CN102635105A - Sand-barren polygonal rectangular cement sand brick - Google Patents

Sand-barren polygonal rectangular cement sand brick Download PDF

Info

Publication number
CN102635105A
CN102635105A CN2012101412014A CN201210141201A CN102635105A CN 102635105 A CN102635105 A CN 102635105A CN 2012101412014 A CN2012101412014 A CN 2012101412014A CN 201210141201 A CN201210141201 A CN 201210141201A CN 102635105 A CN102635105 A CN 102635105A
Authority
CN
China
Prior art keywords
sand
brick body
mortar
brick
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101412014A
Other languages
Chinese (zh)
Inventor
张炜
周莹
沙广彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012101412014A priority Critical patent/CN102635105A/en
Publication of CN102635105A publication Critical patent/CN102635105A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The invention relates to a land desertification and desertification control technology, in particular to a sand-barren polygonal rectangular cement sand brick. The invention aims to solve the problems that a sand stabilization effect is not ideal, the cost is high and land desertification or desertification cannot be fundamentally controlled by adopting the traditional land desertification and desertification control technology. The sand-barren polygonal rectangular cement sand brick comprises a brick body. The brick body is made of the following raw materials: desert sand and cement, wherein the weight ratio of the desert sand to the cement is (1.5:1)-(5.58:1); the brick body is 1-8m in height; and the widest part of the brick body is 0.5-3m in width. According to the sand-barren polygonal rectangular cement sand brick, the problems that the sand stabilization effect is not ideal, the cost is high and the land desertification or the desertification cannot be fundamentally controlled by adopting the traditional land desertification and desertification control technology are effectively solved, and various disadvantages of biological control and chemical control are overcome. The sand-barren polygonal rectangular cement sand brick is suitable for land desertification and desertification control.

Description

The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland
Technical field
The present invention relates to desertification of land, desertification treatment technology, specifically is the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland.
Background technology
Desertification of land, desertification problem are one of environment, society, economic problems of the maximum that faces of the world today.The rapid spread of desertification of land, desertification has not only caused the deterioration and the serious economy loss of environment, even has also caused some regional social concerns, has hindered economic development and social stability.For example, in northwest China, distributing vast desert, desert and Gobi desert account for the sixth of Chinese area.Because natural causes such as the weather arid is short of rain add human unreasonable activities, cause desertification of land, desertification constantly to spread in this area, degenerate in flakes in the grassland, and a large amount of vegetation are swallowed up, thereby this area also is called " barren land " by people.The United Nations Conference on Environment and Development of holding in 1992 is summarised as climate change and mankind's activity with the factor of desertification of land, desertification; And finally being decided to be " World Day to combat desertification " on the June in every year 17; Be intended to further improve the understanding of people, arouse the sense of responsibility and the sense of urgency that people prevent and treat desertification of land, desertification control desertification of land, desertification importance.
The control soil is husky, the key of desertification is to fix the sand, and various desertifications of land for a long time, desertification treatment technology are just around fixing the sand to carry out.Existing desertification of land, desertification treatment technology mainly comprise biological treating and chemical harnessing.Biological treating is meant and relies on plantation vegetation (like trees, turf etc.) to carry out sand consolidation with biologic that this is also to be to promote the technology of improvement the most widely the earliest.Chemical harnessing is meant that then the surface sprinkling sand-consolidating agent carries out chemical sand-fixing on the sand dune.Practice shows, adopts existing desertification of land, desertification treatment technology to prevent and treat desertification of land, desertification, produces little effect.Particularly, the shortcoming of biological treating is: the vegetation of being planted is very easily blown away by dust storm or is buried by the sand dune, adds the desert area drought and water shortage, and vegetation can't survive too of a specified duration, causes sand-fixing effect unsatisfactory.And the shortcoming of chemical harnessing is: one of which because the sand-consolidating agent demand is very huge, causes treatment cost very high.Its two owing to limited by the desert area weather conditions, can't plant vegetation when carrying out chemical sand-fixing, thereby can't fundamentally administer desertification of land, desertification.Based on above analysis; Problem to having desertification of land now, desertification treatment technology sand-fixing effect is undesirable, with high costs and can't fundamentally administers desertification of land, desertification is necessary to invent a kind of brand-new desertification of land, desertification treatment technology.
Summary of the invention
The problem of the present invention in order to solve existing desertification of land, desertification treatment technology sand-fixing effect is undesirable, with high costs and can't fundamentally administers desertification of land, desertification provides a kind of sandy wasteland unconcerned polygon huge cement sanded brick.
The present invention adopts following technical scheme to realize: the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises the brick body; The brick body is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 1.5:1-5.58:1; The height of brick body is 1-8m; The widest part width of brick body is 0.5-3m.The shape of brick body is decided according to the actual requirements.
During concrete the use, the several bricks body uprightly is positioned over top of sand dune in turn, makes each brick body arrange and build up brick wall one through crane gear.The orientation of brick wall and desert wind are to vertical, and the leeward side at brick wall adopts desert sand to be piled into husky wall simultaneously, is used to support brick wall.Using such method, desert area uniformly-spaced (usually at interval 0.5km) build up the multiple tracks brick wall, and form the brick wall grid through the multiple tracks brick wall, the sand dune is formed latticed cutting apart.When dust storm passed through the brick wall grid, whenever through one brick wall, wind-force intensity will be successively decreased, and sand and dust density also decreases, and had not only played thus and had reduced the effect of desert dust storm, and fundamentally stoped flowing of sand dune, played the effect of effectively fixing the sand.On the basis of effectively fixing the sand, the plantation vegetation can guarantee that just vegetation has enough growth periods at the brick wall rear, makes vegetation be able to the large tracts of land survival with the formation oasis, thereby thoroughly contains spreading of desertification of land, desertification, improves existent environment of people.Based on said process, to compare with biological treating, the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland of the present invention can not blown away or buried by the sand dune because own wt is huge by dust storm.Thereby adopt the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland of the present invention that latticed cutting apart carried out on the sand dune, and the sand dune can't be moved in the brick wall grid, effectively improve sand-fixing effect.Simultaneously, produce sanded brick and brick wall itself and can spend a large amount of desert sand again, thereby reduce the sand amount in desert, further improve sand-fixing effect.Compare with chemical harnessing, the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland of the present invention need not to adopt sand-consolidating agent, and adopts with husky sand control, and simultaneously, sanded brick can be produced in the desert on the spot, and it is very convenient to construct.In sum, the problem that the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland of the present invention has promptly thoroughly solved existing desertification of land effectively, desertification treatment technology sand-fixing effect is undesirable, with high costs and can't fundamentally administer desertification of land, desertification.
The preparation method of the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland of the present invention comprises the steps: a. preparation mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 1.5:1-5.58:1; The denseness of mortar is 20-100mm; B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting; C. grouting: the mortar for preparing is poured into dies cavity; D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting; E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 10-20d; F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains the brick body.
The problem that the present invention efficiently solves existing desertification of land, desertification treatment technology sand-fixing effect is undesirable, with high costs and can't fundamentally administer desertification of land, desertification; The various shortcomings that it has overcome biological treating and chemical harnessing existence are applicable to the improvement of desertification of land, desertification.
Description of drawings
Fig. 1 is first kind of structural representation of the present invention.
Fig. 2 is second kind of structural representation of the present invention.
Among the figure: 1-brick body, 2-arc groove.
The specific embodiment
Embodiment one
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 1.5:1; The height of brick body 1 is 1m; The widest part width of brick body 1 is 0.5m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 1.5:1; The denseness of mortar is 20mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 10d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 1, in the present embodiment, brick body 1 is the straight brick body.
Embodiment two
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 5.58:1; The height of brick body 1 is 8m; The widest part width of brick body 1 is 3m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 5.58:1; The denseness of mortar is 100mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 20d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 1, in the present embodiment, brick body 1 is the straight brick body.
Embodiment three
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 4.85:1; The height of brick body 1 is 4m; The widest part width of brick body 1 is 1.5m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 4.85:1; The denseness of mortar is 50mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 12d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 1, in the present embodiment, brick body 1 is the straight brick body.
Embodiment four
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 1.5:1; The height of brick body 1 is 1m; The widest part width of brick body 1 is 0.5m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 1.5:1; The denseness of mortar is 20mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 10d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 2, brick body 1 is the concave brick body; The front surface along continuous straight runs of brick body 1 is provided with arc groove 2.The effect of arc groove is: when the desert dust storm blowed to the front surface of brick body, wind direction can upwards reverse along arc groove, offsets a part of wind-force intensity, thereby further optimizes sand-fixing effect.
Embodiment five
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 5.58:1; The height of brick body 1 is 8m; The widest part width of brick body 1 is 3m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 5.58:1; The denseness of mortar is 100mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 20d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 2, brick body 1 is the concave brick body; The front surface along continuous straight runs of brick body 1 is provided with arc groove 2.The effect of arc groove is: when the desert dust storm blowed to the front surface of brick body, wind direction can upwards reverse along arc groove, offsets a part of wind-force intensity, thereby further optimizes sand-fixing effect.
Embodiment six
The unconcerned polygon huge cement sanded brick in a kind of sandy wasteland comprises brick body 1; Brick body 1 is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 4.85:1; The height of brick body 1 is 4m; The widest part width of brick body 1 is 1.5m;
Its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 4.85:1; The denseness of mortar is 50mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 12d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body 1;
As shown in Figure 1, in the present embodiment, brick body 1 is the straight brick body;
As shown in Figure 2, brick body 1 is the concave brick body; The front surface along continuous straight runs of brick body 1 is provided with arc groove 2.The effect of arc groove is: when the desert dust storm blowed to the front surface of brick body, wind direction can upwards reverse along arc groove, offsets a part of wind-force intensity, thereby further optimizes sand-fixing effect.

Claims (4)

1. the unconcerned polygon huge cement sanded brick in sandy wasteland is characterized in that: comprise brick body (1); Brick body (1) is processed by following raw material: desert sand and cement; Wherein, desert weight ratio husky and cement is 1.5:1-5.58:1; The height of brick body (1) is 1-8m; The widest part width of brick body (1) is 0.5-3m.
2. the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland according to claim 1, it is characterized in that: its preparation method comprises the steps:
A. prepare mortar: desert sand, cement, water are mixed, and stir the formation mortar; Desert weight ratio husky and cement is 1.5:1-5.58:1; The denseness of mortar is 20-100mm;
B. molding: mfg. moulding die, and at mold cavity surfaces laying plastic sheeting;
C. grouting: the mortar for preparing is poured into dies cavity;
D. vibrate: the mortar to pouring into dies cavity carries out vibration compacting;
E. maintenance: seal maintenance through the mortar of plastic sheeting after to vibration compacting, curing time is 10-20d;
F. form removal: with mortar after the maintenance and mold separation, and the mortar after will separating carries out air dry, promptly obtains brick body (1).
3. the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland according to claim 1 and 2, it is characterized in that: brick body (1) is the straight brick body.
4. the unconcerned polygon huge cement sanded brick in a kind of sandy wasteland according to claim 1 and 2, it is characterized in that: brick body (1) is the concave brick body; The front surface along continuous straight runs of brick body (1) is provided with arc groove (2).
CN2012101412014A 2012-05-09 2012-05-09 Sand-barren polygonal rectangular cement sand brick Pending CN102635105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101412014A CN102635105A (en) 2012-05-09 2012-05-09 Sand-barren polygonal rectangular cement sand brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101412014A CN102635105A (en) 2012-05-09 2012-05-09 Sand-barren polygonal rectangular cement sand brick

Publications (1)

Publication Number Publication Date
CN102635105A true CN102635105A (en) 2012-08-15

Family

ID=46619672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101412014A Pending CN102635105A (en) 2012-05-09 2012-05-09 Sand-barren polygonal rectangular cement sand brick

Country Status (1)

Country Link
CN (1) CN102635105A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276715A (en) * 2013-04-23 2013-09-04 东北大学秦皇岛分校 Novel desertification control bricks and desertification control method thereof
CN110028284A (en) * 2019-04-10 2019-07-19 石河子大学 Graphene oxide desert sand cement-based composite material

