CN115033640A - Electric power construction engineering supervision experience uploading and consulting system - Google Patents
Electric power construction engineering supervision experience uploading and consulting system Download PDFInfo
- Publication number
- CN115033640A CN115033640A CN202210450261.8A CN202210450261A CN115033640A CN 115033640 A CN115033640 A CN 115033640A CN 202210450261 A CN202210450261 A CN 202210450261A CN 115033640 A CN115033640 A CN 115033640A
- Authority
- CN
- China
- Prior art keywords
- data
- supervision
- module
- unit
- uploading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/27—Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/16—File or folder operations, e.g. details of user interfaces specifically adapted to file systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6218—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
- G06F21/6227—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database where protection concerns the structure of data, e.g. records, types, queries
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- Human Resources & Organizations (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Computing Systems (AREA)
- Human Computer Interaction (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Bioethics (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域technical field
本发明涉及监理数据系统技术领域,具体涉及一种电力建设工程监理经验上传与查阅系统。The invention relates to the technical field of supervisory data systems, in particular to a system for uploading and consulting experience in electric power construction project supervision.
背景技术Background technique
工程监理是电力建设项目中的重要环节,其顺利可靠的实施才能加强检查和控制电力建设工程的质量,保证电力企业的安全运行。Engineering supervision is an important link in electric power construction projects, and its smooth and reliable implementation can strengthen the inspection and control of the quality of electric power construction projects and ensure the safe operation of electric power enterprises.
整个监理工作组根据职责内容以及权限大小进行划分,各个监理员负责各自的监理内容,且将监理过程中的数据进行记录,从而构建出整个建设项目各个环节的数据内容,但是现有技术中,缺少辅助监理经验内容记录以及查阅的系统,不同监理人的监理数据内容只能通过汇总打印送至项目监理机构,也会将电子版内容传输给项目监理机构,这样内容由于并非经过系统性的分类和储存,造成后期查阅时存在不便,且也不方便进行整理,同时负责不同内容的监理人想要了解其他项目进度时,存在不方便调阅资料的缺陷,鉴于此,本发明提出一种电力建设工程监理经验上传与查阅系统。The entire supervision working group is divided according to the content of responsibilities and the size of the authority. Each supervisor is responsible for their own supervision content, and records the data in the supervision process, so as to construct the data content of each link of the entire construction project, but in the existing technology, There is a lack of a system to record and review the content of the auxiliary supervision experience. The supervision data content of different supervisors can only be sent to the project supervision agency by summarizing and printing, and the electronic version of the content will also be transmitted to the project supervision agency. Because the content is not systematically classified and storage, resulting in inconvenience in later review, and it is also inconvenient to organize. At the same time, when the supervisor responsible for different content wants to know the progress of other projects, it is inconvenient to read the data. In view of this, the present invention proposes a power Construction project supervision experience upload and review system.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于:为解决上述背景技术中提出的问题,本发明提供了一种电力建设工程监理经验上传与查阅系统。The purpose of the present invention is: in order to solve the problems raised in the above-mentioned background technology, the present invention provides a system for uploading and checking experience of electric power construction project supervision.
本发明为了实现上述目的具体采用以下技术方案:The present invention specifically adopts the following technical solutions in order to achieve the above object:
一种电力建设工程监理经验上传与查阅系统,包括:A power construction project supervision experience uploading and reviewing system, comprising:
数据获取单元,用于获取监理数据,并对监理数据进行分类处理;A data acquisition unit, used for acquiring supervision data and classifying the supervision data;
数据库单元,与数据获取单元连接,用于储存数据获取单元获取的监理数据,数据库单元根据数据分类信息,将监理数据储存在相应的文件中;A database unit, connected with the data acquisition unit, is used for storing the supervision data acquired by the data acquisition unit, and the database unit stores the supervision data in a corresponding file according to the data classification information;
云储存单元,与数据库单元连接,数据库单元将储存的监理数据同步上传至云储存单元中,且每个数据库单元具有唯一的标识,同一个数据库单元的监理数据储存在同一个文件中;The cloud storage unit is connected with the database unit, the database unit uploads the stored supervision data to the cloud storage unit synchronously, and each database unit has a unique identifier, and the supervision data of the same database unit is stored in the same file;
数据查阅单元,与数据库单元连接,可查阅数据库单元储存的监理数据,或进入云储存单元,发出请求查阅指令,若请求通过,则可查阅其他数据库单元上传的监理数据,若请求不通过,则不可查阅其他数据库单元上传的监理数据。The data reference unit is connected to the database unit, and can check the supervision data stored in the database unit, or enter the cloud storage unit, and issue a request for reference. The supervision data uploaded by other database units cannot be consulted.
