CN109137735A - A kind of pile-driving method and special equipment using Bridge Erector - Google Patents

A kind of pile-driving method and special equipment using Bridge Erector Download PDF

Info

Publication number
CN109137735A
CN109137735A CN201811007101.6A CN201811007101A CN109137735A CN 109137735 A CN109137735 A CN 109137735A CN 201811007101 A CN201811007101 A CN 201811007101A CN 109137735 A CN109137735 A CN 109137735A
Authority
CN
China
Prior art keywords
bridge erector
bridge
pile
construction
erector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811007101.6A
Other languages
Chinese (zh)
Inventor
魏东海
沙焕焕
邓亚光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811007101.6A priority Critical patent/CN109137735A/en
Priority to PCT/CN2018/103698 priority patent/WO2020042192A1/en
Publication of CN109137735A publication Critical patent/CN109137735A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of pile-driving method using Bridge Erector and special equipments, are constructed using Bridge Erector, piling machine;Before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, extend to the longitudinal bracing frame on ground, dress can at least one of sliding rail is moved forward and backward along Bridge Erector pilot hole machine, blender, piling machine on Bridge Erector.The present invention is easy for construction, quick, and making the construction of bridge prefabrication method includes pile foundation, substantially increases construction efficiency, saves construction cost.

Description

A kind of pile-driving method and special equipment using Bridge Erector
Technical field
The present invention relates to a kind of pile-driving method and special equipments.
Background technique
The superstructure construction of the overpass such as existing highway, railway, pipeline is transported using prefabrication again more and more To the method for on-site consolidation, Bridge Erector is exactly to travel in bridge rail, and prefabricated beam piece is placed into prefabricated bridge pier Equipment up, this method require to accomplish fluently lower part pile foundation in advance, and pile foundation needs independent construction scheme to construct in advance.If engineering Matter complicated condition is in the lake Jiang Hai, then pile foundation construction difficulty is big, engineering progress is slow, using pile driving barge, temporary trestle bridge etc. Additional facilities cost is high.
Summary of the invention
The purpose of the present invention is to provide a kind of easy for construction, work efficiency is high using Bridge Erector pile-driving method and specially Use equipment.
The technical solution of the invention is as follows:
A kind of pile-driving method using Bridge Erector, it is characterized in that: being constructed using Bridge Erector, piling machine;In Bridge Erector front end Front and back telescopic arms on setting can longitudinal extension, extend to the longitudinal bracing frame on ground, fill and can be slided along Bridge Erector on Bridge Erector Pilot hole machine that rail is moved forward and backward, blender, at least one of piling machine;
Construction includes the following steps:
(1) engineering starts generally access bridge, has ground construction condition, using conventional piling machine construct first three across pile foundation, Prefabricated stake top portion is equipped with assembled cap beam and can connect with prefabricated cushion cap, then installs and fill prefabricated cushion cap, precast pier, then in bridge Bridge Erector assembling is completed on pier, and prefabricated abutment is installed using Bridge Erector;
(2) the front and back telescopic arms extension of Bridge Erector front end extends to and transfers longitudinal bracing frame, support frame more than behind next place's stake position It is fixed on ground;
(3) if pile sinking difficulty need pilot hole or need it is compound using soil cement and prefabricated pile, first by mobile pilot hole machine or Blender is moved to stake position by the sliding rail in end arms before Bridge Erector, carries out pilot hole or stirring operation, then removes stake position;
(4) subsequent movement formula piling machine is moved to stake position by the sliding rail in end arms before Bridge Erector, prefabricated pile has passed through rear The bridge floor that construction is completed is transported at piling machine, vertical decentralization to ground, by pressing, embraces one of pressure, vibration, hammering or several Kind mode makes prefabricated pile sink down into predetermined depth, and precast pile is equipped with steel pipe as longitudinally through formula pipeline, can pass through piling machine On high-pressure pump squeeze into Fast Setting Cement Slurry, gas, powder and wash away a subsoil body, the interim resistance that reduces makes tubular pole sink, later period soil cement Body solidification, pile peripheral earth strength enhancing;
(5) on this position stake all construction after the completion of by prefabricated cushion cap, precast pier by rear constructed completion bridge floor transport It is installed to stake position;
(6) Bridge Erector moves forward one across being fixed on Bridge Erector foreleg on the bridge pier of newest construction, pack up the support on ground Frame, then telescopic arms are protracted, step (2) ~ (6) are repeated until bridge all construction completions.
A kind of pile-driving method construction equipment using Bridge Erector, it is characterized in that: including Bridge Erector, in Bridge Erector front end In the telescopic arms of front and back setting can longitudinal extension, be fixed on the longitudinal bracing frame on ground, Bridge Erector main body is shelved on by supporting leg On the bridge pier and longitudinal bracing frame, main body and telescopic arm are equipped with sliding rail;It is additionally provided with the pilot hole machine that can be moved on the slide rail, stirs At least one of machine, piling machine are mixed, piling machine is equipped with high-pressure pump.
The present invention is easy for construction, quick, and making the construction of bridge prefabrication method includes pile foundation, substantially increases construction efficiency, saves Construction cost is saved.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is construction equipment schematic diagram of the present invention.
Specific embodiment
A kind of pile-driving method using Bridge Erector, it is characterized in that: being constructed using Bridge Erector, piling machine;In Bridge Erector In the front and back telescopic arms of front end setting can longitudinal extension, extend to the longitudinal bracing frame on ground, dress can be along Bridge Erector on Bridge Erector At least one of pilot hole machine that upper sliding rail is moved forward and backward, blender, piling machine;
Construction includes the following steps:
(1) engineering starts generally access bridge, has ground construction condition, using conventional piling machine construct first three across pile foundation, Prefabricated stake top portion is equipped with assembled cap beam and can connect with prefabricated cushion cap, then installs and fill prefabricated cushion cap 7, precast pier 8, then exists Bridge Erector assembling is completed on bridge pier, and prefabricated abutment 9 is installed using Bridge Erector;
(2) the front and back telescopic arms extension of Bridge Erector front end extends to and transfers longitudinal bracing frame, support frame more than behind next place's stake position It is fixed on ground;
(3) if pile sinking difficulty need pilot hole or need it is compound using soil cement and prefabricated pile, first by mobile pilot hole machine or Blender is moved to stake position by the sliding rail in end arms before Bridge Erector, carries out pilot hole or stirring operation, then removes stake position;
(4) subsequent movement formula piling machine is moved to stake position by the sliding rail in end arms before Bridge Erector, prefabricated pile 10 passes through rear The bridge floor of completion of having constructed is transported at piling machine, vertical decentralization to ground, by pressing, embrace one of pressure, vibration, hammering or Several ways make prefabricated pile sink down into predetermined depth, precast pile be equipped with 1 ~ 4 (or more) steel pipe is as longitudinally through formula pipe Road can be squeezed into Fast Setting Cement Slurry, gas, powder by the high-pressure pump on piling machine and wash away a subsoil body, and the interim resistance that reduces makes tubular pole Sink, the solidification of later period soil-cement body, pile peripheral earth strength enhancing;
(5) on this position stake all construction after the completion of by prefabricated cushion cap, precast pier by rear constructed completion bridge floor transport It is installed to stake position;
(6) Bridge Erector moves forward one across being fixed on Bridge Erector foreleg on the bridge pier of newest construction, pack up the support on ground Frame, then telescopic arms are protracted, step (2) ~ (6) are repeated until bridge all construction completions.
A kind of pile-driving method construction equipment using Bridge Erector, including Bridge Erector 1, can stretch before and after Bridge Erector front end On contracting arm 2 setting can longitudinal extension, be fixed on the longitudinal bracing frame 3 on ground, Bridge Erector main body is shelved on the bridge by supporting leg 4 On pier and longitudinal bracing frame, main body is equipped with sliding rail 5;It is additionally provided with the piling machine 6 that can be moved on the slide rail.

Claims (2)

1. a kind of pile-driving method using Bridge Erector, it is characterized in that: being constructed using Bridge Erector, piling machine;Before Bridge Erector In the front and back telescopic arms at end setting can longitudinal extension, extend to the longitudinal bracing frame on ground, dress can be along Bridge Erector on Bridge Erector Pilot hole machine that sliding rail is moved forward and backward, blender, at least one of piling machine;
Construction includes the following steps:
(1) engineering starts have ground construction condition for access bridge, using piling machine construct it is former across pile foundation, in prefabricated pile stake Top is equipped with assembled cap beam and can connect with prefabricated cushion cap, then installs and fill prefabricated cushion cap, precast pier, then completes on bridge pier Bridge Erector assembling installs prefabricated abutment using Bridge Erector;
(2) the front and back telescopic arms extension of Bridge Erector front end extends to and transfers longitudinal bracing frame, support frame more than behind next place's stake position It is fixed on ground;
(3) if pile sinking difficulty need pilot hole or need it is compound using soil cement and prefabricated pile, first by mobile pilot hole machine or Blender is moved to stake position by the sliding rail in end arms before Bridge Erector, carries out pilot hole or stirring operation, then removes stake position;
(4) subsequent movement formula piling machine is moved to stake position by the sliding rail in end arms before Bridge Erector, prefabricated pile has passed through rear The bridge floor that construction is completed is transported at piling machine, vertical decentralization to ground, by pressing, embraces one of pressure, vibration, hammering or several Kind mode makes prefabricated pile sink down into predetermined depth, and precast pile is equipped with steel pipe as longitudinally through formula pipeline, can pass through piling machine On high-pressure pump squeeze into Fast Setting Cement Slurry, gas, powder and wash away a subsoil body, the interim resistance that reduces makes tubular pole sink, later period soil cement Body solidification, pile peripheral earth strength enhancing;
(5) on this position stake all construction after the completion of by prefabricated cushion cap, precast pier by rear constructed completion bridge floor transport It is installed to stake position;
(6) Bridge Erector moves forward one across being fixed on Bridge Erector foreleg on the bridge pier of newest construction, pack up the support on ground Frame, then telescopic arms are protracted;
Step (2) ~ (6) are repeated until bridge all construction completions.
2. a kind of pile-driving method construction equipment described in claim 1 using Bridge Erector, it is characterized in that: include Bridge Erector, Before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, be fixed on the longitudinal bracing frame on ground, Bridge Erector main body It is shelved on the bridge pier and longitudinal bracing frame by supporting leg, main body and telescopic arm are equipped with sliding rail;Being additionally provided with can be on the slide rail At least one of mobile pilot hole machine, blender, piling machine, piling machine are equipped with high-pressure pump.
CN201811007101.6A 2018-08-31 2018-08-31 A kind of pile-driving method and special equipment using Bridge Erector Withdrawn CN109137735A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811007101.6A CN109137735A (en) 2018-08-31 2018-08-31 A kind of pile-driving method and special equipment using Bridge Erector
PCT/CN2018/103698 WO2020042192A1 (en) 2018-08-31 2018-09-02 Pile driving method and special apparatus, for when using bridge erecting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811007101.6A CN109137735A (en) 2018-08-31 2018-08-31 A kind of pile-driving method and special equipment using Bridge Erector

Publications (1)

Publication Number Publication Date
CN109137735A true CN109137735A (en) 2019-01-04

Family

ID=64825737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811007101.6A Withdrawn CN109137735A (en) 2018-08-31 2018-08-31 A kind of pile-driving method and special equipment using Bridge Erector

Country Status (2)

Country Link
CN (1) CN109137735A (en)
WO (1) WO2020042192A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254837A (en) * 2020-03-04 2020-06-09 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method
CN115094781A (en) * 2022-08-12 2022-09-23 中国铁建重工集团股份有限公司 Bridge fabrication machine and construction method thereof
CN115323938A (en) * 2022-09-20 2022-11-11 中国铁建重工集团股份有限公司 a bridge making machine
CN117802987A (en) * 2023-12-15 2024-04-02 中交第二航务工程局有限公司 A vertical pile foundation assembled dock integrated construction device and method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758861A (en) * 2017-03-17 2017-05-31 王燏斌 A kind of bridging device and its construction method
KR101762148B1 (en) * 2017-04-18 2017-07-27 (주)리튼브릿지 Bridge using precast psc deck type girder and construction method therefor
CN107740350A (en) * 2017-09-21 2018-02-27 郑州新大方重工科技有限公司 The bridge pier column construction method and its passing method of full precast bridge Bridge Erector
CN207062949U (en) * 2017-07-05 2018-03-02 河南省高远公路养护技术有限公司 A kind of traveling pile driver

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101962956B (en) * 2009-07-22 2012-03-07 中交公路规划设计院有限公司 Bridge prefabricated foundation and bed-burying method thereof
JP5477898B2 (en) * 2009-10-28 2014-04-23 戸田建設株式会社 Construction equipment and construction method for foundation work of directly elevated viaduct
CN204298740U (en) * 2014-11-14 2015-04-29 中铁大桥局集团有限公司 A kind of mobile platform for trestle construction
JP6083655B2 (en) * 2015-03-24 2017-02-22 五洋建設株式会社 Hanging frame and method of constructing structure using the same
CN106120787B (en) * 2016-06-29 2018-09-14 中交第二航务工程局有限公司 A kind of construction method carrying out pile sinking based on pushing tow travelling platform
JP6702835B2 (en) * 2016-09-27 2020-06-03 三井住友建設株式会社 Bridge girder erection method for multi span span bridge
CN207567766U (en) * 2017-11-08 2018-07-03 罗万友 Piling machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758861A (en) * 2017-03-17 2017-05-31 王燏斌 A kind of bridging device and its construction method
KR101762148B1 (en) * 2017-04-18 2017-07-27 (주)리튼브릿지 Bridge using precast psc deck type girder and construction method therefor
CN207062949U (en) * 2017-07-05 2018-03-02 河南省高远公路养护技术有限公司 A kind of traveling pile driver
CN107740350A (en) * 2017-09-21 2018-02-27 郑州新大方重工科技有限公司 The bridge pier column construction method and its passing method of full precast bridge Bridge Erector

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254837A (en) * 2020-03-04 2020-06-09 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method
CN111254837B (en) * 2020-03-04 2021-06-22 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method
CN115094781A (en) * 2022-08-12 2022-09-23 中国铁建重工集团股份有限公司 Bridge fabrication machine and construction method thereof
CN115323938A (en) * 2022-09-20 2022-11-11 中国铁建重工集团股份有限公司 a bridge making machine
CN117802987A (en) * 2023-12-15 2024-04-02 中交第二航务工程局有限公司 A vertical pile foundation assembled dock integrated construction device and method thereof
CN117802987B (en) * 2023-12-15 2025-02-14 中交第二航务工程局有限公司 An integrated construction device and method for a vertical pile foundation assembled dock

Also Published As

Publication number Publication date
WO2020042192A1 (en) 2020-03-05

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down construction method using ready-made concrete pillar member
CN106285738B (en) A kind of " steel reinforced concrete-hydraulic pressure " roadside support device and method for protecting support for deep tunnel
CN106638640B (en) Construction method without bottom concrete combined type cofferdam under the conditions of formation geology
JP6762800B2 (en) Reinforcement method and structure of existing pile foundation
CN109137735A (en) A kind of pile-driving method and special equipment using Bridge Erector
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN103031839B (en) Construction method of hand-dug piles
CN106930321B (en) A construction method for building underground structures with large diameter pipe jacking combined with hole piles
KR101121538B1 (en) Diaphragm wall tunnel method - dtm, and tunnel structure using diaphragm wall
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN108914927A (en) The miniature steel pipe pile reinforced construction method of existing line base insuring highway' slope
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN216787146U (en) Comprehensive pipe rack suspension pile deep foundation pit support
KR100375020B1 (en) a pole for mud wall and constrution method of fence for mud
CN105986578A (en) Ejecting pipe construction method of roadside tubular underground garage
JP2019015100A (en) How to remove the Yamato wall
KR20110019674A (en) W. Basic reinforcement method
KR102392517B1 (en) Top-down method using by double beam system
CN102605781A (en) Rocky bed steel pipe pile sinking construction process
KR20210009502A (en) Cast-in-place pile using Pressurized grouting and construction method
CN112343614B (en) U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method
CN103015435A (en) Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN109972644B (en) Open caisson device for pushing and construction method thereof
CN118911155A (en) Deep foundation pit supporting device and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190104

WW01 Invention patent application withdrawn after publication