CN109570254B - Heat transfer aluminum pipe blank hot extrusion rough forming device - Google Patents
Heat transfer aluminum pipe blank hot extrusion rough forming device Download PDFInfo
- Publication number
- CN109570254B CN109570254B CN201811447548.5A CN201811447548A CN109570254B CN 109570254 B CN109570254 B CN 109570254B CN 201811447548 A CN201811447548 A CN 201811447548A CN 109570254 B CN109570254 B CN 109570254B
- Authority
- CN
- China
- Prior art keywords
- heat
- end surface
- fixing
- fixing plate
- metal shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/02—Making uncoated products
- B21C23/04—Making uncoated products by direct extrusion
- B21C23/08—Making wire, rods or tubes
- B21C23/085—Making tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/009—Gas treatment of work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/21—Presses specially adapted for extruding metal
- B21C23/212—Details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C23/00—Extruding metal; Impact extrusion
- B21C23/21—Presses specially adapted for extruding metal
- B21C23/217—Tube extrusion presses
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C29/00—Cooling or heating extruded work or parts of the extrusion press
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C29/00—Cooling or heating extruded work or parts of the extrusion press
- B21C29/003—Cooling or heating of work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C35/00—Removing work or waste from extruding presses; Drawing-off extruded work; Cleaning dies, ducts, containers, or mandrels for metal extruding
- B21C35/02—Removing or drawing-off work
- B21C35/03—Straightening the work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Extrusion Of Metal (AREA)
- Body Structure For Vehicles (AREA)
Abstract
本发明公开了一种传热铝管胚料热挤压粗成型装置,包括隔热外金属壳,所述隔热外金属壳的上端面安装有进料口,所述隔热外金属壳一侧的端面安装有传感器固定板,所述传感器固定板的一侧安装有分流器,所述传感器固定板的前端面安装有温度传感器,温度传感器有三个,所述隔热外金属壳的后端面安装有液压机,所述隔热外金属壳的下端面安装有固定底座,所述固定底座一侧的端面安装控制平台,所述隔热外金属壳的前端面安装有固定盘。本发明通过氮气对铝管成型后出来的过程中,进行降温和防氧化处理,使铝管具备一定的韧性,提高铝管的质量,且挤压锤前端面安装了限位顶针,使铝管生产过程中节省了一个流程,从而大大的提高生产效率。
The invention discloses a heat-transferring aluminum tube blank hot extrusion rough forming device, comprising a heat-insulating outer metal shell, the upper end surface of the heat-insulating outer metal shell is provided with a feeding port, and the heat-insulating outer metal shell is a A sensor fixing plate is installed on the end surface of the side, a shunt is installed on one side of the sensor fixing plate, a temperature sensor is installed on the front end surface of the sensor fixing plate, there are three temperature sensors, and the rear end surface of the heat insulation outer metal shell is installed A hydraulic press is installed, a fixed base is installed on the lower end surface of the heat insulating outer metal shell, a control platform is installed on one end surface of the fixed base, and a fixed plate is installed on the front end surface of the heat insulating outer metal shell. In the present invention, in the process of forming the aluminum tube with nitrogen, the process of cooling and anti-oxidation is carried out, so that the aluminum tube has a certain toughness, and the quality of the aluminum tube is improved, and a limit thimble is installed on the front end surface of the extrusion hammer, so that the aluminum tube has a certain toughness. One process is saved in the production process, thereby greatly improving production efficiency.
Description
技术领域technical field
本发明涉及传热铝管生产技术领域,具体为一种传热铝管胚料热挤压粗成型装置。The invention relates to the technical field of heat-transfer aluminum tube production, in particular to a heat-transfer aluminum tube blank hot extrusion rough forming device.
背景技术Background technique
铝管作为换热器的元件之一,置于筒体之内,主要是用在将热流体的部分热量传递给冷流体的设备中,流体在热交换管内部流过进行热交换。换热器为提高性能,会使用一种具有较多散热面积的翅式热交换管,普通的热交换管都是在铝管的外表直接螺旋式缠绕散热板,散热板与铝管外表相接触,通过散热板的面积延伸扩大热交换管的散热效果,而换热器作为炼油、化工、环保、能源、电力等工业中的一种重要单元设备,凭借着耐腐蚀、重量轻,还广泛用于汽车、轮船、航天、航空、电器、农业、机电、家居等行业,出现供不应求的现象,所以传热铝管的发展前景很好。As one of the elements of the heat exchanger, the aluminum tube is placed in the cylinder, and is mainly used in the equipment that transfers part of the heat of the hot fluid to the cold fluid, and the fluid flows inside the heat exchange tube for heat exchange. In order to improve the performance of the heat exchanger, a finned heat exchange tube with more heat dissipation area will be used. The ordinary heat exchange tube is directly spirally wound the heat dissipation plate on the surface of the aluminum tube, and the heat dissipation plate is in contact with the surface of the aluminum tube. , expand the heat dissipation effect of the heat exchange tube through the area extension of the heat dissipation plate, and the heat exchanger is an important unit equipment in the industries of oil refining, chemical industry, environmental protection, energy, electric power, etc., with its corrosion resistance and light weight, it is also widely used In the automobile, ship, aerospace, aviation, electrical appliances, agriculture, electromechanical, household and other industries, the supply is in short supply, so the development prospect of heat transfer aluminum tubes is very good.
但是,现有的传热铝管胚料热挤压粗成型装置生产效率过慢,且粗料成型容易弯曲,表面氧化严重;因此,不满足现有的需求,对此我们提出了一种传热铝管胚料热挤压粗成型装置。However, the production efficiency of the existing heat transfer aluminum tube blank hot extrusion rough forming device is too slow, and the rough material is easily bent, and the surface is oxidized seriously; therefore, it does not meet the existing needs, and we propose a method Hot aluminum tube blank hot extrusion rough forming device.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种传热铝管胚料热挤压粗成型装置,以解决上述背景技术中提出的生产效率过慢,且粗料成型容易弯曲,表面氧化严重等问题。The purpose of the present invention is to provide a heat transfer aluminum tube blank hot extrusion rough forming device to solve the problems of slow production efficiency, easy bending of rough material forming and serious surface oxidation proposed in the above background technology.
为实现上述目的,本发明提供如下技术方案:一种传热铝管胚料热挤压粗成型装置,包括隔热外金属壳,所述隔热外金属壳的上端面安装有进料口,所述隔热外金属壳一侧的端面安装有传感器固定板,所述传感器固定板的一侧安装有分流器,所述传感器固定板的前端面安装有温度传感器,温度传感器有三个,所述隔热外金属壳的后端面安装有液压机,所述隔热外金属壳的下端面安装有固定底座,所述固定底座一侧的端面安装控制平台,所述隔热外金属壳的前端面安装有固定盘,固定盘有十二个,所述固定盘的一侧安装有冷却装置,所述固定底座的内壁安装有空压机,所述隔热外金属壳的内壁安装有出料口加固件,所述出料口加固件的一侧安装有加热电阻,所述加热电阻的外表面安装有石墨层,所述石墨层的内壁安装有合金耐温内胆,所述合金耐温内胆的内壁安装有挤压仓,所述挤压仓的一侧安装有挤压锤,所述挤压锤的前端面安装有限位顶针,所述挤压锤的一侧安装有万向轴,所述万向轴的一侧安装有液压臂,所述挤压仓的另一侧安装有出料口,所述出料口的一侧安装有直径限位件。In order to achieve the above purpose, the present invention provides the following technical solutions: a heat-transfer aluminum tube blank hot extrusion rough forming device, comprising a heat-insulating outer metal shell, the upper end surface of the heat-insulating outer metal shell is provided with a feeding port, A sensor fixing plate is installed on the end surface of one side of the heat insulating outer metal shell, a shunt is installed on one side of the sensor fixing plate, and a temperature sensor is installed on the front end surface of the sensor fixing plate. There are three temperature sensors. A hydraulic press is installed on the rear end surface of the heat insulation outer metal shell, a fixed base is installed on the lower end surface of the heat insulation outer metal shell, a control platform is installed on the end surface of one side of the fixed base, and the front end surface of the heat insulation outer metal shell is installed There are fixed disks, there are twelve fixed disks, a cooling device is installed on one side of the fixed disk, an air compressor is installed on the inner wall of the fixed base, and a discharge port is installed on the inner wall of the heat-insulating outer metal shell to reinforce A heating resistor is installed on one side of the discharge port reinforcement, a graphite layer is installed on the outer surface of the heating resistor, and an alloy temperature-resistant inner tank is installed on the inner wall of the graphite layer, and the alloy temperature-resistant inner tank is installed A squeeze chamber is installed on the inner wall of the squeeze chamber, a squeeze hammer is installed on one side of the squeeze chamber, a limit thimble is installed on the front end of the squeeze hammer, and a universal shaft is installed on one side of the squeeze hammer. A hydraulic arm is installed on one side of the universal shaft, a discharge port is installed on the other side of the extrusion bin, and a diameter limiter is installed on one side of the discharge port.
优选的,所述固定盘的前端面安装有导向片,所述固定盘的后端面安装有软管固定件,所述软管固定件的斜下方安装有连接件,所述固定盘的内壁安装有密封固定件,所述密封固定件的两侧均安装有固定盘内置。Preferably, a guide piece is installed on the front end surface of the fixing plate, a hose fixing member is installed on the rear end surface of the fixing plate, a connecting member is installed at the oblique lower part of the hose fixing member, and the inner wall of the fixing plate is installed There is a sealing fixing piece, and both sides of the sealing fixing piece are installed with built-in fixing discs.
优选的,所述冷却装置的上方安装有支撑柱,所述支撑柱的一侧安装有延伸脚车,延伸脚车有两个,所述延伸脚车的一侧安装有拉杆固定板,拉杆固定板有两个,所述拉杆固定板的一端安装有拉杆,所述拉杆的两端安装有拉杆固定件,所述延伸脚车的下方安装有滚轮,所述滚轮的上方安装有电机,所述电机的一侧安装有防撞板,所述支撑柱的上方安装有喷气固定件乙,所述喷气固定件乙的上方安装有喷气固定件甲,所述喷气固定件甲和喷气固定件乙的内壁均安装有粗胚固定件,粗胚固定件共设置有八个,所述粗胚固定件的一侧安装有喷嘴,喷嘴共设置有八个,所述冷却装置的一侧安装有制氮器。Preferably, a support column is installed above the cooling device, an extension trolley is installed on one side of the support column, there are two extension trolleys, and a tie rod fixing plate is installed on one side of the extension trolley, and the tie rod is fixed There are two plates, one end of the tie rod fixing plate is installed with a tie rod, both ends of the tie rod are installed with tie rod fixing parts, a roller is installed under the extension trolley, and a motor is installed above the roller, the A crash plate is installed on one side of the motor, a jet fixing piece B is installed above the support column, a jet fixing piece A is installed above the jet fixing piece B, and the jet fixing piece A and the jet fixing piece B are installed. The inner wall is equipped with rough embryo fixing pieces, there are eight rough embryo fixing pieces in total, nozzles are installed on one side of the rough embryo fixing pieces, and there are eight nozzles in total, and a nitrogen generator is installed on one side of the cooling device. device.
优选的,所述加热电阻与控制平台电性连接。Preferably, the heating resistor is electrically connected to the control platform.
优选的,所述空压机与分流器通过耐压软管连接。Preferably, the air compressor and the diverter are connected by a pressure-resistant hose.
优选的,所述传感器固定板的端面设置有孔,所述温度传感器的端面设置有卡槽,所述隔热外金属壳的端面设置有螺纹孔,所述传感器固定板和温度传感器通过卡槽固定,且传感器固定板与隔热外金属壳通过螺栓连接。Preferably, the end surface of the sensor fixing plate is provided with a hole, the end surface of the temperature sensor is provided with a slot, the end surface of the heat insulating outer metal shell is provided with a threaded hole, and the sensor fixing plate and the temperature sensor pass through the slot. fixed, and the sensor fixing plate and the heat-insulating outer metal shell are connected by bolts.
优选的,所述挤压仓的内壁设置有螺纹,所述挤压锤的外表面设置有螺纹,所述挤压仓与挤压锤通过螺纹连接。Preferably, the inner wall of the extrusion chamber is provided with threads, the outer surface of the extrusion hammer is provided with threads, and the extrusion chamber and the extrusion hammer are connected by threads.
优选的,所述挤压锤的前端面设置有螺纹孔,限位顶针的一端设置有螺纹,所述挤压锤与限位顶针通过螺纹连接。Preferably, the front end surface of the extrusion hammer is provided with a threaded hole, one end of the limit thimble is provided with a thread, and the extrusion hammer and the limit thimble are connected by thread.
优选的,所述固定盘内置的外表面设置有橡胶套,固定盘内置与密封固定件通过气保焊连接,所述软管固定件的外表面设置有螺纹,所述固定盘的后端面设置有螺纹孔,所述软管固定件与固定盘通过螺纹连接,且软管固定件与固定盘连接处设置有气芯。Preferably, the built-in outer surface of the fixing plate is provided with a rubber sleeve, the built-in fixing plate is connected with the sealing fixing member by gas shielded welding, the outer surface of the hose fixing member is provided with threads, and the rear end surface of the fixing plate is provided with A threaded hole is provided, the hose fixing piece is connected with the fixing disc through threads, and an air core is provided at the connection between the hose fixing piece and the fixing disc.
优选的,所述电机与滚轮通过传动皮带连接,所述喷气固定件甲的下端面设置有孔,所述喷气固定件乙的上端面设置有螺纹孔,所述喷气固定件甲与喷气固定件乙通过螺栓连接,且喷气固定件乙与支撑柱通过气保焊连接,所述防撞板的端面设置有孔,所述延伸脚车的前端面设置有螺纹孔,所述滚轮与延伸脚车通过螺栓连接,所述拉杆的端面设置有空心槽,所述拉杆固定板的一端设置有螺纹孔,所述拉杆固定件的一端设置有螺纹,所述拉杆固定件贯穿于拉杆与拉杆固定板通过螺纹连接。Preferably, the motor and the roller are connected by a transmission belt, the lower end surface of the jet fixing member A is provided with a hole, the upper end surface of the jet fixing member B is provided with a threaded hole, and the jet fixing member A and the jet fixing member are provided with threaded holes. B is connected by bolts, and the jet fixing part B and the support column are connected by gas shielded welding, the end surface of the crash plate is provided with holes, the front end surface of the extension trolley is provided with threaded holes, and the roller is connected to the extension trolley. Through bolt connection, the end face of the tie rod is provided with a hollow groove, one end of the tie rod fixing plate is provided with a threaded hole, and one end of the tie rod fixing piece is provided with a thread, and the tie rod fixing piece passes through the tie rod and the tie rod fixing plate. Threaded connection.
与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:
1、本发明通过挤压锤的前端面设置有螺纹孔,限位顶针的一端设置有螺纹,挤压锤与限位顶针通过螺纹连接,能够很好的在铝管生产的过程中直接中心开孔,节省了一个伸出流程,从而提高生产效率;1. In the present invention, the front end face of the extrusion hammer is provided with a threaded hole, and one end of the limit thimble is provided with a thread. Hole, saves a protruding process, thereby improving production efficiency;
2、本发明通过氮气对铝管成型后出来的过程中,进行降温和防氧化处理,使铝管具备一定的韧性,提高铝管的质量;2. In the present invention, in the process of forming the aluminum tube with nitrogen, the process of cooling and anti-oxidation is carried out, so that the aluminum tube has a certain toughness and the quality of the aluminum tube is improved;
3、本发明通过热挤压的原理,从而使加热电阻进行设备预热,并且有石墨层经过保温,能够很好的加快铝胚料的软化,从而提高生产效率;3. The present invention adopts the principle of hot extrusion, so that the heating resistor is preheated, and the graphite layer is kept warm, which can speed up the softening of the aluminum blank, thereby improving the production efficiency;
4、本发明通过固定盘对赶出来的铝管进行成型固定,避免铝管因为重力而导致弯曲;4. The present invention forms and fixes the driven aluminum tube through the fixing plate, so as to avoid the bending of the aluminum tube due to gravity;
5、本发明通过几个延伸脚车的配合使用,可以很好的生产出客户需要的特殊规格长度的铝管,且中间无焊缝,更加密封。5. The present invention can produce aluminum tubes with special specifications and lengths required by customers through the coordinated use of several extension trolleys, and there is no welding seam in the middle, which is more airtight.
附图说明Description of drawings
图1为本发明的一种传热铝管胚料热挤压粗成型装置整体主视图;1 is an overall front view of a heat transfer aluminum tube blank hot extrusion rough forming device of the present invention;
图2为本发明的一种传热铝管胚料热挤压粗成型装置整体主剖视图;2 is an overall front cross-sectional view of a heat transfer aluminum tube blank hot extrusion rough forming device according to the present invention;
图3为本发明的一种传热铝管胚料热挤压粗成型装置整体侧视图;3 is an overall side view of a heat-transfer aluminum tube blank hot extrusion rough forming device according to the present invention;
图4为本发明的固定盘局部结构示意图;Fig. 4 is the partial structure schematic diagram of the fixed plate of the present invention;
图5为本发明的冷却装置局部结构示意图。FIG. 5 is a schematic diagram of the partial structure of the cooling device of the present invention.
图中:1、进料口;2、隔热外金属壳;3、温度传感器;4、液压机;5、控制平台;6、固定底座;7、传感器固定板;8、分流器;9、固定盘;10、冷却装置;11、万向轴;12、液压臂;13、合金耐温内胆;14、加热电阻;15、石墨层;16、空压机;17、出料口;18、挤压锤;19、挤压仓;20、出料口加固件;21、直径限位件;22、固定盘内置;23、密封固定件;24、连接件;25、软管固定件;26、导向片;27、制氮器;28、喷气固定件甲;29、喷嘴;30、粗胚固定件;31、喷气固定件乙;32、支撑柱;33、延伸脚车;34、拉杆;35、拉杆固定板;36、拉杆固定件;37、电机;38、防撞板;39、滚轮;40、限位顶针。In the picture: 1. Feed inlet; 2. Heat-insulating outer metal shell; 3. Temperature sensor; 4. Hydraulic press; 5. Control platform; 6. Fixed base; 7. Sensor fixing plate; 8. Diverter; 9. Fixed Disc; 10. Cooling device; 11. Cardan shaft; 12. Hydraulic arm; 13. Alloy temperature-resistant inner tank; 14. Heating resistor; 15. Graphite layer; 16. Air compressor; 17. Discharge port; 18. Extrusion hammer; 19. Extrusion bin; 20. Outlet reinforcement; 21. Diameter limiter; 22. Built-in fixing plate; 23. Sealing fixing part; 24. Connecting part; 25. Hose fixing part; 26 , guide plate; 27, nitrogen generator; 28, jet fixing part A; 29, nozzle; 30, rough blank fixing part; 31, jet fixing part B; 32, support column; 33, extension bicycle; 34, tie rod; 35, tie rod fixing plate; 36, tie rod fixing part; 37, motor; 38, anti-collision plate; 39, roller; 40, limit thimble.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.
请参阅图1-5,本发明提供的一种实施例:一种传热铝管胚料热挤压粗成型装置,包括隔热外金属壳2,隔热外金属壳2的上端面安装有进料口1,隔热外金属壳2一侧的端面安装有传感器固定板7,传感器固定板7的一侧安装有分流器8,传感器固定板7的前端面安装有温度传感器3,温度传感器3有三个,测量温度更加精准,隔热外金属壳2的后端面安装有液压机4,隔热外金属壳2的下端面安装有固定底座6,固定底座6一侧的端面安装控制平台5,隔热外金属壳2的前端面安装有固定盘9,固定盘9有十二个,固定盘9的一侧安装有冷却装置10,固定底座6的内壁安装有空压机16,隔热外金属壳2的内壁安装有出料口加固件20,出料口加固件20的一侧安装有加热电阻14,加热电阻14的外表面安装有石墨层15,能够很好的起到保温作用,石墨层15的内壁安装有合金耐温内胆13,合金耐温内胆13的内壁安装有挤压仓19,挤压仓19的一侧安装有挤压锤18,挤压锤18的前端面安装有限位顶针40,能够直接在磁粗料成型过程中开孔,节省生产的过程,挤压锤18的一侧安装有万向轴11,万向轴11的一侧安装有液压臂12,挤压仓19的另一侧安装有出料口17,出料口17的一侧安装有直径限位件21。Please refer to FIGS. 1-5, an embodiment provided by the present invention: a heat-transfer aluminum tube blank hot extrusion rough forming device, comprising an insulating
进一步,固定盘9的前端面安装有导向片26,固定盘9的后端面安装有软管固定件25,软管固定件25的斜下方安装有连接件24,固定盘9的内壁安装有密封固定件23,密封固定件23的两侧均安装有固定盘内置22。Further, a
进一步,冷却装置10的上方安装有支撑柱32,支撑柱32的一侧安装有延伸脚车33,延伸脚车33有两个,延伸脚车33的一侧安装有拉杆固定板35,拉杆固定板35有两个,拉杆固定板35的一端安装有拉杆34,拉杆34的两端安装有拉杆固定件36,延伸脚车33的下方安装有滚轮39,滚轮39的上方安装有电机37,电机37的一侧安装有防撞板38,支撑柱32的上方安装有喷气固定件乙31,喷气固定件乙31的上方安装有喷气固定件甲28,喷气固定件甲28和喷气固定件乙31的内壁均安装有粗胚固定件30,粗胚固定件30共设置有八个,粗胚固定件30的一侧安装有喷嘴29,喷嘴29共设置有八个,冷却装置10的一侧安装有制氮器27。Further, a
进一步,加热电阻14与控制平台5电性连接,能够很好的根据温度来控制加热电阻14。Further, the
进一步,空压机16与分流器8通过耐压软管连接,连接中没有阻碍,且安装便捷。Further, the
进一步,传感器固定板7的端面设置有孔,温度传感器3的端面设置有卡槽,隔热外金属壳2的端面设置有螺纹孔,传感器固定板7和温度传感器3通过卡槽固定,且传感器固定板7与隔热外金属壳2通过螺栓连接,便于安装和拆卸。Further, the end surface of the
进一步,挤压仓19的内壁设置有螺纹,挤压锤18的外表面设置有螺纹,挤压仓19与挤压锤18通过螺纹连接,便于安装和拆卸。Further, the inner wall of the
进一步,挤压锤18的前端面设置有螺纹孔,限位顶针40的一端设置有螺纹,挤压锤18与限位顶针40通过螺纹连接。Further, the front end surface of the
进一步,固定盘内置22的外表面设置有橡胶套,能够很好的增加密封性,避免漏气从而减小压力,固定盘内置22与密封固定件23通过气保焊连接,增加连接点的牢固性,软管固定件25的外表面设置有螺纹,固定盘9的后端面设置有螺纹孔,软管固定件25与固定盘9通过螺纹连接,便于安装和拆卸,且软管固定件25与固定盘9连接处设置有气芯,能够很好的减小气体向外泄漏。Further, the outer surface of the fixed plate built-in 22 is provided with a rubber sleeve, which can well increase the sealing performance, avoid air leakage and reduce the pressure. The fixed plate built-in 22 and the sealing
进一步,电机37与滚轮39通过传动皮带连接,喷气固定件甲28的下端面设置有孔,喷气固定件乙31的上端面设置有螺纹孔,喷气固定件甲28与喷气固定件乙31通过螺栓连接,便于安装和拆卸,且喷气固定件乙31与支撑柱32通过气保焊连接,增加连接点的牢固性,防撞板38的端面设置有孔,延伸脚车33的前端面设置有螺纹孔,滚轮39与延伸脚车33通过螺栓连接,便于安装和拆卸,拉杆34的端面设置有空心槽,拉杆固定板35的一端设置有螺纹孔,拉杆固定件36的一端设置有螺纹,拉杆固定件36贯穿于拉杆34与拉杆固定板35通过螺纹连接,便于安装和拆卸。Further, the
工作原理:使用时,将设备的通电之后,通过控制平台5的控制将加热电阻14启动,调整至预热的状态,使挤压仓19的内部进入预热温度,同时石墨层15会对合金耐温内胆13的表面进行隔绝和保温,表面温度流失而浪费能源,并将限位顶针40与挤压锤18进行安装,观察传感器固定板7表面的温度传感器3,通过三种不同的温度传感器3来确定内部的预热温度到达后,将柔软的铝胚料从进料口1倒入挤压仓19的内部,并经过石墨层15对挤压仓19的内部进行加热,使铝胚料变的更加柔软,之后通过液压机4对液压臂12进行加压,让万向轴11向前带动挤压锤18,而万向轴11本身是可随意方向的活动,挤压锤18的外表面和挤压仓19的内部螺纹咬合,向前移动时,挤压锤18会旋转并开始把铝胚料挤压到出料口17,并经过出料口17对其粗成型的圆柱进行直径定型,之后调试过后的经过固定盘9再次对其限制,防止变形弯曲,之后送到冷却装置10上方的喷气固定件甲28和喷气固定件乙31的内部经过制氮器27制造的氮气对铝成型粗料进行冷却,并使铝管向后延伸,可以通过延伸脚车33生产出比其它铝管更长的,且中间不间断。Working principle: When in use, after the equipment is powered on, the
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, but that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments are to be regarded in all respects as illustrative and not restrictive, and the scope of the invention is to be defined by the appended claims rather than the foregoing description, which are therefore intended to fall within the scope of the claims. All changes within the meaning and scope of the equivalents of , are included in the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811447548.5A CN109570254B (en) | 2018-11-29 | 2018-11-29 | Heat transfer aluminum pipe blank hot extrusion rough forming device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811447548.5A CN109570254B (en) | 2018-11-29 | 2018-11-29 | Heat transfer aluminum pipe blank hot extrusion rough forming device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109570254A CN109570254A (en) | 2019-04-05 |
| CN109570254B true CN109570254B (en) | 2020-09-08 |
Family
ID=65923752
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811447548.5A Active CN109570254B (en) | 2018-11-29 | 2018-11-29 | Heat transfer aluminum pipe blank hot extrusion rough forming device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109570254B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117282796B (en) * | 2023-08-14 | 2024-08-09 | 福建祥鑫新材料科技有限公司 | Preparation method of aluminum alloy for electronic product and aluminum alloy obtained by using method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2238161C2 (en) * | 2002-10-28 | 2004-10-20 | Открытое акционерное общество "Чепецкий механический завод" | Method for forward extrusion of tube-profile article |
| CN103894435A (en) * | 2014-03-27 | 2014-07-02 | 太原理工大学 | Reciprocated extruding device for preparing superfine grain magnesium alloy and processing method thereof |
| CN103978060A (en) * | 2014-05-13 | 2014-08-13 | 扬州宏福铝业有限公司 | Dual-layer metal composite pipe semi-solid inverted extrusion molding die and applications thereof |
| CN207839630U (en) * | 2017-07-17 | 2018-09-11 | 大连康丰科技有限公司 | Long length specially shaped copper tube production line |
-
2018
- 2018-11-29 CN CN201811447548.5A patent/CN109570254B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2238161C2 (en) * | 2002-10-28 | 2004-10-20 | Открытое акционерное общество "Чепецкий механический завод" | Method for forward extrusion of tube-profile article |
| CN103894435A (en) * | 2014-03-27 | 2014-07-02 | 太原理工大学 | Reciprocated extruding device for preparing superfine grain magnesium alloy and processing method thereof |
| CN103978060A (en) * | 2014-05-13 | 2014-08-13 | 扬州宏福铝业有限公司 | Dual-layer metal composite pipe semi-solid inverted extrusion molding die and applications thereof |
| CN207839630U (en) * | 2017-07-17 | 2018-09-11 | 大连康丰科技有限公司 | Long length specially shaped copper tube production line |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109570254A (en) | 2019-04-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11097335B2 (en) | Opening-and-closing type heater and wind generator shaft forging process using the same | |
| CN109570254B (en) | Heat transfer aluminum pipe blank hot extrusion rough forming device | |
| CN108714677B (en) | Multi-process forging heating device for automobile aluminum alloy wheel hub | |
| CN101508154A (en) | High-temperature low-pressure steam continuous vulcanization method and device for rubber wires and cables | |
| CN201361664Y (en) | Rotary pipe expander | |
| CN110102588A (en) | A kind of preparation facilities revolving wing aluminum pipe and the preparation process using it | |
| CN214199664U (en) | A high temperature zinc ingot waste heat utilization device | |
| CN210231009U (en) | Cooling device of flattening equipment | |
| CN115899799A (en) | A Pneumatic Thermal Energy Heating System | |
| CN211367656U (en) | Hollow spindle center hole quenching tooling | |
| CN209810937U (en) | High-performance threaded pipe mold | |
| CN103900406A (en) | Phase change convection heat dissipation device for heating | |
| CN106426927A (en) | Cooling device for 3D printing device | |
| CN205024266U (en) | Whole hot type inductor that adds of constant velocity cardan joint | |
| CN210688433U (en) | Dry-type efficient energy-saving electromagnetic heating heat exchanger | |
| CN201429146Y (en) | Energy-saving environment-friendly heat storage radiator | |
| CN211990852U (en) | A multi-layer water-cooled cover for a continuous casting tension leveler | |
| CN112629299A (en) | Heat pipe manufacturing method and manufacturing instrument thereof | |
| CN221848587U (en) | A high-strength composite copper tube for cooling tank crystallizer | |
| CN204356536U (en) | The inner bag of non-maintaining oily warm-up mill | |
| CN103266203B (en) | Steel plate cooling device and method | |
| CN213378540U (en) | Tube drawing machine with cooling mechanism | |
| CN221475974U (en) | Heating mechanism of hot runner mold | |
| CN2252975Y (en) | Inner spiral combined fin pipe | |
| CN218798175U (en) | A wear-resistant hot roll |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 224200 No.9, Weiqi Road, Dongtai Economic Development Zone, Yancheng City, Jiangsu Province Applicant after: SHANGHAI SAXIN DONGTAI HEAT TRANSMISSION MATERIAL CO.,LTD. Address before: 224200 No. 9 Weiqi Road, Yancheng Economic Development Zone, Jiangsu Province Applicant before: SHANGHAI SAXIN DONGTAI HEAT TRANSMISSION MATERIAL CO.,LTD. |
|
| CB02 | Change of applicant information | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A heat transfer aluminum tube blank hot extrusion rough forming device Effective date of registration: 20230905 Granted publication date: 20200908 Pledgee: Bank of China Limited Dongtai Branch Pledgor: SHANGHAI SAXIN DONGTAI HEAT TRANSMISSION MATERIAL CO.,LTD. Registration number: Y2023980055182 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20200908 Pledgee: Bank of China Limited Dongtai Branch Pledgor: SHANGHAI SAXIN DONGTAI HEAT TRANSMISSION MATERIAL CO.,LTD. Registration number: Y2023980055182 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A heat transfer aluminum tube blank hot extrusion rough forming device Granted publication date: 20200908 Pledgee: Bank of China Limited Dongtai Branch Pledgor: SHANGHAI SAXIN DONGTAI HEAT TRANSMISSION MATERIAL CO.,LTD. Registration number: Y2025980032424 |