进一步地,所述数据获取单元获取的监理数据包括:Further, the supervision data acquired by the data acquisition unit includes:
文字数据,涉及监理工作中所处理的内容、注意事项、问题点、改进点、工作建议以及工作评断;Textual data, involving the content, precautions, problems, improvement points, work suggestions and work judgments handled in the supervision work;
图片数据,涉及监理工作中所拍摄的图片内容;Picture data, involving the content of pictures taken during the supervision work;
视频数据,涉及监理工作中所拍摄的视频内容。Video data, involving video content captured during supervision work.
进一步地,所述数据获取单元对监理数据分类方法包括:Further, the method for classifying supervision data by the data acquisition unit includes:
根据职责分工划分第一分类模块;Divide the first classification module according to the division of responsibilities;
根据工作内容划分第二分类模块;Divide the second classification module according to the work content;
根据数据内容划分第三分类模块。The third classification module is divided according to the data content.
进一步地,还包括权限单元,其为用户终端配置查阅和上传权限,并提供身份验证以及数据加密和解密处理;其中,Further, it also includes an authority unit, which configures viewing and uploading authority for the user terminal, and provides identity verification and data encryption and decryption processing; wherein,
权限高的用户终端可直接查阅权限低的用户终端的监理数据,同级别的用户终端无法相互查阅;User terminals with high authority can directly check the supervision data of user terminals with low authority, and user terminals at the same level cannot check each other;
用户终端进入数据库单元和云储存单元时,均需要进行身份验证;When the user terminal enters the database unit and the cloud storage unit, authentication is required;
用户终端上传或下载监理数据过程中,数据经过加密处理;When the user terminal uploads or downloads supervision data, the data is encrypted;
进一步地,所述数据库单元包括临时储存模块和长期储存模块;临时储存模块用于储存未上传至长期储存模块的监理数据,当监理数据完成上传后,临时储存模块自动删除上传后的监理数据,临时储存模块中,监理数据可进行修改或删除;长期储存模块用于储存监理获取模块获取的全部监理数据,且监理数据由临时储存模块上传至长期储存模块后,监理数据无法进行修改或删除工作。Further, the database unit includes a temporary storage module and a long-term storage module; the temporary storage module is used to store the supervision data that is not uploaded to the long-term storage module, and after the supervision data is uploaded, the temporary storage module automatically deletes the uploaded supervision data, In the temporary storage module, the supervision data can be modified or deleted; the long-term storage module is used to store all the supervision data obtained by the supervision acquisition module, and after the supervision data is uploaded from the temporary storage module to the long-term storage module, the supervision data cannot be modified or deleted. .
进一步地,所述长期储存模块中,预设的分类信息根据等级顺序划分依次包括:Further, in the long-term storage module, the preset classification information sequentially includes:
职责文件夹,根据监理人员的具体工作职责进行确定;Responsibilities folder, determined according to the specific job responsibilities of supervisors;
时间文件夹,在职责文件夹下,根据监理数据上传的时间点,生成时间文件夹,该时间段上传的监理数据均储存在该时间文件夹内;Time folder, under the responsibility folder, according to the time point when the supervision data is uploaded, the time folder is generated, and the supervision data uploaded in this time period are stored in the time folder;
工作内容文件夹,用户终端在上传监理数据前,会标识好所上传的监理数据的所指代的具体工作内容,监理数据上传时,会在时间文件夹中自动生产工作内容文件夹,同一个工作内容的监理数据储存在同一个工作内容文件夹中;Work content folder. Before uploading the supervision data, the user terminal will identify the specific work content that the uploaded supervision data refers to. When the supervision data is uploaded, a work content folder will be automatically generated in the time folder. The supervision data of the work content is stored in the same work content folder;
数据类型文件夹,用户终端在上传监理数据前,会将不同的数据内容预先划分好,当数据上传完成后,不同的类型数据储存在相应的文件夹中。Data type folder. Before uploading supervision data, the user terminal will divide different data contents in advance. After the data upload is completed, different types of data will be stored in the corresponding folders.
进一步地,当用户终端处于联网状态下,云储存单元自动获取长期储存模块权限,将其内部储存的监理数据自动上传至云储存单元中。Further, when the user terminal is in a networked state, the cloud storage unit automatically obtains the long-term storage module authority, and automatically uploads the supervision data stored in the cloud storage unit to the cloud storage unit.
进一步地,所述数据库单元还包括校验模块,当数据库单元内部监理数据上传后,已上传的监理数据自动生成校验码,校验模块在设定的时间周期下,检测监理数据的校验码,当检测未存在校验码数据时,则提醒用户终端及时上传数据。Further, the database unit also includes a verification module, when the internal supervision data of the database unit is uploaded, the uploaded supervision data automatically generates a verification code, and the verification module detects the verification of the supervision data under the set time period. When it is detected that there is no check code data, the user terminal is reminded to upload the data in time.
进一步地,所述数据查阅单元包括检索模块、请求模块和下载模块,所述检索模块用于根据关键词检索数据库单元和云储存单元所储存的监理数据;所述请求模块用于发出和接受请求指令,并对请求指令进行处理;所述下载模块用于在获取监理数据查阅权限后,对监理数据进行下载。Further, the data reference unit includes a retrieval module, a request module and a download module, and the retrieval module is used to retrieve the supervision data stored in the database unit and the cloud storage unit according to keywords; the request module is used to issue and accept requests. The download module is used to download the supervision data after obtaining the supervision data viewing authority.
本发明的有益效果如下:The beneficial effects of the present invention are as follows:
1、本发明为工程监理相关人员提供了便利,首先整个项目工程中各个监理人员获取的监理数据可由数据库单元上传至云储存单元内,这样负责人员方便根据后台来查阅整个项目工程进度,与现有监理人员需要将数据单独整理好,再交由项目监理机构进行分类汇总相比,更加方便,可以及时了解到项目运行中遇到的问题和进度,方便及时应对处理。1. The present invention provides convenience for the relevant personnel of project supervision. First, the supervision data obtained by each supervisor in the entire project can be uploaded to the cloud storage unit by the database unit, so that the responsible personnel can easily check the progress of the entire project according to the background. There are supervisors who need to sort out the data separately, and then hand it over to the project supervision agency for classification and summarization.
附图说明Description of drawings
图1是本发明系统原理框图;Fig. 1 is the system principle block diagram of the present invention;
图2是本发明数据库单元框图;Fig. 2 is the database unit block diagram of the present invention;
图3是本发明数据查阅单元框图。Figure 3 is a block diagram of the data reference unit of the present invention.
具体实施方式Detailed ways
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be described clearly and completely below with reference to the accompanying drawings in the embodiments of the present invention.
如图1所示,本发明一个实施例提出的一种电力建设工程监理经验上传与查阅系统,包括:As shown in FIG. 1 , a system for uploading and reviewing power construction project supervision experience proposed by an embodiment of the present invention includes:
数据获取单元,用于获取监理数据,并对监理数据进行分类处理,其中数据获取单元由监理人进行操作,对监理人所负责的项目内容相关数据进行采集,然后由终端将这些数据整理后进行上传,且数据上传会对数据进行分类,分类好的数据便于相应的储存,以及后期查阅时方便进行检索查找;The data acquisition unit is used to acquire supervision data and classify and process the supervision data. The data acquisition unit is operated by the supervisor to collect the data related to the project content that the supervisor is responsible for, and then the terminal organizes these data for Uploading, and data uploading will classify the data, the classified data is convenient for corresponding storage, and it is convenient for retrieval and search in later reference;
数据库单元,与数据获取单元连接,用于储存数据获取单元获取的监理数据,数据库单元根据数据分类信息,将监理数据储存在相应的文件中,数据库单元用于保存监理人获取的监理数据,其中数据库单元为配置在终端上的储存器;The database unit, connected with the data acquisition unit, is used to store the supervision data acquired by the data acquisition unit. The database unit stores the supervision data in the corresponding files according to the data classification information, and the database unit is used to save the supervision data acquired by the supervisor, wherein The database unit is a storage configured on the terminal;
