[go: up one dir, main page]

CN109344369A - Voucher production method and terminal device based on initial value verification - Google Patents

Voucher production method and terminal device based on initial value verification Download PDF

Info

Publication number
CN109344369A
CN109344369A CN201810961245.9A CN201810961245A CN109344369A CN 109344369 A CN109344369 A CN 109344369A CN 201810961245 A CN201810961245 A CN 201810961245A CN 109344369 A CN109344369 A CN 109344369A
Authority
CN
China
Prior art keywords
initial value
value
numerical value
corresponding numerical
record table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810961245.9A
Other languages
Chinese (zh)
Other versions
CN109344369B (en
Inventor
林剑年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Life Insurance Company of China Ltd
Original Assignee
Ping An Life Insurance Company of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Life Insurance Company of China Ltd filed Critical Ping An Life Insurance Company of China Ltd
Priority to CN201810961245.9A priority Critical patent/CN109344369B/en
Publication of CN109344369A publication Critical patent/CN109344369A/en
Application granted granted Critical
Publication of CN109344369B publication Critical patent/CN109344369B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/194Calculation of difference between files
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is suitable for technical field of data processing, provides the method and terminal device of a kind of voucher production based on initial value verification, the corresponding relationship of data category and numerical value is recorded by engineering record table;In manual amendment's instruction that user's input is not detected, calculate the difference in engineering record table between first stage initial value generation time corresponding numerical value and second stage initial value generation time corresponding numerical value, as time difference, if time difference is not less than preset time threshold, then pass through the corresponding initial value difference value of time difference described in preset regression equation calculation, and with this renewal project record sheet, when engineering record table in the updated meets logic verify rule and regular various verification, generate engineering accreditation table, to improve the actual effect of data in engineering record table, and it reduces update and verifies the human cost of data.

Description

Voucher production method and terminal device based on initial value verification
Technical field
The invention belongs to technical field of data processing more particularly to a kind of voucher production methods and end based on initial value verification End equipment.
Background technique
In engineering, " initial value " i.e. " original value " is the parameter of the value of a common description engineering subject matter, by It is in the expense accreditation scene of all kinds of engineerings more complicated, there is the initial value in two stages, i.e. completed papers under normal circumstances The initial value of initial value and accounts settling phase.Completed papers initial value is the contract value of engineering, but in accounts settling phase, settlement amounts can All kinds of surcharges, such as trustship expense, the defaulted amount of money and all kinds of service charges can occur, this is just due to the extension of time Resulting in settlement amounts, there is any discrepancy with contract value.In addition there are also some actual scenes (situations such as such as contract subtract rent, throw a lease), no Initial value with the stage also will appear difference.
During the accreditation of existing engineering cost, lack the accreditation method of unified automation, it is difficult to quickly and accurately Judge whether the initial value of different phase meets accreditation requirement, is asked in accreditation in the presence of verification inaccuracy and accreditation low efficiency Topic.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of voucher production method and terminal device based on initial value verification, To solve the problems, such as that the prior art existing the degree of automation during voucher production is low.
The first aspect of the embodiment of the present invention provides a kind of voucher production method based on initial value verification, comprising:
Initial engineering record table is obtained, the engineering record table records the corresponding relationship of data category and numerical value, described Data category includes: first stage initial value, second stage initial value, first stage initial value generates the time, second stage initial value generates Time and initial value adjust number;
Detect whether that the manual amendment for receiving user's input instructs;
If not receiving manual amendment's instruction of user's input, first stage initial value described in the engineering record table is calculated The difference between time corresponding numerical value and second stage initial value generation time corresponding numerical value is generated, as the time difference Value;
If the time difference is not less than preset time threshold, pass through the time difference described in preset regression equation calculation It is worth corresponding initial value difference value, and the initial value difference value is corresponding as the adjustment number of initial value described in the engineering record table Numerical value, to update the engineering record table;
If the corresponding numerical value of first stage initial value, second stage initial value in the updated engineering record table are corresponding Numerical value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check rule simultaneously, then for more Engineering record table distribution voucher number and accreditation date after new, generate engineering accreditation table.
The second aspect of the embodiment of the present invention provides a kind of terminal device, including memory and processor, described to deposit The computer program that can be run on the processor is stored in reservoir, when the processor executes the computer program, Realize following steps:
Initial engineering record table is obtained, the engineering record table records the corresponding relationship of data category and numerical value, described Data category includes: first stage initial value, second stage initial value, first stage initial value generates the time, second stage initial value generates Time and initial value adjust number;
Detect whether that the manual amendment for receiving user's input instructs;
If not receiving manual amendment's instruction of user's input, first stage initial value described in the engineering record table is calculated The difference between time corresponding numerical value and second stage initial value generation time corresponding numerical value is generated, as the time difference Value;
If the time difference is not less than preset time threshold, pass through the time difference described in preset regression equation calculation It is worth corresponding initial value difference value, and the initial value difference value is corresponding as the adjustment number of initial value described in the engineering record table Numerical value, to update the engineering record table;
If the corresponding numerical value of first stage initial value, second stage initial value in the updated engineering record table are corresponding Numerical value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check rule simultaneously, then for more Engineering record table distribution voucher number and accreditation date after new, generate engineering accreditation table.
The third aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the computer program realizes following steps when being executed by processor:
Initial engineering record table is obtained, the engineering record table records the corresponding relationship of data category and numerical value, described Data category includes: first stage initial value, second stage initial value, first stage initial value generates the time, second stage initial value generates Time and initial value adjust number;Detect whether that the manual amendment for receiving user's input instructs;If not receiving the people of user's input Work modification instruction then calculates first stage initial value described in the engineering record table and generates time corresponding numerical value and described the Two-stage initial value generates the difference between time corresponding numerical value, as time difference;If the time difference is not less than default Time threshold, then by the corresponding initial value difference value of time difference described in preset regression equation calculation, and by the initial value Difference value is as the corresponding numerical value of the adjustment number of initial value described in the engineering record table, to update the engineering record table;If The corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value and institute in the updated engineering record table It states the corresponding numerical value of initial value adjustment number while meeting logic verify rule and format check rule, be then updated described Engineering record table distributes voucher number and accreditation date, generates engineering accreditation table.
Optionally, before the initial engineering record table of the acquisition, further includes:
Training data set is obtained, the training data set includes preset quantity time difference and initial value difference value Corresponding relationship, in the training data set each corresponding relationship according to the time difference size ordered arrangement;
Pass through the first formula:It calculates Parameter A and parameter B, it is describedThe WiFor i-th of time difference pair in the training data set The weight coefficient answered, the Dis ' are the average value of whole initial value difference values in the training data set, the Time ' For the average value of All Time difference in the training data set, the DisiIt is former for i-th in the training data set It is worth difference value, the TimeiFor i-th time difference in the training data set, the e is natural constant, and the n is The preset quantity;Regression model will be brought by first formula calculated parameter A and the parameter B: Dis=A ×TimeB, to generate regression equation, the Dis is the initial value difference value, and Time is the time difference.
Optionally, after described to update the engineering record table, further include
Judge that format, the second stage of the corresponding numerical value of first stage initial value in the updated engineering record table are former Whether the format of the format and the corresponding numerical value of initial value adjustment number that are worth corresponding numerical value belongs to preset format set; Pass through the second formula: Err=val1-val2-Dif calculates accreditation error amount, and the val1 is corresponding for the first stage initial value Numerical value, the val2 is the corresponding numerical value of the second stage initial value, and the Dif is that the initial value adjusts the corresponding number of number Value;If accreditation error amount, which is less than, presets error threshold, and the corresponding numerical value of first stage initial value in the engineering record table The format of format, the format of the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number belongs to pre- If format set, then determine the corresponding numerical value of first stage initial value in the updated engineering record table, second stage The corresponding numerical value of initial value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check simultaneously Rule.
Optionally, further includes:
If the corresponding numerical value of first stage initial value, second stage initial value in the updated engineering record table are corresponding Numerical value and the corresponding numerical value of initial value adjustment number do not meet logic verify rule and format check rule simultaneously, then adjust With preset adjustment thread, the engineering record table is adjusted, and shows accreditation error message.
Optionally, further includes: if receiving manual amendment's instruction of user's input, parse in manual amendment's instruction The modified values for including;Using the modified values as the corresponding numerical value of the adjustment number of initial value described in the engineering record table, with more The new engineering record table.
In embodiments of the present invention, the corresponding relationship of data category and numerical value is recorded by engineering record table;It is not detecting When the manual amendment's instruction inputted to user, calculate first stage initial value in engineering record table generate time corresponding numerical value and Second stage initial value generates the difference between time corresponding numerical value, as time difference, if time difference is not less than preset Time threshold, then by the corresponding initial value difference value of time difference described in preset regression equation calculation, and with this renewal project Record sheet generates engineering accreditation table when engineering record table in the updated meets logic verify rule and regular various verification, To improve the actual effect of data in engineering record table, and reduces update and verify the human cost of data.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation flow chart of the voucher production method provided in an embodiment of the present invention based on initial value verification;
Fig. 2 is the structural block diagram of the voucher producing device provided in an embodiment of the present invention based on initial value verification;
Fig. 3 is the schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 shows the implementation process of the voucher production method provided in an embodiment of the present invention based on initial value verification, the party Method process includes step S101 to S108.The specific implementation principle of each step is as follows.
S101: obtaining initial engineering record table, and the engineering record table records the corresponding relationship of data category and numerical value, The data category includes: first stage initial value, second stage initial value, first stage initial value generation time, second stage initial value It generates the time and initial value adjusts number.
In embodiments of the present invention, original engineering record table can be to only include data category but the sky without corresponding numerical value Table is also possible to the record sheet that partial data classification has corresponding numerical value.By taking the decoration cost of workplace as an example, first stage initial value can be with It is the contract value of completed papers, second stage initial value can be the settlement amounts of accounts settling phase, wherein the contract of completed papers The amount of money can be filled in advance at the first stage initial value into original engineering record table;Furthermore first stage initial value generates the time It can also be written in advance.It is to be appreciated that the numerical value not being written in original engineering record table, can fill in line according to preset Journey is gradually inserted during subsequent.
On the other hand, in engineering record table the corresponding numerical value of each data type be also it is variable, in the embodiment of the present invention In, the variation of numerical value is realized by two ways in engineering record table.The first, the manual amendment for receiving user's input refers to It enables;Second, the difference of time, its corresponding initial value difference by preset regression equation calculation are generated based on two initial values Value, reuses initial value difference value and is adjusted to engineering record table, wherein specific calculating process will be explained below.
S102: it detects whether to receive manual amendment's instruction of user's input.
S103 parses repairing of including in manual amendment instruction if receiving manual amendment's instruction of user's input Revaluate.
Optionally, the corresponding numerical value of number is adjusted using the modified values as initial value described in the engineering record table, with Update the engineering record table.
It is to be appreciated that before the update, the initial value adjustment number of engineering record table has its corresponding numerical value, this numerical value It can be null value, after the updating, the modified values are instead of the original corresponding numerical value of initial value adjustment number.
S104 calculates the first rank described in the engineering record table if not receiving manual amendment's instruction of user's input Section initial value generates the difference between time corresponding numerical value and second stage initial value generation time corresponding numerical value, as Time difference.
S105, judges whether the time difference is less than preset time threshold.
S106, if the time difference is less than preset time threshold, not to the corresponding number of the original adjustment number Value is adjusted.
It is to be appreciated that under the premise of being not received by manual amendment's instruction, in embodiments of the present invention, if the time Difference is sufficiently small, then the difference between the corresponding numerical value of first stage initial value numerical value corresponding with second stage initial value should not be with Original adjustment number has biggish difference, so not being automatically adjusted to the corresponding numerical value of original adjustment number.
It is to be appreciated that if in the case where not changing the corresponding numerical value of original adjustment number, first stage initial value, Two-stage initial value and initial value adjustment number do not meet preset logic verify rule, then prove at least one data category pair There are abnormal conditions for the numerical value answered, then not generate voucher.
S107, if the time difference is not less than preset time threshold, by described in preset regression equation calculation The corresponding initial value difference value of time difference, and number is adjusted using the initial value difference value as initial value described in the engineering record table The corresponding numerical value of volume, to update the engineering record table.
Notably, in embodiments of the present invention, regression equation has been set in advance, when progress to this step When, it is only necessary to it brings the time difference determined in above-mentioned steps into regression equation, the corresponding initial value of time difference can be solved Difference value.
Optionally, before the initial engineering record table of the acquisition, further includes:
Training data set is obtained, the training data set includes preset quantity time difference and initial value difference value Corresponding relationship, in the training data set each corresponding relationship according to the time difference size ordered arrangement.
Optionally, pass through the first formula: Calculating parameter A and parameter B, it is describedThe WiFor i-th of time difference in the training data set It is worth corresponding weight coefficient, the Dis ' is the average value of whole initial value difference values in the training data set, described Time ' is the average value of All Time difference in the training data set, the DisiIt is in the training data set I initial value difference value, the TimeiFor i-th of time difference in the training data set, the e is natural constant, described N is the preset quantity.
It is to be appreciated that by first formula calculated parameter A and the parameter B into regression model will be brought: Dis=A × TimeB, to generate regression equation, the Dis is the initial value difference value, and Time is the time difference.
Notably, according to the calculated parameter B of actual data, often value is therefore entire in 1~1.1 section Regression equation is in fact a more gentle power function curve in the lesser section of time difference.
S108 judges that the corresponding numerical value of first stage initial value in the updated engineering record table, second stage are former Be worth corresponding numerical value and the corresponding numerical value of initial value adjustment number whether and meanwhile meet that logic verify is regular and format school Test rule.
It is to be appreciated that this judgment step mainly includes that two sons judge, first: judging the updated engineering record The format of the corresponding numerical value of first stage initial value in table, the format of the corresponding numerical value of second stage initial value and the initial value tune Whether the format of the corresponding numerical value of integer volume belongs to preset format set;Second: being judged by preset logic verify rule Whether the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number accord with Preset logic.
Optionally, preset format set includes digit, default system and the preset characters type after default decimal point Deng.
Optionally, after the update engineering record table, the preset logic verify rule that passes through of progress judges Whether the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number accord with Preset logic, comprising:
Optionally, passing through the second formula: Err=val1-val2-Dif calculates accreditation error amount, and the val1 is described the The corresponding numerical value of one stage initial value, the val2 are the corresponding numerical value of the second stage initial value, and the Dif is the initial value tune The corresponding numerical value of integer volume.
It is to be appreciated that if accreditation error amount is less than default error threshold, and the first stage in the engineering record table The format of the corresponding numerical value of initial value, the format of the corresponding numerical value of second stage initial value and the corresponding number of initial value adjustment number The format of value belongs to preset format set, then determines that the first stage initial value in the updated engineering record table is corresponding Numerical value, the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number meet logic verify rule simultaneously Then and format check is regular.
S109, if the corresponding numerical value of first stage initial value, second stage initial value in the updated engineering record table Corresponding numerical value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check rule simultaneously, Voucher number and accreditation date then are distributed for the updated engineering record table, generates engineering accreditation table.
S1010, if the corresponding numerical value of first stage initial value, second stage initial value in the updated engineering record table Corresponding numerical value and the corresponding numerical value of initial value adjustment number do not meet logic verify rule and format check rule simultaneously Then, then preset adjustment thread is called, the engineering record table is adjusted, and show accreditation error message.
Optionally, the adjustment thread includes actively sending inquiry message to user, to receive the artificial of user's input Adjustment instruction, and then parse to manually adjust in instruction and be corresponded to comprising the corresponding numerical value of first stage initial value or second stage initial value Numerical value.
Notably, in embodiments of the present invention, manually adjusting instruction with manual amendment's instruction is two kinds entirely different Instruction.Wherein, only comprising the corresponding numerical value of initial value adjustment number in the manual amendment's instruction mentioned in S103, and do not include The corresponding numerical value of first stage initial value or the corresponding numerical value of second stage initial value.And the instruction that manually adjusts in this step includes Be the corresponding numerical value of first stage initial value or the corresponding numerical value of second stage initial value, and it is corresponding not include initial value adjustment number Numerical value.
It is to be appreciated that the embodiment of the present invention records the corresponding relationship of data category and numerical value by engineering record table;? When manual amendment's instruction of user's input is not detected, calculates first stage initial value in engineering record table and generate time corresponding number Value and second stage initial value generate the difference between time corresponding numerical value, as time difference, if time difference is not less than Preset time threshold, then by the corresponding initial value difference value of time difference described in preset regression equation calculation, and more with this Newly built construction record sheet generates engineering when engineering record table in the updated meets logic verify rule and regular various verification Accreditation table to improve the actual effect of data in engineering record table, and reduces update and verifies the human cost of data.
Corresponding to the voucher production method based on initial value verification described in foregoing embodiments, Fig. 2 shows implementations of the present invention The structural block diagram for the voucher producing device based on initial value verification that example provides illustrates only and present invention reality for ease of description Apply the relevant part of example.
Referring to Fig. 2, which includes:
Module 201 is obtained, for obtaining initial engineering record table, the engineering record table records data category and numerical value Corresponding relationship, the data category includes: that first stage initial value, second stage initial value, first stage initial value generate time, the Two-stage initial value generates the time and initial value adjusts number;
Detection module 202, for detecting whether receiving manual amendment's instruction of user's input;
Computing module 203, if manual amendment's instruction for not receiving user's input, calculates in the engineering record table The first stage initial value generates time corresponding numerical value and the second stage initial value generates between time corresponding numerical value Difference, as time difference;
Update module 204 passes through preset recurrence side if being not less than preset time threshold for the time difference Journey calculates the corresponding initial value difference value of the time difference, and using the initial value difference value as described in the engineering record table Initial value adjusts the corresponding numerical value of number, to update the engineering record table;
Make module 205, if in the updated engineering record table the corresponding numerical value of first stage initial value, the The corresponding numerical value of two-stage initial value and the corresponding numerical value of initial value adjustment number meet logic verify rule simultaneously to pass Formula verification rule, then distribute voucher number and accreditation date for the updated engineering record table, generate engineering accreditation table.
Optionally, described device further include:
Set obtains module, and for obtaining training data set, the training data set includes the preset quantity time The corresponding relationship of difference and initial value difference value, each corresponding relationship is according to the big of the time difference in the training data set Small ordered arrangement;
Fitting module, for passing through the first formula: Calculating parameter A and parameter B, it is describedThe WiFor i-th of time difference in the training data set It is worth corresponding weight coefficient, the Dis ' is the average value of whole initial value difference values in the training data set, described Time ' is the average value of All Time difference in the training data set, the DisiIt is in the training data set i-th A initial value difference value, the TimeiFor i-th of time difference in the training data set, the e is natural constant, described N is the preset quantity;
Generation module, for recurrence mould will to be brought by first formula calculated parameter A and the parameter B Type: Dis=A × TimeB, to generate regression equation, the Dis is the initial value difference value, and Time is the time difference.
Optionally, described device includes:
Judgment module, for judge the corresponding numerical value of first stage initial value in the engineering record table format, second Whether the format of the format of the corresponding numerical value of stage initial value and the corresponding numerical value of initial value adjustment number belongs to preset lattice Formula set;
Error calculating module, for passing through the second formula: Err=val1-val2-Dif calculates accreditation error amount, described Val1 is the corresponding numerical value of the first stage initial value, and the val2 is the corresponding numerical value of the second stage initial value, the Dif The corresponding numerical value of number is adjusted for the initial value;
Determination module, if being less than default error threshold, and the first rank in the engineering record table for accreditation error amount The format of the corresponding numerical value of section initial value, the format of the corresponding numerical value of second stage initial value and initial value adjustment number are corresponding The format of numerical value belongs to preset format set, then determines the first stage initial value pair in the updated engineering record table Numerical value, the corresponding numerical value of second stage initial value and the initial value answered adjust the corresponding numerical value of number while meeting logic verify Rule and format check rule.
Optionally, described device further include:
Report an error module, if in the updated engineering record table the corresponding numerical value of first stage initial value, second The corresponding numerical value of stage initial value and the corresponding numerical value of initial value adjustment number do not meet logic verify rule simultaneously to pass Formula verification rule, then call preset adjustment thread, be adjusted to the engineering record table, and show accreditation error message.
Optionally, described device further include:
Parsing module parses in manual amendment's instruction if manual amendment's instruction for receiving user's input The modified values for including;
Module is adjusted, for using the modified values as the corresponding number of the adjustment number of initial value described in the engineering record table Value, to update the engineering record table.
In embodiments of the present invention, the corresponding relationship of data category and numerical value is recorded by engineering record table;It is not detecting When the manual amendment's instruction inputted to user, calculate first stage initial value in engineering record table generate time corresponding numerical value and Second stage initial value generates the difference between time corresponding numerical value, as time difference, if time difference is not less than preset Time threshold, then by the corresponding initial value difference value of time difference described in preset regression equation calculation, and with this renewal project Record sheet generates engineering accreditation table when engineering record table in the updated meets logic verify rule and regular various verification, To improve the actual effect of data in engineering record table, and reduces update and verify the human cost of data.
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 3, the terminal of the embodiment is set Standby 3 include: processor 30, memory 31 and are stored in the meter that can be run in the memory 31 and on the processor 30 Calculation machine program 32, such as the voucher production process based on initial value verification.When the processor 30 executes the computer program 32 Realize it is above-mentioned it is each based on initial value verification voucher production embodiment of the method in step, such as step 101 shown in FIG. 1 to 1010.Alternatively, the processor 30 realizes each module in above-mentioned each Installation practice/mono- when executing the computer program 32 The function of member, such as the function of unit 201 to 205 shown in Fig. 2.
Illustratively, the computer program 32 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 31, and are executed by the processor 30, to complete the present invention.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for Implementation procedure of the computer program 32 in the terminal device 3 is described.
The terminal device 3 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The terminal device may include, but be not limited only to, processor 30, memory 31.It will be understood by those skilled in the art that Fig. 3 The only example of terminal device 3 does not constitute the restriction to terminal device 3, may include than illustrating more or fewer portions Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net Network access device, bus etc..
Alleged processor 30 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 31 can be the internal storage unit of the terminal device 3, for example, terminal device 3 hard disk or Memory.The memory 31 is also possible to the External memory equipment of the terminal device 3, such as is equipped on the terminal device 3 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, Flash card (Flash Card) etc..Further, the memory 31 can also both include the storage inside of the terminal device 3 Unit also includes External memory equipment.The memory 31 is for storing needed for the computer program and the terminal device Other programs and data.The memory 31 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of voucher production method based on initial value verification characterized by comprising
Initial engineering record table is obtained, the engineering record table records the corresponding relationship of data category and numerical value, the data Classification includes: first stage initial value, second stage initial value, first stage initial value generates the time, second stage initial value generates the time And initial value adjusts number;
Detect whether that the manual amendment for receiving user's input instructs;
If not receiving manual amendment's instruction of user's input, the generation of first stage initial value described in the engineering record table is calculated Time corresponding numerical value and the second stage initial value generate the difference between time corresponding numerical value, as time difference;
If the time difference is not less than preset time threshold, pass through time difference pair described in preset regression equation calculation The initial value difference value answered, and using the initial value difference value as the corresponding number of the adjustment number of initial value described in the engineering record table Value, to update the engineering record table;
If the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value in the updated engineering record table And the corresponding numerical value of initial value adjustment number meets logic verify rule and format check rule simultaneously, then to update after Engineering record table distribution voucher number and accreditation date, generate engineering accreditation table.
2. the voucher production method as described in claim 1 based on initial value verification, which is characterized in that obtained initially described Before engineering record table, further includes:
Training data set is obtained, the training data set includes that preset quantity time difference is corresponding with initial value difference value Relationship, in the training data set each corresponding relationship according to the time difference size ordered arrangement;
Pass through the first formula:Calculating parameter A It is described with parameter BThe WiFor the corresponding power of i-th of time difference in the training data set Weight coefficient, the Dis ' are the average value of whole initial value difference values in the training data set, and the Time ' is described The average value of All Time difference in training data set, the DisiFor i-th of initial value difference in the training data set Value, the TimeiFor i-th of time difference in the training data set, the e is natural constant, and the n is described default Quantity;
Regression model will be brought by first formula calculated parameter A and the parameter B: Dis=A × TimeB, with Regression equation is generated, the Dis is the initial value difference value, and Time is the time difference.
3. the voucher production method as described in claim 1 based on initial value verification, which is characterized in that described described in update After engineering record table, further includes:
Judge format, the second stage initial value pair of the corresponding numerical value of first stage initial value in the updated engineering record table Whether the format of the format for the numerical value answered and the corresponding numerical value of initial value adjustment number belongs to preset format set;
Pass through the second formula: Err=val1-val2-Dif calculates accreditation error amount, and the val1 is the first stage initial value Corresponding numerical value, the val2 are the corresponding numerical value of the second stage initial value, and the Dif is that initial value adjustment number is corresponding Numerical value;
If accreditation error amount, which is less than, presets error threshold, and the corresponding numerical value of first stage initial value in the engineering record table The format of format, the format of the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number belongs to pre- If format set, then determine the corresponding numerical value of first stage initial value in the updated engineering record table, second stage The corresponding numerical value of initial value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check simultaneously Rule.
4. the voucher production method as described in claim 1 based on initial value verification, which is characterized in that further include:
If the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value in the updated engineering record table And the initial value adjusts the corresponding numerical value of number and does not meet logic verify rule and format check rule simultaneously, then calls pre- If adjustment thread, the engineering record table is adjusted, and show accreditation error message.
5. the voucher production method as described in claim 1 based on initial value verification, which is characterized in that further include:
If receiving manual amendment's instruction of user's input, the modified values for including in manual amendment's instruction are parsed;
Using the modified values as the corresponding numerical value of the adjustment number of initial value described in the engineering record table, to update the engineering Record sheet.
6. a kind of terminal device, including memory and processor, it is stored with and can transports on the processor in the memory Capable computer program, which is characterized in that when the processor executes the computer program, realize following steps:
Initial engineering record table is obtained, the engineering record table includes the corresponding relationship of multiple data categories and numerical value, described Data category includes: first stage initial value, second stage initial value, first stage initial value generates the time, second stage initial value generates Time and initial value adjust number;
Detect whether that the manual amendment for receiving user's input instructs;
If not receiving manual amendment's instruction of user's input, the generation of first stage initial value described in the engineering record table is calculated Time corresponding numerical value and the second stage initial value generate the difference between time corresponding numerical value, as time difference;
If the time difference is not less than preset time threshold, pass through time difference pair described in preset regression equation calculation The initial value difference value answered, and using the initial value difference value as the corresponding number of the adjustment number of initial value described in the engineering record table Value, to update the engineering record table;
If the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value in the updated engineering record table And the corresponding numerical value of initial value adjustment number meets logic verify rule and format check rule simultaneously, then to update after Engineering record table distribution voucher number and accreditation date, to generate engineering accreditation table.
7. terminal device as claimed in claim 6, which is characterized in that before the initial engineering record table of the acquisition, also Include:
Training data set is obtained, the training data set includes that preset quantity time difference is corresponding with initial value difference value Relationship, in the training data set each corresponding relationship according to the time difference size ordered arrangement;
Pass through the first formula:Calculating parameter A It is described with parameter BThe WiFor the corresponding power of i-th of time difference in the training data set Weight coefficient, the Dis ' are the average value of whole initial value difference values in the training data set, and the Time ' is described The average value of All Time difference in training data set, the DisiFor i-th of initial value difference in the training data set Value, the TimeiFor i-th of time difference in the training data set, the e is natural constant;
Regression model will be brought by first formula calculated parameter A and the parameter B: Dis=A × TimeB, institute Stating Dis is the initial value difference value, and Time is the time difference, to generate regression equation.
8. terminal device as claimed in claim 6, which is characterized in that it is described to update the engineering record table after, also Include:
Judge format, the second stage initial value pair of the corresponding numerical value of first stage initial value in the updated engineering record table Whether the format of the format for the numerical value answered and the corresponding numerical value of initial value adjustment number belongs to preset format set;
Pass through the second formula: Err=val1-val2-Dif calculates accreditation error amount, and the val1 is the first stage initial value Corresponding numerical value, the val2 are the corresponding numerical value of the second stage initial value, and the Dif is that initial value adjustment number is corresponding Numerical value;
If accreditation error amount, which is less than, presets error threshold, and the corresponding numerical value of first stage initial value in the engineering record table The format of format, the format of the corresponding numerical value of second stage initial value and the corresponding numerical value of initial value adjustment number belongs to pre- If format set, then determine the corresponding numerical value of first stage initial value in the updated engineering record table, second stage The corresponding numerical value of initial value and the corresponding numerical value of initial value adjustment number meet logic verify rule and format check simultaneously Rule.
9. terminal device as claimed in claim 6, which is characterized in that further include:
If the corresponding numerical value of first stage initial value, the corresponding numerical value of second stage initial value in the updated engineering record table And the initial value adjusts the corresponding numerical value of number and does not meet logic verify rule and format check rule simultaneously, then calls pre- If adjustment thread, the engineering record table is adjusted, and show accreditation error message.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as claim 1 to 5 of realization the method.
CN201810961245.9A 2018-08-22 2018-08-22 Certificate making method based on original value verification and terminal equipment Active CN109344369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810961245.9A CN109344369B (en) 2018-08-22 2018-08-22 Certificate making method based on original value verification and terminal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810961245.9A CN109344369B (en) 2018-08-22 2018-08-22 Certificate making method based on original value verification and terminal equipment

Publications (2)

Publication Number Publication Date
CN109344369A true CN109344369A (en) 2019-02-15
CN109344369B CN109344369B (en) 2023-04-07

Family

ID=65291639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810961245.9A Active CN109344369B (en) 2018-08-22 2018-08-22 Certificate making method based on original value verification and terminal equipment

Country Status (1)

Country Link
CN (1) CN109344369B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088278A1 (en) * 2005-10-17 2010-04-08 Wood George W Network file update mechanism with integrity assurance
US20150339943A1 (en) * 2014-04-30 2015-11-26 Faud Khan Methods and systems relating to training and certification
CN107958370A (en) * 2017-12-04 2018-04-24 国网河北省电力公司经济技术研究院 Project cost data verification method and terminal device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088278A1 (en) * 2005-10-17 2010-04-08 Wood George W Network file update mechanism with integrity assurance
US20150339943A1 (en) * 2014-04-30 2015-11-26 Faud Khan Methods and systems relating to training and certification
CN107958370A (en) * 2017-12-04 2018-04-24 国网河北省电力公司经济技术研究院 Project cost data verification method and terminal device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鲁静等: "基于图像识别的移动端原始凭证电子化智能填单系统", 《计算机工程》 *

Also Published As

Publication number Publication date
CN109344369B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN113129145B (en) Electronic evidence storing and verifying method and device based on block chain
US20120143830A1 (en) Interactive proof to validate outsourced data stream processing
CN107766132A (en) Multi-task scheduling method, application server and computer-readable recording medium
CN104156832A (en) Intersystem data verification method and device
CN107562780A (en) A kind of vehicle match method, electronic equipment and storage medium
CN106407830A (en) Detection method and device of cloud-based database
CN110738477A (en) reconciliation method, device, computer equipment and storage medium
CN109582550B (en) Method, device and server for acquiring full-service scene fault set
CN105530272A (en) Method and device for application data synchronization
CN109815344B (en) Network model training system, method, device and medium based on parameter sharing
CN109066687A (en) A kind of electric power system tide calculation method, system and electronic equipment
CN109299846A (en) A method, system and terminal equipment for reliability analysis of nuclear power plant equipment
CN107908603A (en) Dynamic generation document method and application server
CN109885614A (en) A kind of method and apparatus that data are synchronous
CN107329853A (en) Backup method, standby system and the electronic equipment of data-base cluster
CN113141410A (en) Dynamically adjusted QPS control method, system, device and storage medium
CN110472109A (en) Mobilism Data Quality Analysis method and plateform system
CN106326062A (en) Method and device for controlling running state of application program
CN108614866A (en) Internetbank client's Contribution Analysis method, apparatus and system
CN104348628A (en) Method and device for obtaining local Root authority
CN109615506A (en) Collection information processing method and system
CN109348434A (en) A kind of sending method of scene information, sending device and terminal device
CN109344369A (en) Voucher production method and terminal device based on initial value verification
CN112801616B (en) Abnormal account book processing method and device
CN115774718A (en) Data report generation method and device and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant