CN108797301A - A kind of road construction lime pay-off equipment - Google Patents
A kind of road construction lime pay-off equipment Download PDFInfo
- Publication number
- CN108797301A CN108797301A CN201810420510.2A CN201810420510A CN108797301A CN 108797301 A CN108797301 A CN 108797301A CN 201810420510 A CN201810420510 A CN 201810420510A CN 108797301 A CN108797301 A CN 108797301A
- Authority
- CN
- China
- Prior art keywords
- shaft
- blanking tube
- bearing seat
- cart
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 235000008733 Citrus aurantifolia Nutrition 0.000 title claims abstract description 31
- 235000011941 Tilia x europaea Nutrition 0.000 title claims abstract description 31
- 239000004571 lime Substances 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 23
- 239000010959 steel Substances 0.000 claims description 23
- 244000309464 bull Species 0.000 claims description 16
- 239000000843 powder Substances 0.000 abstract description 12
- 230000000694 effects Effects 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 7
- 235000019738 Limestone Nutrition 0.000 description 16
- 239000006028 limestone Substances 0.000 description 16
- 239000002699 waste material Substances 0.000 description 4
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 244000144972 livestock Species 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/16—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
- E01C23/20—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ
- E01C23/24—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ by pouring
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The present invention relates to a kind of pay-off equipment more particularly to a kind of road construction lime pay-off equipments.Therefore, technical problem of the invention is:It provides that a kind of flexibility is stronger, and setting-out is relatively uniform, wasting road construction lime pay-off equipment is not easy in operating process.A kind of road construction lime pay-off equipment includes cart, holder, drain hopper, blanking tube, inclined plate, cylindricality framework, discharge barrel, mounting plate, motor, first rotating shaft, first bearing seat, helical blade etc.;Cart upper side right part is equipped with holder, and stent ends are equipped with drain hopper, and drain hopper is located at right over cart, and drain hopper lower end is equipped with blanking tube.It is stronger that invention achieves flexibilities, and setting-out is relatively uniform, and wasting effect is not easy in operating process.By the way that cart is arranged, so that the equipment is flexibly moved, achieved the effect that enhance flexibility.By be arranged receiving hopper, can make lime powder flow out more at the uniform velocity, achieved the effect that setting-out is relatively uniform.
Description
Technical field
The present invention relates to a kind of pay-off equipment more particularly to a kind of road construction lime pay-off equipments.
Background technology
Road engineering refers to being engaged in an applied science and technology of the planning of road, exploration, design, construction, maintenance etc..
Road typically refers to as land transportation service, and the various motor vehicles that pass through, carry the various roads for riding livestock and pedestrian on the back at people's animal-drawn vehicle
General designation.Road is divided into urban road, highway, factories and mines road, road, forest road etc. by character of use.Expressway around city
Arterial highway and highway are then limited highways that traffic discrepancy is controlled, running at high speed.
Road construction refers to that road engineering is built according to plan.Public way construction needs to refer in road surface drafting traffic
Timberline could preferably ensure traffic safety in this way.And existing road construction line drawing device is there are flexibility is strong, setting-out
Less uniformly, the shortcomings that waste being easily caused in operating process.
Therefore stronger there is an urgent need for researching and developing a kind of flexibility, setting-out is relatively uniform, and wasting road is not easy in operating process
Road construction lime pay-off equipment.
Invention content
It is not strong that there are flexibilities in order to overcome existing road construction line drawing device, and setting-out is less uniform, operating process
In the shortcomings that easily causing waste, therefore, technical problem of the invention is:There is provided that a kind of flexibility is stronger, and setting-out is relatively uniform,
Wasting road construction lime pay-off equipment is not easy in operating process.
A kind of road construction lime pay-off equipment includes cart, holder, drain hopper, blanking tube, inclined plate, cylindricality frame
Body, discharge barrel, mounting plate, motor, first rotating shaft, first bearing seat, helical blade, connecting rod, second bearing seat, the second shaft,
First bevel gear, 3rd bearing seat, third shaft, second bevel gear and broken blade, cart upper side right part are equipped with holder, branch
Frame end is equipped with drain hopper, and drain hopper is located at right over cart, and drain hopper lower end is equipped with blanking tube, blanking tube in drain hopper
Portion communicates, and is equipped with inclined plate in blanking tube at left and right sides of lower part, cylindricality framework, cylindricality framework top are equipped in the middle part of cart upper side
It connect with blanking tube downside on the left of portion, is communicated inside cylindricality framework and blanking tube, cylindricality framework lower wall right part is equipped with discharge barrel, goes out
For barrel among cart right part, cart upper side left part is equipped with mounting plate, and mounting plate right upper portion is equipped with motor, cylindricality framework
It is embedded in the middle part of two walls of left and right to be connected with first bearing seat, it is connected with first rotating shaft between the first bearing seat of the left and right sides,
First rotating shaft right part is connected with helical blade, and helical blade is located inside cylindricality framework, on the right side of first rotating shaft left end and motor
Axis connection is exported, outer wall lower part is equipped with connecting rod on the left of blanking tube, and connecting rod left end is equipped with second bearing seat, the interior connection of second bearing seat
There are the second shaft, the second shaft to be located on the upside of first rotating shaft, the second shaft lower end and first rotating shaft left part are respectively connected with the first cone
Gear, two first bevel gear engagements, two wall of blanking tube or so middle part is embedded to be connected with 3rd bearing seat, the left and right sides
It is connected with third shaft between 3rd bearing seat, third shaft left end and the second shaft top are respectively connected with second bevel gear, and two
A second bevel gear engagement, third shaft middle part are all uniformly connected with more broken blades in both sides up and down, and broken blade is respectively positioned on
In blanking tube.
Further, further include having cam, movable plate, baffle, the first spring and wedge block, be equipped at the top of the second shaft convex
Wheel, blanking tube left wall top are provided with a word hole, and being passed through in a word hole has movable plate, and baffle is connected on the left of movable plate, and baffle is right
Side lower part and cam contact, are connected with the first spring between baffle right upper portion and blanking tube left upper portion, on the right side of blanking tube in
Wall top is equipped with wedge block, and left part is contacted with right part on the upside of movable plate on the downside of wedge block.
Further, further include have strut, fourth bearing seat, the 4th shaft, belt pulley, flat belt, disk, second spring and
Steel ball, cylindricality framework top right side are equipped with strut, and strut top is equipped with fourth bearing seat, the 4th turn is connected in fourth bearing seat
Axis, the 4th shaft middle part and third shaft right end are equipped with belt pulley, and upper and lower two belt pulleys are located on same vertical line, two
Flat belt is wound between belt pulley, the 4th shaft left end is equipped with disk, and disk top and the bottom are respectively connected with second spring, second spring
End be equipped with steel ball, steel ball and the drain hopper outer right wall lower contacts of upside.
Further, further include having receiving hopper, sliding sleeve, slide bar, third spring and idler wheel, discharge barrel bottom right, which is hinged with, to be connect
Hopper, receiving hopper right side central are equipped with sliding sleeve, and sliding sleeve inner sliding type is connected with slide bar, and top end of sliding rod is connected with third spring, the
The upper end of three springs is connected to receiving hopper right side central, and slide bar end rotary type is connected with idler wheel.
Further, further include having 5th bearing seat, bull stick, cover board and handle, 5th bearing seat be equipped on the left of cradle top,
Bull stick is connected in 5th bearing seat, bull stick top is equipped with cover board, and cover board covers at the top of drain hopper, and left part is equipped with handle on the upside of cover board
Hand.
When staff uses the equipment, suitable pulverized limestone, the pulverized limestone in drain hopper are first packed into drain hopper
It can gradually fall into blanking tube, then the equipment is pushed on the construction road for needing to carry out setting-out, be then turned on motor, motor
First rotating shaft is driven to rotate clockwise, the first bevel gear and helical blade of downside rotate clockwise therewith, the first cone of downside
Gear drives the first bevel gear of upside to rotate counterclockwise immediately, to make the second shaft rotate, the second cone in the second shaft
Second bevel gear rotation on gear and then drive third shaft, third shaft and broken blade rotate therewith, and broken blade can
The pulverized limestone to lump in blanking tube is crushed, the pulverized limestone for crushing completion is gradually fallen into cylindricality framework, then by spiral
Blade is sent to discharge barrel and falls, and the personnel of working at the same time need the pulverized limestone for falling the equipment along linear pushing can be in road
Road draws a white line.Motor is closed after the completion of setting-out, and the equipment is pushed to original position.
Because further including having cam, movable plate, baffle, the first spring and wedge block, cam is equipped at the top of the second shaft, under
Barrel left wall top is provided with a word hole, and being passed through in a word hole has movable plate, and baffle, baffle lower right side are connected on the left of movable plate
With cam contact, the first spring, blanking tube right side upper inside wall are connected between baffle right upper portion and blanking tube left upper portion
Equipped with wedge block, left part is contacted with right part on the upside of movable plate on the downside of wedge block.So the second shaft can be with moving cam when rotating
Rotation, when the distal end of cam, which is gradually gone to, to be contacted with baffle, the first spring is gradually stretched, and baffle and movable plate are gradually to the left
Mobile, the pulverized limestone in drain hopper is slowly fallen into blanking tube, when the distal end of cam does not contact gradually with baffle, the first spring
It gradually resets, to drive baffle and movable plate gradually to move right, the pulverized limestone in drain hopper, which tapers off, to be fallen.Cam is not
Disconnected rotation, can be such that the pulverized limestone intermittence in drain hopper falls into blanking tube, thus make lime of the broken blade to caking
Powder more thoroughly crush.
Because further including having strut, fourth bearing seat, the 4th shaft, belt pulley, flat belt, disk, second spring and steel
Pearl, cylindricality framework top right side are equipped with strut, and strut top is equipped with fourth bearing seat, the 4th turn is connected in fourth bearing seat
Axis, the 4th shaft middle part and third shaft right end are equipped with belt pulley, and upper and lower two belt pulleys are located on same vertical line, two
Flat belt is wound between belt pulley, the 4th shaft left end is equipped with disk, and disk top and the bottom are respectively connected with second spring, second spring
End be equipped with steel ball, steel ball and the drain hopper outer right wall lower contacts of upside, so third shaft can band when rotating
The pulley rotation of dynamic downside, the belt pulley of downside again by the belt pulley on the upside of flat-belt drive, to make the 4th shaft and
Disk rotational, the second spring on disk drive steel ball to rotate immediately, and steel ball intermittent can hit blowing during rotating
Struggle against outer right wall, and the pulverized limestone caking for sticking in inner wall on the right side of drain hopper can thus fallen, has reached the effect for reducing waste
Fruit.
Because further including thering is receiving hopper, sliding sleeve, slide bar, third spring and idler wheel, discharge barrel bottom right to be hinged with splicing
Bucket, receiving hopper right side central are equipped with sliding sleeve, and sliding sleeve inner sliding type is connected with slide bar, and top end of sliding rod is connected with third spring, third
The upper end of spring is connected to receiving hopper right side central, and slide bar end rotary type is connected with idler wheel.So the stone fallen by discharge barrel
Grey powder can be dropped down onto first in receiving hopper, then slowly drop down onto road surface from receiving hopper, can thus lime powder be made to fall more
At the uniform velocity, to keep the line of picture more uniformly beautiful.Idler wheel can be rotated together with moving for cart, and third spring plays buffering
Effect, will not thus hinder cart to move.
