pouring
riser
running channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811081511.5A
Other languages
Chinese (zh)
Other versions
CN109014059B (en
Inventor
李益凤
唐应彬
唐微涵
唐惠琳
张璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Xin Juxin Machinery Co Ltd
Original Assignee
Chongqing Xin Juxin Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Xin Juxin Machinery Co Ltd filed Critical Chongqing Xin Juxin Machinery Co Ltd
Priority to CN201811081511.5A priority Critical patent/CN109014059B/en
Publication of CN109014059A publication Critical patent/CN109014059A/en
Application granted granted Critical
Publication of CN109014059B publication Critical patent/CN109014059B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/082Sprues, pouring cups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/088Feeder heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/20Stack moulds, i.e. arrangement of multiple moulds or flasks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • B22C9/28Moulds for peculiarly-shaped castings for wheels, rolls, or rollers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The present invention provides a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique, using pouring in vertically clamped moulds, molten metal molten iron flow speed is fast, and poring rate is fast, and a secondary mold can be realized once-cast production more than one piece Wheel casting, and production efficiency is improved while expanding production capacity;The present invention is poured using the casting mould of Optimal Structure Designing, riser is provided between same row's casting mold cavity, when casting, it allows molten metal first to flow through riser and is re-introduced into type chamber, feeding can be carried out to casting in time, the feeding effect of riser is improved, shrinkage cavity and rarefaction defect is eliminated, improves the quality of Wheel casting;In addition, the present invention will be divided to running channel to be divided on two fan casting moulds, when casting, molten metal alternately circulates in dividing in running channel for sand mold respectively, molten metal smoothly can be transported to type chamber everywhere, impact force of the molten metal to sand mold when effectively slowing down pouring in vertically clamped moulds.

Description

A kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique
One, technical field
The invention belongs to flywheel casting field, in particular to a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique.
Two, background technique
Flywheel (flying wheel) is a kind of disk-shaped part that rotary inertia is very big.For four-stroke engine, Every four piston stroke works done are primary, i.e. only expansion space stroke work done, and be vented, air inlet and compression three strokes will consume Function.Therefore in cyclically-varying, speed of crankshaft is also unstable for the torque that crankshaft externally exports.In order to improve this situation, in song Shaft rear end device flywheel, its effect are to store engine power, overcome the resistance of other component, revolve crankshaft uniformly Turn.
Existing flywheel is made by the way of horizontal parting pouring in vertically clamped moulds.Bolster is used first, is respectively formed edge The sand mold up and down of horizontal plane parting will form casting mold after the molding of upper and lower sand mold, then by the molten metal molten iron after melting from cast gate The type that place is injected into upper and lower sand mold intracavitary is poured.Existing forging type inefficiency, and the flywheel mass that casting obtains Difference.
Three, summary of the invention
The object of the present invention is to provide a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique, improve production efficiency with And Wheel casting quality.
Present invention technical solution used for the above purpose is: a kind of flywheel vertical-parting pouring in vertically clamped moulds founder Skill, key are: the following steps are included:
Step 1: production mold: flywheel casting mould is designed as the first mold and the second mold of vertical-parting, described the One mold includes multiple the first casting type chambers being spaced apart, and first positioned at first mold top edge middle position pours Mouthful, be connected to the first cross gate of first cast gate bottom, and the riser at the first casting type cavity gap and First point of running channel, the riser include upper riser and lower riser;Second mold includes multiple the second casting being spaced apart Type chamber, the second cast gate positioned at second mold top edge middle position, be connected to second cast gate bottom second are horizontal Running channel, and divide cast gate and second point of running channel at the second casting type cavity gap, it is described that cast gate is divided to be overlapped in respectively The indentation, there of the second casting type chamber, second point of running channel include upper second point of running channel and lower second point of running channel;
Step 2: melting: putting into medium-frequency induction furnace major ingredient, the auxiliary material in the trolley that feeds by charger and added Heat fusing, medium-frequency induction furnace iron liquid are melted since low temperature, and temperature is gradually increasing, final smelting temperature control 1650~ 1700 DEG C, and after 5~10min of heat preservation, opening operation bell refines iron liquid, degasification, removes Slag treatment, and molten metal is net Change, and keep bonded hard ferrite magnet in the outlet water temperature range of setting, qualified iron liquid can be released by forehearth outlet;
Step 3: casting: by the first mold and the second mould box of casting mould, after mould assembling, the first casting type Chamber and the second casting type chamber, the first cast gate and the second cast gate, the first cross gate and the second cross gate, riser and cast gate is divided to be overlapped, Upper second point of running channel is connected between the second cross gate and upper riser, and lower second point of running channel is connected to first point of running channel and lower riser Between, by iron liquid pouring in vertically clamped moulds to mold, after casting, casting 5~10min of natural cooling in sand mold;
Step 4: unpacking, pouring box is opened along vertical-parting face, takes out cast, after cast(ing) surface is cleared up sanding, into Row inspection of blank, finishing, product inspection, storage.
Further, the first casting type chamber and the second casting type chamber are respectively 4, are respectively divided into spaced two rows.
Further, the composition of the major ingredient are as follows: steel scrap 30%, the pig iron 40%, foundry returns 30%.
Further, the additive amount of the auxiliary material are as follows: carburant 12kg/T, ferrosilicon 4kg/T, manganese iron 1.5kg/T.
Further, the width of first point of running channel and lower second point of running channel is the 1/3 of the riser bottom width.
Further, first point of running channel and upper second point of running channel are vertically arranged, lower second point of running channel inclination The center line of setting, the upper riser and first point of running channel is overlapped with the perpendicular bisector that above ranked first casting type chamber midpoint line, The perpendicular bisector that the center line of the lower riser ranked first casting type chamber midpoint line under is overlapped.
Further, described to divide cast gate for sector, and hang down about in same row the second casting type chamber midpoint line Line is symmetrical.
Further, first mold and the second mold are formed with the dowel hole of mould assembling, and when mould assembling, the two Dowel hole be overlapped.
Compared with prior art, the present invention having the following advantages and beneficial effects:
The present invention provides a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique, and molten metal molten iron flow speed is fast, casting Speed is fast, and a secondary mold can be realized once-cast production more than one piece Wheel casting, and life is improved while expanding production capacity Produce efficiency;The present invention is poured using the casting mould of Optimal Structure Designing, is provided with and is emitted between same row's casting mold cavity Mouthful, it when casting, allows molten metal first to flow through riser and is re-introduced into type chamber, feeding can be carried out to casting in time, improve the feeding of riser Effect eliminates shrinkage cavity and rarefaction defect, improves the quality of Wheel casting;The present invention will be divided to running channel to be divided into two fan casting moulds On, when casting, molten metal alternately circulates in dividing in running channel for sand mold respectively, and it is each molten metal smoothly can be transported to type chamber Place, impact force of the molten metal to sand mold when effectively slowing down pouring in vertically clamped moulds.
Four, Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Fig. 2 is the structural schematic diagram of the first mold of the invention;
Fig. 3 is the structural schematic diagram of the second mold of the invention;
Fig. 4 is the structural schematic diagram of the first, second mold clamping of the invention.
Specific embodiment
Detailed description furtherly is made to the present invention in the following with reference to the drawings and specific embodiments, so as to those skilled in the art Member understands.
Process flow chart as shown in connection with fig. 1, a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique of the invention, including Following steps:
Step 1: production mold: flywheel casting mould is designed as the first mold 1 and the second mold 2 of vertical-parting, in conjunction with Shown in Fig. 1-2, first mold 1 includes multiple the first casting type chambers 11 being spaced apart, and is located at first mold top First cast gate 12 in edge middle position, is connected to the first cross gate 13 of 12 bottom of the first cast gate, and is located at described the The riser and first point of running channel 14 of one casting type chamber, 11 gap location, the riser include upper riser 151 and lower riser 152;It is described Second mold 2 includes multiple the second casting type chambers 21 being spaced apart, positioned at the of the 2 top edge middle position of the second mold Two cast gates 22 are connected to the second cross gate 23 of 22 bottom of the second cast gate, and between the second casting type chamber 21 Divide cast gate 24 and second point of running channel at gap, the indentation, there for dividing cast gate 24 to be overlapped in the second casting type chamber 21 respectively, Second point of running channel includes upper second point of running channel 251 and lower second point of running channel 252;
Step 2: melting: putting into medium-frequency induction furnace major ingredient, the auxiliary material in the trolley that feeds by charger and added Heat fusing, medium-frequency induction furnace iron liquid are melted since low temperature, and temperature is gradually increasing, final smelting temperature control 1650~ 1700 DEG C, and after 5~10min of heat preservation, opening operation bell refines iron liquid, degasification, removes Slag treatment, and molten metal is net Change, and keep bonded hard ferrite magnet in the outlet water temperature range of setting, conventional leaving water temperature is 1300~1350 DEG C, passes through forehearth Outlet can release qualified iron liquid;
Step 3: casting: by 2 mould assembling of the first mold 1 and the second mold of casting mould, after mould assembling, first casting Type chamber 11 and the second casting type chamber 21, the first cast gate 12 and the second cast gate 22, the first cross gate 13 and the second cross gate 23, riser With divide cast gate 24 to be overlapped, upper second point of running channel 251 be connected between the second cross gate 23 and upper riser 151, lower second point of running channel 252 are connected between first point of running channel 14 and lower riser 152, and by iron liquid pouring in vertically clamped moulds to mold, after casting, casting is in sand mold Middle 5~10min of natural cooling (specifically being increased and decreased according to casting weight);
Step 4: unpacking, pouring box is opened along vertical-parting face, takes out cast, after cast(ing) surface is cleared up sanding, into Row inspection of blank, finishing, product inspection, storage.
Using flywheel vertical-parting pouring in vertically clamped moulds casting technique of the invention, molten metal molten iron flow speed is fast, casting speed Degree is fast, and a secondary mold can be realized once-cast production more than one piece Wheel casting, and production is improved while expanding production capacity Efficiency;The present invention is poured using the casting mould of Optimal Structure Designing, ranked first in the first mold 1, the second the same of mold 2 It is provided with upper and lower riser 151,152 between casting type chamber 11, the second casting type chamber 21, when casting, molten metal is allowed first to flow through riser It is re-introduced into type chamber, feeding can be carried out to casting in time, improve the feeding effect of riser, eliminate shrinkage cavity and rarefaction defect, improved The quality of Wheel casting;The present invention will divide running channel, and first point of running channel 14, upper and lower second point of running channel 251,252 are divided into the first mould Have on the 1, second mold 2, when casting, molten metal alternately circulates in dividing in running channel for sand mold respectively, can be smoothly molten metal The type chamber of being transported to everywhere, impact force of the molten metal to sand mold when effectively slowing down pouring in vertically clamped moulds.
Casting mould used by casting technique of the invention, the first casting type chamber and the second casting type chamber are respectively 4, Respectively it is divided into spaced two rows.It is poured using the casting mould, can once cast to form four Wheel castings, Production efficiency is improved, the mass production being suitble in industry.
The composition of the major ingredient of the invention are as follows: steel scrap 30%, the pig iron 40%, foundry returns 30%.The addition of the auxiliary material Amount are as follows: carburant 12kg/T, ferrosilicon 4kg/T, manganese iron 1.5kg/T.Smelting and pouring is carried out using the raw material of above-mentioned composition, it is acquired Wheel casting ingredient it is uniform, the graphite of metallographic structure allows a small amount of B, C and D type based on A type, using pearlite as matrix, Free ferrite is no more than 20%, and carbide and steadite are less than 5%, and the hardness of material is HB180-230.
The width of first point of running channel 14 and lower second point of running channel 252 of the invention is the 1/ of the riser bottom width 3.When pouring in vertically clamped moulds, divide the width of running channel narrow, when molten iron does not also have filling completely to descend riser 152, divides the molten iron in running channel cooling, cut Disconnected molten iron prevents filling downwards is lower from arranging casting mold cavity, is easy to cause lower part casting quality defect;Divide the width of running channel wide, divides and pour Molten iron in road is not easy to cool down, and during feeding, the molten iron of upper riser 151 is constantly flowed into lower riser 152, causes The feeding a casting for arranging casting mold cavity is insufficient, leads to problems such as top casting that loose, shrinkage cavity occurs.First point of 14 He of running channel will be stated The width of lower second point of running channel 252 is the 1/3 of the riser bottom width, can guarantee the molten metal of each type chamber simultaneously It is full of, improves cast casting quality.
First point of running channel 14 of the invention and upper second point of running channel 251 are vertically arranged, lower second point of running channel 252 It is obliquely installed, the center line of the upper riser 151 and first point of running channel 14 and above ranked first 11 midpoint line of casting type chamber Perpendicular bisector is overlapped, and the perpendicular bisector that the center line of the lower riser 152 ranked first 11 midpoint line of casting type chamber under is overlapped.Using The running gate system of such structure can improve the mold-filling capacity of molten metal at the casting channel for forming shortest path, casting, The quick flowing for being conducive to molten metal achievees the effect that quick stamp, avoids running gate system air-breathing, so that casting be avoided to generate oxygen Change, loose, shrinkage cavity the defects of, ensure that good Wheel casting quality.Riser is formed in the middle position of casting mold cavity, is guaranteed To the uniformity and timeliness of both sides feeding a casting when casting.
Divide cast gate 24 for sector described in of the invention, and the perpendicular bisector about same row the second casting type chamber midpoint line It is symmetrical.When casting, flow through the metal of riser and flowed into along type wall, stamp block and it is steady, the flowing of molten iron and heat are along entire Type chamber is evenly distributed, and divides the position of cast gate 24 symmetrical about running channel, guarantees the uniformity with row's casting pouring, equivalence.
First mold 1 and the second mold 2 of the invention is formed with the dowel hole 16,26 of mould assembling, and when mould assembling, The dowel hole of the two is overlapped.First mold 1 and the second mold 2 pass through the positioning pin realization also cross dowel hole 16,26 Mould assembling positioning.
Although above-described embodiment is made that detailed description to the present invention, it is only a part of the embodiment of the present invention, Rather than whole embodiments, people can also obtain other embodiments under the premise of without creativeness according to the present embodiment, these Embodiment belongs to the scope of the present invention.

Claims (8)

1. a kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique, it is characterised in that: the following steps are included:
Step 1: production mold: flywheel casting mould is designed as the first mold and the second mold of vertical-parting, first mould Tool includes multiple the first casting type chambers being spaced apart, and the first cast gate positioned at first mold top edge middle position connects It is connected to the first cross gate of first cast gate bottom, and the riser at the first casting type cavity gap and first point Running channel, the riser include upper riser and lower riser;Second mold includes multiple the second casting type chambers being spaced apart, position The second cast gate in second mold top edge middle position is connected to the second cross gate of second cast gate bottom, with And divide cast gate and second point of running channel at the second casting type cavity gap, it is described that cast gate is divided to be overlapped in described second respectively The indentation, there of casting type chamber, second point of running channel include upper second point of running channel and lower second point of running channel;
Step 2: melting: putting into medium-frequency induction furnace heat by major ingredient, the auxiliary material in the trolley that feeds by charger and melt Change, medium-frequency induction furnace iron liquid is melted since low temperature, and temperature is gradually increasing, and final smelting temperature is controlled 1650~1700 DEG C, and after 5~10min of heat preservation, opening operation bell refines iron liquid, degasification, removes Slag treatment, molten metal is purified, and It keeps bonded hard ferrite magnet in the outlet water temperature range of setting, qualified iron liquid can be released by forehearth outlet;
Step 3: casting: by the first mold and the second mould box of casting mould, after mould assembling, the first casting type chamber and Second casting type chamber, the first cast gate and the second cast gate, the first cross gate and the second cross gate, riser and cast gate is divided to be overlapped, upper Two points of running channels are connected between the second cross gate and upper riser, lower second point of running channel be connected to first point of running channel and lower riser it Between, by iron liquid pouring in vertically clamped moulds to mold, after casting, casting 5~10min of natural cooling in sand mold;
Step 4: unpacking, pouring box is opened along vertical-parting face, takes out cast, after cast(ing) surface is cleared up sanding, carries out hair Base inspection, finishing, product inspection, storage.
2. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 1, it is characterised in that: the first casting type chamber It is respectively 4 with the second casting type chamber, is respectively divided into spaced two rows.
3. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 1, it is characterised in that: the group of the major ingredient Become: steel scrap 30%, the pig iron 40%, foundry returns 30%.
4. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 1, it is characterised in that: the auxiliary material adds Dosage are as follows: carburant 12kg/T, ferrosilicon 4kg/T, manganese iron 1.5kg/T.
5. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 2, it is characterised in that: described first point is poured The width of road and lower second point of running channel is the 1/3 of the riser bottom width.
6. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 2, it is characterised in that: described first point is poured Road and upper second point of running channel are vertically arranged, and lower second point of running channel is obliquely installed, the upper riser and first point of running channel Center line is overlapped with the perpendicular bisector that above ranked first casting type chamber midpoint line, and the center line of the lower riser ranked first casting under The perpendicular bisector of type chamber midpoint line is overlapped.
7. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 2, it is characterised in that: described to divide the cast gate to be Sector, and the perpendicular bisector about same row the second casting type chamber midpoint line is symmetrical.
8. flywheel vertical-parting pouring in vertically clamped moulds casting technique according to claim 1, it is characterised in that: first mold The dowel hole of mould assembling is formed with the second mold, and when mould assembling, the dowel hole of the two is overlapped.
CN201811081511.5A 2018-09-17 2018-09-17 Vertical casting process for vertical parting of flywheel Active CN109014059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811081511.5A CN109014059B (en) 2018-09-17 2018-09-17 Vertical casting process for vertical parting of flywheel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811081511.5A CN109014059B (en) 2018-09-17 2018-09-17 Vertical casting process for vertical parting of flywheel

Publications (2)

Publication Number Publication Date
CN109014059A true CN109014059A (en) 2018-12-18
CN109014059B CN109014059B (en) 2020-07-21

Family

ID=64622050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811081511.5A Active CN109014059B (en) 2018-09-17 2018-09-17 Vertical casting process for vertical parting of flywheel

Country Status (1)

Country Link
CN (1) CN109014059B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110238377A (en) * 2019-07-19 2019-09-17 史小涛 A kind of castings production equipment
CN115301893A (en) * 2022-07-25 2022-11-08 北京众星时代科技有限公司 Horizontal pouring mold with pouring gate positioned at middle-lower part of parting surface and pouring method
CN118893178A (en) * 2024-09-25 2024-11-05 山西卡耐夫管业股份有限公司 A vertical casting mold and casting process for hydraulic oil pump
CN119187461A (en) * 2024-09-26 2024-12-27 湖北泰克摩擦材料有限公司 Vertical parting casting die for suspension swing arm

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103862000A (en) * 2014-04-04 2014-06-18 江苏力源金河铸造有限公司 Vertical parting horizontal pouring casting technology for end cover casting core shell
CN106392013A (en) * 2016-12-09 2017-02-15 河北工业大学 Riser and pouring system for producing gray pig iron hub castings on DISA line and design method of riser and pouring system
CN206356537U (en) * 2016-11-28 2017-07-28 上海圣德曼铸造海安有限公司 Automobile brake clamps the casting mold structure of housing
CN107096893A (en) * 2017-05-16 2017-08-29 山东美陵化工设备股份有限公司 Bracket casting mixed type apparatus for pouring and bracket casting casting technique
CN107457368A (en) * 2017-07-24 2017-12-12 绍兴市振杨机械有限公司 A kind of casting mould of thin-walled impeller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103862000A (en) * 2014-04-04 2014-06-18 江苏力源金河铸造有限公司 Vertical parting horizontal pouring casting technology for end cover casting core shell
CN206356537U (en) * 2016-11-28 2017-07-28 上海圣德曼铸造海安有限公司 Automobile brake clamps the casting mold structure of housing
CN106392013A (en) * 2016-12-09 2017-02-15 河北工业大学 Riser and pouring system for producing gray pig iron hub castings on DISA line and design method of riser and pouring system
CN107096893A (en) * 2017-05-16 2017-08-29 山东美陵化工设备股份有限公司 Bracket casting mixed type apparatus for pouring and bracket casting casting technique
CN107457368A (en) * 2017-07-24 2017-12-12 绍兴市振杨机械有限公司 A kind of casting mould of thin-walled impeller

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110238377A (en) * 2019-07-19 2019-09-17 史小涛 A kind of castings production equipment
CN110238377B (en) * 2019-07-19 2024-03-08 史小涛 Foundry goods production facility
CN115301893A (en) * 2022-07-25 2022-11-08 北京众星时代科技有限公司 Horizontal pouring mold with pouring gate positioned at middle-lower part of parting surface and pouring method
CN118893178A (en) * 2024-09-25 2024-11-05 山西卡耐夫管业股份有限公司 A vertical casting mold and casting process for hydraulic oil pump
CN119187461A (en) * 2024-09-26 2024-12-27 湖北泰克摩擦材料有限公司 Vertical parting casting die for suspension swing arm
CN119187461B (en) * 2024-09-26 2025-06-06 湖北泰克摩擦材料有限公司 A vertical parting casting mold for a suspension swing arm

Also Published As

Publication number Publication date
CN109014059B (en) 2020-07-21

Similar Documents

Publication Publication Date Title
CN109047667B (en) Casting process of frame saw bearing block
CN109014059A (en) A kind of flywheel vertical-parting pouring in vertically clamped moulds casting technique
CN102554130B (en) Casting method for high-nickel austenite nodular cast iron exhaust manifold
CN113145797B (en) Casting method of large-scale two-plate injection molding machine template casting
CN103084542A (en) Process for casting heat-resistant steel or wear-resistant alloy steel by evaporative pattern casting (EPC)
CN106238688B (en) A kind of casting method of piston type casting
CN106513564A (en) Bearing cover casting process
CN105665650A (en) Precoated sand mold for casting stainless steel thin-walled workpiece
CN106623795A (en) Running and feeding system on DISA line of small-size cylinder gray iron castings and design method of running and feeding system
CN115710611A (en) Casting method of template casting for large-scale injection molding machine
CN203830665U (en) Novel casting pattern structure of automobile brake disc
CN110257697A (en) A kind of grate-cooler grate plate high abrasion heat resistance casting and its casting technique
CN105798271A (en) Automobile mold casting cast by compounding ductile iron and gray iron, gating system and casting method
CN208976769U (en) Improve the casting mould of casting quality consistency
CN209849837U (en) DISA vertical green sand molding line cylinder mould
CN208976778U (en) Flywheel casting mould
CN103341594A (en) Casting method of brake shell
CN208976770U (en) Prevent the casting mould of casting flaw
CN108080569A (en) A kind of lost foam casting processing method of vehicle front draft lug
CN115229136A (en) Casting method of thick-section wheel type casting with external tooth grooves and bosses
CN106111914A (en) The casting method of upper bearing (metal) class foundry goods
CN208976771U (en) The one flywheel casting mould of mould six
CN105772686A (en) Bimetal composite casting pouring system
CN106493308A (en) A kind of gate valve foundry goods of low cost without rising head
CN206716960U (en) Bracket casting mixed type apparatus for pouring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant