CN109339399A - A kind of section construction method of steel construction in elevator shaft - Google Patents

A kind of section construction method of steel construction in elevator shaft Download PDF

Info

Publication number
CN109339399A
CN109339399A CN201811403982.3A CN201811403982A CN109339399A CN 109339399 A CN109339399 A CN 109339399A CN 201811403982 A CN201811403982 A CN 201811403982A CN 109339399 A CN109339399 A CN 109339399A
Authority
CN
China
Prior art keywords
construction
platform
steel
elevator shaft
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811403982.3A
Other languages
Chinese (zh)
Other versions
CN109339399B (en
Inventor
姚剑
刘春波
曹兴臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOSTEEL CONSTRUCTION CO LTD
Original Assignee
BAOSTEEL CONSTRUCTION CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOSTEEL CONSTRUCTION CO LTD filed Critical BAOSTEEL CONSTRUCTION CO LTD
Priority to CN201811403982.3A priority Critical patent/CN109339399B/en
Publication of CN109339399A publication Critical patent/CN109339399A/en
Application granted granted Critical
Publication of CN109339399B publication Critical patent/CN109339399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/161Handling units comprising at least considerable parts of two sides of a room or like enclosed space
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of section construction methods of steel construction in elevator shaft, its main feature is that the method that elevator shaft is divided into several construction segmentations using isolation platform, each construction subsection setup hoistable platform realizes the cross-operation that different height section is carried out in same hoistway.The present invention has the cross-operation that different height section is carried out in same hoistway compared with prior art, effectively avoid influence of the Construction of Steel Structure to lower part hoistway, security risk is reduced, provides Construction of Steel Structure method in a set of safe, orderly, efficient elevator for super high-rise building.

Description

A kind of section construction method of steel construction in elevator shaft
Technical field
The present invention relates to elevator shaft installation technology of steel structure field, specifically a kind of elevator shaft of super high-rise building The section construction method of interior steel construction.
Background technique
Usually there is multiple elevator shafts in super high-rise building in Core Walls Structure, the steel construction in elevator shaft is generally light The girder steel of type, such steel construction need to can be installed after the completion of Core Walls Structure civil engineering structure, and be at this time closing in Core Walls Structure The interior space, be not available steel construction in the conventional cranes tool such as tower crane lifting hoistway, the hoistway of skyscraper is high, floor More, operating environment is complicated, inside hoistway is not easy that firm job platform is arranged, and the different height section in same hoistway is deposited The cross-operation the case where, security risk is big.
Summary of the invention
The purpose of the present invention is the segmentation of steel construction is applied in view of the deficiencies of the prior art and in a kind of elevator shaft for designing Work method, the method that elevator shaft is divided into the construction segmentation of several hoistways using isolation platform, each hoistway construction section are set Hoistable platform is set, the cross-operation for carrying out different height section in same hoistway is realized, effectively avoids Construction of Steel Structure under The influence of portion's hoistway reduces security risk, provides steel knot in a set of safe, orderly, efficient elevator for super high-rise building Structure construction method,
Realizing the specific technical solution of the object of the invention is: the section construction method of steel construction, feature in a kind of elevator shaft Be using isolation platform by elevator shaft be divided into several construction segmentation method, each construction subsection setup hoistable platform, Realize the cross-operation that different height section is carried out in same hoistway, Specific construction carries out in the steps below:
A step: built-in fitting being constructed together with the civil engineering structure of elevator shaft, and is installed on the inner wall of elevator shaft, described pre- Embedded part is the fixed built-in fitting of track girder built-in fitting, isolation platform built-in fitting and hoistable platform.
B step: it is a construction segmentation by 7 ~ 10 floors, elevator shaft is divided into several constructions point from the bottom to top Section.
Step c: isolation platform, material loading platform, monorail and the hoistable platform of each construction segmentation, the liter are successively installed Drop platform is equipped with hoist engine and lifting wire rope controls it in the upper and lower lifting of construction segmentation;The material loading platform setting is rising The placement dropped under platform, and temporarily fed for hoistway steel construction, structure, production and installation are similar with isolation platform, while The Construction of Steel Structure region on top is kept apart with lower part hoistway;The monorail is equipped with electric block.
Step d: the steel member being installed in elevator is transported to the corresponding of Work sectors isolation platform by baggage elevator Floor, be moved to hoistable platform carry out feeding, using electric block according to sequence from bottom to up successively installation segmentation Elevator shaft steel member.
Step e: the steel member installation of other construction segmentations is successively carried out by Step d, or intersects by Step d and carries out each construction The steel member of segmentation is installed, until the steel member of all construction segmentations is installed.
F step: isolation platform, material loading platform, monorail and hoistable platform are successively removed by the erection sequence of step c.
The isolation platform and material loading platform are made using steel plate with fashioned iron ribbing, and are held on the fixation of hoistway embedded board Connection is bolted on support.
The elevating mechanism that the hoistable platform is driven using wirerope and hoist engine, and configure elevating safety lock, construct and shine Bright lamp, and enter and leave the safety rope of hoistable platform.
The present invention has the cross-operation that different height section is carried out in same hoistway compared with prior art, effectively avoids Influence of the Construction of Steel Structure to lower part hoistway reduces security risk, provides for super high-rise building a set of safe, orderly, efficient Elevator in Construction of Steel Structure method.
Detailed description of the invention
Fig. 1 is Work sectors arrangement schematic diagram;
Fig. 2 is implementation example figure.
Specific embodiment
Refering to attached drawing 1, the method that elevator shaft 6 is divided into several construction segmentations using isolation platform 1 by the present invention, often A construction subsection setup hoistable platform 5 realizes the cross-operation that different height Work sectors are carried out in same hoistway, specific Construction carries out in the steps below:
A step: built-in fitting being constructed together with the civil engineering structure of elevator shaft, and is installed on the inner wall of elevator shaft 6, described pre- Embedded part is the fixed built-in fitting of track girder built-in fitting, isolation platform built-in fitting and hoistable platform.
B step: it is a construction segmentation by 7 ~ 10 floors, elevator shaft 6 is divided into several constructions point from the bottom to top Section.
Step c: successively installing isolation platform 1, material loading platform 11, monorail 2 and the hoistable platform 5 of each construction segmentation, The isolation platform 1 is to be arranged at the top of Work sectors;The material loading platform 11 is the hoistway steel knot being arranged under hoistable platform 5 Structure temporarily feeds placement, while also keeping apart in the Construction of Steel Structure region on top with lower part hoistway, effectively steel construction is avoided to apply Influence of the work to lower part hoistway is reduced security risk, isolation platform 1 and material loading platform 11 and is made using steel plate with fashioned iron ribbing, And it is held on the hold-down support of hoistway embedded board and is bolted connection;The monorail 2 is equipped with electric block 3;It is described The elevating mechanism 10 that hoistable platform 5 is driven using wire rope pulley group and hoist engine, and configure elevating safety lock, construction illumination Lamp, and enter and leave the safety rope 4 of hoistable platform.
Step d: the steel member being installed in elevator is transported to the corresponding of Work sectors isolation platform 1 by baggage elevator Floor is moved to hoistable platform 5 and carries out feeding, successively installs elevator shaft 6 according to sequence from bottom to up using electric block 3 Interior steel member.
Step e: the steel member installation of other construction segmentations is successively carried out by Step d, or intersects by Step d and carries out each construction The steel member of segmentation is installed, until the steel member of all Work sectors is installed.
F step: isolation platform 1, material loading platform 11, monorail 2, electric block 3 are successively removed by the erection sequence of step c With hoistable platform 5.
By following specific embodiments, the present invention is described in further detail.
Embodiment 1
Refering to attached drawing 2, the present invention is a construction segmentation by 7 ~ 10 floors, and elevator shaft 6 is divided into several from the bottom to top Construction segmentation, then carries out the installation exercise of steel construction in elevator in the steps below:
(1), the installation of lifting facility: monorail 2 uses i shaped steel, and specification and electric block 3 are mating, 2 both ends of monorail It is fixedly connected by bolt with insert 9, electric block 3 is debugged qualification and can put into after being installed on monorail 2 to be made With 3 lifting capacity of electric block is greater than required installation steel member piece weight and is greater than the piece weight of material loading platform 11, lifting Stroke is greater than the height of hoistway construction segmentation.
(2), the isolation of Work sectors: isolation platform 1 is mainly made of steel plate and fashioned iron ribbing, according to elevator shaft 6 The size of planar dimension is made generally in 3 ~ 4 pieces of platform cover boards, and platform side edge thereof, which is directly held on, is welded on the pre-buried branch of hoistway On seat 8, blending bolt is fixedly connected with support 8, is provided with two movable hoisting rings 7 to be easily installed every piece of platform cover board, isolation is flat After platform 1 is installed, lower part Construction of Steel Structure region is isolated with hoistway overhead, can effectively stop top high-altitude junk, Reduce construction safety hidden danger.
(3), the production and installation of lifting operation platform: hoistable platform 5 is driven using wire rope pulley group and hoist engine Elevating mechanism 10, and elevating safety lock and construction illumination lamp are configured, a set of firm peace is separately separately configured at every layer of lift port Full rope 4, safety belt need to be hung on this safety rope 4 by construction personnel, after hoistable platform 5 of being allowed for access carry out installation exercise behaviour Make.
(4), the installation of material loading platform: the material loading platform 11 of lower part is arranged on the elevator shaft 6 under hoistable platform 5, Structure, production and installation are similar with the isolation platform 1 on top, at the same also by the Construction of Steel Structure region on top and lower part hoistway every It leaves, effectively avoids influence of the Construction of Steel Structure to lower part hoistway, reduce security risk.
Above only the present invention will be further described, is not intended to limit the invention patent, and all is of the invention equivalent Implement, is intended to be limited solely by within the scope of the claims of the invention patent.

Claims (3)

1. a kind of section construction method of steel construction in elevator shaft, it is characterised in that divided elevator shaft using isolation platform For the method for several construction segmentations, each construction subsection setup hoistable platform, realization carries out different height in same hoistway The cross-operation of Work sectors, Specific construction carry out in the steps below:
A step: built-in fitting being constructed together with the civil engineering structure of elevator shaft, and is installed on the inner wall of elevator shaft, described pre- Embedded part is the fixed built-in fitting of track girder built-in fitting, isolation platform built-in fitting and hoistable platform;
B step: it is a construction segmentation by 7 ~ 10 floors, elevator shaft is divided into several construction segmentations from the bottom to top;
Step c: successively installing isolation platform, material loading platform, monorail and the hoistable platform of each construction segmentation, and the lifting is flat Platform is equipped with hoist engine and lifting wire rope controls it in the upper and lower lifting of construction segmentation;The material loading platform setting is flat in lifting Under platform, and the placement temporarily fed for hoistway steel construction, structure, production and installation are similar with isolation platform, while also will be upper The Construction of Steel Structure region in portion keeps apart with lower part hoistway;The monorail is equipped with electric block;
The steel member being installed in elevator: being transported to the respective storey of Work sectors isolation platform by Step d by baggage elevator, It is moved to hoistable platform and carries out feeding, using electric block according to the elevator that successively installation is segmented of sequence from bottom to up Road steel member;
Step e: successively being carried out the steel member installation of other construction segmentations by Step d, or is intersected by Step d and carried out each construction segmentation Steel member installation, until it is all construction segmentation steel members be installed;
F step: isolation platform, material loading platform, monorail and hoistable platform are successively removed by the erection sequence of step c.
2. according to claim 1 in elevator shaft steel construction section construction method, it is characterised in that the isolation platform It is made using steel plate with fashioned iron ribbing with material loading platform, and is held on the company of being bolted on the hold-down support of hoistway embedded board It connects.
3. according to claim 1 in elevator shaft steel construction section construction method, it is characterised in that the hoistable platform Using the elevating mechanism of wirerope and hoist engine driving, and elevating safety lock, construction illumination lamp are configured, and enter and leave hoistable platform Safety rope.
CN201811403982.3A 2018-11-23 2018-11-23 Sectional construction method of steel structure in elevator hoistway Active CN109339399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811403982.3A CN109339399B (en) 2018-11-23 2018-11-23 Sectional construction method of steel structure in elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811403982.3A CN109339399B (en) 2018-11-23 2018-11-23 Sectional construction method of steel structure in elevator hoistway

Publications (2)

Publication Number Publication Date
CN109339399A true CN109339399A (en) 2019-02-15
CN109339399B CN109339399B (en) 2023-08-25

Family

ID=65317502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811403982.3A Active CN109339399B (en) 2018-11-23 2018-11-23 Sectional construction method of steel structure in elevator hoistway

Country Status (1)

Country Link
CN (1) CN109339399B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980367A (en) * 2020-08-31 2020-11-24 中国二十二冶集团有限公司 Elevator shaft inverted construction method
WO2021057193A1 (en) * 2019-09-28 2021-04-01 中建三局集团有限公司 Skyscraper firefighting elevator scaffolding-less segmented installation and construction method
CN116181037A (en) * 2022-06-21 2023-05-30 中建八局第一建设有限公司 A kind of construction structure and construction method of stairwell in super high-rise core tube by segmental jump
CN118087885A (en) * 2024-04-15 2024-05-28 中国二十二冶集团有限公司 Installation method of steel structure elevator shaft

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060123724A1 (en) * 2004-12-09 2006-06-15 Pollack Robert W Device and method to provide air circulation space proximate to insulation material
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
US20120023863A1 (en) * 2009-04-06 2012-02-02 Kone Corporation Method And Elevator Arrangement
CN102502378A (en) * 2011-11-15 2012-06-20 中建三局建设工程股份有限公司 Climbing elevator for building construction
JP2013216483A (en) * 2012-04-12 2013-10-24 Toshiba Elevator Co Ltd Lifting height extending construction method for elevator for construction
CN103821356A (en) * 2014-02-25 2014-05-28 上海鑫尔森模架工程有限公司 Construction equipment and system of elevator shaft shear wall
CN204456814U (en) * 2015-02-16 2015-07-08 北京建工四建工程建设有限公司 Plain type staircase hoistway operation platform
CN108609454A (en) * 2018-05-11 2018-10-02 日立电梯(中国)有限公司 A kind of segmented setting out method of elevator installation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060123724A1 (en) * 2004-12-09 2006-06-15 Pollack Robert W Device and method to provide air circulation space proximate to insulation material
US20120023863A1 (en) * 2009-04-06 2012-02-02 Kone Corporation Method And Elevator Arrangement
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN102502378A (en) * 2011-11-15 2012-06-20 中建三局建设工程股份有限公司 Climbing elevator for building construction
JP2013216483A (en) * 2012-04-12 2013-10-24 Toshiba Elevator Co Ltd Lifting height extending construction method for elevator for construction
CN103821356A (en) * 2014-02-25 2014-05-28 上海鑫尔森模架工程有限公司 Construction equipment and system of elevator shaft shear wall
CN204456814U (en) * 2015-02-16 2015-07-08 北京建工四建工程建设有限公司 Plain type staircase hoistway operation platform
CN108609454A (en) * 2018-05-11 2018-10-02 日立电梯(中国)有限公司 A kind of segmented setting out method of elevator installation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021057193A1 (en) * 2019-09-28 2021-04-01 中建三局集团有限公司 Skyscraper firefighting elevator scaffolding-less segmented installation and construction method
CN111980367A (en) * 2020-08-31 2020-11-24 中国二十二冶集团有限公司 Elevator shaft inverted construction method
CN116181037A (en) * 2022-06-21 2023-05-30 中建八局第一建设有限公司 A kind of construction structure and construction method of stairwell in super high-rise core tube by segmental jump
CN116181037B (en) * 2022-06-21 2025-08-26 中建八局第一建设有限公司 A segmented leap-level construction structure and construction method for a stairwell in a super-high-rise core tube
CN118087885A (en) * 2024-04-15 2024-05-28 中国二十二冶集团有限公司 Installation method of steel structure elevator shaft

Also Published As

Publication number Publication date
CN109339399B (en) 2023-08-25

Similar Documents

Publication Publication Date Title
CN110228743B (en) Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof
AU2010309721B2 (en) Elevator arrangement and method
US7635049B2 (en) Method and apparatus for installing an elevator during the construction of a building
CN109339399A (en) A kind of section construction method of steel construction in elevator shaft
EP1583710B1 (en) Method and apparatus for installing an elevator during construction of a building
CN205955236U (en) Container formula of taking pulley platform of unloading of encorbelmenting
US9676596B2 (en) Elevator refurbishing method
CN103790390B (en) Glass panel hoisting system and construction method for large-span dome glass curtain wall construction
CN112955398B (en) Method for installing an elevator installation
US7389888B2 (en) Mobile crane with ballasting
CN207513158U (en) Concrete stack shell constructing device
CN102536249A (en) Fast construction method of headframe lifting system
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN209179426U (en) A kind of elevator shaft steel construction section construction device
CN215248971U (en) Hoisting construction device for large-scale overweight electromechanical equipment of high-rise and super high-rise building
CN210480530U (en) Elevator shaft traction overhead two-to-one suspension ratio construction elevator
KR101923925B1 (en) Rope type elevator apparatus of high speed and heavy road and mast structure equipped with crane for constructing high-rise building
CN110203834B (en) Hoisting device and hoisting method for Z-shaped cantilever beam structure of large paper machine
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable
CN211004358U (en) Special equipment for disassembling and installing hydraulic support
CN118742504A (en) Lift construction device and method
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN109694004A (en) A kind of headframe bridge crane installation sheave wheel platform and crane installation method
CN113175203A (en) Method for setting lifting power equipment in attached lifting scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant