CN103726875A - Method for remote filling of explosion-proof compression-resistant closing of coal mine - Google Patents

Method for remote filling of explosion-proof compression-resistant closing of coal mine Download PDF

Info

Publication number
CN103726875A
CN103726875A CN201410020093.4A CN201410020093A CN103726875A CN 103726875 A CN103726875 A CN 103726875A CN 201410020093 A CN201410020093 A CN 201410020093A CN 103726875 A CN103726875 A CN 103726875A
Authority
CN
China
Prior art keywords
airtight
explosion
closed
roadway
proof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410020093.4A
Other languages
Chinese (zh)
Inventor
马汉鹏
钟膨蓬
戴正烈
李华炜
李其中
商振
陈亮
张虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Institute of Science and Technology
Original Assignee
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Institute of Science and Technology filed Critical North China Institute of Science and Technology
Priority to CN201410020093.4A priority Critical patent/CN103726875A/en
Publication of CN103726875A publication Critical patent/CN103726875A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sealing Material Composition (AREA)

Abstract

本发明涉及一种煤矿防爆抗压密闭的远程填充方法,其包括以下步骤:1)在发生火灾的密闭段巷道内两侧各堆砌一个密闭墙;2)在远离火区一侧的密闭墙和巷道侧壁之间设置若干导管,导管一端进入两个密闭墙之间的巷道内,另一端连接直通矿井外部的输送管路;3)向设置于矿井外部的输送管路内注入填充材料,填充材料经由导管流入巷道内,填充材料固化后填充并密闭两个密闭墙之间的巷道。采用此种方法可以有效保障密闭工作人员生命安全。采用流动性强的泡沫水泥作为填充材料,可以渗透到密闭空间的各个缝隙,使得完成后的密闭墙具有不易漏风的优点。泡沫水泥既抗爆能力强又抗压能力强,因此,密闭墙无需砌的很厚,有效减少密闭工程量和密封时间,又便于抵抗密闭空间内周边巷道变形。本发明可以广泛用于矿山井下密闭填充领域。

Figure 201410020093

The invention relates to a remote filling method for explosion-proof and pressure-resistant airtightness of coal mines, which comprises the following steps: 1) building an airtight wall on both sides of the airtight section roadway where a fire occurs; A number of conduits are set between the side walls of the tunnel. One end of the conduit enters the tunnel between the two closed walls, and the other end is connected to the conveying pipeline directly outside the mine; 3) Filling material is injected into the conveying pipeline arranged outside the mine, filling The material flows into the roadway through the conduit, and the filling material solidifies and fills and seals the roadway between the two closed walls. This method can effectively guarantee the life safety of airtight workers. The foam cement with strong fluidity is used as the filling material, which can penetrate into every gap in the closed space, so that the closed wall after completion has the advantage of not being easy to leak air. Foamed cement has strong anti-explosion ability and strong anti-compression ability. Therefore, the airtight wall does not need to be very thick, which effectively reduces the amount of airtight engineering and sealing time, and is convenient for resisting the deformation of the surrounding roadways in the airtight space. The invention can be widely used in the field of closed filling in underground mines.

Figure 201410020093

Description

The long-range fill method that a kind of coal mine explosion-proof resistance to compression is airtight
Technical field
The present invention relates to a kind of mine explosion-proof resistance to compression sealing method, particularly about the airtight long-range fill method of a kind of coal mine explosion-proof resistance to compression.
Background technology
Aspect the antiknock ability of enhancing fire dam, the measure of mainly taking is at present the thickness that increases twice fire dam, and what airtight body of wall was mostly used is the materials such as brick, concrete, clay, lime, cement, sand, rubble and rubble, these ways can cause airtight engineering quantity large, build the drawbacks such as the time of building is long.And for the constructor of fire dam, fire enclosure is an extremely dangerous process, the high risk factors such as gas, coal dust are threatening their life security constantly.The thickness that adopt to increase fire dam strengthens the fire dam that the antiknock ability of fire dam builds up, and airtight performance is poor, a little less than antiknock, impact resistance, is difficult to effectively stop air leakage phenomena, has greatly increased the management difficulty in goaf.Therefore, be necessary to propose a kind of antiknock ability of fire dam but also sealing method of good leak tightness of not only having increased.
Summary of the invention
For the problems referred to above, the object of this invention is to provide the airtight long-range fill method of a kind of coal mine explosion-proof resistance to compression.
For achieving the above object, the present invention takes following technical scheme: the long-range fill method that a kind of coal mine explosion-proof resistance to compression is airtight, and it comprises the following steps: 1) in airtight section of tunnel of breaking out of fire, a fire dam is respectively piled up in both sides; 2) between the fire dam away from flame range one side and tunnel sidewall, some conduits are set, conduit one end enters in two tunnels between fire dam, and the other end connects the transfer pipeline of straight-through mine outside; 3) to being arranged in the transfer pipeline of mine outside, inject packing material, packing material flows in tunnel via conduit, after packing material solidifies, fill and airtight two fire dams between tunnel.
On two described fire dams from top to bottom successively respectively correspondence offer a measure hole, a peep hole and a spilled water hole, and described spilled water hole is arranged at described fire dam bottom; On two described fire dams, between corresponding two described measure holes, two described peep holes and two described spilled water holes, all adopt pipe to be communicated with.
Described conduit is two, and described conduit adopts the floral tube that diameter is 108mm, and on described floral tube, the diameter of aperture is 10mm.
Described packing material is foamed cement.
The present invention is owing to taking above technical scheme, it has the following advantages: 1, the present invention adopts and insert conduit between two fire dams, conduit is connected in the transfer pipeline of mine outside, therefore in transfer pipeline, add packing material, packing material can flow into the confined space between two fire dams and tunnel, realize long-range filling airtight, adopt this kind of method can the airtight staff's life security of effective guarantee.2, in the present invention, conduit adopts floral tube, and the hole on floral tube contributes to packing material flow out fast and be filled in confined space uniformly.3, the present invention adopts foamed cement as packing material, and foamed cement mobility is strong, can be penetrated into each gap of confined space, and the fire dam after therefore completing has advantages of and is difficult for leaking out.Due to, foamed cement antiknock ability is strong, therefore very thick without what fire dam was built, reduce greatly airtight engineering quantity and sealing time, and foamed cement anti-pressure ability is convenient to by force resist the roadway deformation of confined space inner rim.The present invention can be widely used in the airtight padding field of mine down-hole.
Accompanying drawing explanation
Fig. 1 is conduit scheme of installation of the present invention
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is described in detail.
As shown in Figure 1, the airtight long-range fill method of coal mine explosion-proof resistance to compression provided by the invention comprises following content:
1) in the tunnel for breaking out of fire, a fire dam 1 is respectively piled up in 100 both sides, tunnel airtight section of needs, on two fire dams 1 from top to bottom successively respectively correspondence offer a measure hole 2, a peep hole 3 and a spilled water hole 4, and spilled water hole 4 is arranged at fire dam 1 bottom;
2) all adopt pipe to be communicated with two measure holes corresponding on two fire dams 12, two peep holes 3 and two spilled water holes 4;
3) between the fire dam 1 away from flame range one side and tunnel 100 sidewalls, some conduits 5 are set, conduit 5 one end enter in two tunnels 100 between fire dam 1, and the other end connects the transfer pipeline (not shown) of straight-through mine outside;
4) to being arranged in the transfer pipeline of mine outside, inject packing material, packing material flows in tunnels 100 via conduit 5, and packing material solidifies at short notice, fills and airtight this section of tunnel 100.Adopt that this kind of mode is long-range to be realized airtightly, can effectively strengthen antiknock ability and the sealing ability of fire dam 1.
In above-described embodiment, the measure hole 2 of offering on fire dam 1, peep hole 3 and spilled water hole 4 are the operative norm of piling up fire dam 1 under mine, therefore no longer describe in detail.
In above-described embodiment, conduit 5 is preferably two, and conduit 5 employing floral tubes, and the diameter of floral tube is preferably 108mm, and on floral tube, the diameter of aperture is preferably 10mm.
In above-described embodiment, packing material is preferably foamed cement.
The various embodiments described above are only for illustrating the present invention; wherein the structure of each parts, connected mode and manufacture craft etc. all can change to some extent; every equivalents of carrying out on the basis of technical solution of the present invention and improvement, all should not get rid of outside protection scope of the present invention.

Claims (5)

1.一种煤矿防爆抗压密闭的远程填充方法,其包括以下步骤:1. A remote filling method of explosion-proof and pressure-resistant airtight coal mine, which comprises the following steps: 1)在发生火灾的密闭段巷道内两侧各堆砌一个密闭墙;1) Build a closed wall on both sides of the closed roadway where the fire occurs; 2)在远离火区一侧的密闭墙和巷道侧壁之间设置若干导管,导管一端进入两个密闭墙之间的巷道内,另一端连接直通矿井外部的输送管路;2) Set several conduits between the closed wall on the side away from the fire zone and the side wall of the roadway. One end of the conduit enters the roadway between the two closed walls, and the other end is connected to the conveying pipeline directly outside the mine; 3)向设置于矿井外部的输送管路内注入填充材料,填充材料经由导管流入巷道内,填充材料固化后填充并密闭两个密闭墙之间的巷道。3) Filling material is injected into the conveying pipeline installed outside the mine, the filling material flows into the roadway through the conduit, and the filling material solidifies and fills and seals the roadway between the two closed walls. 2.如权利要求1所述的一种煤矿防爆抗压密闭的远程填充方法,其特征在于:两个所述密闭墙上从上至下依次分别对应开设一措施孔、一观察孔和一泄水孔,且所述泄水孔设置于所述密闭墙底部;两个所述密闭墙上相对应的两个所述措施孔、两个所述观察孔和两个所述泄水孔之间均采用圆管进行连通。2. The remote filling method for explosion-proof and pressure-resistant airtightness of coal mines as claimed in claim 1, characterized in that: a measure hole, an observation hole and a leaking hole are correspondingly opened on the two airtight walls from top to bottom. water hole, and the drain hole is arranged at the bottom of the airtight wall; between the two corresponding measure holes, the two observation holes and the two drain holes on the two airtight walls They are all connected by round pipes. 3.如权利要求1所述的一种煤矿防爆抗压密闭的远程填充方法,其特征在于:所述导管为两个,所述导管采用直径为108mm的花管,所述花管上小孔的直径为10mm。3. A remote filling method for explosion-proof, pressure-resistant and airtight coal mines as claimed in claim 1, characterized in that: there are two conduits, and the conduits are flower tubes with a diameter of 108mm, and the small holes on the flower tubes are The diameter is 10mm. 4.如权利要求2所述的一种煤矿防爆抗压密闭的远程填充方法,其特征在于:所述导管为两个,所述导管采用直径为108mm的花管,所述花管上小孔的直径为10mm。4. A remote filling method for explosion-proof, pressure-resistant and airtight coal mines as claimed in claim 2, characterized in that: there are two conduits, and the conduits use flower tubes with a diameter of 108mm, and the small holes on the flower tubes The diameter is 10mm. 5.如权利要求1或2或3或4所述的一种煤矿防爆抗压密闭的远程填充方法,其特征在于:所述填充材料为泡沫水泥。5. A remote filling method for explosion-proof, pressure-resistant and airtight coal mines as claimed in claim 1 or 2 or 3 or 4, characterized in that: said filling material is foamed cement.
CN201410020093.4A 2014-01-16 2014-01-16 Method for remote filling of explosion-proof compression-resistant closing of coal mine Pending CN103726875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410020093.4A CN103726875A (en) 2014-01-16 2014-01-16 Method for remote filling of explosion-proof compression-resistant closing of coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410020093.4A CN103726875A (en) 2014-01-16 2014-01-16 Method for remote filling of explosion-proof compression-resistant closing of coal mine

Publications (1)

Publication Number Publication Date
CN103726875A true CN103726875A (en) 2014-04-16

Family

ID=50451142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410020093.4A Pending CN103726875A (en) 2014-01-16 2014-01-16 Method for remote filling of explosion-proof compression-resistant closing of coal mine

Country Status (1)

Country Link
CN (1) CN103726875A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179527A (en) * 2014-05-13 2014-12-03 中国神华能源股份有限公司 Coal mine connection roadway and sealing method thereof
WO2018121107A1 (en) * 2016-12-28 2018-07-05 中国矿业大学 Mine anti-explosion trapezoidal sealing wall and construction method therefor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1947817A (en) * 2006-11-22 2007-04-18 杜志刚 Method for explosion suppression and fire-extinguishing during catching fire in working face of high gas coal mine
CN201232572Y (en) * 2008-07-14 2009-05-06 义马煤业(集团)有限责任公司 Coal mine tunnel goaf fire wall
CN101476476A (en) * 2008-11-24 2009-07-08 杜志刚 Extinguishing method for chief wind road on fire
CN102518472A (en) * 2011-12-31 2012-06-27 大同煤矿集团有限责任公司 Mine goaf closing method
CN202745940U (en) * 2012-08-24 2013-02-20 淮南矿业(集团)有限责任公司 Enclosing construction for gob

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1947817A (en) * 2006-11-22 2007-04-18 杜志刚 Method for explosion suppression and fire-extinguishing during catching fire in working face of high gas coal mine
CN201232572Y (en) * 2008-07-14 2009-05-06 义马煤业(集团)有限责任公司 Coal mine tunnel goaf fire wall
CN101476476A (en) * 2008-11-24 2009-07-08 杜志刚 Extinguishing method for chief wind road on fire
CN102518472A (en) * 2011-12-31 2012-06-27 大同煤矿集团有限责任公司 Mine goaf closing method
CN202745940U (en) * 2012-08-24 2013-02-20 淮南矿业(集团)有限责任公司 Enclosing construction for gob

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179527A (en) * 2014-05-13 2014-12-03 中国神华能源股份有限公司 Coal mine connection roadway and sealing method thereof
WO2018121107A1 (en) * 2016-12-28 2018-07-05 中国矿业大学 Mine anti-explosion trapezoidal sealing wall and construction method therefor

Similar Documents

Publication Publication Date Title
CN110017167B (en) Coal mine explosion-proof sealing wall and construction method thereof
CN102140901B (en) High pressure resistant drilled hole sealing method
CN105064412B (en) Gasbag-type open trench tunnel movement joint sealing structure
CN102900396A (en) Method for integrally sealing and separating gas extraction drilled hole in coal seam
CN103075128A (en) Method for sealing gas extraction drill holes
CN104213932A (en) Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method
CN104563958A (en) Hole sealing device
CN108104865B (en) A kind of layer drilling method for air leakage prevention and gas extraction
CN105781549A (en) Device and method for blasting rock by combining external air pressure and internal water bags
CN102071898A (en) Self-formed baffle and reaction type foam hole sealing device thereof
CN216240675U (en) Sectional type tunnel sealing grouting device
CN104533522A (en) Rapid safe construction method and device for bag poured airtight wall and anti-explosion wall
CN105525928B (en) Construction method of shield inclined shaft segment wall rear plugging ring
CN110805471A (en) A kind of seal for renovating abandoned coal mine roadway into oil depot chamber and its construction method
CN103726875A (en) Method for remote filling of explosion-proof compression-resistant closing of coal mine
CN103743304B (en) Demolition set
CN104612625B (en) A kind of hole sealing device for hypotonic coal seam gas phase fracturing borehole
CN103967444A (en) Gas extraction hole drilling hole sealing technology in manner of two-end self-blocking and under pressure
CN103362548B (en) Provisions for grouting
CN203430466U (en) Drill hole sealing device for gas extraction of coal mine
CN201934051U (en) Self-forming baffle and reactive foam sealing device thereof
CN110005421A (en) Sandy soil layer shield driven Metro tunnel originates portal sealing device and encapsulating method
CN107905762A (en) A kind of solid powder band pressure grouting dynamic seal hole method
CN111456810A (en) Coal mine underground sealing wall and construction method thereof
CN101476336B (en) Method for plugging deeply buried underground water-permeable channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination