[go: up one dir, main page]

CN103222142B - The framework of cable guide system and the sleeve pipe for this framework - Google Patents

The framework of cable guide system and the sleeve pipe for this framework Download PDF

Info

Publication number
CN103222142B
CN103222142B CN201180043690.3A CN201180043690A CN103222142B CN 103222142 B CN103222142 B CN 103222142B CN 201180043690 A CN201180043690 A CN 201180043690A CN 103222142 B CN103222142 B CN 103222142B
Authority
CN
China
Prior art keywords
framework
sleeve pipe
jockey
batten
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201180043690.3A
Other languages
Chinese (zh)
Other versions
CN103222142A (en
Inventor
丹尼斯·斯波兰格尔
托尔斯腾·迪耶贝尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Phoenix Contact GmbH and Co KG
Original Assignee
Phoenix Contact GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Phoenix Contact GmbH and Co KG filed Critical Phoenix Contact GmbH and Co KG
Publication of CN103222142A publication Critical patent/CN103222142A/en
Application granted granted Critical
Publication of CN103222142B publication Critical patent/CN103222142B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/22Installations of cables or lines through walls, floors or ceilings, e.g. into buildings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/007Devices for relieving mechanical stress
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/08Distribution boxes; Connection or junction boxes
    • H02G3/081Bases, casings or covers
    • H02G3/083Inlets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Insulating Bodies (AREA)
  • Details Of Indoor Wiring (AREA)

Abstract

The present invention relates to the framework (1,1a, 1b) of cable guide system.Framework for receiving multiple sleeve pipe (20,120,220), and comprises at least one batten (2,12), and batten has certain distance relative to framework and lower than adjacent framework.Batten (2,12) is provided with jockey (3,3 ', 3 "), and it is suitable for the corresponding jockey mating member (23,123,223) received, and jockey mating member is arranged on sleeve pipe (20,120,220).Jockey (3,3 ', 3 ") be arranged such that sleeve pipe is in fact only arranged in framework along the direction perpendicular to framework.The invention still further relates to the sleeve pipe (20,120,220) for cable guide system.Sleeve pipe to be received in framework and to comprise main body, and in main body, be provided with through hole (21,121,221), through hole is vertically arranged on from upside to downside in main body to receive cable.Sleeve pipe comprises at least one batten (22,122,132,222,232,322), and it has certain distance relative to main body and lower than adjacent main body.Batten is provided with jockey (23,123,223), and it is arranged such that jockey is suitable for receiving corresponding jockey mating member (3,3 ', 3 "), and jockey mating member is arranged on framework.Jockey (23,123,223) is arranged such that sleeve pipe in fact only along being arranged in framework perpendicular to the direction of framework, for each sleeve pipe to be installed, batten (2,12) is provided with at least two jockeys (3,3 ', 3 ").