云储存单元,与数据库单元连接,数据库单元将储存的监理数据同步上传至云储存单元中,且每个数据库单元具有唯一的标识,同一个数据库单元的监理数据储存在同一个文件中,利用云技术可以将众多监理人员的数据库单元内部数据储存在云空间内,这样可以实现数据的汇总,相关技术人员在相互借鉴时,提供一个查阅平台,且也为后台监控项目进度容提供了方便;The cloud storage unit is connected to the database unit. The database unit uploads the stored supervision data to the cloud storage unit synchronously, and each database unit has a unique identifier. The supervision data of the same database unit is stored in the same file. The technology can store the internal data of the database units of many supervisors in the cloud space, so that the data can be aggregated. When the relevant technical personnel learn from each other, they can provide a viewing platform, and also provide convenience for background monitoring of the project progress;
数据查阅单元,与数据库单元连接,可查阅数据库单元储存的监理数据,或进入云储存单元,发出请求查阅指令,若请求通过,则可查阅其他数据库单元上传的监理数据,若请求不通过,则不可查阅其他数据库单元上传的监理数据,通过数据查阅单元可查阅别人和自己的已经储存的监理数据,且查阅别人数据时,需要获得别人的同意,保证了数据的保密性;The data reference unit is connected to the database unit, and can check the supervision data stored in the database unit, or enter the cloud storage unit, and issue a request for reference. It is not possible to consult the supervision data uploaded by other database units. Through the data review unit, you can review the stored supervision data of others and yourself. When reviewing other people's data, you need to obtain the consent of others, which ensures the confidentiality of the data;
本发明系统为工程监理相关人员提供了便利,首先整个项目工程中各个监理人员获取的监理数据可由数据库单元上传至云储存单元内,这样负责人员方便根据后台来查阅整个项目工程进度,与现有监理人员需要将数据单独整理好,再交由项目监理机构进行分类汇总相比,更加方便,可以及时了解到项目运行中遇到的问题和进度,方便及时应对处理;The system of the invention provides convenience for the relevant personnel of project supervision. First, the supervision data obtained by each supervisor in the entire project can be uploaded to the cloud storage unit from the database unit, so that the responsible personnel can easily check the progress of the entire project according to the background, which is consistent with the existing It is more convenient for the supervisors to sort out the data separately, and then hand it over to the project supervisory agency for classification and summarization. It is more convenient to know the problems and progress encountered in the operation of the project in time, and it is convenient to deal with them in a timely manner;
监理数据的时效性更高,获取的监理数据可以在整理好的第一时间内进行上传,这样可以获取最新的项目进展内容,可减少由于各个项目数据不充分,不能及时判断出下一步的项目进展,造成各个项目无法协同对接,从而造成项目进展不统一,而耽误整体项目进度的情况发生;The supervision data is more time-sensitive, and the obtained supervision data can be uploaded in the first time after sorting, so that the latest project progress content can be obtained, which can reduce the inability to judge the next project in time due to insufficient data of each project. progress, resulting in the inability of each project to be coordinated and docked, resulting in inconsistent project progress and delaying the overall project progress;
方便监理人员查阅自己已经上传的监理数据,现有监理人员获得的监理数据由于缺少系统性的分类和储存,造成在后期检索查阅时,经常出现找不到之前的数据情况,且还易造成数据丢失,若是数据忘记送至项目监理机构,严重时,会造成项目内容数据丢失,给项目进度工作带来影响,而应用不系统后,数据可以得到及时上传和备份,避免数据丢失,系统化的数据更方便检索查阅。It is convenient for supervisors to check the supervision data they have uploaded. Due to the lack of systematic classification and storage of the supervision data obtained by the existing supervisors, it is often impossible to find the previous data in the later search and review, and it is easy to cause data. If the data is lost, if the data is forgotten to be sent to the project supervision agency, in severe cases, the data of the project content will be lost, which will affect the progress of the project. After the application is not systematic, the data can be uploaded and backed up in time to avoid data loss. The data is easier to retrieve and consult.
在一些实施例中,所述数据获取单元获取的监理数据包括:In some embodiments, the supervision data obtained by the data obtaining unit includes:
文字数据,涉及监理工作中所处理的内容、注意事项、问题点、改进点、工作建议以及工作评断;Textual data, involving the content, precautions, problems, improvement points, work suggestions and work judgments handled in the supervision work;
图片数据,涉及监理工作中所拍摄的图片内容;Picture data, involving the content of pictures taken during the supervision work;
视频数据,涉及监理工作中所拍摄的视频内容;Video data, involving the video content captured in the supervision work;
数据获取单元获取数据的方式是由智能终端、电脑等设备实现的,图片数据和视频数据可由智能终端手机进行拍摄记录,而文字数据可由手机或电脑进行编辑,其中本系统具有程序,程序可下载在手机以及电脑上,数据由程序进行上传,且在编辑文字信息时,预设有特定的模板,在模板内的相应标签下,记录相关的数据内容,其中模板的标签内容可由监理人员自行修改;The way the data acquisition unit acquires data is realized by devices such as smart terminals, computers, etc. The picture data and video data can be photographed and recorded by the smart terminal mobile phone, while the text data can be edited by the mobile phone or computer. The system has a program, and the program can be downloaded On the mobile phone and computer, the data is uploaded by the program, and when editing text information, a specific template is preset, and the relevant data content is recorded under the corresponding label in the template. The label content of the template can be modified by the supervisors. ;
以图片数据为例,图片数据通过手机拍摄获取后,通过手机进入程序,然后进行数据上传,在数据上传时,会设定好图片数据分类信息内容,从而对图片数据保存上传,这样储存在数据库单元的图片数据是分类好的数据。Take the picture data as an example, after the picture data is captured by the mobile phone, enter the program through the mobile phone, and then upload the data. When uploading the data, the content of the picture data classification information will be set, so as to save and upload the picture data, so that it is stored in the database. The image data of the unit is classified data.
在一些实施例中,所述数据获取单元对监理数据分类方法包括:In some embodiments, the method for classifying supervision data by the data acquisition unit includes:
根据职责分工划分第一分类模块;Divide the first classification module according to the division of responsibilities;
根据工作内容划分第二分类模块;Divide the second classification module according to the work content;
根据数据内容划分第三分类模块;Divide the third classification module according to the data content;
在第一分类模块、第二分类模块以及第三分类模块的配合下,上传至数据库单元属于已经分类好的,其中监理人员所负责的项目不同,因此第一分类模块是根据其职责分工进行划分,且同一个项目中,存在不同环节的工作内容,因此根据整个环节内容划分为第二分类模块,且根据的不同的数据类型划分第三分类模块,以负责浇筑混凝土基座的项目监理人为例,其项目为浇筑混凝土基座,其上传的是浇筑混凝土基座中混凝土浇筑环节,上传的数据有文字数据、图片数据和视频数据,正好对应第一分类模块、第二分类模块和第三分类,这样的设定的好处时,整个项目内容环环相扣,数据有序性程度高,方便后期查阅以及全面了解项目进展内容。With the cooperation of the first classification module, the second classification module and the third classification module, the uploading to the database unit belongs to the already classified, and the projects in charge of the supervisors are different, so the first classification module is divided according to its responsibilities. , and in the same project, there are work contents of different links, so it is divided into the second classification module according to the content of the whole link, and the third classification module is divided according to the different data types, taking the project supervisor responsible for pouring the concrete foundation as an example , its project is pouring concrete base, and it uploads the concrete pouring link in the pouring concrete base. The uploaded data includes text data, picture data and video data, which correspond to the first classification module, the second classification module and the third classification module. , the benefits of such a setting are that the content of the entire project is interlinked, and the data is highly ordered, which is convenient for later review and a comprehensive understanding of the progress of the project.
在一些实施例中,还包括权限单元,其为用户终端配置查阅和上传权限,并提供身份验证以及数据加密和解密处理;其中,In some embodiments, an authority unit is also included, which configures viewing and uploading authority for the user terminal, and provides authentication and data encryption and decryption processing; wherein,
权限高的用户终端可直接查阅权限低的用户终端的监理数据,同级别的用户终端无法相互查阅;User terminals with high authority can directly check the supervision data of user terminals with low authority, and user terminals at the same level cannot check each other;
用户终端进入数据库单元和云储存单元时,均需要进行身份验证;When the user terminal enters the database unit and the cloud storage unit, authentication is required;
用户终端上传或下载监理数据过程中,数据经过加密处理;When the user terminal uploads or downloads supervision data, the data is encrypted;
为保证对数据的防护,用户终端在进入程序时,需要进行身份验证,校验身份合格后,才可以使用程序完成数据的上传以及查阅工作,且在应用是,后台给总负责人以及分负责人配置权限,这样方便查阅其所属人员的项目进度内容,但是同级别的人员无法直接查阅,必须经过被查阅人员同意或获得后台给予的权限,这样提高了数据的保密性,且数据的上传或下载均通过程序进行,因此通过程序查看数据时,由程序对数据进行解密,从而可以了解数据内容,且登入程序需要进行身份验证,因此实现了数据的保密,而通过非程序查看数据时,由于数据得到加密,无法了解到数据内容。In order to ensure the protection of data, the user terminal needs to perform identity verification when entering the program. After the identity verification is qualified, the program can be used to complete the uploading and viewing of data, and in the application, the background is given to the general person in charge and the sub-responsible. It is convenient to check the project progress content of the personnel to which they belong, but the personnel at the same level cannot directly check, and must obtain the consent of the person being checked or the authority given by the background, which improves the confidentiality of the data, and the uploading or The download is performed through the program, so when viewing the data through the program, the program decrypts the data, so that the content of the data can be understood, and the login program needs to be authenticated, so the confidentiality of the data is realized. The data is encrypted and the content of the data cannot be understood.
在一些实施例中,所述数据库单元包括临时储存模块和长期储存模块;临时储存模块用于储存未上传至长期储存模块的监理数据,当监理数据完成上传后,临时储存模块自动删除上传后的监理数据,临时储存模块中,监理数据可进行修改或删除;长期储存模块用于储存监理获取模块获取的全部监理数据,且监理数据由临时储存模块上传至长期储存模块后,监理数据无法进行修改或删除工作;为给监理人员提供便利,数据首先存储在临时储存模块中,数据经过编辑确认后,在传输至长期储存模块内,避免数据直接储存后无法修改,且确认后存储在长期储存模块内部的数据无法在进行修改,避免后期篡改数据造假。In some embodiments, the database unit includes a temporary storage module and a long-term storage module; the temporary storage module is used to store supervision data that has not been uploaded to the long-term storage module, and after the supervision data is uploaded, the temporary storage module automatically deletes the uploaded data. Supervision data, in the temporary storage module, the supervision data can be modified or deleted; the long-term storage module is used to store all supervision data acquired by the supervision acquisition module, and the supervision data cannot be modified after the supervision data is uploaded from the temporary storage module to the long-term storage module. or delete work; in order to provide convenience for supervisors, the data is first stored in the temporary storage module, and after the data has been edited and confirmed, it is transmitted to the long-term storage module, so as to prevent the data from being directly stored and cannot be modified, and it is stored in the long-term storage module after confirmation. The internal data cannot be modified in the future to avoid tampering with data fraud in the later stage.
在一些实施例中,所述长期储存模块中,预设的分类信息根据等级顺序划分依次包括:In some embodiments, in the long-term storage module, the preset classification information sequentially includes:
职责文件夹,根据监理人员的具体工作职责进行确定;Responsibilities folder, determined according to the specific job responsibilities of supervisors;
时间文件夹,在职责文件夹下,根据监理数据上传的时间点,生成时间文件夹,该时间段上传的监理数据均储存在该时间文件夹内;Time folder, under the responsibility folder, according to the time point when the supervision data is uploaded, the time folder is generated, and the supervision data uploaded in this time period are stored in the time folder;
工作内容文件夹,用户终端在上传监理数据前,会标识好所上传的监理数据的所指代的具体工作内容,监理数据上传时,会在时间文件夹中自动生产工作内容文件夹,同一个工作内容的监理数据储存在同一个工作内容文件夹中;Work content folder. Before uploading the supervision data, the user terminal will identify the specific work content that the uploaded supervision data refers to. When the supervision data is uploaded, a work content folder will be automatically generated in the time folder. The supervision data of the work content is stored in the same work content folder;
数据类型文件夹,用户终端在上传监理数据前,会将不同的数据内容预先划分好,当数据上传完成后,不同的类型数据储存在相应的文件夹中;Data type folder. Before uploading supervision data, the user terminal will divide different data contents in advance. After the data upload is completed, different types of data will be stored in the corresponding folders;
存储在长期数据模块内部的数据得到了有效的分类储存,方便进行检索查阅。The data stored in the long-term data module has been effectively classified and stored, which is convenient for retrieval and reference.
在一些实施例中,为保证数据可以及时长传至云储存单元,当用户终端处于联网状态下,云储存单元自动获取长期储存模块权限,将其内部储存的监理数据自动上传至云储存单元中,保证数据的时效性。In some embodiments, in order to ensure that data can be transmitted to the cloud storage unit in a timely manner, when the user terminal is connected to the Internet, the cloud storage unit automatically obtains the permission of the long-term storage module, and automatically uploads the supervision data stored in the cloud storage unit to the cloud storage unit. , to ensure the timeliness of the data.
在一些实施例中,所述数据库单元还包括校验模块,当数据库单元内部监理数据上传后,已上传的监理数据自动生成校验码,校验模块在设定的时间周期下,检测监理数据的校验码,当检测未存在校验码数据时,则提醒用户终端及时上传数据。In some embodiments, the database unit further includes a verification module. After the internal supervision data of the database unit is uploaded, the uploaded supervision data automatically generates a verification code, and the verification module detects the supervision data within a set time period. If there is no check code data, the user terminal will be reminded to upload the data in time.
在一些实施例中,所述数据查阅单元包括检索模块、请求模块和下载模块,所述检索模块用于根据关键词检索数据库单元和云储存单元所储存的监理数据;所述请求模块用于发出和接受请求指令,并对请求指令进行处理;所述下载模块用于在获取监理数据查阅权限后,对监理数据进行下载。In some embodiments, the data review unit includes a retrieval module, a request module and a download module, the retrieval module is used to retrieve the supervision data stored in the database unit and the cloud storage unit according to keywords; the request module is used to send and accept the request instruction, and process the request instruction; the download module is used to download the supervision data after obtaining the supervision data viewing authority.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210450261.8A CN115033640A (en) | 2022-04-26 | 2022-04-26 | Electric power construction engineering supervision experience uploading and consulting system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210450261.8A CN115033640A (en) | 2022-04-26 | 2022-04-26 | Electric power construction engineering supervision experience uploading and consulting system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115033640A true CN115033640A (en) | 2022-09-09 |
Family
ID=83118870
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210450261.8A Pending CN115033640A (en) | 2022-04-26 | 2022-04-26 | Electric power construction engineering supervision experience uploading and consulting system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115033640A (en) |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005135296A (en) * | 2003-10-31 | 2005-05-26 | Nec Corp | Attendance management system, method, and program |
| KR101675034B1 (en) * | 2016-03-07 | 2016-11-11 | 주식회사 씨엠엑스건축사사무소 | Method, appratus and computer-readable recording medium for supporting real-time construction supervision |
| CN108846772A (en) * | 2018-06-26 | 2018-11-20 | 南通森雅商务服务有限公司 | Project supervision, cost, the total management system of bid, consulting |
| CN108921488A (en) * | 2018-05-03 | 2018-11-30 | 北京水规院京华工程管理有限公司 | Marine traffic engineering manages platform |
| CN110648065A (en) * | 2019-09-23 | 2020-01-03 | 盘锦检验检测中心 | Data management platform of inspection and quarantine equipment |
| KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
| CN111737195A (en) * | 2019-09-24 | 2020-10-02 | 安徽理工大学 | A Document Storage System for Project Management |
| CN112749401A (en) * | 2020-12-31 | 2021-05-04 | 河南华北水电工程监理有限公司 | Supervision work management method, system, computer device and storage medium |
| CN112990746A (en) * | 2021-04-01 | 2021-06-18 | 青海省育才工程技术咨询有限公司 | Cloud platform intelligent management system of inspection and detection mechanism |
| CN113593676A (en) * | 2021-07-14 | 2021-11-02 | 山东第一医科大学附属肿瘤医院(山东省肿瘤防治研究院、山东省肿瘤医院) | Medical image data storage system |
| CN113780841A (en) * | 2021-09-15 | 2021-12-10 | 铁科院(北京)工程咨询有限公司 | Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set |
| US20220019595A1 (en) * | 2020-07-17 | 2022-01-20 | Chicony Power Technology Co., Ltd. | Integrated intelligent building management system and management method thereof |
-
2022
- 2022-04-26 CN CN202210450261.8A patent/CN115033640A/en active Pending
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005135296A (en) * | 2003-10-31 | 2005-05-26 | Nec Corp | Attendance management system, method, and program |
| KR101675034B1 (en) * | 2016-03-07 | 2016-11-11 | 주식회사 씨엠엑스건축사사무소 | Method, appratus and computer-readable recording medium for supporting real-time construction supervision |
| CN108921488A (en) * | 2018-05-03 | 2018-11-30 | 北京水规院京华工程管理有限公司 | Marine traffic engineering manages platform |
| CN108846772A (en) * | 2018-06-26 | 2018-11-20 | 南通森雅商务服务有限公司 | Project supervision, cost, the total management system of bid, consulting |
| KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
| CN110648065A (en) * | 2019-09-23 | 2020-01-03 | 盘锦检验检测中心 | Data management platform of inspection and quarantine equipment |
| CN111737195A (en) * | 2019-09-24 | 2020-10-02 | 安徽理工大学 | A Document Storage System for Project Management |
| US20220019595A1 (en) * | 2020-07-17 | 2022-01-20 | Chicony Power Technology Co., Ltd. | Integrated intelligent building management system and management method thereof |
| CN112749401A (en) * | 2020-12-31 | 2021-05-04 | 河南华北水电工程监理有限公司 | Supervision work management method, system, computer device and storage medium |
| CN112990746A (en) * | 2021-04-01 | 2021-06-18 | 青海省育才工程技术咨询有限公司 | Cloud platform intelligent management system of inspection and detection mechanism |
| CN113593676A (en) * | 2021-07-14 | 2021-11-02 | 山东第一医科大学附属肿瘤医院(山东省肿瘤防治研究院、山东省肿瘤医院) | Medical image data storage system |
| CN113780841A (en) * | 2021-09-15 | 2021-12-10 | 铁科院(北京)工程咨询有限公司 | Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set |
Non-Patent Citations (2)
| Title |
|---|
| 吴丛煊;: ""云存储"提升监理资料信息化管理水平", 设备监理, no. 04 * |
| 陈崇成;林剑峰;吴小竹;巫建伟;连惠群;: "基于NoSQL的海量空间数据云存储与服务方法", 地球信息科学学报, no. 02 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108647311B (en) | Electronic processing system and method for engineering construction management process file | |
| US8156092B2 (en) | Document de-duplication and modification detection | |
| US11513812B2 (en) | Targeted data extraction system and method | |
| US20180144426A1 (en) | Digital evidence management | |
| CN114218467B (en) | Digital archive management method and system | |
| CN104239041B (en) | A kind of method and apparatus generating processing scheme and configuration | |
| CN112583918B (en) | Intranet and extranet document interaction system, method and storage medium | |
| CN114416638A (en) | Automatic electronic file filing method and system | |
| CN117453982B (en) | File management file classification system | |
| CN105049798A (en) | Policeman law enforcement audio and video recording system and recording method | |
| CN110866224A (en) | Picture right determining method and system based on block chain | |
| CN111104680A (en) | A safe and intelligent experimental data management system and method | |
| CN109190390A (en) | The screenshotss evidence collecting method and device of website sensitive information behavior are pasted in a kind of pair of duplication | |
| KR102040772B1 (en) | Data management method for consulting project relation to registering items on public procurement service | |
| CN112395476A (en) | Engineering data management method | |
| US12158951B2 (en) | System and method for generating a minimal forensic image of a dataset of interest | |
| JP2004229070A (en) | File classification device, file classification program, digital camera, and file classification system | |
| CN115033640A (en) | Electric power construction engineering supervision experience uploading and consulting system | |
| CN111309689A (en) | File duplicate checking method and device | |
| CN118885441A (en) | A digital management method and system based on enterprise archives | |
| CN209401021U (en) | An Electronic Evidence Fixing System | |
| JP2017199095A (en) | Mold electronic medical record system | |
| CN108984415A (en) | A kind of product use-case persistence maintenance system and management method | |
| CN115082021A (en) | A system and management method for realizing consent of personal information subject | |
| CN106778920A (en) | A kind of power transmission lines overhauling equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220909 |