CN107059900A - 一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 - Google Patents
一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 Download PDFInfo
- Publication number
- CN107059900A CN107059900A CN201710177243.6A CN201710177243A CN107059900A CN 107059900 A CN107059900 A CN 107059900A CN 201710177243 A CN201710177243 A CN 201710177243A CN 107059900 A CN107059900 A CN 107059900A
- Authority
- CN
- China
- Prior art keywords
- double
- cofferdam
- gle
- image radiography
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710177243.6A CN107059900B (zh) | 2017-03-23 | 2017-03-23 | 一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710177243.6A CN107059900B (zh) | 2017-03-23 | 2017-03-23 | 一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107059900A true CN107059900A (zh) | 2017-08-18 |
| CN107059900B CN107059900B (zh) | 2019-04-23 |
Family
ID=59621218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710177243.6A Active CN107059900B (zh) | 2017-03-23 | 2017-03-23 | 一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107059900B (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107869144A (zh) * | 2017-11-17 | 2018-04-03 | 中铁二十二局集团第四工程有限公司 | 一种预掏槽环封双壁钢围堰深水基础综合施工方法 |
| CN108360541A (zh) * | 2018-03-14 | 2018-08-03 | 兰州理工大学 | 用于引导卵石土地基钢板桩下沉的导向装置及使用方法 |
| CN111119212A (zh) * | 2019-12-18 | 2020-05-08 | 中建三局基础设施建设投资有限公司 | 一种用于深厚黏土层条件下双壁钢围堰下沉的施工方法 |
| CN115233711A (zh) * | 2022-07-19 | 2022-10-25 | 中铁大桥局集团第二工程有限公司 | 一种卵石河床的双壁钢套箱围堰施工方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101962954A (zh) * | 2010-09-27 | 2011-02-02 | 中铁大桥局集团第一工程有限公司 | 圆筒形钢套箱围堰及其施工方法 |
| CN102094429A (zh) * | 2011-01-12 | 2011-06-15 | 广东省长大公路工程有限公司 | 双壁钢围堰的下放控制方法 |
| CN102409688A (zh) * | 2011-08-16 | 2012-04-11 | 中建三局建设工程股份有限公司 | 一种钢板桩围堰的施工方法 |
| CN102409690A (zh) * | 2011-09-21 | 2012-04-11 | 长沙理工大学 | 多台连续千斤顶同步下放无底双壁钢套箱围堰的施工工艺 |
-
2017
- 2017-03-23 CN CN201710177243.6A patent/CN107059900B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101962954A (zh) * | 2010-09-27 | 2011-02-02 | 中铁大桥局集团第一工程有限公司 | 圆筒形钢套箱围堰及其施工方法 |
| CN102094429A (zh) * | 2011-01-12 | 2011-06-15 | 广东省长大公路工程有限公司 | 双壁钢围堰的下放控制方法 |
| CN102409688A (zh) * | 2011-08-16 | 2012-04-11 | 中建三局建设工程股份有限公司 | 一种钢板桩围堰的施工方法 |
| CN102409690A (zh) * | 2011-09-21 | 2012-04-11 | 长沙理工大学 | 多台连续千斤顶同步下放无底双壁钢套箱围堰的施工工艺 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107869144A (zh) * | 2017-11-17 | 2018-04-03 | 中铁二十二局集团第四工程有限公司 | 一种预掏槽环封双壁钢围堰深水基础综合施工方法 |
| CN108360541A (zh) * | 2018-03-14 | 2018-08-03 | 兰州理工大学 | 用于引导卵石土地基钢板桩下沉的导向装置及使用方法 |
| CN108360541B (zh) * | 2018-03-14 | 2020-04-03 | 兰州理工大学 | 用于引导卵石土地基钢板桩下沉的导向装置及使用方法 |
| CN111119212A (zh) * | 2019-12-18 | 2020-05-08 | 中建三局基础设施建设投资有限公司 | 一种用于深厚黏土层条件下双壁钢围堰下沉的施工方法 |
| CN115233711A (zh) * | 2022-07-19 | 2022-10-25 | 中铁大桥局集团第二工程有限公司 | 一种卵石河床的双壁钢套箱围堰施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107059900B (zh) | 2019-04-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11840817B2 (en) | Method for constructing steel sheet pile cofferdam on deep sand gravel overburden layer | |
| CN101139838B (zh) | 高承压水地区超深基坑的施工方法 | |
| CN105002913B (zh) | 一种强透水地层深基坑封底止水结构及其施工方法 | |
| CN104711994A (zh) | 基坑深井降水及封堵施工方法 | |
| US20160376762A1 (en) | Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon | |
| CN104196034A (zh) | 一种利用钢板桩作为支护围堰的基坑施工方法 | |
| CN111593728A (zh) | 植入式嵌岩桩的“先桩法”内插式导管架基础施工系统 | |
| CN101358453A (zh) | 复合型套箱围堰及其建造方法 | |
| CN110359476B (zh) | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 | |
| CN112627212B (zh) | 一种临水围堰内管井降水法干挖施工方法 | |
| CN112627172A (zh) | 岩溶地区大直径钻孔灌注桩成桩体系及施工方法 | |
| CN107059900A (zh) | 一种双壁钢套箱围堰在砂卵石地层中快速下沉的施工方法 | |
| CN113737780A (zh) | 水下嵌岩混凝土桩及其施工方法 | |
| CN202194149U (zh) | 一种止水帷幕 | |
| CN110565686A (zh) | 管廊下穿河道的施工方法 | |
| CN102635126B (zh) | 一种铝合金热轧板锭铸造井的施工方法 | |
| CN205205844U (zh) | 一种电梯基坑或集水坑内管井降水施工用构件 | |
| CN108035357B (zh) | 灌注桩施工方案及其漏斗 | |
| CN113737834A (zh) | 一种可回收负压贯入式沉井结构及施工方法 | |
| CN108316326A (zh) | 一种沉井的快速施工方法 | |
| CN218933931U (zh) | 一种深基坑邻近既有建筑的加固结构 | |
| CN108277816B (zh) | 一种沉井基础的免开挖施工方法 | |
| CN118030074A (zh) | 海底硬岩地质下盾构隧道中排水口垂直顶升施工方法 | |
| CN204825916U (zh) | 一种强透水地层深基坑封底止水结构 | |
| CN108487273A (zh) | 一种水中基础施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 40/F, New Era Business Center, 456 Wuluo Road, Wuhan, Hubei 430064 Patentee after: CCTEB INFRASTRUCTURE CONSTRUCTION INVESTMENT CO.,LTD. Patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 40/F, New Era Business Center, No. 456, Wuluo Road, Wuchang District, Wuhan, Hubei 430000 Patentee before: CCTEB INFRASTRUCTURE CONSTRUCTION Co.,Ltd. Patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20221202 Address after: 40/F, New Era Business Center, 456 Wuluo Road, Wuhan, Hubei 430064 Patentee after: CCTEB INFRASTRUCTURE CONSTRUCTION INVESTMENT CO.,LTD. Patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd. Patentee after: China Construction Third Engineering Bureau Science and Innovation Industry Development Co.,Ltd. Address before: 40/F, New Era Business Center, 456 Wuluo Road, Wuhan, Hubei 430064 Patentee before: CCTEB INFRASTRUCTURE CONSTRUCTION INVESTMENT CO.,LTD. Patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd. |