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1102610A (en) * 1994-08-30 1995-05-17 国家建材局苏州混凝土水泥制品研究院 Prefabrication method and mold for decorative concrete product
CN2480415Y (en) * 2000-09-22 2002-03-06 胡维民 Sand bag and cement prefabricated board for building sand wall
WO2003050060A1 (en) * 2001-12-12 2003-06-19 Roland Heinle Agent for use in sandy soils and method for improving sandy soils by using this agent
CN1580417A (en) * 2003-07-31 2005-02-16 丁荣吾 Nutrient-component-containing composite biological brick, and its manufacture method and use
CN1817815A (en) * 2006-01-14 2006-08-16 王屹峰 Non-stone and firing-free steamed blocks and production thereof
CN2928950Y (en) * 2006-06-13 2007-08-01 武汉市海格尔科技有限公司 Sand fixing greening brick containing water retaining agent

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1102610A (en) * 1994-08-30 1995-05-17 国家建材局苏州混凝土水泥制品研究院 Prefabrication method and mold for decorative concrete product
CN2480415Y (en) * 2000-09-22 2002-03-06 胡维民 Sand bag and cement prefabricated board for building sand wall
WO2003050060A1 (en) * 2001-12-12 2003-06-19 Roland Heinle Agent for use in sandy soils and method for improving sandy soils by using this agent
CN1580417A (en) * 2003-07-31 2005-02-16 丁荣吾 Nutrient-component-containing composite biological brick, and its manufacture method and use
CN1817815A (en) * 2006-01-14 2006-08-16 王屹峰 Non-stone and firing-free steamed blocks and production thereof
CN2928950Y (en) * 2006-06-13 2007-08-01 武汉市海格尔科技有限公司 Sand fixing greening brick containing water retaining agent

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276715A (en) * 2013-04-23 2013-09-04 东北大学秦皇岛分校 Novel desertification control bricks and desertification control method thereof
CN103276715B (en) * 2013-04-23 2015-12-23 东北大学秦皇岛分校 A kind of preparation method of sand control brick and desertification control method thereof
CN110028284A (en) * 2019-04-10 2019-07-19 石河子大学 Graphene oxide desert sand cement-based composite material

Similar Documents

Publication Publication Date Title
CN103130460B (en) A kind of vegetation type slag celluar concrete and Synthesis and applications thereof
CN109279835A (en) Biomimetic cement with directional porous structure and preparation method thereof
CN105818395B (en) A kind of method of waste plastic production water-permeable brick and the flooring mode of the water-permeable brick
CN202364617U (en) Sidewalk self-irrigation tree pool
CN106499117A (en) A kind of movable greening enclosing wall plate
CN102635105A (en) Sand-barren polygonal rectangular cement sand brick
CN208293335U (en) One kind can straw-planting type assembled cement concrete parking device
CN103276715B (en) A kind of preparation method of sand control brick and desertification control method thereof
CN201649121U (en) A soil-wrapped planting concrete retaining wall block
CN212896172U (en) River course slope protection and canal bottom structure for ecological reconstruction of black and odorous river course
CN102002954A (en) Ecological bag
CN105908762B (en) The method that mullet grass is planted in side slope
CN205171302U (en) Novel gardens floor file structure suitable for ancient tree protection is transplanted with megaphanerophyte
CN105218043A (en) Brick-shaped structural product and manufacturing method thereof and manufacturing method of flow channel structure contained in brick-shaped structural product
CN210695116U (en) Ecological enclosure of pin-connected panel circulated application
CN201290259Y (en) Solid planting block capable of realizing moisture keeping function
CN209669626U (en) A kind of pervious concrete brick
CN110130368A (en) Renovation method of in-situ ecological greening concrete for hard slope protection
CN206457845U (en) Class cavernous body ecological concrete retaining wall building block
CN108612274A (en) A kind of ecological culture medium and its construction method for wall spraying
CN2914640Y (en) Biologic building block
CN104987121B (en) Nutritional foaming and coagulating grass planting building block and preparation method therefor
CN201004846Y (en) Circular arc shaped zoology building blocks
CN212294541U (en) An ecological slope protection for water utilization
CN210439228U (en) A combined ecological slope protection block

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815