CN102266652A - Formula and preparation process of plastic dumbbell ball or bell sheet for body building - Google Patents
Formula and preparation process of plastic dumbbell ball or bell sheet for body building Download PDFInfo
- Publication number
- CN102266652A CN102266652A CN2011102312150A CN201110231215A CN102266652A CN 102266652 A CN102266652 A CN 102266652A CN 2011102312150 A CN2011102312150 A CN 2011102312150A CN 201110231215 A CN201110231215 A CN 201110231215A CN 102266652 A CN102266652 A CN 102266652A
- Authority
- CN
- China
- Prior art keywords
- dumbbell ball
- disc
- ball
- dumbbell
- iron powder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000002360 preparation method Methods 0.000 title claims description 13
- 239000004033 plastic Substances 0.000 title abstract 2
- 238000009472 formulation Methods 0.000 title 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 21
- 239000003822 epoxy resin Substances 0.000 claims abstract description 12
- 239000003292 glue Substances 0.000 claims abstract description 12
- 229920000647 polyepoxide Polymers 0.000 claims abstract description 12
- 150000001875 compounds Chemical class 0.000 claims description 15
- 238000005516 engineering process Methods 0.000 claims description 13
- 238000001816 cooling Methods 0.000 claims description 8
- 238000005498 polishing Methods 0.000 claims description 7
- 235000013599 spices Nutrition 0.000 claims description 7
- 238000005507 spraying Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 5
- 239000002994 raw material Substances 0.000 abstract description 3
- 238000005265 energy consumption Methods 0.000 abstract description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 abstract 1
- 235000021190 leftovers Nutrition 0.000 abstract 1
- 229910052742 iron Inorganic materials 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 239000002440 industrial waste Substances 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000005272 metallurgy Methods 0.000 description 1
- 238000005245 sintering Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Adhesives Or Adhesive Processes (AREA)
Abstract
The invention relates to a formula of a plastic dumbbell ball or a bell sheet for body building. The formula is characterized by consisting of the following components in percentage by weight: 75 to 90 percent of iron powder and 10 to 25 percent of epoxy resin glue. The formula has the advantages that: 1, the iron powder raw material of the dumbbell ball or the bell sheet is industrial leftovers, so the cost is low; 2, due to certain plasticity, the manufactured dumbbell ball or the manufactured bell sheet has no damage to the ground or the surrounding environment and is relatively safe to the human body; 3, the dumbbell ball or the bell sheet is not easy to rust, and has relatively long service life; and 4, the process is simple and easy in operation, and can realize zero discharge and low energy consumption in the manufacturing process.
Description
Technical field
The present invention relates to the prescription of a kind of body-building with plasticity dumbbell ball, disc.
The invention still further relates to the preparation technology of a kind of body-building with plasticity dumbbell ball, disc.
Background technology
At present, in industrial processes, can produce a large amount of iron and steel leftover bits and pieces, especially at industrial circles such as machining, metallurgy, the leftover bits and pieces that produces mostly is iron filings, iron powder, iron end etc. greatly, usually these industrial wastes only being done garbage disposal falls, utilization rate is lower, and severe contamination environment, do not meet the requirement of the energy-saving and emission-reduction policy that country advocates.And for the preparation method of dumbbell ball, disc, what adopt mostly is traditional process, and the required raw material of traditional technology is more, require relatively stricter, the manufacture craft more complicated, production efficiency is low, required cost is higher.For addressing the above problem, the spy provides a kind of new technical scheme.
Summary of the invention
The purpose of this invention is to provide a kind of body-building with plasticity dumbbell ball, disc prescription.
Another object of the present invention provides the preparation technology of a kind of body-building with plasticity dumbbell ball, disc.
The technical solution used in the present invention is:
Body-building is made up of the component of following weight percentage: iron powder 75%-90%, epoxy resin glue 10%-25% with the prescription of plasticity dumbbell ball, disc.
Component by following weight percentage is formed: iron powder 80%-85%, epoxy resin glue 15%-20%.
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of above-mentioned component and epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 500-600 ℃ baking oven baking 2-3 hour, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
The present invention can be placed in dumbbell bar the appropriate location of mould earlier in the process of preparation dumbbell ball, and then compound on filling in mould, and through after the baking oven baking, the blank that film can obtain dumbbell is unloaded in cooling like this.The dumbbell of producing by this method since dumbbell bar and dumbbell ball be sintering together, so in use more solid and reliable.
Advantage of the present invention is: 1, the raw material iron powder of this product is industrial leftover bits and pieces, and cost is low; 2, the product of Zhi Zaoing has certain plasticity, and taking and placing are to ground or the equal not damaged of surrounding environment, and are also comparatively safe to the person; 3, product is difficult for getting rusty, and service life is longer; 4, this technology is simple, easy operating, and in manufacture process, can accomplish zero-emission, low energy consumption.
The specific embodiment
Embodiment 1
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of 75 weight portions and 10 parts by weight of epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 500 ℃ baking oven baking 2 hours, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Embodiment 2
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of 85 weight portions and 20 parts by weight of epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 550 ℃ baking oven baking 2.5 hours, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Embodiment 3
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of 90 weight portions and 25 parts by weight of epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 600 ℃ baking oven baking 3 hours, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Embodiment 4
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of 80 weight portions and 15 parts by weight of epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 550 ℃ baking oven baking 2.2 hours, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Embodiment 5
The preparation technology of body-building plasticity dumbbell ball, disc, its step comprises: at first the iron powder of 83 weight portions and 17 parts by weight of epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 580 ℃ baking oven baking 2.3 hours, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Claims (3)
1. body-building is with the prescription of plasticity dumbbell ball, disc, and it is characterized in that: the component by following weight percentage is formed: iron powder 75%-90%, epoxy resin glue 10%-25%.
2. the prescription of body-building according to claim 1 plasticity dumbbell ball, disc, it is characterized in that: the component by following weight percentage is formed: iron powder 80%-85%, epoxy resin glue 15%-20%.
3. body-building is with the preparation technology of plasticity dumbbell ball, disc, it is characterized in that: its step comprises: at first the iron powder of above-mentioned component and epoxy resin glue are stirred in the spice machine and make compound, compound in the mould of dumbbell ball or disc, filling then, size according to dumbbell ball or disc shape is equipped with corresponding forcing press pressurization, after the pressurization mould put into temperature and be controlled at 500-600 ℃ baking oven baking 2-3 hour, the outlet cooling is unloaded film and is got blank then, blank is after polishing is handled, spray coating as requested, pack at last.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011102312150A CN102266652A (en) | 2011-08-12 | 2011-08-12 | Formula and preparation process of plastic dumbbell ball or bell sheet for body building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011102312150A CN102266652A (en) | 2011-08-12 | 2011-08-12 | Formula and preparation process of plastic dumbbell ball or bell sheet for body building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102266652A true CN102266652A (en) | 2011-12-07 |
Family
ID=45049226
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011102312150A Pending CN102266652A (en) | 2011-08-12 | 2011-08-12 | Formula and preparation process of plastic dumbbell ball or bell sheet for body building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102266652A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107138730A (en) * | 2017-04-23 | 2017-09-08 | 扬州市康乐机械有限公司 | A kind of method for manufacturing fixed weight dumbbell plate |
| CN110757093A (en) * | 2019-12-24 | 2020-02-07 | 烟台大学 | Sports equipment processingequipment |
| CN112604229A (en) * | 2020-12-09 | 2021-04-06 | 山西四喜春工贸有限公司 | Preparation method for dumbbell barbell disc made of blast furnace dust iron oxide |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006073230A1 (en) * | 2005-01-10 | 2006-07-13 | Vesta Co., Ltd. | Impact absorption possible dumbbell and barbell disk |
| CN102029523A (en) * | 2009-09-24 | 2011-04-27 | 张斌 | Efficient, environment-friendly, practical and standardized manufacturing process of disc for body building |
| CN102094935A (en) * | 2010-12-31 | 2011-06-15 | 吉林省福瑞成粉体材料有限公司 | Energy-saving and environment-friendly counterweight product and manufacturing method thereof |
| CN102100958A (en) * | 2009-12-17 | 2011-06-22 | 王志 | Manufacturing method for fitness equipment and accessories thereof |
-
2011
- 2011-08-12 CN CN2011102312150A patent/CN102266652A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006073230A1 (en) * | 2005-01-10 | 2006-07-13 | Vesta Co., Ltd. | Impact absorption possible dumbbell and barbell disk |
| CN102029523A (en) * | 2009-09-24 | 2011-04-27 | 张斌 | Efficient, environment-friendly, practical and standardized manufacturing process of disc for body building |
| CN102100958A (en) * | 2009-12-17 | 2011-06-22 | 王志 | Manufacturing method for fitness equipment and accessories thereof |
| CN102094935A (en) * | 2010-12-31 | 2011-06-15 | 吉林省福瑞成粉体材料有限公司 | Energy-saving and environment-friendly counterweight product and manufacturing method thereof |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107138730A (en) * | 2017-04-23 | 2017-09-08 | 扬州市康乐机械有限公司 | A kind of method for manufacturing fixed weight dumbbell plate |
| WO2018196667A1 (en) * | 2017-04-23 | 2018-11-01 | 扬州市康乐机械有限公司 | Method for manufacturing weight plate having fixed weight for dumbbell |
| CN107138730B (en) * | 2017-04-23 | 2019-10-25 | 扬州市康乐机械有限公司 | A method of manufacture fixed weight dumbbell plate |
| CN110757093A (en) * | 2019-12-24 | 2020-02-07 | 烟台大学 | Sports equipment processingequipment |
| CN110757093B (en) * | 2019-12-24 | 2020-03-31 | 烟台大学 | A sports equipment processing device |
| CN112604229A (en) * | 2020-12-09 | 2021-04-06 | 山西四喜春工贸有限公司 | Preparation method for dumbbell barbell disc made of blast furnace dust iron oxide |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103406532B (en) | A kind of car shaft-type component powder metallurgy material and preparation method thereof | |
| CN103602922B (en) | A kind of powder metallurgical ferrous alloy and preparation method thereof | |
| CN103409687B (en) | A kind of powder metallurgy support and preparation method thereof | |
| CN108161772B (en) | Diamond cutter head prepared from metal ceramic binder by microwave sintering and preparation method of diamond cutter head | |
| CN104096835B (en) | A kind of energy-conservation powder metallurgical technique | |
| CN103361532B (en) | Sosoloid toughened metal ceramic and preparation method thereof | |
| CN103086699A (en) | Regenerative ceramic tile and producing method thereof | |
| CN104148618B (en) | A kind of TiC base cemented carbide grid composite strengthening grinding roller | |
| CN103361534A (en) | Metal ceramic with phase change heat storage function and manufacturing method thereof | |
| CN104532041A (en) | A kind of preparation technology of Mo2NiB2 base cermet | |
| CN107309430A (en) | A kind of large parts metal powder injection molding method | |
| CN102266652A (en) | Formula and preparation process of plastic dumbbell ball or bell sheet for body building | |
| CN104451324B (en) | Preparation process of WCoB-based metal ceramic | |
| CN104529244A (en) | Anti-aging and antibacterial artificial quartzite board and manufacturing method thereof | |
| CN102773482A (en) | Method for manufacturing butterfly valve rod by powder metallurgy | |
| CN101555148B (en) | High strength acid resistant refractory brick and preparation method thereof | |
| CN101121612A (en) | Method for preparing self-releasing glaze ceramic material by utilizing red mud and red sandstone | |
| CN103602927B (en) | A kind of Pb-free bearing steel and preparation method thereof | |
| CN105013574A (en) | High-hardness compound abrasion-resistant ball | |
| CN110814245B (en) | Forging method of aluminum alloy forging | |
| CN104120361B (en) | A kind of composite powder metallurgy material and preparation method thereof | |
| CN103600061B (en) | A kind of powder metallurgy plunger displacement pump blank and preparation method thereof | |
| CN106566974A (en) | Automobile magnetic water pump powder metallurgy inner/outer magnet ring and preparation method thereof | |
| CN102773485A (en) | A powder metallurgy preparation method for check valve spool | |
| CN106078486A (en) | A kind of honing stone for machining steel thin wall chromate treatment cylinder sleeve |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20111207 |