoyancy backing plate 14 may be any detachable connection manner such as screw connection, buckle connection or hinge connection.

进一步地,所述气缸2设置于所述浮升垫板14的底部,所述气缸2包括第一气缸21、第二气缸22、第三气缸23、第四气缸24,所述第一气缸21和所述第二气缸22设置于所述第一浮升垫板141的底部,所述第三气缸23和所述第四气缸24设置于所述第二浮升垫板142的底部。Further, the cylinder 2 is arranged at the bottom of the buoyancy pad 14, the cylinder 2 includes a first cylinder 21, a second cylinder 22, a third cylinder 23, and a fourth cylinder 24, and the first cylinder 21 And the second air cylinder 22 is arranged at the bottom of the first buoyancy pad 141 , and the third air cylinder 23 and the fourth air cylinder 24 are arranged at the bottom of the second buoyancy pad 142 .

可以理解,所述气缸2设置的数量可以为2个、4个、6个或6个以上的偶数数量,成对地呈现。It can be understood that the number of the cylinders 2 can be 2, 4, 6 or an even number of more than 6, presented in pairs.

请结合参考图2和图3,当所述气缸2开始工作时,所述第一气缸21、所述第二气缸22、所述第三气缸23、所述第四气缸24同步开启,将所述浮升台1顶升并使浮升台1始终保持水平,直至所述第一浮升导轨131和所述第二浮升导轨132进入流水线,与流水线对接。Please refer to Fig. 2 and Fig. 3, when the cylinder 2 starts to work, the first cylinder 21, the second cylinder 22, the third cylinder 23, and the fourth cylinder 24 are synchronously opened, and the The buoyant platform 1 is jacked up and the buoyant platform 1 is always kept horizontal until the first buoyant guide rail 131 and the second buoyant guide rail 132 enter the assembly line and dock with the assembly line.

进一步地,所述待加工模具3从流水线进入所述浮升台1,首先经过所述第一浮升垫板141,经所述第一限位块111、所述第二限位块112、所述第一浮升导轨131和所述第二浮升导轨132实现第一次定位,这次定位确保所述待加工模具3精准进入所述浮升台1。Further, the mold 3 to be processed enters the buoyancy platform 1 from the assembly line, first passes through the first buoyancy backing plate 141, passes through the first limit block 111, the second limit block 112, The first buoyant guide rail 131 and the second buoyant guide rail 132 realize the first positioning, and this positioning ensures that the mold 3 to be processed enters the buoyant platform 1 accurately.

进一步地,所述待加工模具3进入所述第一浮升导轨131和所述第二浮升导轨132之后,继续沿着流水线方向输送,直至到达所述第二浮升垫板142,此时所述待加工模具3的前端再次与所述第三限位块113、所述第四限位块114卡接,此时整个所述待加工模具3的四个方位被所述第一限位块111、所述第二限位块112、所述第三限位块113、所述第四限位块114卡接,所述待加工模具3底部被所述第一浮升导轨131、所述第二浮升导轨132卡接。Further, after the mold 3 to be processed enters the first buoyant guide rail 131 and the second buoyant guide rail 132, it continues to be conveyed along the direction of the assembly line until it reaches the second buoyant backing plate 142, at this time The front end of the mold to be processed 3 is engaged with the third limiting block 113 and the fourth limiting block 114 again, and at this time, the four orientations of the entire mold to be processed 3 are clamped by the first limiting block. block 111, the second limit block 112, the third limit block 113, and the fourth limit block 114 are clamped, and the bottom of the mold 3 to be processed is held by the first floating guide rail 131 and the fourth limit block 114. The second buoyant guide rail 132 is clamped.

具体地,所述限位块11通过螺纹连接的方式与所述浮升垫板14连接,这种连接方式结构简单、连接可靠、装拆方便,便于后期的维护。Specifically, the limiting block 11 is connected to the buoyancy backing plate 14 through a screw connection, which is simple in structure, reliable in connection, convenient in assembly and disassembly, and convenient for later maintenance.

可以理解,所述限位块11与所述浮升垫板14的连接可以是螺纹连接、卡扣连接的任意一种可拆卸连接方式。It can be understood that the connection between the limiting block 11 and the buoyancy backing plate 14 may be any detachable connection manner such as screw connection or buckle connection.

可以理解,所述限位块11的数量可以为4个、6个、8个或者8个以上的偶数数量,成对地呈现。It can be understood that the number of the limiting blocks 11 may be 4, 6, 8 or an even number of more than 8, presented in pairs.

具体地,所述导向块12包括第一导向块121和第二导向块122,所述第一导向块121安装于所述第一导向座151的外壳上,所述第二导向块122安装于所述第二导向座152的外壳上,所述第一导向块121和所述第二导向块122均设有滑向所述浮升导轨13的斜面。Specifically, the guide block 12 includes a first guide block 121 and a second guide block 122, the first guide block 121 is installed on the shell of the first guide seat 151, and the second guide block 122 is installed on On the shell of the second guide seat 152 , the first guide block 121 and the second guide block 122 are both provided with slopes that slide toward the buoyant guide rail 13 .

具体地,所述导向块12通过螺纹连接的方式与所述浮升垫板14连接,这种连接方式结构简单、连接可靠、装拆方便,便于后期的维护。Specifically, the guide block 12 is connected to the buoyancy backing plate 14 through a threaded connection, which is simple in structure, reliable in connection, convenient in assembly and disassembly, and convenient for later maintenance.

可以理解,所述导向块12与所述浮升垫板14的连接可以是螺纹连接、卡扣连接的任意一种可拆卸连接方式。It can be understood that the connection between the guide block 12 and the buoyancy backing plate 14 may be any detachable connection manner such as screw connection or buckle connection.

可以理解,所述导向块12设置的数量可以为2个、4个、6个或6个以上的偶数数量,成对地呈现。It can be understood that the number of the guide blocks 12 can be 2, 4, 6 or an even number of more than 6, presented in pairs.

进一步地,所述待加工模具3完全进入所述浮升台1后,开始下降进入下模床区域,如果所述待加工模具3在流水线往前输送卡接过程中,停留位置过前或者过后,在下降时会受到来自所述第一导向块121和所述第二导向块122的共同导向,使所述待加工模具3往所述浮升导轨13的中间位置靠拢,实现第二次定位,确保接下来的加工模床可以准确对所述待加工模具3进行加工。Further, after the mold to be processed 3 completely enters the lifting table 1, it starts to descend into the lower mold bed area. , will receive the common guidance from the first guide block 121 and the second guide block 122 when descending, so that the mold 3 to be processed moves closer to the middle position of the lifting guide rail 13 to realize the second positioning , to ensure that the next processing mold bed can accurately process the mold 3 to be processed.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的原则之内所作的任何修改,等同替换和改进等均应包含本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements within the principles of the present invention shall be included within the protection scope of the present invention.

Claims (6)

1. The utility model provides an injection mold's buoyancy lift mechanism which characterized in that: comprises a floating platform, a guide seat and a cylinder;
the floating platform comprises a floating guide rail and a floating base plate;
the floating base plate is connected with the floating guide rail and the air cylinder, the guide seat is provided with a guide groove, and the floating base plate is arranged in the guide groove;
the floating platform can be driven by the power of the cylinder to lift in the guide range of the guide seat.
2. The lift mechanism of an injection mold of claim 1, wherein: the floating platform comprises a limiting block, and the limiting block is arranged on the floating base plate.
3. The lift mechanism of an injection mold of claim 1, wherein: the floating platform comprises a guide block, the guide block is installed on the guide seat, the guide block is provided with an inclined plane, and the inclined plane slides to the direction of the floating guide rail.
4. The lift mechanism of an injection mold of claim 1, wherein: the guide holder includes guide holder shell and guide holder inner shell, the guide way set up in the guide holder shell with between the guide holder inner shell.
5. The lift mechanism of an injection mold of claim 1, wherein: the buoyancy lifting base plate is provided with a groove, and the buoyancy lifting guide rail can be fixed in the groove.
6. The lift mechanism of an injection mold of claim 1, wherein: the buoyancy lift guide rail comprises a first buoyancy lift guide rail and a second buoyancy lift guide rail, and the first buoyancy lift guide rail and the second buoyancy lift guide rail are parallel to each other.
CN202210020248.9A 2022-01-10 2022-01-10 Floating mechanism of injection mold Pending CN115534220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210020248.9A CN115534220A (en) 2022-01-10 2022-01-10 Floating mechanism of injection mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210020248.9A CN115534220A (en) 2022-01-10 2022-01-10 Floating mechanism of injection mold

Publications (1)

Publication Number Publication Date
CN115534220A true CN115534220A (en) 2022-12-30

Family

ID=84724412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210020248.9A Pending CN115534220A (en) 2022-01-10 2022-01-10 Floating mechanism of injection mold

Country Status (1)

Country Link
CN (1) CN115534220A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5351744A (en) * 1990-06-19 1994-10-04 Tour & Andersson Ab Device in a press casting machine and method of using such device
CN109132483A (en) * 2018-07-16 2019-01-04 苏州冠浩斯精密机械有限公司 The jacking component of brake pump brake piston feeder
CN112976486A (en) * 2021-03-11 2021-06-18 丰铁机械(苏州)有限公司 Composite structure capable of quickly changing die and quickly locking
CN213704409U (en) * 2020-10-30 2021-07-16 东莞市旺鑫精密工业有限公司 A mobile phone automatic injection molding and pressing equipment
CN214395481U (en) * 2020-12-03 2021-10-15 长春富维安道拓汽车饰件系统有限公司 A movable lower die holder for pressing equipment
CN215046677U (en) * 2021-04-25 2021-12-07 深圳市智莱科技股份有限公司 Goods collecting device and storage cabinet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5351744A (en) * 1990-06-19 1994-10-04 Tour & Andersson Ab Device in a press casting machine and method of using such device
CN109132483A (en) * 2018-07-16 2019-01-04 苏州冠浩斯精密机械有限公司 The jacking component of brake pump brake piston feeder
CN213704409U (en) * 2020-10-30 2021-07-16 东莞市旺鑫精密工业有限公司 A mobile phone automatic injection molding and pressing equipment
CN214395481U (en) * 2020-12-03 2021-10-15 长春富维安道拓汽车饰件系统有限公司 A movable lower die holder for pressing equipment
CN112976486A (en) * 2021-03-11 2021-06-18 丰铁机械(苏州)有限公司 Composite structure capable of quickly changing die and quickly locking
CN215046677U (en) * 2021-04-25 2021-12-07 深圳市智莱科技股份有限公司 Goods collecting device and storage cabinet

Similar Documents

Publication Publication Date Title
CN114291547B (en) Weighing counting and stacking system for strip-shaped profile
CN207723804U (en) A new type of terminal automatic assembly equipment
CN207616041U (en) A kind of automatic photovoltaic frame corner brace machine
CN115534220A (en) Floating mechanism of injection mold
CN211937958U (en) Automatic detection mechanism for polished sleeper mold
CN211425514U (en) Stamping workpiece outward appearance detection device
CN106736184A (en) A kind of high accuracy flexibility auxiliary welding device
CN207325662U (en) A kind of bending mechanism
CN205309742U (en) Automatic machine of loosening screw a little
CN206394254U (en) Laser marking and detection all-in-one machine
CN211234356U (en) A thickness detection device
CN218706809U (en) Processing charging equipment for water based paint
CN206795221U (en) The alignment device of backlight module kludge
CN223530879U (en) Square battery cover size detection device for continuous conveyor lines
CN209455459U (en) A kind of jacking apparatus
CN207248337U (en) A kind of automatic auxiliary calibration device for lithium battery feeding system
CN210755216U (en) Thimble for machining
CN215813086U (en) Flat plate type electronic product flexibility testing butt joint device
CN210146797U (en) High-precision guiding device
CN220407769U (en) Automatic wire shielding cover assembling mechanism
CN206028489U (en) Bending processing mould of last pillar work piece of band conveyer
CN220454752U (en) Pressure feedback mechanism with adjustable function for detection equipment
CN221252787U (en) Material moving mechanism capable of detecting positive and negative materials
CN220798367U (en) Integrated image acquisition assembly and acquisition device
CN210023705U (en) Convenient opening and closing mold blank for hardware part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination