CN109162635A - A kind of new pressure measuring drill hole construction technology - Google Patents

A kind of new pressure measuring drill hole construction technology Download PDF

Info

Publication number
CN109162635A
CN109162635A CN201811092913.5A CN201811092913A CN109162635A CN 109162635 A CN109162635 A CN 109162635A CN 201811092913 A CN201811092913 A CN 201811092913A CN 109162635 A CN109162635 A CN 109162635A
Authority
CN
China
Prior art keywords
hole
pressure measuring
slip casting
drilling
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811092913.5A
Other languages
Chinese (zh)
Inventor
李学良
王斌
何登云
张玉林
葛宏舵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Co Ltd
Original Assignee
Huaibei Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Co Ltd filed Critical Huaibei Mining Co Ltd
Priority to CN201811092913.5A priority Critical patent/CN109162635A/en
Publication of CN109162635A publication Critical patent/CN109162635A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of new pressure measuring drill hole construction technologies, comprising the following steps: step 1 preparation of construction;Step 2 determines bore position;Step 3 slip casting;Pressure measuring sleeve part under step 4;Step 5 sealing of hole;Step 6 stops slip casting;Step 7 observes gas pressure, when inspecting hole, with stake anchor point borehole, determine bore position, drilling machine is in place later, ensure that pedestal is steady, not run-off the straight displacement carries out pressure measuring drill hole, convenient for bore operation, wherein the proportion of slurries will meet the requirements, it can stop slip casting after cement slurry returns slurry from return pipe, if hole wall occurs seeping slurry problem, timely use grout off, and slip casting is carried out using intermittent mode, until not permeable slurry, the leakproofness for guaranteeing hole wall can be sent it to, using the new process construction pressure measuring drill hole of grouting behind shaft or drift lining, piezo-effect is fairly obvious, the too low problem of the success rate for the pressure measuring drill hole of avoiding over, it adopts new technology after sealing of hole, substantially increase the success rate of pressure measuring drill hole detection gas pressure.

Description

A kind of new pressure measuring drill hole construction technology
Technical field
The present invention relates to a kind of drill construction techniques, and in particular to a kind of new pressure measuring drill hole construction technology.
Background technique
Currently, gas accident is one of disaster and security risk of coal mine, in order to avoid in Comprehensive Gas Control Blindness, accomplishes effective, reliable and proactive, needs to have the gas pressure in coal seam one accurately to grasp, could be to danger The necessary precautionary measures are taken in danger zone domain in time, avoid Gas Disaster, have the initiative status in gas preventing and control work, according to watt The needs of this control require construction pressure measuring drill hole every year, and coal core are taken to survey relevant Gas explosion burns.Due to tunnel lithology Blowing out during being tunneled influences, and palisades generate a large amount of vibration crack, when pressure measuring drill hole slip casting, does not well solve crack leakage Gas problem causes part drilling not detect gas pressure or the gas pressure inaccuracy surveyed, is not achieved and expected surveys pressure effect Fruit.
Summary of the invention
The purpose of the present invention is to provide a kind of new pressure measuring drill hole construction technologies to be mentioned with ensure that the leakproofness of hole wall The success rate of high pressure measuring drill hole detection gas pressure.
In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions:
The present invention provides a kind of new pressure measuring drill hole construction technologies, including following construction procedure:
Step 1: preparation of construction carries out pipes investigation, understands 2 meters of place or less barrier, it is ensured that building site leveling, compacting, rationally Arrange construction machinery etc.,
Step 2: when inspecting hole, with stake anchor point borehole, bore position is determined, drilling machine is in place later, it is ensured that pedestal is steady, does not send out Raw angular displacements carry out pressure measuring drill hole, creep into bore position using drill bit when drilling, drilling well is first crept into drill bit when creeping into, it is contemplated that Stop drilling at 2 meters before seeing coal, diffuses into bottom hole with reaming bit;
Step 3: carrying out casing in the drilling of the step 2, and grouting behind shaft or drift lining is carried out after casing, carries out after full hole setting of casing Grouting behind shaft or drift lining, backward hole in injection expansion hole sealing agent, slip casting can stop slip casting after reaching certain pressure;
Step 4: using drill bit cleaning bottom of hole after slip casting 24 hours, drilling is shown in after coal with pressure air drill into deslagging, drills through drilling machine behind coal seam Stop drilling and exit coal seam, is rinsed with water rock hole wall, lower pressure measuring sleeve part and sealing of hole;
Step 5: after pressure measuring sleeve part tripping in bottom hole, injection hole sealing is carried out;
Step 6: when drilling grouting behind shaft or drift lining and hole-sealing grouting, scene will have administrative staff's field surveillance of profession;The proportion of slurries It meets the requirements, slip casting can be stopped after cement slurry returns slurry from return pipe, if hole wall occurs seeping slurry problem, timely use water Mudding is stifled, and carries out slip casting using intermittent mode, until not permeable slurry;
Step 7: stop slip casting after return pipe outflow in slurries, close Grouting Pipe, upper pressure gauge observes gas pressure after 24 hours Power.
As a preferred technical solution of the present invention, the drill bit in the step 2 and the step 4 is ¢ 94mm Drill bit, the reaming bit of the step 2 kind are the reaming bit of ¢ 127mm, and the casing in the step 3 is ¢ 108mm.
As a preferred technical solution of the present invention, the pressure air drill in the step 3 is conventional mechanical, the drilling machine For conventional mechanical.
As a preferred technical solution of the present invention, the slurries include that cement slurry and water are grey, the cement slurry and institute Stating water ash proportion is 1:1.
As a preferred technical solution of the present invention, the bit central, which uses, determines stake locator align piles position.
The beneficial effects obtained by the present invention are as follows being: the device is a kind of new pressure measuring drill hole construction technology, using infusing after wall The new process construction pressure measuring drill hole of slurry, piezo-effect is fairly obvious, the too low problem of the success rate for the pressure measuring drill hole of avoiding over, It adopts new technology sealing of hole, and to construct in strict accordance with the requirement of technical measures during drilling construction, operation behavior will standardize, each After a link will be implemented completely out and out, slip casting can be stopped after returning slurry from return pipe by cement slurry, if hole wall Occur seeping slurry problem, grout off is timely used, and slip casting is carried out using intermittent mode, until not permeable slurry, to ensure that hole The leakproofness of wall is conducive to the success rate for substantially increasing pressure measuring drill hole detection gas pressure.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below by embodiment, the present invention is described in further detail.
Specific embodiment
Embodiment 1
The present invention provides a kind of new pressure measuring drill hole construction technology, including following construction procedure:
Step 1: preparation of construction carries out pipes investigation, understands 2 meters of place or less barrier, it is ensured that building site leveling, compacting, rationally Arrange construction machinery etc.,
Step 2: when inspecting hole, with stake anchor point borehole, bore position is determined, drilling machine is in place later, it is ensured that pedestal is steady, does not send out Raw angular displacements carry out pressure measuring drill hole, creep into bore position using drill bit when drilling, drilling well is first crept into drill bit when creeping into, it is contemplated that Stop drilling at 2 meters before seeing coal, diffuses into bottom hole with reaming bit;
Step 3: carrying out casing in the drilling of the step 2, and grouting behind shaft or drift lining is carried out after casing, carries out after full hole setting of casing Grouting behind shaft or drift lining, backward hole in injection expansion hole sealing agent, slip casting can stop slip casting after reaching certain pressure;
Step 4: using drill bit cleaning bottom of hole after slip casting 24 hours, drilling is shown in after coal with pressure air drill into deslagging, drills through drilling machine behind coal seam Stop drilling and exit coal seam, is rinsed with water rock hole wall, lower pressure measuring sleeve part and sealing of hole;
Step 5: after pressure measuring sleeve part tripping in bottom hole, injection hole sealing is carried out;
Step 6: when drilling grouting behind shaft or drift lining and hole-sealing grouting, scene will have administrative staff's field surveillance of profession;The proportion of slurries It meets the requirements, slip casting can be stopped after cement slurry returns slurry from return pipe, if hole wall occurs seeping slurry problem, timely use water Mudding is stifled, and carries out slip casting using intermittent mode, until not permeable slurry;
Step 7: stop slip casting after return pipe outflow in slurries, close Grouting Pipe, upper pressure gauge observes gas pressure after 24 hours Power.
Embodiment 2
The present invention provides a kind of new pressure measuring drill hole construction technology, including following construction procedure:
Step 1: preparation of construction carries out pipes investigation, understands 2 meters of place or less barrier, it is ensured that building site leveling, compacting, rationally Arrange construction machinery etc.,
Step 2: when inspecting hole, with stake anchor point borehole, bore position is determined, drilling machine is in place later, it is ensured that pedestal is steady, does not send out Raw angular displacements carry out pressure measuring drill hole, creep into bore position using drill bit when drilling, drilling well is first crept into drill bit when creeping into, it is contemplated that Stop drilling at 2 meters before seeing coal, diffuses into bottom hole with reaming bit;
Step 3: carrying out casing in the drilling of the step 2, and grouting behind shaft or drift lining is carried out after casing, carries out after full hole setting of casing Grouting behind shaft or drift lining, slip casting can stop slip casting after reaching certain pressure;
Step 4: using drill bit cleaning bottom of hole after slip casting 24 hours, drilling is shown in after coal with pressure air drill into deslagging, drills through drilling machine behind coal seam Stop drilling and exit coal seam, is rinsed with water rock hole wall, lower pressure measuring sleeve part and sealing of hole;
Step 5: after pressure measuring sleeve part tripping in bottom hole, injection hole sealing is carried out;
Step 6: when drilling grouting behind shaft or drift lining and hole-sealing grouting, scene will have administrative staff's field surveillance of profession;The proportion of slurries It meets the requirements, slip casting can be stopped after cement slurry returns slurry from return pipe;
Step 7: stop slip casting after return pipe outflow in slurries, close Grouting Pipe, upper pressure gauge observes gas pressure after 12 hours Power.
Embodiment 3
The present invention provides a kind of new pressure measuring drill hole construction technology, including following construction procedure:
Step 1: preparation of construction carries out pipes investigation, understands 2 meters of place or less barrier, it is ensured that building site leveling, compacting, rationally Arrange construction machinery etc.,
Step 2: when inspecting hole, with stake anchor point borehole, bore position is determined, drilling machine is in place later, it is ensured that pedestal is steady, does not send out Raw angular displacements carry out pressure measuring drill hole, creep into bore position using drill bit when drilling, drilling well is first crept into drill bit when creeping into, it is contemplated that Stop drilling at 2 meters before seeing coal, diffuses into bottom hole with reaming bit;
Step 3: carrying out casing in the drilling of the step 2, and grouting behind shaft or drift lining is carried out after casing, carries out after full hole setting of casing Grouting behind shaft or drift lining, backward hole in injection expansion hole sealing agent, slip casting can stop slip casting after reaching certain pressure;
Step 4: using drill bit cleaning bottom of hole after slip casting 24 hours, drilling is shown in after coal with pressure air drill into deslagging, drills through drilling machine behind coal seam Stop drilling and exit coal seam, is rinsed with water rock hole wall, lower pressure measuring sleeve part and sealing of hole;
Step 5: after pressure measuring sleeve part tripping in bottom hole, injection hole sealing is carried out;
Step 6: when drilling grouting behind shaft or drift lining and hole-sealing grouting, scene will have administrative staff's field surveillance of profession;The proportion of slurries It meets the requirements, slip casting can be stopped after cement slurry returns slurry from return pipe, if hole wall occurs seeping slurry problem, sealed using baffle It is stifled, continue slip casting;
Step 7: stop slip casting after return pipe outflow in slurries, close Grouting Pipe, upper pressure gauge observes gas pressure after 24 hours Power.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (5)

1. a kind of new pressure measuring drill hole construction technology, which is characterized in that the construction technology the following steps are included:
Step 1: preparation of construction carries out pipes investigation, understands 2 meters of place or less barrier, it is ensured that building site leveling, compacting, rationally Arrange construction machinery etc.,
Step 2: when inspecting hole, with stake anchor point borehole, bore position is determined, drilling machine is in place later, it is ensured that pedestal is steady, does not send out Raw angular displacements carry out pressure measuring drill hole, creep into bore position using drill bit when drilling, drilling well is first crept into drill bit when creeping into, it is contemplated that Stop drilling at 2 meters before seeing coal, diffuses into bottom hole with reaming bit;
Step 3: carrying out casing in the drilling of the step 2, and grouting behind shaft or drift lining is carried out after casing, carries out after full hole setting of casing Grouting behind shaft or drift lining, backward hole in injection expansion hole sealing agent, slip casting can stop slip casting after reaching certain pressure;
Step 4: using drill bit cleaning bottom of hole after slip casting 24 hours, drilling is shown in after coal with pressure air drill into deslagging, drills through drilling machine behind coal seam Stop drilling and exit coal seam, is rinsed with water rock hole wall, lower pressure measuring sleeve part and sealing of hole;
Step 5: after pressure measuring sleeve part tripping in bottom hole, injection hole sealing is carried out;
Step 6: when drilling grouting behind shaft or drift lining and hole-sealing grouting, scene will have administrative staff's field surveillance of profession;The proportion of slurries It meets the requirements, slip casting can be stopped after cement slurry returns slurry from return pipe, if hole wall occurs seeping slurry problem, timely use water Mudding is stifled, and carries out slip casting using intermittent mode, until not permeable slurry;
Step 7: stop slip casting after return pipe outflow in slurries, close Grouting Pipe, upper pressure gauge observes gas pressure after 24 hours Power.
2. the new pressure measuring drill hole construction technology of one kind according to claim 1, which is characterized in that the step 2 and described Drill bit in step 4 is ¢ 94mm drill bit, and the reaming bit of the step 2 kind is the reaming bit of ¢ 127mm, the step Casing in rapid three is ¢ 108mm.
3. the new pressure measuring drill hole construction technology of one kind according to claim 1, which is characterized in that the pressure in the step 3 Air drill is conventional mechanical, and the drilling machine is conventional mechanical.
4. the new pressure measuring drill hole construction technology of one kind according to claim 1, which is characterized in that the slurries include cement Slurry and water ash, the cement slurry and water ash proportion are 1:1.
5. the new pressure measuring drill hole construction technology of one kind according to claim 1, which is characterized in that the bit central uses Determine stake locator align piles position.
CN201811092913.5A 2018-09-19 2018-09-19 A kind of new pressure measuring drill hole construction technology Pending CN109162635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811092913.5A CN109162635A (en) 2018-09-19 2018-09-19 A kind of new pressure measuring drill hole construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811092913.5A CN109162635A (en) 2018-09-19 2018-09-19 A kind of new pressure measuring drill hole construction technology

Publications (1)

Publication Number Publication Date
CN109162635A true CN109162635A (en) 2019-01-08

Family

ID=64879534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811092913.5A Pending CN109162635A (en) 2018-09-19 2018-09-19 A kind of new pressure measuring drill hole construction technology

Country Status (1)

Country Link
CN (1) CN109162635A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513100A (en) * 2019-09-11 2019-11-29 华北科技学院 A field experiment method to improve the success rate of gas pressure measurement
CN110541726A (en) * 2019-06-12 2019-12-06 义马煤业集团孟津煤矿有限责任公司 Two-blocking, two-injection and one-return water-through pipe direct connection sealing method for gas drainage in coal mines
CN113464122A (en) * 2021-06-23 2021-10-01 中国矿业大学 Method for improving gas pressure determination accuracy through auxiliary drilling

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2585080C (en) * 2004-10-26 2009-12-22 Halliburton Energy Services, Inc. Methods and systems for reverse-circulation cementing in subterranean formations
CN102071961A (en) * 2010-12-24 2011-05-25 陕西陕煤韩城矿业有限公司 Downward gas drainage drill hole and pressure testing drill hole sealing method
CN102383781A (en) * 2011-07-15 2012-03-21 河南理工大学 Method for measuring gas pressure of coal bed
CN103015984A (en) * 2012-12-19 2013-04-03 河南焦煤能源有限公司科学技术研究所 Method for measuring gas pressure of coal seam by casing high-pressure hole sealing method
CN204126636U (en) * 2014-06-19 2015-01-28 国投新集能源股份有限公司 Upward drilling pressure measuring device for water isolation
CN104389587A (en) * 2014-10-11 2015-03-04 安徽建筑大学 Quick measurement method of coal seam gas pressure
CN105804692A (en) * 2016-03-29 2016-07-27 中国矿业大学(北京) Novel coal mine gas pressure measurement grouting hole sealing method
CN106894785A (en) * 2017-03-10 2017-06-27 河南工程学院 Easy gushing water coal seam upward hole gas pressure measurement method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2585080C (en) * 2004-10-26 2009-12-22 Halliburton Energy Services, Inc. Methods and systems for reverse-circulation cementing in subterranean formations
CN102071961A (en) * 2010-12-24 2011-05-25 陕西陕煤韩城矿业有限公司 Downward gas drainage drill hole and pressure testing drill hole sealing method
CN102383781A (en) * 2011-07-15 2012-03-21 河南理工大学 Method for measuring gas pressure of coal bed
CN103015984A (en) * 2012-12-19 2013-04-03 河南焦煤能源有限公司科学技术研究所 Method for measuring gas pressure of coal seam by casing high-pressure hole sealing method
CN204126636U (en) * 2014-06-19 2015-01-28 国投新集能源股份有限公司 Upward drilling pressure measuring device for water isolation
CN104389587A (en) * 2014-10-11 2015-03-04 安徽建筑大学 Quick measurement method of coal seam gas pressure
CN105804692A (en) * 2016-03-29 2016-07-27 中国矿业大学(北京) Novel coal mine gas pressure measurement grouting hole sealing method
CN106894785A (en) * 2017-03-10 2017-06-27 河南工程学院 Easy gushing water coal seam upward hole gas pressure measurement method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张再镕等: "煤层瓦斯压力快速测定技术", 《内蒙古煤炭经济》 *
邢红旗: "套管注浆法在煤层瓦斯压力测定中的实践与应用", 《煤矿技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541726A (en) * 2019-06-12 2019-12-06 义马煤业集团孟津煤矿有限责任公司 Two-blocking, two-injection and one-return water-through pipe direct connection sealing method for gas drainage in coal mines
CN110513100A (en) * 2019-09-11 2019-11-29 华北科技学院 A field experiment method to improve the success rate of gas pressure measurement
CN113464122A (en) * 2021-06-23 2021-10-01 中国矿业大学 Method for improving gas pressure determination accuracy through auxiliary drilling

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN103742129B (en) The method of weak seam measuring gas pressure of coal bed by drilling hole
CN101457853B (en) Non-excavation pipe-pulling construction method
CN104748632B (en) One chock blasting construction method under water
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN103835651B (en) A kind of single hole directional drilling local slip casting mine shaft rising boring technique
CN103643918B (en) A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water
CN104532821A (en) Extra-large karst cave bottom treatment construction method
CN109139052B (en) A grouting hole device and construction method based on high-pressure deep hole grouting
CN104631470A (en) Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
CN102330567A (en) Goaf slip casting treatment method of road
CN104047611B (en) Weak broken wall rock tunnel two serves as a contrast the best opportunity method of discrimination applied
CN112031017A (en) Construction method suitable for deep water pile foundation steel casing under bare rock geological condition
CN103835648A (en) Raise-boring technology for improving rock stratum performance through ground grouting
CN109162635A (en) A kind of new pressure measuring drill hole construction technology
CN107724953A (en) The down-the-hole hammer reverse circulating drilling process construction method of Fluid Sealing
CN109162751A (en) Coal seam group near interval fire hazard treating method
CN109341934B (en) A dynamic monitoring equipment and monitoring method for floor aquifer water pressure
CN103290827B (en) Mounting, burying and grouting method for multi-point displacement meter
CN108005662A (en) A kind of processing method of underground water seal cave depot bank area geology crushed zone
Peng et al. Water inrush-induced failure during deep excavation for a metro station in karst regions in Shenzhen, China: Cause diagnosis and post-accident restoration
CN104963341B (en) A kind of manifold type earth source heat pump mixing backfilling process and backfill material
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN106968650A (en) It is a kind of to administer surface pipe and the method for gas-bearing formation casing annulus has channeling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190108