CN106776157A - It is used for the device of big customer's power supply service in a kind of electric power system - Google Patents
It is used for the device of big customer's power supply service in a kind of electric power system Download PDFInfo
- Publication number
- CN106776157A CN106776157A CN201710039500.XA CN201710039500A CN106776157A CN 106776157 A CN106776157 A CN 106776157A CN 201710039500 A CN201710039500 A CN 201710039500A CN 106776157 A CN106776157 A CN 106776157A
- Authority
- CN
- China
- Prior art keywords
- chip
- pin
- server
- triode
- resistance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/16—Error detection or correction of the data by redundancy in hardware
- G06F11/20—Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
- G06F11/202—Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
- G06F11/2038—Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant with a single idle spare processing component
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/20—Cooling means
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3058—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Software Systems (AREA)
- Health & Medical Sciences (AREA)
- Bioethics (AREA)
- Computing Systems (AREA)
- Human Computer Interaction (AREA)
- Power Sources (AREA)
Abstract
本发明提供了一种供电系统中用于大客户用电服务的装置,包括用于给大客户提供用电信息数据及用电提醒的服务器,所述的服务器包括第一服务器和第二服务器,第一服务器和第二服务器分别与切换控制单元连接,切换控制单元通过网络与大客户客户端连接,所述的第一服务器和第二服务器之间定时交换数据并存储;该方案的装置,设置有两个服务器,可以实现数据的及时交互,可以及时的切换,保证了给大客户服务的畅通。
The present invention provides a device in a power supply system for power consumption services for large customers, including a server for providing power consumption information data and power consumption reminders to large customers, and the server includes a first server and a second server, The first server and the second server are respectively connected to the switching control unit, and the switching control unit is connected to the big customer client through the network, and the first server and the second server regularly exchange and store data; the device of this solution is set There are two servers, which can realize the timely interaction of data and switch in time, ensuring the smooth service to large customers.
Description
技术领域technical field
本发明涉及的是一种供电系统中用于大客户用电服务的装置。The invention relates to a device used in a power supply system for large customer electricity service.
背景技术Background technique
在现有技术中,公知的技术是随着电网的完善和供电系统的稳定,产生了很多用电量大并且稳定的用电永久性客户,目前供电系统已经有针对大客户的服务,但是目前在对大客户服务时,均采用单一服务器,这样一旦服务器出现故障,就会影响大客户的用电,给企业造成损失,并且也会影响供电企业的工作,这是现有技术所存在的不足之处。In the prior art, the known technology is that with the improvement of the power grid and the stability of the power supply system, many permanent customers with large and stable power consumption have been produced. At present, the power supply system has provided services for large customers, but at present When serving large customers, a single server is used. Once the server fails, it will affect the power consumption of large customers, cause losses to the enterprise, and also affect the work of the power supply enterprise. This is the deficiency of the existing technology. place.
发明内容Contents of the invention
本发明的目的就是针对现有技术所存在的不足,而提供一种供电系统中用于大客户用电服务的装置的技术方案,该方案的装置,设置有两个服务器,可以实现数据的及时交互,可以及时的切换,保证了给大客户服务的畅通。The purpose of the present invention is to provide a technical solution for a device used in a power supply system for large customer electricity services in view of the deficiencies in the prior art. The device of this solution is provided with two servers, which can realize timely Interaction can be switched in time to ensure smooth service to large customers.
本方案是通过如下技术措施来实现的:一种供电系统中用于大客户用电服务的装置,包括用于给大客户提供用电信息数据及用电提醒的服务器,所述的服务器包括第一服务器和第二服务器,第一服务器和第二服务器分别与切换控制单元连接,切换控制单元通过网络与大客户客户端连接,所述的第一服务器和第二服务器之间定时交换数据并存储。This solution is realized through the following technical measures: a device for power consumption service for large customers in a power supply system, including a server for providing power consumption information data and power consumption reminders to large customers, and the server includes the first A server and a second server, the first server and the second server are respectively connected to the switch control unit, the switch control unit is connected to the big customer client through the network, and the first server and the second server regularly exchange data and store .
所述的切换控制单元包括带有上盖的长方形壳体,在长方形壳体内设置有电路板,在上盖和长方形客体闭合处设置有行程开关;所述的电路板上设置有处理器,处理器分别与切换执行单元、语音模块、行程开关、温湿度传感器、无线通信模块、声光报警模块连接,所述的处理器通过驱动模块与风扇连接。The switching control unit includes a rectangular housing with a top cover, a circuit board is arranged in the rectangular housing, and a travel switch is provided at the closing position between the upper cover and the rectangular object; a processor is provided on the circuit board to process The controller is respectively connected with the switching execution unit, the voice module, the travel switch, the temperature and humidity sensor, the wireless communication module, and the sound and light alarm module, and the processor is connected with the fan through the drive module.
有一用于存储切换信息和温湿度信息的存储模块与所述的处理器连接。A storage module for storing switching information and temperature and humidity information is connected with the processor.
所述的驱动元包括芯片IC1,芯片IC1的2脚通过第一电容 C1与第一个三极管VT1的集电极连接,第一个三极管VT1的的发射极接地,第一个三极管VT1的基极通过电阻R1与处理器连接,第一个三极管VT1的集电极通过第一滑动变阻器RB1、电阻R2与+V连接,芯片IC1的2脚通过电阻R3与+V连接,芯片IC1的4脚与+V连接,芯片IC1的4脚与芯片IC1的8脚连接,芯片IC1的1脚接地,芯片IC1的7脚通过第二滑动变阻器RB2、电阻R4与+V连接,芯片IC1的6脚与芯片IC1的7脚连接,芯片IC1的6脚通过第二电容从接地,芯片IC1的3脚通过电阻R5与芯片IC2的13脚连接,芯片IC2的14脚与+V连接,芯片IC2的16脚与芯片IC2的14脚连接,芯片IC2的15脚通过第三电容C3与+V连接,芯片IC2的15脚通过电阻R6接地,芯片IC2的8脚接地,芯片IC2的11脚通过第七电阻R7与第二个三极管VT2的基极连接,第二个三极管VT2的发射极接地,第二个三极管VT2的集电极通过继电器J与+V连接,有一个二极管D与继电器J并联,继电器的常开触点J-1串联在风扇和供电电源之间。The drive unit includes a chip IC1, the pin 2 of the chip IC1 is connected to the collector of the first triode VT1 through the first capacitor C1, the emitter of the first triode VT1 is grounded, and the base of the first triode VT1 passes through Resistor R1 is connected to the processor, the collector of the first triode VT1 is connected to +V through the first sliding rheostat RB1 and resistor R2, pin 2 of chip IC1 is connected to +V through resistor R3, pin 4 of chip IC1 is connected to +V Connection, pin 4 of chip IC1 is connected to pin 8 of chip IC1, pin 1 of chip IC1 is grounded, pin 7 of chip IC1 is connected to +V through the second sliding rheostat RB2 and resistor R4, pin 6 of chip IC1 is connected to pin 1 of chip IC1 7-pin connection, the 6-pin of the chip IC1 is grounded through the second capacitor, the 3-pin of the chip IC1 is connected to the 13-pin of the chip IC2 through the resistor R5, the 14-pin of the chip IC2 is connected to +V, the 16-pin of the chip IC2 is connected to the chip IC2 The 14-pin connection of chip IC2, the 15-pin of the chip IC2 is connected to +V through the third capacitor C3, the 15-pin of the chip IC2 is grounded through the resistor R6, the 8-pin of the chip IC2 is grounded, the 11-pin of the chip IC2 is connected to the second through the seventh resistor R7 The base of the first triode VT2 is connected, the emitter of the second triode VT2 is grounded, the collector of the second triode VT2 is connected to +V through the relay J, a diode D is connected in parallel with the relay J, and the normally open contact J of the relay -1 is connected in series between the fan and the power supply.
本方案的有益效果可根据对上述方案的叙述得知,由于在该方案中有两个服务器,工作时,其中一个服务器进行工作,保证大客户的正常工作,当此服务器出现故障时,切换控制单元控制切换到另一个服务器,保证工作的顺利进行,两个服务器工作时及时进行数据的交互,避免出现数据的丢失;切换控制单元的壳体上设置有行程开关,这样一但有人要强行打开时,行程开关动作,处理器获得信息后,通过无线通信模块进行远程报警,并且控制声光报警模块进行现场报警,有温湿度传感器可以获得温湿度信息,如果温湿度异常,处理器也会进行报警,如果温度过高,则处理器控制风扇工作,进行降温;芯片IC1采用NE555,芯片IC2 cd4017;有存储模块,可以存储两个服务器切换的时间和次数,还可以存储温湿度信息。语音模块可以模仿人的声音,对于试图打开上盖的人员也有震慑作用,由此可见,本发明与现有技术相比,具有突出的实质性特点和显著的进步,其实施的有益效果也是显而易见的。The beneficial effect of this scheme can be known according to the narration of the above-mentioned scheme. Since there are two servers in this scheme, one of the servers will work during work to ensure the normal work of large customers. When this server fails, switch control The unit control is switched to another server to ensure the smooth progress of the work. When the two servers are working, the data interaction is carried out in time to avoid data loss; When the limit switch is activated, the processor will send a remote alarm through the wireless communication module after obtaining the information, and control the sound and light alarm module to send an on-site alarm. The temperature and humidity sensor can obtain the temperature and humidity information. If the temperature and humidity are abnormal, the processor will also carry out Alarm, if the temperature is too high, the processor controls the fan to work to cool down; the chip IC1 uses NE555, and the chip IC2 cd4017; there is a storage module, which can store the time and times of switching between the two servers, and can also store temperature and humidity information. The voice module can imitate the voice of a person, and it also has a deterrent effect on the personnel who try to open the upper cover. It can be seen that the present invention has outstanding substantive features and significant progress compared with the prior art, and the beneficial effects of its implementation are also obvious of.
附图说明Description of drawings
图1为本发明具体实施方式的结构示意图。Fig. 1 is a schematic structural diagram of a specific embodiment of the present invention.
图2为本发明具体实施方式的连接图。Fig. 2 is a connection diagram of a specific embodiment of the present invention.
图3为切换控制单元的电气原理图。Figure 3 is an electrical schematic diagram of the switching control unit.
图4为驱动模块的电路图。Figure 4 is a circuit diagram of the drive module.
图中,1为长方形壳体,2为上盖,3为电路板,4为风扇,5为温湿度传感器,6为行程开关。In the figure, 1 is a rectangular housing, 2 is an upper cover, 3 is a circuit board, 4 is a fan, 5 is a temperature and humidity sensor, and 6 is a travel switch.
具体实施方式detailed description
为能清楚说明本方案的技术特点,下面通过一个具体实施方式,并结合其附图,对本方案进行阐述。In order to clearly illustrate the technical features of the solution, the solution will be described below through a specific implementation mode combined with the accompanying drawings.
通过附图可以看出,本方案的一种供电系统中用于大客户用电服务的装置,包括用于给大客户提供用电信息数据及用电提醒的服务器,所述的服务器包括第一服务器和第二服务器,第一服务器和第二服务器分别与切换控制单元连接,切换控制单元通过网络与大客户客户端连接,所述的第一服务器和第二服务器之间定时交换数据并存储。It can be seen from the accompanying drawings that a device for power consumption services for large customers in a power supply system of this solution includes a server for providing power consumption information data and power consumption reminders to large customers. The server includes a first The server and the second server, the first server and the second server are respectively connected to the switching control unit, and the switching control unit is connected to the big customer client through the network, and the first server and the second server regularly exchange and store data.
所述的切换控制单元包括带有上盖2的长方形壳体1,在长方形壳体1内设置有电路3板,在上盖2和长方形客体闭合处设置有行程开关6;所述的电路板3上设置有处理器,处理器分别与切换执行单元、语音模块、行程开关、温湿度传感器5、无线通信模块、声光报警模块连接,所述的处理器通过驱动模块与风扇4连接。The switching control unit includes a rectangular housing 1 with an upper cover 2, a circuit board 3 is arranged in the rectangular housing 1, and a travel switch 6 is arranged at the closed position between the upper cover 2 and the rectangular object; the circuit board 3 is provided with a processor, and the processor is respectively connected with the switching execution unit, the voice module, the travel switch, the temperature and humidity sensor 5, the wireless communication module, and the sound and light alarm module, and the processor is connected with the fan 4 through the drive module.
有一用于存储切换信息和温湿度信息的存储模块与所述的处理器连接。A storage module for storing switching information and temperature and humidity information is connected with the processor.
所述的驱动元包括芯片IC1,芯片IC1的2脚通过第一电容 C1与第一个三极管VT1的集电极连接,第一个三极管VT1的的发射极接地,第一个三极管VT1的基极通过电阻R1与处理器连接,第一个三极管VT1的集电极通过第一滑动变阻器RB1、电阻R2与+V连接,芯片IC1的2脚通过电阻R3与+V连接,芯片IC1的4脚与+V连接,芯片IC1的4脚与芯片IC1的8脚连接,芯片IC1的1脚接地,芯片IC1的7脚通过第二滑动变阻器RB2、电阻R4与+V连接,芯片IC1的6脚与芯片IC1的7脚连接,芯片IC1的6脚通过第二电容从接地,芯片IC1的3脚通过电阻R5与芯片IC2的13脚连接,芯片IC2的14脚与+V连接,芯片IC2的16脚与芯片IC2的14脚连接,芯片IC2的15脚通过第三电容C3与+V连接,芯片IC2的15脚通过电阻R6接地,芯片IC2的8脚接地,芯片IC2的11脚通过第七电阻R7与第二个三极管VT2的基极连接,第二个三极管VT2的发射极接地,第二个三极管VT2的集电极通过继电器J与+V连接,有一个二极管D与继电器J并联,继电器的常开触点J-1串联在风扇4和供电电源之间。The drive unit includes a chip IC1, the pin 2 of the chip IC1 is connected to the collector of the first triode VT1 through the first capacitor C1, the emitter of the first triode VT1 is grounded, and the base of the first triode VT1 passes through Resistor R1 is connected to the processor, the collector of the first triode VT1 is connected to +V through the first sliding rheostat RB1 and resistor R2, pin 2 of chip IC1 is connected to +V through resistor R3, pin 4 of chip IC1 is connected to +V Connection, pin 4 of chip IC1 is connected to pin 8 of chip IC1, pin 1 of chip IC1 is grounded, pin 7 of chip IC1 is connected to +V through the second sliding rheostat RB2 and resistor R4, pin 6 of chip IC1 is connected to pin 1 of chip IC1 7-pin connection, the 6-pin of the chip IC1 is grounded through the second capacitor, the 3-pin of the chip IC1 is connected to the 13-pin of the chip IC2 through the resistor R5, the 14-pin of the chip IC2 is connected to +V, the 16-pin of the chip IC2 is connected to the chip IC2 The 14-pin connection of chip IC2, the 15-pin of the chip IC2 is connected to +V through the third capacitor C3, the 15-pin of the chip IC2 is grounded through the resistor R6, the 8-pin of the chip IC2 is grounded, the 11-pin of the chip IC2 is connected to the second through the seventh resistor R7 The base of the first triode VT2 is connected, the emitter of the second triode VT2 is grounded, the collector of the second triode VT2 is connected to +V through the relay J, a diode D is connected in parallel with the relay J, and the normally open contact J of the relay -1 is connected in series between the fan 4 and the power supply.
本发明并不仅限于上述具体实施方式,本领域普通技术人员在本发明的实质范围内做出的变化、改型、添加或替换,也应属于本发明的保护范围。The present invention is not limited to the above-mentioned specific implementation methods, and changes, modifications, additions or substitutions made by those skilled in the art within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710039500.XA CN106776157A (en) | 2017-01-19 | 2017-01-19 | It is used for the device of big customer's power supply service in a kind of electric power system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710039500.XA CN106776157A (en) | 2017-01-19 | 2017-01-19 | It is used for the device of big customer's power supply service in a kind of electric power system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106776157A true CN106776157A (en) | 2017-05-31 |
Family
ID=58944564
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710039500.XA Pending CN106776157A (en) | 2017-01-19 | 2017-01-19 | It is used for the device of big customer's power supply service in a kind of electric power system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106776157A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101876924A (en) * | 2009-04-30 | 2010-11-03 | 升东网络科技发展(上海)有限公司 | Database fault automatic detection and transfer method |
| US20120250834A1 (en) * | 2011-04-04 | 2012-10-04 | Numerex Corp. | Delivery of alarm system event data and audio |
| CN103944759A (en) * | 2014-04-16 | 2014-07-23 | 国家电网公司 | Fault warning system of communication transmission network management part of power communication network |
| CN104902704A (en) * | 2015-05-12 | 2015-09-09 | 国家电网公司 | Reactive power factor abnormality remote alarm device |
| CN105404222A (en) * | 2015-12-04 | 2016-03-16 | 重庆臻远电气有限公司 | Misoperation-prevention switch cabinet monitoring device |
| CN105976544A (en) * | 2016-06-29 | 2016-09-28 | 厦门日华科技股份有限公司 | Emergency alarm device |
-
2017
- 2017-01-19 CN CN201710039500.XA patent/CN106776157A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101876924A (en) * | 2009-04-30 | 2010-11-03 | 升东网络科技发展(上海)有限公司 | Database fault automatic detection and transfer method |
| US20120250834A1 (en) * | 2011-04-04 | 2012-10-04 | Numerex Corp. | Delivery of alarm system event data and audio |
| CN103944759A (en) * | 2014-04-16 | 2014-07-23 | 国家电网公司 | Fault warning system of communication transmission network management part of power communication network |
| CN104902704A (en) * | 2015-05-12 | 2015-09-09 | 国家电网公司 | Reactive power factor abnormality remote alarm device |
| CN105404222A (en) * | 2015-12-04 | 2016-03-16 | 重庆臻远电气有限公司 | Misoperation-prevention switch cabinet monitoring device |
| CN105976544A (en) * | 2016-06-29 | 2016-09-28 | 厦门日华科技股份有限公司 | Emergency alarm device |
Non-Patent Citations (1)
| Title |
|---|
| 李响初等: "《实用电子控制线路200例》", 31 March 2009 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207832246U (en) | A kind of microenvironment intelligent detection device at cultural heritage scenic spot | |
| CN106776157A (en) | It is used for the device of big customer's power supply service in a kind of electric power system | |
| CN105098995A (en) | Switch state monitoring device in transformer substation cabinet | |
| CN106812660B (en) | Wind light mutual complementing power generation monitoring system | |
| CN205422662U (en) | Intelligent control ware based on natural gas well gas production | |
| CN204669310U (en) | A kind of solar cell high/low temperature photovoltaic property test experimental bed | |
| CN202699669U (en) | Intelligent fragrance machine | |
| CN205017100U (en) | Switch condition monitoring device in transformer substation's cabinet | |
| CN207302157U (en) | A kind of fingerprint with access control device is checked card attendance recorder | |
| CN207804655U (en) | A kind of portable sterilizing apparatus for daily necessities | |
| CN209607078U (en) | A photovoltaic power generation campus intelligent locker and system | |
| CN210804069U (en) | A safe shower system | |
| CN203842831U (en) | Electric energy meter sorting device based on bar code | |
| CN206420110U (en) | A kind of air cleaning facility intelligent control board | |
| CN203405819U (en) | Intelligent power supply permission managing device based on radio frequency identification technology | |
| CN115133633A (en) | But renewable energy's green intelligent water gauge | |
| CN209104900U (en) | A monitoring and management system for a communication junction box | |
| CN207895640U (en) | A kind of smart home security camera system | |
| CN208640279U (en) | A kind of fingerprint recognition Intelligent water cup | |
| CN209982649U (en) | Based on internet of things technology power consumption information intelligent analysis equipment | |
| CN205563578U (en) | Developments password tablet based on fingerprint identification function | |
| CN205486231U (en) | Student's card of university's dormitory management | |
| CN206249441U (en) | A kind of human resources time clock | |
| CN205719141U (en) | Internet of Things intelligent flow meter | |
| CN206258513U (en) | A kind of distribution line on-Line Monitor Device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
| RJ01 | Rejection of invention patent application after publication |