CN109736411A - A kind of method of openpit dredging and mud disposition - Google Patents
A kind of method of openpit dredging and mud disposition Download PDFInfo
- Publication number
- CN109736411A CN109736411A CN201910061166.7A CN201910061166A CN109736411A CN 109736411 A CN109736411 A CN 109736411A CN 201910061166 A CN201910061166 A CN 201910061166A CN 109736411 A CN109736411 A CN 109736411A
- Authority
- CN
- China
- Prior art keywords
- mud
- openpit
- dredging
- water
- disposition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
The invention discloses a kind of methods that openpit dredging and mud are disposed, and build intercepting ditch in openpit upper step, the periphery Cai Keng charge for remittance is shut off to draining pump pond, is expelled directly out;Meanwhile constructing filter structure in case the sludge dewatering cleaned out, is then carried out muddy water layered shaping at hole bottom, i.e., the water on mud top is drained using buoyancy tank pump, then shovel dress outward transport to mud in refuse dump.The mud for adopting hole will be transported to pour into the filter structure that refuse dump has been constructed in advance, be dehydrated using self gravity nature desiccation.Method of the invention makes full use of opencast equipment, the permeability of water and the strainability of coarse crushing stone in mud, and not only equipment investment expense is lower, but also has good effect to sludge dewatering.
Description
Technical field
The invention belongs to Ratio in Open-pit Mine to cheat sludge treatment technical field, and in particular to it is existing that hole mud is adopted in a kind of surface mining
The method of field cleaning and mud disposition.
Background technique
For surface mine in recovery process, Atmospheric precipitation and stope periphery Local Layer water burst can wash away step side
Side, causes to be scattered by the highwall ground after in-place blasting out to the bottom Cai Keng, and a large amount of mud are generated after ponding impregnates, and hinders mine
Normal production work.
Existing dredging technology is chiefly used in there is no the dredging for surface mine for ground installations such as lake, river, reservoirs
Technology.Due to the long-term ponding in openpit bottom, mud is in that saturation state is sunken to hole bottom, and different parts mud is heavy after precipitation
Shallow lake thickness is simultaneously uneven.Mud is conveyed according to slush pump, then needs constantly to move pump housing position and change pipeline, and dilute
Sludge volume amount after releasing is larger, and the time that required heap row space requirement is larger, precipitating needs is longer.Sludge treatment technology at present
Using most for mechanical dehydration method, this method equipment investment is big, treatment effeciency bottom, operation and maintenance are complicated and energy consumption is higher.
Summary of the invention
To solve the above problems, use is cut the present invention provides a kind of method that openpit dredging and mud are disposed
Ditch, muddy water layered shaping and the method that filter structure combines is constructed, the dredging and mud disposition for openpit propose
New solution.
The specific technical proposal of the invention is:
A kind of method of openpit dredging and mud disposition, steps are as follows:
Step 1: highwall intercepting ditch is built in the slope foot of open pit slope 1, the water that will shut off is directed directly to draining Cang Shui
Pond;
Step 2: buoyancy tank draining pump is arranged in the Cai Keng profundal zone relatively shallower from amount of sludge, will adopt hole bottom water pump drainage extremely
Drain storehouse pond;
Step 3: after mud exposes the surface, mud is transported into stope by equipment such as backhoe, carriers and is arranged down to preparatory
Build natural-dehydration in the refuse dump sludge dewatering structure completed.
Further, steps are as follows for the build of the refuse dump sludge dewatering structure:
Step 1: in the middle part of refuse dump excavate by silt space, it is desirable that space in delay it is ramp-like collected with Li Yunishui toward unilateral side,
The ground dug out is stacked in downstream dam respectively and upstream row is fallen on platform;
Step 2: in one layer of anti-seepage geotextile of the upstream row laying of falling platform surface;
Step 3: by silt space bottom making a layer thickness be 0.5m coarse crushing rock layers as filter layer.
Further, it is described by silt space be delay it is ramp-like, it is low in particular close to downstream dam, fall platform close to upstream row
It is high.
Further, the upstream row falls the edge of platform and is provided with reversing barricade.
Compared with prior art, the invention has the benefit that the method for the present invention is reduced by setting intercepting ditch imports hole
Bottom water amount, hole bed mud water stratification handle and carry out the mode to sludge dewatering in refuse dump, sufficiently sharp compared with conventional method
With mine existing device, avoid newly-increased desilting equipment and pipeline expense, eliminate low concentration mud outside bank up it is bad
Environment influences, and reduces dredging cost, improves the economic benefit in mine.
Detailed description of the invention
Fig. 1 is dredging muddy water in open-air pit bottom of the present invention layering cleaning schematic diagram;
Fig. 2 is sludge dewatering structural profile illustration in refuse dump of the present invention;
1- open pit slope;2- highwall intercepting ditch;3- bottom precipitation mud;4- shallow layer precipitating water;5- buoyancy tank draining pump;
6- drains storehouse pond;1 '-refuse dump original level landforms;2 '-downstreams dam;3 '-upstream rows fall platform;4 '-coarse crushing rock layers;
5 '-downstream collecting gutters;6 '-anti-seepage geotextiles;7 '-reversing barricades;8 '-mud.
Specific embodiment
To further describe the present invention, with reference to the accompanying drawings and examples to a kind of openpit dredging of the present invention and mud
The method of disposition is described in further detail.
As shown in Figure 1, a kind of method of openpit dredging and mud disposition, construction procedure is as follows:
Step 1: highwall intercepting ditch 2 is built in the slope foot of open pit slope 1, the water that will shut off is directed directly to draining Cang Shui
Pond 6 is arranged multiple intercepting ditch and reduces the hole bottom water amount that imports, alleviation hole 5 pressure of bottom buoyancy tank suction pump.
Step 2: open-air pit bottom includes the shallow layer precipitating water 4 and bottom precipitation mud 3 on top, relatively shallower from amount of sludge
The profundal zone Cai Keng arrange buoyancy tank draining pump 5, will adopt hole bottom water pump drainage to draining storehouse pond 6.
Step 3: after mud exposes the surface, mud is transported into stope row by equipment such as backhoe, carriers and is poured in advance
It builds in the refuse dump sludge dewatering structure completed, is dehydrated using self gravity nature desiccation.
As shown in Fig. 2, above-mentioned refuse dump sludge dewatering structure is to carry out dehydration construction, construction step to mud
It is rapid as follows:
Step 1: it excavates in the middle part of refuse dump by silt space, it is desirable that space is ramp-like with the past unilateral remittance of sharp 8 ' water of mud in delaying
Collection, the ground dug out is stacked in downstream dam 2 ' respectively and upstream row is fallen on platform 3 '.It is ramp-like to delay by silt space, in particular close to
Downstream dam 2 ' is low, and it is high to fall platform 3 ' close to upstream row, and falling mud 8 ' that platform is toppled over from upstream row in this way being capable of cloth more evenly
Completely entirely by silt space bottom.
Step 2: 3 ' surface of platform is fallen in upstream row and lays one layer of anti-seepage geotextile 6 ', for completely cutting off mud 8 ', in protection
Trip arranges platform, prolongs its service life.
Step 3: filter layer is being used as by the coarse crushing rock layers 4 ' that silt space bottom making a layer thickness is 0.5m, it should be noted that
It needs to reserve downstream collecting gutter 5 ' in topography lowest part when laying.When mud 8 ' is fallen in coarse crushing rock layers, in self gravity work
It can sink under, be filtered by coarse crushing rock layers, final water is collected to downstream collecting gutter 5 '.
Topple over mud 8 ' in order to facilitate vehicle, upstream row fall platform 3 ' edge be provided with reversing barricade 7 ', protect vehicle
Safety, prevents vehicle from sliding.
The method of the present invention is reduced the hole bottom water amount that imports, hole bed mud water stratification processing by intercepting ditch and carried out in refuse dump
To the mode of sludge dewatering, compared with conventional method, mine existing device is made full use of, avoids newly-increased desilting equipment and pipeline
Expense, eliminate low concentration mud influences in the poor environment that outside is banked up, and reduces dredging cost, improves the economy in mine
Benefit.This method makes full use of opencast equipment, the permeability of water and the strainability of coarse crushing stone in mud, not only equipment
Investment cost is lower, and has preferable effect to sludge dewatering.
Claims (5)
1. a kind of method of openpit dredging and mud disposition, characterized in that steps are as follows:
Step 1: highwall intercepting ditch (2) are built in the slope foot of open pit slope (1), the water that will shut off is directed directly to draining Cang Shui
Pond (6);
Step 2: buoyancy tank draining pump (5) are arranged in the Cai Keng profundal zone relatively shallower from amount of sludge, will adopt hole bottom water pump drainage to row
Sump pond (6);
Step 3: after mud exposes the surface, mud is transported into stope row by equipment such as backhoe, carriers and is built down to preparatory
Natural-dehydration in the refuse dump sludge dewatering structure of completion.
2. the method for a kind of openpit dredging according to claim 1 and mud disposition, characterized in that the casting
Steps are as follows for the build of field sludge dewatering structure:
Step 1: in the middle part of refuse dump excavate by silt space, it is desirable that space in delay it is ramp-like collected with sharp mud (8 ') water toward unilateral side,
The ground dug out is stacked in downstream dam (2 ') respectively and upstream row is fallen on platform (3 ');
Step 2: upstream row fall platform (3 ') surface lay one layer of anti-seepage geotextile (6 ');
Step 3: filter layer is being used as by the coarse crushing rock layers (4 ') that silt space bottom making a layer thickness is 0.5m.
3. the method for a kind of openpit dredging according to claim 2 and mud disposition, characterized in that described to be become silted up
Space be delay it is ramp-like, it is low in particular close to downstream dam (2 '), close to upstream row fall platform (3 ') height.
4. the method for a kind of openpit dredging according to claim 2 and mud disposition, characterized in that the upstream
The edge for arranging platform (3 ') is provided with reversing barricade (7 ').
5. the method for a kind of openpit dredging according to claim 2 and mud disposition, characterized in that the step
Three, it needs to reserve downstream collecting gutter (5 ') in topography lowest part when being laid with coarse crushing rock layers (4 ').
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910061166.7A CN109736411A (en) | 2019-01-23 | 2019-01-23 | A kind of method of openpit dredging and mud disposition |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910061166.7A CN109736411A (en) | 2019-01-23 | 2019-01-23 | A kind of method of openpit dredging and mud disposition |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109736411A true CN109736411A (en) | 2019-05-10 |
Family
ID=66365619
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910061166.7A Pending CN109736411A (en) | 2019-01-23 | 2019-01-23 | A kind of method of openpit dredging and mud disposition |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109736411A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111335383A (en) * | 2020-04-03 | 2020-06-26 | 广州市璞境生态保护技术有限公司 | A system and method for dredging black and odorous water bodies |
| CN111832759A (en) * | 2020-07-13 | 2020-10-27 | 福建省港航勘察设计院有限公司 | Water transport engineering classification coding method based on BIM |
| CN111852555A (en) * | 2020-07-06 | 2020-10-30 | 紫金矿业集团股份有限公司 | Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine |
| CN113374067A (en) * | 2021-07-10 | 2021-09-10 | 徐州天科机械制造有限公司 | Method and apparatus for cleaning underground ditch |
| CN114033379A (en) * | 2021-09-30 | 2022-02-11 | 华能伊敏煤电有限责任公司 | A kind of treatment method of super large volume silt silt area in open pit mine |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0252098A (en) * | 1988-08-11 | 1990-02-21 | Sakae Hatayama | Treatment of dredging sludge with dehydrating agent |
| CN1081733A (en) * | 1992-07-25 | 1994-02-09 | 山东省菏泽地区工业经济技术研究中心 | River course dry type desilting (excavation) method and equipment |
| CN102701567A (en) * | 2012-06-05 | 2012-10-03 | 江苏杰成凯新材料科技有限公司 | Rapid dewatering treatment method for high-water-content dredged silt |
| JP2013017989A (en) * | 2011-06-17 | 2013-01-31 | Yano Kogyo:Kk | Method and system for dredging sludge |
| CN106638891A (en) * | 2017-02-13 | 2017-05-10 | 中钢集团马鞍山矿山研究院有限公司 | Comprehensive water managing method in underground mining stage of open pit into underground mining |
| CN108824350A (en) * | 2018-06-06 | 2018-11-16 | 上海景铭建设发展有限公司 | A kind of comprehensive processing method in river |
-
2019
- 2019-01-23 CN CN201910061166.7A patent/CN109736411A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0252098A (en) * | 1988-08-11 | 1990-02-21 | Sakae Hatayama | Treatment of dredging sludge with dehydrating agent |
| CN1081733A (en) * | 1992-07-25 | 1994-02-09 | 山东省菏泽地区工业经济技术研究中心 | River course dry type desilting (excavation) method and equipment |
| JP2013017989A (en) * | 2011-06-17 | 2013-01-31 | Yano Kogyo:Kk | Method and system for dredging sludge |
| CN102701567A (en) * | 2012-06-05 | 2012-10-03 | 江苏杰成凯新材料科技有限公司 | Rapid dewatering treatment method for high-water-content dredged silt |
| CN106638891A (en) * | 2017-02-13 | 2017-05-10 | 中钢集团马鞍山矿山研究院有限公司 | Comprehensive water managing method in underground mining stage of open pit into underground mining |
| CN108824350A (en) * | 2018-06-06 | 2018-11-16 | 上海景铭建设发展有限公司 | A kind of comprehensive processing method in river |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111335383A (en) * | 2020-04-03 | 2020-06-26 | 广州市璞境生态保护技术有限公司 | A system and method for dredging black and odorous water bodies |
| CN111852555A (en) * | 2020-07-06 | 2020-10-30 | 紫金矿业集团股份有限公司 | Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine |
| CN111852555B (en) * | 2020-07-06 | 2021-08-03 | 紫金矿业集团股份有限公司 | Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine |
| CN111832759A (en) * | 2020-07-13 | 2020-10-27 | 福建省港航勘察设计院有限公司 | Water transport engineering classification coding method based on BIM |
| CN111832759B (en) * | 2020-07-13 | 2021-11-09 | 福建省港航勘察设计院有限公司 | Water transport engineering classification coding method based on BIM |
| CN113374067A (en) * | 2021-07-10 | 2021-09-10 | 徐州天科机械制造有限公司 | Method and apparatus for cleaning underground ditch |
| CN114033379A (en) * | 2021-09-30 | 2022-02-11 | 华能伊敏煤电有限责任公司 | A kind of treatment method of super large volume silt silt area in open pit mine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109736411A (en) | A kind of method of openpit dredging and mud disposition | |
| CN103397645B (en) | A kind of dry heap arranges with wet the tailings pile discharge method combined | |
| CN113874531B (en) | Tailings deposition | |
| CN105926576B (en) | A method of it builds a dam for upper reaches method tailings alluviation and accelerates Tailings Slurry dewatering and coagulating | |
| CN103924576A (en) | Intelligent control three-dimensional drainage vacuum preloading method for particle tailing ore reinforced fill dam | |
| CN104480950B (en) | The Tailings Dam fill dam and its technique of building a dam of upstream type are oozed based on forced-ventilated | |
| CN113605492A (en) | A three-dimensional protection and utilization method of water resources in open-pit mines | |
| CN114575359B (en) | Weak-permeability soil layer side slope underground flood control method | |
| WO2023109378A1 (en) | Waste rock and dry tailings combined treatment method for open pit | |
| CN102817354A (en) | Method for dredging soft foundation by dredger fill and reinforcement | |
| WO2014066974A1 (en) | Tailings management techniques and sand dump operations for extraction tailings | |
| CN110499814A (en) | The row for reducing saturation line of tailings pond buried depth seeps system layer method for arranging | |
| CN114855762A (en) | Device and method for closed-warehouse field sealing of tailing warehouse | |
| CN103061327A (en) | Comprehensive water control technique for dump | |
| CN204435430U (en) | A kind of reverse row being applicable to upstream type Tailings Dam oozes system and upstream type Tailings Dam | |
| CN114000565B (en) | Three-dimensional water storage system for internal-drainage strip mine and arrangement method | |
| CN103046564B (en) | Comprehensive water controlling method applicable to waste dumps with confined water at waste dump bases | |
| CN107354949A (en) | Water recycling system for foundation pits of subway stations adjacent to high slopes | |
| CN103046536B (en) | A kind of refuse dump integral harness measure being suitable for soft foundation | |
| CN114278379B (en) | Tailing recovery method | |
| CN218263739U (en) | Storehouse basin anti-seepage structure for storehouse of pumped storage power station | |
| CN114016569B (en) | Device and method for taking and recovering shallow groundwater of internal-drainage strip mine | |
| CN113622364B (en) | A construction method for open pit underground reservoirs in poor water areas with a depth greater than 100m | |
| CN205975789U (en) | City housing construction rainwater collection stores up and utilizes device | |
| CN211621638U (en) | Foundation pit dewatering and drainage system suitable for binary geological structure layer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 243000 No. 1899 Taibai Avenue, Ma'anshan Economic and Technological Development Zone, Anhui Province Applicant after: Anhui Maanshan Iron and Steel Mining Resources Group Co.,Ltd. Address before: 243000 No. 1899 Taibai Avenue, Ma'anshan Economic and Technological Development Zone, Anhui Province Applicant before: MASTEEL GROUP MINING Co.,Ltd. |
|
| CB02 | Change of applicant information | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |
|
| RJ01 | Rejection of invention patent application after publication |