Because further including having 5th bearing seat, bull stick, cover board and handle, 5th bearing seat is equipped on the left of cradle top, the
Bull stick is connected in five bearing blocks, bull stick top is equipped with cover board, and cover board covers at the top of drain hopper, and left part is equipped with handle on the upside of cover board
Hand closes cover board again so people can be packed into before lime in blanking tube through handle opening cover board after the completion of being packed into.This
Sample can be windproof moisture-proof, preferably protects the pulverized limestone inside drain hopper.
It is stronger that invention achieves flexibilities, and setting-out is relatively uniform, and wasting effect is not easy in operating process.It is logical
Setting cart is crossed, the equipment is enable flexibly to move, has achieved the effect that enhance flexibility.By the way that receiving hopper is arranged, can make
Lime powder outflow more at the uniform velocity, achieved the effect that setting-out is relatively uniform.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of the first front view of the present invention.
Fig. 2 is the schematic cross-sectional view of second of front view of the present invention.
Fig. 3 is the schematic cross-sectional view of the third front view of the present invention.
Fig. 4 is the schematic cross-sectional view of the 4th kind of front view of the present invention.
Fig. 5 is the enlarged diagram of part A of the present invention.
In figure:1 cart, 2 holders, 3 drain hoppers, 4 blanking tubes, 5 inclined plates, 6 cylindricality frameworks, 7 discharge barrels, 8 mounting plates, 9
Motor, 10 first rotating shafts, 11 first bearing seats, 12 helical blades, 13 connecting rods, 14 second bearing seats, 15 second shafts, 16 first
Bevel gear, 17 3rd bearing seats, 18 third shafts, 19 second bevel gears, 20 broken blades, 21 cams, 22 1 word holes, 23 activities
Plate, 24 baffles, 25 first springs, 26 wedge blocks, 27 struts, 28 fourth bearing seats, 29 the 4th shafts, 30 belt pulleys, 31 flat skins
Band, 32 disks, 33 second springs, 34 steel balls, 35 receiving hoppers, 36 sliding sleeves, 37 slide bars, 38 third springs, 39 idler wheels, 40 the 5th axis
Bearing, 41 bull sticks, 42 cover boards, 43 handles.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, the present invention will be described in detail, but not as a limitation of the invention.
Embodiment 1
A kind of road construction lime pay-off equipment, as shown in Figs. 1-5, include cart 1, holder 2, drain hopper 3, blanking tube 4,
Inclined plate 5, cylindricality framework 6, discharge barrel 7, mounting plate 8, motor 9, first rotating shaft 10, first bearing seat 11, helical blade 12, connecting rod
13, second bearing seat 14, the second shaft 15, first bevel gear 16,3rd bearing seat 17, third shaft 18, second bevel gear 19
With broken blade 20,1 upper side right part of cart is equipped with holder 2, and 2 end of holder is equipped with drain hopper 3, and drain hopper 3 is located at cart 1
Surface, 3 lower end of drain hopper is equipped with blanking tube 4, is communicated inside blanking tube 4 and drain hopper 3, in blanking tube 4 at left and right sides of lower part
It is equipped with inclined plate 5, cylindricality framework 6 is installed in the middle part of 1 upper side of cart, 6 top left side of cylindricality framework connects with 4 downside of blanking tube
It connects, is communicated inside cylindricality framework 6 and blanking tube 4,6 lower wall right part of cylindricality framework is equipped with discharge barrel 7, and discharge barrel 7 is right through cart 1
Among portion, 1 upper side left part of cart is equipped with mounting plate 8, and 8 right upper portion of mounting plate is equipped with motor 9,6 or so two wall of cylindricality framework
Middle part is embedded to be connected with first bearing seat 11, and first rotating shaft 10 is connected between the first bearing seat 11 of the left and right sides, the
One shaft, 10 right part is connected with helical blade 12, and helical blade 12 is located inside cylindricality framework 6,10 left end of first rotating shaft and motor
The output axis connection on 9 right sides, 4 left side outer wall lower part of blanking tube are equipped with connecting rod 13, and 13 left end of connecting rod is equipped with second bearing seat 14, the
It is connected with the second shaft 15 in two bearing bracket 14, the second shaft 15 is located at 10 upside of first rotating shaft, 15 lower end of the second shaft and the
One shaft, 10 left part is respectively connected with first bevel gear 16, and two first bevel gears 16 engage, embedding in the middle part of 4 or so two wall of blanking tube
Enter formula and be connected with 3rd bearing seat 17, third shaft 18, third shaft 18 are connected between the 3rd bearing seat 17 of the left and right sides
Left end and 15 top of the second shaft are respectively connected with second bevel gear 19, and two second bevel gears 19 engage, 18 middle part of third shaft
Upper and lower both sides are all uniformly connected with more broken blades 20, and broken blade 20 is respectively positioned in blanking tube 4.
Embodiment 2
A kind of road construction lime pay-off equipment, as shown in Figs. 1-5, include cart 1, holder 2, drain hopper 3, blanking tube 4,
Inclined plate 5, cylindricality framework 6, discharge barrel 7, mounting plate 8, motor 9, first rotating shaft 10, first bearing seat 11, helical blade 12, connecting rod
13, second bearing seat 14, the second shaft 15, first bevel gear 16,3rd bearing seat 17, third shaft 18, second bevel gear 19
With broken blade 20,1 upper side right part of cart is equipped with holder 2, and 2 end of holder is equipped with drain hopper 3, and drain hopper 3 is located at cart 1
Surface, 3 lower end of drain hopper is equipped with blanking tube 4, is communicated inside blanking tube 4 and drain hopper 3, in blanking tube 4 at left and right sides of lower part
It is equipped with inclined plate 5, cylindricality framework 6 is installed in the middle part of 1 upper side of cart, 6 top left side of cylindricality framework connects with 4 downside of blanking tube
It connects, is communicated inside cylindricality framework 6 and blanking tube 4,6 lower wall right part of cylindricality framework is equipped with discharge barrel 7, and discharge barrel 7 is right through cart 1
Among portion, 1 upper side left part of cart is equipped with mounting plate 8, and 8 right upper portion of mounting plate is equipped with motor 9,6 or so two wall of cylindricality framework
Middle part is embedded to be connected with first bearing seat 11, and first rotating shaft 10 is connected between the first bearing seat 11 of the left and right sides, the
One shaft, 10 right part is connected with helical blade 12, and helical blade 12 is located inside cylindricality framework 6,10 left end of first rotating shaft and motor
The output axis connection on 9 right sides, 4 left side outer wall lower part of blanking tube are equipped with connecting rod 13, and 13 left end of connecting rod is equipped with second bearing seat 14, the
It is connected with the second shaft 15 in two bearing bracket 14, the second shaft 15 is located at 10 upside of first rotating shaft, 15 lower end of the second shaft and the
One shaft, 10 left part is respectively connected with first bevel gear 16, and two first bevel gears 16 engage, embedding in the middle part of 4 or so two wall of blanking tube
Enter formula and be connected with 3rd bearing seat 17, third shaft 18, third shaft 18 are connected between the 3rd bearing seat 17 of the left and right sides
Left end and 15 top of the second shaft are respectively connected with second bevel gear 19, and two second bevel gears 19 engage, 18 middle part of third shaft
Upper and lower both sides are all uniformly connected with more broken blades 20, and broken blade 20 is respectively positioned in blanking tube 4.
Further include having cam 21, movable plate 23, baffle 24, the first spring 25 and wedge block 26,15 top of the second shaft is set
There are cam 21,4 left wall top of blanking tube to be provided with a word hole 22, being passed through in a word hole 22 has movable plate 23, and 23 left side of movable plate connects
It is connected to baffle 24,24 lower right side of baffle is contacted with cam 21, is connected between 4 left upper portion of 24 right upper portion of baffle and blanking tube
There are the first spring 25,4 right side upper inside wall of blanking tube to be equipped with wedge block 26,26 downside left part of wedge block and 23 upside of movable plate are right
Portion contacts.
Embodiment 3
A kind of road construction lime pay-off equipment, as shown in Figs. 1-5, include cart 1, holder 2, drain hopper 3, blanking tube 4,
Inclined plate 5, cylindricality framework 6, discharge barrel 7, mounting plate 8, motor 9, first rotating shaft 10, first bearing seat 11, helical blade 12, connecting rod
13, second bearing seat 14, the second shaft 15, first bevel gear 16,3rd bearing seat 17, third shaft 18, second bevel gear 19
With broken blade 20,1 upper side right part of cart is equipped with holder 2, and 2 end of holder is equipped with drain hopper 3, and drain hopper 3 is located at cart 1
Surface, 3 lower end of drain hopper is equipped with blanking tube 4, is communicated inside blanking tube 4 and drain hopper 3, in blanking tube 4 at left and right sides of lower part
It is equipped with inclined plate 5, cylindricality framework 6 is installed in the middle part of 1 upper side of cart, 6 top left side of cylindricality framework connects with 4 downside of blanking tube
It connects, is communicated inside cylindricality framework 6 and blanking tube 4,6 lower wall right part of cylindricality framework is equipped with discharge barrel 7, and discharge barrel 7 is right through cart 1
Among portion, 1 upper side left part of cart is equipped with mounting plate 8, and 8 right upper portion of mounting plate is equipped with motor 9,6 or so two wall of cylindricality framework
Middle part is embedded to be connected with first bearing seat 11, and first rotating shaft 10 is connected between the first bearing seat 11 of the left and right sides, the
One shaft, 10 right part is connected with helical blade 12, and helical blade 12 is located inside cylindricality framework 6,10 left end of first rotating shaft and motor
The output axis connection on 9 right sides, 4 left side outer wall lower part of blanking tube are equipped with connecting rod 13, and 13 left end of connecting rod is equipped with second bearing seat 14, the
It is connected with the second shaft 15 in two bearing bracket 14, the second shaft 15 is located at 10 upside of first rotating shaft, 15 lower end of the second shaft and the
One shaft, 10 left part is respectively connected with first bevel gear 16, and two first bevel gears 16 engage, embedding in the middle part of 4 or so two wall of blanking tube
Enter formula and be connected with 3rd bearing seat 17, third shaft 18, third shaft 18 are connected between the 3rd bearing seat 17 of the left and right sides
Left end and 15 top of the second shaft are respectively connected with second bevel gear 19, and two second bevel gears 19 engage, 18 middle part of third shaft
Upper and lower both sides are all uniformly connected with more broken blades 20, and broken blade 20 is respectively positioned in blanking tube 4.
Further include having cam 21, movable plate 23, baffle 24, the first spring 25 and wedge block 26,15 top of the second shaft is set
There are cam 21,4 left wall top of blanking tube to be provided with a word hole 22, being passed through in a word hole 22 has movable plate 23, and 23 left side of movable plate connects
It is connected to baffle 24,24 lower right side of baffle is contacted with cam 21, is connected between 4 left upper portion of 24 right upper portion of baffle and blanking tube
There are the first spring 25,4 right side upper inside wall of blanking tube to be equipped with wedge block 26,26 downside left part of wedge block and 23 upside of movable plate are right
Portion contacts.
Further include having strut 27, fourth bearing seat 28, the 4th shaft 29, belt pulley 30, flat belt 31, disk 32, second
Spring 33 and steel ball 34,6 top right side of cylindricality framework are equipped with strut 27, and 27 top of strut is equipped with fourth bearing seat 28, the 4th axis
It is connected with the 4th shaft 29 in bearing 28,29 middle part of the 4th shaft and 18 right end of third shaft are equipped with belt pulley 30, and upper and lower two
A belt pulley 30 is located on same vertical line, and flat belt 31 is wound between two belt pulleys 30, and 29 left end of the 4th shaft is equipped with circle
Disk 32,32 top and the bottom of disk are respectively connected with second spring 33, and the end of second spring 33 is equipped with steel ball 34, the steel ball 34 of upside
With 3 outer right wall lower contacts of drain hopper.
Embodiment 4
A kind of road construction lime pay-off equipment, as shown in Figs. 1-5, include cart 1, holder 2, drain hopper 3, blanking tube 4,
Inclined plate 5, cylindricality framework 6, discharge barrel 7, mounting plate 8, motor 9, first rotating shaft 10, first bearing seat 11, helical blade 12, connecting rod
13, second bearing seat 14, the second shaft 15, first bevel gear 16,3rd bearing seat 17, third shaft 18, second bevel gear 19
With broken blade 20,1 upper side right part of cart is equipped with holder 2, and 2 end of holder is equipped with drain hopper 3, and drain hopper 3 is located at cart 1
Surface, 3 lower end of drain hopper is equipped with blanking tube 4, is communicated inside blanking tube 4 and drain hopper 3, in blanking tube 4 at left and right sides of lower part
It is equipped with inclined plate 5, cylindricality framework 6 is installed in the middle part of 1 upper side of cart, 6 top left side of cylindricality framework connects with 4 downside of blanking tube
It connects, is communicated inside cylindricality framework 6 and blanking tube 4,6 lower wall right part of cylindricality framework is equipped with discharge barrel 7, and discharge barrel 7 is right through cart 1
Among portion, 1 upper side left part of cart is equipped with mounting plate 8, and 8 right upper portion of mounting plate is equipped with motor 9,6 or so two wall of cylindricality framework
Middle part is embedded to be connected with first bearing seat 11, and first rotating shaft 10 is connected between the first bearing seat 11 of the left and right sides, the
One shaft, 10 right part is connected with helical blade 12, and helical blade 12 is located inside cylindricality framework 6,10 left end of first rotating shaft and motor
The output axis connection on 9 right sides, 4 left side outer wall lower part of blanking tube are equipped with connecting rod 13, and 13 left end of connecting rod is equipped with second bearing seat 14, the
It is connected with the second shaft 15 in two bearing bracket 14, the second shaft 15 is located at 10 upside of first rotating shaft, 15 lower end of the second shaft and the
One shaft, 10 left part is respectively connected with first bevel gear 16, and two first bevel gears 16 engage, embedding in the middle part of 4 or so two wall of blanking tube
Enter formula and be connected with 3rd bearing seat 17, third shaft 18, third shaft 18 are connected between the 3rd bearing seat 17 of the left and right sides
Left end and 15 top of the second shaft are respectively connected with second bevel gear 19, and two second bevel gears 19 engage, 18 middle part of third shaft
Upper and lower both sides are all uniformly connected with more broken blades 20, and broken blade 20 is respectively positioned in blanking tube 4.
Further include having cam 21, movable plate 23, baffle 24, the first spring 25 and wedge block 26,15 top of the second shaft is set
There are cam 21,4 left wall top of blanking tube to be provided with a word hole 22, being passed through in a word hole 22 has movable plate 23, and 23 left side of movable plate connects
It is connected to baffle 24,24 lower right side of baffle is contacted with cam 21, is connected between 4 left upper portion of 24 right upper portion of baffle and blanking tube
There are the first spring 25,4 right side upper inside wall of blanking tube to be equipped with wedge block 26,26 downside left part of wedge block and 23 upside of movable plate are right
Portion contacts.
Further include having strut 27, fourth bearing seat 28, the 4th shaft 29, belt pulley 30, flat belt 31, disk 32, second
Spring 33 and steel ball 34,6 top right side of cylindricality framework are equipped with strut 27, and 27 top of strut is equipped with fourth bearing seat 28, the 4th axis
It is connected with the 4th shaft 29 in bearing 28,29 middle part of the 4th shaft and 18 right end of third shaft are equipped with belt pulley 30, and upper and lower two
A belt pulley 30 is located on same vertical line, and flat belt 31 is wound between two belt pulleys 30, and 29 left end of the 4th shaft is equipped with circle
Disk 32,32 top and the bottom of disk are respectively connected with second spring 33, and the end of second spring 33 is equipped with steel ball 34, the steel ball 34 of upside
With 3 outer right wall lower contacts of drain hopper.
Further include having receiving hopper 35, sliding sleeve 36, slide bar 37, third spring 38 and idler wheel 39,7 bottom right of discharge barrel is hinged
There are receiving hopper 35,35 right side central of receiving hopper to be equipped with sliding sleeve 36,36 inner sliding type of sliding sleeve is connected with slide bar 37, and 37 top of slide bar connects
It is connected to third spring 38, the upper end of third spring 38 is connected to 35 right side central of receiving hopper, and 37 end rotary type of slide bar is connected with
Idler wheel 39.
Further include having 5th bearing seat 40, bull stick 41, cover board 42 and handle 43,2 top left side of holder is equipped with 5th bearing
Seat 40 is connected with bull stick 41 in 5th bearing seat 40, and 41 top of bull stick is equipped with cover board 42, and cover board 42 covers 3 top of drain hopper, lid
42 upside left part of plate is equipped with handle 43.
When staff uses the equipment, suitable pulverized limestone, the lime in drain hopper 3 are first packed into drain hopper 3
Powder can gradually be fallen into blanking tube 4, then the equipment is pushed on the construction road for needing to carry out setting-out, and motor 9 is then turned on,
Motor 9 drives first rotating shaft 10 to rotate clockwise, and the first bevel gear 16 and helical blade 12 of downside rotate clockwise therewith, under
The first bevel gear 16 of side drives the first bevel gear 16 of upside to rotate counterclockwise immediately, to make the second shaft 15 rotate, the
Second bevel gear 19 in two shafts 15 and then the second bevel gear 19 in third shaft 18 is driven to rotate, third shaft 18 and broken
Broken blade 20 rotates therewith, and broken blade 20 can crush the pulverized limestone to lump in blanking tube 4, crush the lime of completion
Powder is gradually fallen into cylindricality framework 6, then is sent to discharge barrel 7 by helical blade 12 and is fallen, and the personnel that work at the same time need to set this
For along linear pushing, the pulverized limestone fallen can draw a white line on road.Motor 9 is closed after the completion of setting-out, and this
Equipment is pushed to original position.
Because further including having cam 21, movable plate 23, baffle 24, the first spring 25 and wedge block 26, the second shaft 15 top
Portion is equipped with cam 21, and 4 left wall top of blanking tube is provided with a word hole 22, and being passed through in a word hole 22 has movable plate 23, and movable plate 23 is left
Side is connected with baffle 24, and 24 lower right side of baffle is contacted with cam 21, between 4 left upper portion of 24 right upper portion of baffle and blanking tube
Be connected with the first spring 25,4 right side upper inside wall of blanking tube is equipped with wedge block 26,26 downside left part of wedge block on movable plate 23
Side right part contact.So the second shaft 15 can rotate when rotating with moving cam 21, when the distal end of cam 21 gradually goes to and keeps off
When plate 24 contacts, the first spring 25 is gradually stretched, and baffle 24 and movable plate 23 are gradually moved to the left, the lime in drain hopper 3
Powder is slowly fallen into blanking tube 4, and when the distal end of cam 21 does not contact gradually with baffle 24, the first spring 25 gradually resets, from
And baffle 24 and movable plate 23 is driven gradually to move right, the pulverized limestone in drain hopper 3, which tapers off, to be fallen.Cam 21 constantly turns
It is dynamic, the pulverized limestone intermittence in drain hopper 3 can be made to fall into blanking tube 4, thus make lime of the broken blade 20 to caking
Powder more thoroughly crush.
Because further include have strut 27, fourth bearing seat 28, the 4th shaft 29, belt pulley 30, flat belt 31, disk 32,
Second spring 33 and steel ball 34,6 top right side of cylindricality framework are equipped with strut 27, and 27 top of strut is equipped with fourth bearing seat 28, the
The 4th shaft 29 is connected in four bearing blocks 28,29 middle part of the 4th shaft and 18 right end of third shaft are equipped with belt pulley 30, on
Lower two belt pulleys 30 are located on same vertical line, and flat belt 31 is wound between two belt pulleys 30, and 29 left end of the 4th shaft is set
There are disk 32,32 top and the bottom of disk to be respectively connected with second spring 33, the end of second spring 33 is equipped with steel ball 34, the steel of upside
Pearl 34 and 3 outer right wall lower contacts of drain hopper, so third shaft 18 can drive the belt pulley 30 of downside to rotate when rotating,
The belt pulley 30 of downside is again by the belt pulley 30 of the transmission of flat belt 31 upside, to make the 4th shaft 29 and disk 32 rotate,
Second spring 33 on disk 32 drives steel ball 34 to rotate immediately, and steel ball 34 intermittent can hit drain hopper during rotating
3 outer right walls can thus be such that the pulverized limestone caking for sticking in 3 right side inner wall of drain hopper falls, reach the effect for reducing waste
Fruit.
Because further including having receiving hopper 35, sliding sleeve 36, slide bar 37, third spring 38 and idler wheel 39,7 bottom right of discharge barrel
It is hinged with receiving hopper 35,35 right side central of receiving hopper is equipped with sliding sleeve 36, and 36 inner sliding type of sliding sleeve is connected with slide bar 37, and slide bar 37 pushes up
End is connected with third spring 38, and the upper end of third spring 38 is connected to 35 right side central of receiving hopper, and 37 end rotary type of slide bar connects
It is connected to idler wheel 39.So the lime powder fallen by discharge barrel 7 can first drop down onto in receiving hopper 35, then slowly dropped down onto from receiving hopper 35
Road surface, can thus make that lime powder falls more at the uniform velocity, to keep the line of picture more uniformly beautiful.Idler wheel 39 can be with
Moving and rotating together for cart 1, third spring 38 works as a buffer, and cart 1 will not thus be hindered to move.
Because further including having 5th bearing seat 40, bull stick 41, cover board 42 and handle 43,2 top left side of holder is equipped with the 5th
Bearing block 40 is connected with bull stick 41 in 5th bearing seat 40, and 41 top of bull stick is equipped with cover board 42, and cover board 42 covers the top of drain hopper 3
Portion, 42 upside left part of cover board are equipped with handle 43, so people are opened before being packed into lime in blanking tube 4 by handle 43
Cover board 42 closes cover board 42 again after the completion of being packed into.Thus it can preferably protect the lime inside drain hopper 3 with windproof moisture-proof
Powder.
Above-described embodiment, only presently preferred embodiments of the present invention, is not used for limiting the scope of the present invention, therefore all with this
The equivalence changes that content is done described in invention claim should all be included within scope of the invention as claimed.
Claims (5)
1. a kind of road construction lime pay-off equipment, which is characterized in that include cart(1), holder(2), drain hopper(3),
Blanking tube(4), inclined plate(5), cylindricality framework(6), discharge barrel(7), mounting plate(8), motor(9), first rotating shaft(10), first axle
Bearing(11), helical blade(12), connecting rod(13), second bearing seat(14), the second shaft(15), first bevel gear(16),
Three bearing blocks(17), third shaft(18), second bevel gear(19)And broken blade(20), cart(1)Upper side right part is equipped with
Holder(2), holder(2)End is equipped with drain hopper(3), drain hopper(3)Positioned at cart(1)Surface, drain hopper(3)Lower end is set
There is blanking tube(4), blanking tube(4)With drain hopper(3)Inside communicates, blanking tube(4)It is equipped with inclined plate at left and right sides of interior lower part
(5), cart(1)Cylindricality framework is installed in the middle part of upper side(6), cylindricality framework(6)Top left side and blanking tube(4)Downside connects
It connects, cylindricality framework(6)With blanking tube(4)Inside communicates, cylindricality framework(6)Lower wall right part is equipped with discharge barrel(7), discharge barrel(7)
Through cart(1)Among right part, cart(1)Upper side left part is equipped with mounting plate(8), mounting plate(8)Right upper portion is equipped with motor
(9), cylindricality framework(6)It is embedded in the middle part of two walls of left and right to be connected with first bearing seat(11), the first bearing seat of the left and right sides
(11)Between be connected with first rotating shaft(10), first rotating shaft(10)Right part is connected with helical blade(12), helical blade(12)Position
In cylindricality framework(6)Inside, first rotating shaft(10)Left end and motor(9)The output axis connection on right side, blanking tube(4)Left side outer wall
Lower part is equipped with connecting rod(13), connecting rod(13)Left end is equipped with second bearing seat(14), second bearing seat(14)Inside it is connected with second turn
Axis(15), the second shaft(15)Positioned at first rotating shaft(10)Upside, the second shaft(15)Lower end and first rotating shaft(10)Left part is equal
It is connected with first bevel gear(16), two first bevel gears(16)Engagement, blanking tube(4)Embedded connection in the middle part of two walls of left and right
There is 3rd bearing seat(17), the 3rd bearing seat of the left and right sides(17)Between be connected with third shaft(18), third shaft(18)
Left end and the second shaft(15)Top is respectively connected with second bevel gear(19), two second bevel gears(19)Engagement, third shaft
(18)Middle part is all uniformly connected with more broken blades in both sides up and down(20), broken blade(20)It is respectively positioned on blanking tube(4)It is interior.
2. a kind of road construction lime pay-off equipment according to claim 1, which is characterized in that further include having cam
(21), movable plate(23), baffle(24), the first spring(25)And wedge block(26), the second shaft(15)Top is equipped with cam
(21), blanking tube(4)Left wall top is provided with a word hole(22), a word hole(22)Interior pass through has movable plate(23), movable plate(23)
Left side is connected with baffle(24), baffle(24)Lower right side and cam(21)Contact, baffle(24)Right upper portion and blanking tube(4)
The first spring is connected between left upper portion(25), blanking tube(4)Right side upper inside wall is equipped with wedge block(26), wedge block(26)
Downside left part and movable plate(23)Upside right part contact.
3. a kind of road construction lime pay-off equipment according to claim 2, which is characterized in that further include having strut
(27), fourth bearing seat(28), the 4th shaft(29), belt pulley(30), flat belt(31), disk(32), second spring(33)
And steel ball(34), cylindricality framework(6)Top right side is equipped with strut(27), strut(27)Top is equipped with fourth bearing seat(28), the
Four bearing blocks(28)Inside it is connected with the 4th shaft(29), the 4th shaft(29)Middle part and third shaft(18)Right end is equipped with belt
Wheel(30), upper and lower two belt pulleys(30)On same vertical line, two belt pulleys(30)Between be wound with flat belt(31), the
Four shafts(29)Left end is equipped with disk(32), disk(32)Top and the bottom are respectively connected with second spring(33), second spring(33)'s
End is equipped with steel ball(34), the steel ball of upside(34)With drain hopper(3)Outer right wall lower contacts.
4. a kind of road construction lime pay-off equipment according to claim 3, which is characterized in that further include having receiving hopper
(35), sliding sleeve(36), slide bar(37), third spring(38)And idler wheel(39), discharge barrel(7)Bottom right is hinged with receiving hopper
(35), receiving hopper(35)Right side central is equipped with sliding sleeve(36), sliding sleeve(36)Inner sliding type is connected with slide bar(37), slide bar(37)Top
End is connected with third spring(38), third spring(38)Upper end be connected to receiving hopper(35)Right side central, slide bar(37)End
Rotary type is connected with idler wheel(39).
5. a kind of road construction lime pay-off equipment according to claim 4, which is characterized in that further include having the 5th axis
Bearing(40), bull stick(41), cover board(42)And handle(43), holder(2)Top left side is equipped with 5th bearing seat(40), the 5th axis
Bearing(40)Inside it is connected with bull stick(41), bull stick(41)Top is equipped with cover board(42), cover board(42)Cover drain hopper(3)Top,
Cover board(42)Upside left part is equipped with handle(43).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810420510.2A CN108797301A (en) | 2018-05-04 | 2018-05-04 | A kind of road construction lime pay-off equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810420510.2A CN108797301A (en) | 2018-05-04 | 2018-05-04 | A kind of road construction lime pay-off equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108797301A true CN108797301A (en) | 2018-11-13 |
Family
ID=64093732
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810420510.2A Pending CN108797301A (en) | 2018-05-04 | 2018-05-04 | A kind of road construction lime pay-off equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108797301A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111420758A (en) * | 2020-06-16 | 2020-07-17 | 桂林鸿程矿山设备制造有限责任公司 | Material grading grinding production device applied to suspension roller type ring roller mill |
| CN111571934A (en) * | 2020-05-13 | 2020-08-25 | 安徽万有新材料有限公司 | Injection molding machine for plastic processing |
| CN111764670A (en) * | 2020-06-11 | 2020-10-13 | 温必连 | Lime spraying equipment for construction site location line |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040240938A1 (en) * | 2003-05-28 | 2004-12-02 | Ron Hicks | Tractive box for traffic stripe and method of use |
| CN206204757U (en) * | 2016-09-24 | 2017-05-31 | 中交第一航务工程局有限公司 | Heat molten type asphalt roads graticule artificial construction's heating kettle |
| CN107263710A (en) * | 2017-08-21 | 2017-10-20 | 程新锋 | A kind of bridge construction mixed mud agitating device |
| CN107377077A (en) * | 2017-08-02 | 2017-11-24 | 江勇 | A kind of tea dry sorting breaker |
| CN107446737A (en) * | 2017-07-31 | 2017-12-08 | 闫存 | An integrated device for stirring and pulverizing raw materials for liquor processing |
| CN107715765A (en) * | 2017-10-25 | 2018-02-23 | 许传金 | A kind of seedling growth soil fertilizer agitating device |
| CN107935148A (en) * | 2017-12-23 | 2018-04-20 | 赣州汇桔科技有限公司 | A kind of Solid coagulant dispensing device of sewage disposal with crushing function |
| CN107975237A (en) * | 2017-12-08 | 2018-05-01 | 黄邓花 | A kind of housing construction line runner wagon |
| CN107971063A (en) * | 2017-11-29 | 2018-05-01 | 刘飞 | Pellet crusher is used in one kind cultivation |
-
2018
- 2018-05-04 CN CN201810420510.2A patent/CN108797301A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040240938A1 (en) * | 2003-05-28 | 2004-12-02 | Ron Hicks | Tractive box for traffic stripe and method of use |
| CN206204757U (en) * | 2016-09-24 | 2017-05-31 | 中交第一航务工程局有限公司 | Heat molten type asphalt roads graticule artificial construction's heating kettle |
| CN107446737A (en) * | 2017-07-31 | 2017-12-08 | 闫存 | An integrated device for stirring and pulverizing raw materials for liquor processing |
| CN107377077A (en) * | 2017-08-02 | 2017-11-24 | 江勇 | A kind of tea dry sorting breaker |
| CN107263710A (en) * | 2017-08-21 | 2017-10-20 | 程新锋 | A kind of bridge construction mixed mud agitating device |
| CN107715765A (en) * | 2017-10-25 | 2018-02-23 | 许传金 | A kind of seedling growth soil fertilizer agitating device |
| CN107971063A (en) * | 2017-11-29 | 2018-05-01 | 刘飞 | Pellet crusher is used in one kind cultivation |
| CN107975237A (en) * | 2017-12-08 | 2018-05-01 | 黄邓花 | A kind of housing construction line runner wagon |
| CN107935148A (en) * | 2017-12-23 | 2018-04-20 | 赣州汇桔科技有限公司 | A kind of Solid coagulant dispensing device of sewage disposal with crushing function |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111571934A (en) * | 2020-05-13 | 2020-08-25 | 安徽万有新材料有限公司 | Injection molding machine for plastic processing |
| CN111764670A (en) * | 2020-06-11 | 2020-10-13 | 温必连 | Lime spraying equipment for construction site location line |
| CN111764670B (en) * | 2020-06-11 | 2021-12-17 | 乐陵市顺达建筑有限公司 | Lime spraying equipment for construction site location line |
| CN111420758A (en) * | 2020-06-16 | 2020-07-17 | 桂林鸿程矿山设备制造有限责任公司 | Material grading grinding production device applied to suspension roller type ring roller mill |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108797301A (en) | A kind of road construction lime pay-off equipment | |
| CN206325836U (en) | A kind of material screening machine with screen cloth cleaning function | |
| CN107377118A (en) | A kind of building stones quick crashing screening plant for building | |
| CN107029849A (en) | A kind of construction river sand classified screening device | |
| CN206916598U (en) | A kind of highway pavement maintenance integrated device | |
| CN107935148A (en) | A kind of Solid coagulant dispensing device of sewage disposal with crushing function | |
| CN107716278A (en) | A kind of high-efficiency sand sieve easy to remove | |
| CN206230362U (en) | A kind of duplex is vortexed grinding light polishing machine automatically | |
| CN106185114A (en) | A kind of useless bottle compression collecting box | |
| CN109894258A (en) | A kind of magnetic iron ore pretreatment unit | |
| CN110152974A (en) | A kind of soil remediation gravity type soil screening plant | |
| CN208213660U (en) | A kind of road construction sand screening installation | |
| CN107313395A (en) | A kind of municipal administration hand propelled road surface deicing vehicle for melting ice on | |
| CN105107720A (en) | Planet gear driving type screening device | |
| CN108405174B (en) | Building materials quartz sand rotation type magnetic separation equipment | |
| CN112238138A (en) | Portable soil repair equipment | |
| CN106702950A (en) | Sand cleaning trolley | |
| CN113019513A (en) | Energy-concerving and environment-protective concrete crushing sorting facilities that uses | |
| CN205839676U (en) | A kind of vehicular automatic spreader | |
| US1982266A (en) | System for handling sewage | |
| CN208894636U (en) | An apple sorting and packing machine | |
| CN107876431A (en) | A kind of double-deck apparatus of selecting rice color | |
| CN209334141U (en) | A kind of sand-stone separator | |
| CN109649930A (en) | Metallurgical slag screening machine | |
| AU2003100519A4 (en) | Improved Broadcaster Spreader |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |
|
| RJ01 | Rejection of invention patent application after publication |