Description

The framework of cable guide system and the sleeve pipe for this framework
Technical field
The present invention relates to the framework of cable guide system and corresponding sleeve pipe.
Background technology
Sleeve pipe and framework are known in the prior art, but it easily causes the operation of mistake and is not easy to install.
An example of this situation is the sleeve pipe in EP1236256.In this example, without any exception, all sleeve pipes must be installed before installation frame.And its another defect is the flexible arrangement that rib prevents the sleeve pipe with different-diameter.Also have defect to be that the maintenance work of framework is more difficult, all need to dismantle framework because even change a sleeve pipe.
For other sleeve pipe and the frame system of prior art, these defects are also known (individualism or in combination existence).
Therefore, the object of this invention is to provide a kind of framework of cable guide system and the sleeve pipe for this framework, thus overcome the one or more shortcomings learnt from prior art in an innovative way.
Summary of the invention
This object is realized by a kind of framework of cable guide system, and wherein this framework is set to receive multiple sleeve pipe.Framework comprises at least one batten, batten become stepped relative to framework and the height of batten lower than the height of adjacent framework.Batten is provided with jockey, and jockey is suitable for receiving the corresponding jockey mating member be arranged on sleeve pipe.For this reason, jockey is provided so that jockey allows in fact sleeve pipe to be only arranged in framework along the direction vertical relative to framework, wherein, for each sleeve pipe to be installed, batten is provided with at least two jockeys.
In another embodiment of the invention, from the first jockey, on batten, directly the contiguous first jockey distance of adjacent second jockey of arranging and the second jockey are not corresponding to the distance of being directly close on batten between the 3rd jockey that the second jockey arranges.
In another embodiment of the invention, framework comprises two battens, and two battens become stepped relative to framework, and two battens are arranged on opposite sides of the frame.
In another embodiment of the invention, wherein jockey is projection.
In another embodiment of the invention, jockey is cylindrical or conical butt.
In another embodiment of the invention, framework can be plugged together by multiple branch and form.
In another embodiment of the invention, framework is made up of plastic material or metal.
In another embodiment of the invention, framework comprises fastener, and fastener is arranged on housing.
In another embodiment of the invention, framework comprises one or more base, and one or more base is for holding the corresponding projection be arranged on sleeve pipe.
In another embodiment of the invention, framework comprises one or more opening, and one or more opening is suitable for receiving stable element and corresponding with the depressed part of the edge of sleeve pipe to be accepted.
Object of the present invention is also by receiving the sleeve pipe of cable guide system in the frame to realize, its middle sleeve comprises main body, main body is provided with through hole, through hole is vertically arranged in main body from upper surface to lower surface to receive cable, sleeve pipe comprises at least one batten, at least one batten laterally becomes stepped relative to main body, and the height of at least one batten is lower than the height of adjacent main body, batten is provided with jockey, jockey is arranged such that jockey is suitable for receiving the corresponding jockey mating member be arranged on framework, jockey is also arranged to and makes it allow in fact sleeve pipe to be only arranged in framework along the direction vertical relative to framework, batten is provided with at least two jockeys.
In another embodiment of the present invention, the side contrary with being provided with batten of main body comprises bracing or strutting arrangement, and bracing or strutting arrangement can be bonded in the sleeve pipe be equal to of reversed arrangement horizontal with bracing or strutting arrangement.
In another embodiment of the invention, sleeve pipe comprises two battens, and batten becomes stepped relative to main body, and batten is arranged on the opposite side of main body.
In another embodiment of the invention, jockey is depressed part.
In another embodiment of the invention, jockey is cylindrical or frusto-conical recess portion.
In another embodiment of the present invention, sleeve pipe comprises groove, makes cable more easily to enter in the through hole of main body.
In another embodiment of the invention, groove comprises step.
In another embodiment of the invention, groove not continuous to through hole and/or not from upper surface continuously to lower surface.
In another embodiment of the invention, sealing edge is arranged on some regions of lateral edge, and sealing edge directly adjoins the side comprising batten.
In another embodiment of the invention, sleeve pipe comprises the additional depressed part in vertical direction.
In another embodiment of the invention, sleeve pipe is made up of elastic plastic material.
In another embodiment of the invention, sleeve pipe comprises the projection be positioned on batten, and wherein, projection is suitable for being contained in corresponding base, and base is arranged on framework.
In another embodiment of the invention, sleeve pipe comprise be positioned at edge one or more depressed parts to receive stable element.
Accompanying drawing explanation
Hereafter in more detail the present invention will be described based on accompanying drawing.
In the accompanying drawings:
Fig. 1 shows according to the framework of an embodiment of the invention and the sleeve pipe according to multiple execution mode of the present invention;
Fig. 2 shows according to the framework of an embodiment of the invention and the sleeve pipe according to multiple execution mode of the present invention;
Fig. 3 shows sleeve pipe according to first embodiment of the invention;
Fig. 4 shows sleeve pipe second embodiment of the invention;
Fig. 5 shows the sleeve pipe according to the 3rd execution mode of the present invention;
Fig. 6 shows two views of the sleeve pipe according to the 4th execution mode of the present invention;
Fig. 7 shows two views of the sleeve pipe according to the 5th execution mode of the present invention;
Fig. 8 shows two views of the sleeve pipe according to the 6th execution mode of the present invention;
Fig. 9 shows three views of the sleeve pipe according to the 7th execution mode of the present invention;
Figure 10 shows the framework according to an embodiment of the invention;
Figure 11 shows the sleeve pipe according to the 8th execution mode of the present invention;
Figure 12 shows the details of the framework according to multiple execution mode of the present invention.
Embodiment
Fig. 1 shows the framework 1 according to the cable guide system of an embodiment of the invention and the sleeve pipe 20,120 according to multiple execution mode of the present invention.
Framework 1 comprises batten 2, batten 2 become stepped relative to framework and the height of batten 2 lower than the height of adjacent framework 1.Framework also can comprise the other stepped batten 12 with similar Design.
Batten 2 is furnished with jockey 3,3 ', 3 ", it is suitable for receiving corresponding jockey mating member 23,123,223.
This jockey mating member is arranged on such as sleeve pipe 20,120.
For this reason, jockey 3,3 ', 3 " be arranged such that they allow in fact sleeve pipe to be only installed in framework along the direction vertical relative to framework.This direction is indicated by arrow.
The layout of jockey guarantees that sleeve pipe is easy to insert.And framework can easily receive different sleeve pipes, thus no longer needs the special frames for different sleeve pipe.In addition, if remove single sleeve pipe, also whole framework need not be dismantled again, but, connect if such as discharge the clamping of setting up or fasten connection, then can remove this sleeve pipe from framework.Therefore, flexibility and assembling friendly significantly increase.
And this configuration also allows sleeve pipe 20,120,220 to be firmly held on framework.This corresponding configuration by jockey realizes, such as, need slight pressing to insert.The distortion of the cable in insertion sleeve pipe can also be made, thus cause jockey to connect with the clamping being connected mating member.
According to the first execution mode being contained in the cable guide system of framework 1 waiting, sleeve pipe 20 comprises main body.Through hole 21 is vertically arranged in main body from upper surface to lower surface to receive cable.Be shown specifically this sleeve pipe in figure 3.
Sleeve pipe 20 also comprises batten 22, batten 22 become stepped relative to main body and the height of batten 22 lower than the height of adjacent main body.
Batten is furnished with jockey 23, and it is suitable for receiving jockey mating member 3,3 ', 3 ".
This jockey mating member is such as arranged in framework.
For this reason, jockey 23 is arranged such that they allow in fact sleeve pipe to be only arranged in framework along the direction vertical relative to framework.This direction is indicated by arrow.
And the sleeve pipe 120 according to the second execution mode can also be accepted in framework 1.With the substantive difference of sleeve pipe 20, this sleeve pipe 120 is that this sleeve pipe 120 is suitable for receiving thicker cable.Be shown specifically this sleeve pipe in the diagram.
Treat that the sleeve pipe 120 of the cable guide system of being received by framework 1 comprises main body.Through hole 121 is vertically arranged in this main body from upper surface to lower surface to receive cable.
Sleeve pipe 120 also comprises batten 122,132, batten 122,132 become stepped relative to main body and the height of batten 122,132 lower than the height of adjacent main body.
Batten is provided with jockey 123,223, and it is suitable for receiving corresponding jockey mating member 3,3 ', 3 ".
This jockey mating member is such as arranged on framework.
For this reason, jockey 123,223 is arranged such that they allow in fact sleeve pipe to be only installed in framework along the direction vertical relative to framework.
Fig. 2 shows the framework 1 according to an embodiment of the invention and the sleeve pipe 220,320 according to multiple execution mode of the present invention.
Be shown specifically the sleeve pipe 220 according to the 3rd execution mode in Figure 5.Be shown specifically the sleeve pipe 320 according to the 4th execution mode in the figure 7.
Sleeve pipe 320 comprises batten 322, batten 322 become stepped relative to main body and the height of batten 322 lower than the height of adjacent main body.
With sleeve pipe 20,120 contrary, these sleeve pipes 220,320 comprise depressed part 228,328.These depressed parts can save material.Depressed part 228 allows masterpiece to be used on less area and lower region and is designed to have larger flexibility, thus optimizes the sealing of cable.
Sleeve pipe 220 shown in Fig. 5 comprises the sleeve pipe 20 shown in groove 225, Fig. 6,8 and 9 and comprises groove 25, and the sleeve pipe 320 shown in Fig. 7 comprises groove 325.The through hole 21,121,221 that groove makes cable enter in main body becomes easier.The insertion of cable of this arrangement convenience.Certainly, groove can be arranged in either side, is especially arranged in batten side or the opposite side contrary with batten.But as Figure 6-9, groove by lateral arrangement, thus can realize better sealing in installment state.
Cable inserts in sleeve pipe by groove 25,225,325.
Such groove can be continuous print or close at upper surface such as about 1mm place.
Groove does not need to extend to lower surface from upper surface, but can be designed to only be arranged in subregion, as shown in Fig. 6 by way of example yet.
If groove 25 is not designed to continuous print, then it is torn by means of only insertion cable.In this modification, realize groove 25 in the mode of not losing the material that product is correlated with, thus cause the sealing of optimization.
In addition, as shown in the zoomed-in view in Fig. 9, groove can have step 26.This geometry is forbidden being formed on the sleeve pipe 20 installed manufacturing relevant gap.
The step at this step 26 not necessarily right angle, but the step that can also be point, thus on both sides, form a kind of passage.Step 26 makes the sealing of groove 25 be improved.This may be even necessary in some cases, to allow the application of equipment in explosive air or in wet environment.
And the different execution modes of sleeve pipe also can be provided with interior sealing edge 29,129,229,329, and interior sealing edge 29,129,229,329 improves the sealing of the cable of insertion.This may be even necessary in some cases, to allow the application of equipment in explosive air or in wet environment.
Circumferential sealing edge 29,129,229,329 on inner side is pressed into the insulating barrier of cable because of the compression of element, cable is sealed and eliminates tensioning thus.
In addition, sleeve pipe can comprise the sealing edge 27,127,227,327 being positioned at one or more lateral edge place.Such as, be provided with sealing edge at least some region of the lateral edge of the sleeve pipe in Fig. 3-9, sealing edge directly adjoins the side comprising batten 22,122,132,333,232,322.
Sealing edge 27,127,227,327 is by potted component relative to each other lateral seal.These sealing edges 27,127,227,327 all can be arranged on the side of potted component, and according to offsets in height on both sides.
Particularly preferably, for each sleeve pipe 20,120,220,320 to be installed, the batten 2 and/or 12 of framework 1 is at least furnished with two jockeys 3,3 ', 3 ".
In FIG, such as two jockeys are arranged on the batten 2 of each sleeve pipe 20.Four jockeys are arranged on the batten 2 of each sleeve pipe 120.
Fig. 2 again illustrate be arranged in each sleeve pipe 320 batten 2 on two jockeys.Four jockeys are arranged on the batten 2 of each sleeve pipe 220.
Be not limited to above-described quantity, 3,5 or more jockeys can also be set according to the size of sleeve pipe.
If from the first jockey 3 to be positioned at distance batten 2, directly adjacent second jockey 3 ' of contiguous first jockey 3 and the second jockey 3 ' to be positioned on batten 2, be directly close to the 3rd jockey 3 that the second jockey 3 ' arranges " between distance not corresponding, be then especially favourable.
In this case, simply machinery or even optical encoding can be set, thus prevent mistake from installing.
In addition, framework 1 can be designed to comprise two battens 2,12 stair-stepping relative to framework 1 one-tenth, and wherein batten is arranged on opposite sides of the frame.
Similarly, sleeve pipe 120,220 also can comprise and becomes stair-stepping two battens 122,132,222,232 relative to main body, and wherein batten 122,132,222,232 is arranged on the opposition side of main body, sees Fig. 4 and Fig. 5.
Jockey 3,3 ', 3 on framework " such as projection can be designed to.They correspond to the jockey mating member 23,123,133,223,233,323 on sleeve pipe.
These projections 3,3 ', 3 " any corresponding shape can be adopted.But, if jockey 3,3 ', 3 " there is cylindrical or conical butt, be then particularly preferred.
Similarly, the jockey mating member 23,123,133,223,233,323 on sleeve pipe can have any corresponding shape.But relative to cable sleeve jockey, jockey mating member 23,123,133,223,233,323 is particularly preferred by depression.
Particularly preferably, the jockey 3,3 ', 3 of framework 1 " there is cylindrical or conical butt.
Similar and particularly preferably, the jockey mating member 23,123,133,223,233,323 on sleeve pipe 23,123,133,223,233,323 is designed to 133,233 depressed parts of cylindrical or Frusto-conical 23,123,223,323 depressed parts or shell portion shape or truncted cone section shape.
In addition, adding or substituting as the jockey mating member 23,123,133,223,233,323 on sleeve pipe 23,123,133,223,233,323, the sleeve pipe according to all execution modes can comprise projection B.This projection B illustrates in fig. 11 in an illustrative manner.If become stair-stepping batten 22,122,132,222,232,322 quite thin compared with main body relative to main body, then this projection B is particularly advantageous.Projection B has the design of such as T-shaped and provide stability in the plane perpendicular to cable direction (vertical direction).Thus, projection B can be thickening gradually towards stepped batten, thus be especially easily inserted in the corresponding base C on framework 1a (as shown in figure 12), and in pre-align in base C.In addition, additionally or alternatively one or more depressed part A can be provided with at edge according to the sleeve pipe of all execution modes.After framework 1 and sleeve pipe have been installed, stable element can be accepted in these depressed parts A, and wherein these stable elements provide extra stability along cable direction (vertical direction) to the sleeve pipe in framework 1 and/or framework 1.Framework 1 or frame parts 1a, 1b then also comprise the respective openings for this object, and stable element can be inserted easily.Stable element is designed to such as sell or screw.In addition, sleeve pipe 20,320 also can comprise bracing or strutting arrangement 24,324.
These bracing or strutting arrangements 24,324 are designed to be arranged in side contrary with being provided with batten in main body.
As apparent from Fig. 1 and Fig. 2 can, these bracing or strutting arrangements 24,324 can be bonded in the bracing or strutting arrangement 24,324 be equal to of other sleeve pipe of reversed arrangement horizontal with it.
By being placed in by bracing or strutting arrangement 24,324 on the side of sleeve pipe 20,320, sleeve pipe 20,320 can relative to each other support.Such stability not only makes sleeve pipe 20,320 more be difficult to inwardly turn back, and when two half-unit is mounted, bracing or strutting arrangement 24,324 also makes sleeve pipe 20,320 relative to each other locate, and thereby facilitating installation.
As shown in Fig. 1,2 and 10, framework 1 also can comprise the fastener 5 for being arranged on housing.These fasteners 5 can be designed to such as hole, thus framework is fixed to housing by screw.
According to the present invention, framework 1(is as shown in Figure 10) also can be made up of multiple branch 1a, 1b, branch 1a, 1b such as can be plugged together.
This provides flexibility for inserting intermediate member, thus can use a large amount of sleeve pipes or use larger sleeve pipe.
Jockey 3,3 ', 3 " then guarantee sleeve pipe 20,120,220,320(and there is framework 1a, 1b of more than one piece design) captively remain in branch one of 1a, 1b.
Such as can be mixed with each other use according to the sleeve pipe of multiple execution mode of the present invention.
Can especially easily be made up of elastic plastic material according to sleeve pipe of the present invention.Framework 1 or frame part 1a, 1b can similarly be made up of plastic material or metal.
Generally speaking, it may be noted that the present invention allows to provide a kind of framework and sleeve pipe, when not using middle web, this framework and sleeve pipe guarantee that the sleeve pipe 20,120,220,320 of different size can be arranged in one of framework 1 and identical modification.Jockey 3,3 ', 3 " between skew can be used as machinery or optical encoding and therefore prevent mistake from installing.
By direction (namely along the direction vertical relative to the framework) mounting sleeve 20,120,220,320 along cable, guarantee assembly and disassembly easily.
Can also at framework 1 or frame part 1a, 1b, at jockey 3 ' as shown in figure 12,3 " on optics and/or haptic logo are set, can accurate with clear and definite associating be carried out thus.Which considerably simplifies structure and establishment and cable subsequently to change, because by corresponding establishment, can the mode sleeve pipe that finds cable or be associated targetedly.
List of reference characters

Claims (24)

1. the framework (1,1a, 1b) of cable guide system, wherein,
Described framework is set to receive multiple sleeve pipe (20,120,220),
Described framework comprises at least one batten (2,12), and described batten (2,12) becomes stepped relative to described framework, and the height of described batten (2,12) is lower than the height of adjacent framework,
Described batten (2,12) is provided with jockey (3,3 ', 3 "); described jockey is suitable for receiving and is arranged on corresponding jockey mating member (23,123,223) on sleeve pipe (20,120,220)
Described jockey (3,3 ', 3 ") is arranged to and makes it allow in fact sleeve pipe to be only arranged in described framework along the direction vertical relative to described framework, and
Wherein, for each sleeve pipe to be installed, described batten (2,12) is provided with at least two jockeys (3,3 ', 3 ").
2. framework according to claim 1 is wherein not corresponding to the distance on described batten (2) directly between contiguous described first jockey (3) distance of adjacent second jockey (3 ') of arranging and described second jockey to the 3rd jockey arranged at described second jockey (3 ') of the upper direct vicinity of described batten (2) (3 ") from the first jockey (3).
3. framework according to claim 1, wherein said framework comprises two battens (2,12), and described two battens (2,12) become stepped relative to described framework, and described two battens are arranged on the opposite side of described framework.
4. framework according to claim 1, and wherein said jockey (3,3 ', 3 ") be projection.
5. framework according to claim 1, and wherein said jockey (3,3 ', 3 ") be cylindrical or conical butt.
6. framework according to claim 1, wherein said framework (1,1a, 1b) can be plugged together by multiple branch (1a, 1b) and form.
7. framework according to claim 1, wherein said framework (1,1a, 1b) is made up of plastic material or metal.
8. framework according to claim 1, wherein said framework (1,1a, 1b) comprises fastener (5) to be arranged on housing.
9. framework according to claim 1, wherein said framework (1,1a, 1b) comprises one or more base (C), described one or more base (C) is for holding corresponding projection (B), and described projection (B) is arranged on sleeve pipe (20,120,220).
10. framework according to claim 1, wherein said framework (1,1a, 1b) comprises one or more hole, and described one or more hole is suitable for receiving stable element and corresponding with the depressed part (A) of the edge of sleeve pipe (20,120,220) to be accepted.
The sleeve pipe (20,120,220) of the 11. cable guide systems be contained in framework waiting, wherein
Described sleeve pipe comprises main body,
In described main body, be provided with through hole (21,121,221), described through hole is vertically arranged on to receive cable in described main body from upper surface to lower surface,
Described sleeve pipe comprises at least one batten (22,122,132,222,232,322), and at least one batten described laterally becomes stepped relative to described main body, and the height of at least one batten described is lower than the height of adjacent main body,
At least one batten described is provided with jockey (23,123,223), and described jockey is arranged to and makes it be suitable for receiving and arrange corresponding jockey mating member on said frame (3,3 ', 3 "),
Described jockey (23,123,223) is arranged to and makes it allow in fact described sleeve pipe to be only arranged in described framework along the direction vertical relative to described framework.
12. sleeve pipes according to claim 11, wherein at least two jockeys (23,123,223) are arranged on described batten (22,122,132,222,232,322).
13. sleeve pipes according to claim 11, the side contrary with being provided with described batten of wherein said main body comprises bracing or strutting arrangement (24), and described bracing or strutting arrangement can be bonded on the sleeve pipe be equal to of described bracing or strutting arrangement (24) horizontal reversed arrangement.
14. sleeve pipes according to claim 11, wherein said sleeve pipe comprises two battens (122,132,222,232), and described two battens become stepped relative to described main body, and are arranged on the opposite side of described main body.
15. sleeve pipes according to claim 11, wherein said jockey (23,123,223) is depressed part.
16. sleeve pipes according to claim 15, wherein said jockey (23,123,223) is cylindrical or frusto-conical recess portion.
17. sleeve pipes according to claim 11, wherein said sleeve pipe comprises groove (25,225,325), thus cable can be made more easily to enter in the described through hole (21,121,221) of described main body.
18. sleeve pipes according to claim 17, wherein said groove (25,225,325) comprises step (26).
19. sleeve pipes according to claim 17, wherein said groove (25,225,325) continuously to described through hole and/or not from described upper surface continuously to described lower surface.
20. sleeve pipes according to claim 11, wherein sealing edge (27,127,227,327) is arranged at least some region of lateral edge, and described sealing edge directly adjoins the side comprising described batten.
21. sleeve pipes according to claim 11, wherein said sleeve pipe comprises the additional depressed part (228,328) being positioned at described vertical direction.
22. sleeve pipes according to claim 11, wherein said sleeve pipe is made up of elastic plastic material.
23. sleeve pipes according to claim 11, wherein said sleeve pipe comprises the projection (B) be positioned on described batten (22,122,132,222,232,322), described projection is suitable for being contained in corresponding base (C), and described base (C) is arranged on described framework (1,1a, 1b).
24. according to claim 11 to the sleeve pipe according to any one of 23, wherein said sleeve pipe comprise be positioned at edge one or more depressed parts (A) to receive stable element.
CN201180043690.3A 2010-09-10 2011-09-09 The framework of cable guide system and the sleeve pipe for this framework Active CN103222142B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102010037463.6 2010-09-10
DE102010037463A DE102010037463A1 (en) 2010-09-10 2010-09-10 Frame of a cable entry system and cable grommet for this
PCT/EP2011/065651 WO2012032157A2 (en) 2010-09-10 2011-09-09 Frame for a cable penetration system, and bush therefor

Publications (2)

Publication Number Publication Date
CN103222142A CN103222142A (en) 2013-07-24
CN103222142B true CN103222142B (en) 2016-02-17

Family

ID=44681102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201180043690.3A Active CN103222142B (en) 2010-09-10 2011-09-09 The framework of cable guide system and the sleeve pipe for this framework

Country Status (6)

Country Link
US (1) US8963010B2 (en)
EP (1) EP2614564B1 (en)
JP (1) JP5721290B2 (en)
CN (1) CN103222142B (en)
DE (1) DE102010037463A1 (en)
WO (1) WO2012032157A2 (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011054294A1 (en) * 2011-10-07 2013-04-11 Phoenix Contact Gmbh & Co. Kg Cable gland and method for mounting a cable gland
DE102014102790A1 (en) * 2014-03-03 2015-09-03 Murrelektronik Gmbh Frame for cable glands, fasteners and cable entry system
NL1040892B1 (en) * 2014-07-16 2016-08-16 Beele Eng Bv System for holding in a conduit cables or ducts with different diameters.
DE202015102280U1 (en) * 2015-05-05 2016-05-10 Conta-Clip Verbindungstechnik Gmbh Arrangement with a wall feedthrough for several cables and kit
DE102015211271B3 (en) * 2015-06-18 2016-11-17 Ford Global Technologies, Llc Fastening device for a cable
CN105109702A (en) * 2015-08-13 2015-12-02 中国航空工业集团公司西安飞机设计研究所 Side cabinet
DE202016103494U1 (en) * 2016-06-30 2017-07-06 Conta-Clip Verbindungstechnik Gmbh Cable wall bushing and kit
CN106151709A (en) * 2016-08-03 2016-11-23 江苏迪威高压科技股份有限公司 A kind of suspension type Petrochemical Pipe Joints
DE102016223425A1 (en) * 2016-11-25 2018-05-30 Icotek Project Gmbh & Co. Kg Cable holders with partitions and a number of grommets for passing cables
DE202017102147U1 (en) * 2017-04-10 2017-05-05 Igus Gmbh Cable bushing, in particular strain relief for an energy chain
EP3392988B1 (en) * 2017-04-18 2021-05-26 Roxtec AB Sealed cable passage
DE102017207095A1 (en) * 2017-04-27 2018-10-31 Siemens Aktiengesellschaft Implementing agency
DE202017106818U1 (en) * 2017-11-09 2018-11-14 Conta-Clip Verbindungstechnik Gmbh Arrangement for a cable feedthrough
DE102018109331A1 (en) * 2018-04-19 2019-10-24 Bimed Teknik Aletler Sanayi Ve Ticaret A.S. Strand guiding device
DE102018207019A1 (en) 2018-05-07 2019-11-07 Icotek Project Gmbh & Co. Kg Wall bushing
DE102018113247A1 (en) * 2018-06-04 2019-12-05 Reichle & De-Massari Ag sealing device
DE102018218426A1 (en) * 2018-10-29 2020-04-30 Icotek Project Gmbh & Co. Kg Cable entry
CA3080376C (en) * 2019-05-14 2023-08-29 Laurin T. Wilson, Sr. Insulator insert for service entrance cap
DE202019002833U1 (en) * 2019-07-09 2020-07-16 Kuka Deutschland Gmbh Cable entry for a control cabinet
DE102019214955A1 (en) * 2019-09-30 2021-04-01 Robert Bosch Gmbh Connector and sealing element for a connector
US11527877B2 (en) * 2019-11-25 2022-12-13 Te Connectivity Solutions Gmbh Electrical element pass through plate constructions
US12188601B2 (en) * 2023-02-23 2025-01-07 Chengli Li Cable management device and related installation method
EP4625732A1 (en) 2024-03-28 2025-10-01 HellermannTyton GmbH & Co. KG Cable fairlead system with enhanced stiffness/tightness

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3544785C2 (en) * 1985-12-18 1991-02-07 Bayerische Motoren Werke Ag, 8000 Muenchen, De
JP2001057734A (en) * 1999-08-10 2001-02-27 Fujikura Ltd Drip-proof cable connection box
DE102007012190A1 (en) * 2007-03-14 2008-09-18 Pflitsch Gmbh & Co. Kg Cable throughput device to pass cables through housing wall consists of auxiliary frame for fitting in or at aperture and several holders on side facing away from wall
CN201247931Y (en) * 2007-09-20 2009-05-27 冯云峰 Cable coupling box

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3489440A (en) * 1966-04-18 1970-01-13 Lyckeaborgs Bruk Ab Tight lead-through inlet frame device
SE415619B (en) * 1979-01-18 1980-10-13 Lyckeaborgs Bruk Ab TRANSFER FOR FIRE SAFETY PRESENTATION OF ELECTRICAL CABLES THROUGH A WALL OR SIMILAR OPENING
NL8403650A (en) * 1984-11-30 1986-06-16 Johannes Alfred Beele TRANSIT DEVICE.
GB2186440B (en) * 1986-02-11 1990-03-14 Hawke Cable Glands Ltd Improved transit for cables and pipes
DK158865C (en) 1986-05-13 1990-12-24 Er Electric As MOISTURE LOCKS
NL8901597A (en) * 1989-06-23 1991-01-16 Pidou Bv TRANSIT DEVICE.
DE19721659B4 (en) 1997-05-23 2005-10-20 Murrplastik Systemtechnik Gmbh Arrangement for guiding cables or lines
SE515160C2 (en) * 1999-10-08 2001-06-18 Roxtec Ab Cable entry
DE19959185A1 (en) * 1999-12-08 2001-06-28 Bethke Kunststofftechnik Gmbh Cable entry
DE29924314U1 (en) 1999-12-29 2002-10-24 icotek GmbH, 74405 Gaildorf Device for guiding cables through walls
NL1016703C2 (en) * 2000-11-24 2002-05-27 Beele Eng Bv Feeding device.
DE10313989B4 (en) * 2003-03-27 2012-07-12 Murrplastik Systemtechnik Gmbh Grommet device
DE102004048055A1 (en) * 2004-09-30 2006-04-06 Murrplastik Systemtechnik Gmbh Cable entry device for a housing wall
DE102005002879B4 (en) 2005-01-21 2006-11-30 Schmid, Gabriele Modular bulkhead for the tight passage of round materials such as cables, hoses and round bars through components of all kinds
DE102005017689A1 (en) * 2005-04-08 2006-10-12 Lapp Engineering & Co. Cable gland and cable gland system
DE102005056215B4 (en) * 2005-11-25 2013-05-23 Rittal Gmbh & Co. Kg Device for guiding cables or lines
DE102007012189B3 (en) * 2007-03-14 2008-09-25 Pflitsch Gmbh & Co. Kg Cables feeding-through device, has clamping units, each with spring-elastic side piece for holding it at ramps in insertion position, where clamping units are disassembled in clamping position, in which side pieces are drawn near each other
SE531217C2 (en) * 2007-05-29 2009-01-20 Roxtec Ab Cable entry
SE532027C2 (en) 2008-02-15 2009-10-06 Roxtec Ab Feed-through frame with integrated compression unit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3544785C2 (en) * 1985-12-18 1991-02-07 Bayerische Motoren Werke Ag, 8000 Muenchen, De
JP2001057734A (en) * 1999-08-10 2001-02-27 Fujikura Ltd Drip-proof cable connection box
DE102007012190A1 (en) * 2007-03-14 2008-09-18 Pflitsch Gmbh & Co. Kg Cable throughput device to pass cables through housing wall consists of auxiliary frame for fitting in or at aperture and several holders on side facing away from wall
CN201247931Y (en) * 2007-09-20 2009-05-27 冯云峰 Cable coupling box

Also Published As

Publication number Publication date
JP2013539342A (en) 2013-10-17
US20130292157A1 (en) 2013-11-07
WO2012032157A3 (en) 2013-05-02
US8963010B2 (en) 2015-02-24
EP2614564B1 (en) 2014-08-13
CN103222142A (en) 2013-07-24
DE102010037463A1 (en) 2012-03-15
EP2614564A2 (en) 2013-07-17
WO2012032157A2 (en) 2012-03-15
JP5721290B2 (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN103222142B (en) The framework of cable guide system and the sleeve pipe for this framework
US11316330B2 (en) Cable wall passthrough and kit
US9923307B2 (en) Retaining frame for retaining plug-in connector modules
CN101743366A (en) Assembly for securing two juxtaposed panels to a structure
CN102395735A (en) Joining device for two building elements
JP6836309B2 (en) sticker
US8096827B2 (en) Distributor system and method for its production
CN102203437B (en) Connecting fasteners with gaskets
CN101636891A (en) Cable bolt clamp device with corresponding sleeve or locking nut
US9944239B1 (en) Fluid and dust resistant split grommet
KR102734154B1 (en) Terminal box
SA523451982B1 (en) Systems and methods for modular construction
CN102822539A (en) Part fastening structure and clip using same
US10205270B2 (en) Sealing gasket for electrical connector pins
CN113531220A (en) Cable glands and cable glands
CN103307376A (en) Pipeline connecting device with double inserts and sealing connecting method thereof
CN102371965A (en) Airbag housing
KR101415512B1 (en) sheel powder filler used the dual panel flooring
RU2339140C1 (en) Frame and method for locking one or more resilient modules for cable entries, pipe passages of similar devices
CN101855486B (en) Pipe line
CN103241110A (en) Sealing element for electric vehicle
CN101645589B (en) Mounting structure of electric box
CN205722673U (en) Card cloth lamp box
JP2009264461A (en) Drain hose connector
US20080106044A1 (en) Sealing system and gasket with spaces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant