CN106757053A - The method that dechlorination is moved to reinforced concrete structure uniformity electricity - Google Patents

The method that dechlorination is moved to reinforced concrete structure uniformity electricity Download PDF

Info

Publication number
CN106757053A
CN106757053A CN201710005769.6A CN201710005769A CN106757053A CN 106757053 A CN106757053 A CN 106757053A CN 201710005769 A CN201710005769 A CN 201710005769A CN 106757053 A CN106757053 A CN 106757053A
Authority
CN
China
Prior art keywords
electricity
dechlorination
reinforced concrete
concrete structure
protective cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710005769.6A
Other languages
Chinese (zh)
Other versions
CN106757053B (en
Inventor
徐方圆
毛江鸿
金伟良
潘崇根
许晨
沈建生
李舒灵
高原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Institute of Technology of ZJU
Original Assignee
Ningbo Institute of Technology of ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Institute of Technology of ZJU filed Critical Ningbo Institute of Technology of ZJU
Priority to CN201710005769.6A priority Critical patent/CN106757053B/en
Publication of CN106757053A publication Critical patent/CN106757053A/en
Application granted granted Critical
Publication of CN106757053B publication Critical patent/CN106757053B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23FNON-MECHANICAL REMOVAL OF METALLIC MATERIAL FROM SURFACE; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL; MULTI-STEP PROCESSES FOR SURFACE TREATMENT OF METALLIC MATERIAL INVOLVING AT LEAST ONE PROCESS PROVIDED FOR IN CLASS C23 AND AT LEAST ONE PROCESS COVERED BY SUBCLASS C21D OR C22F OR CLASS C25
    • C23F13/00Inhibiting corrosion of metals by anodic or cathodic protection
    • C23F13/02Inhibiting corrosion of metals by anodic or cathodic protection cathodic; Selection of conditions, parameters or procedures for cathodic protection, e.g. of electrical conditions
    • C23F13/06Constructional parts, or assemblies of cathodic-protection apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/642Protecting metallic construction elements against corrosion
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23FNON-MECHANICAL REMOVAL OF METALLIC MATERIAL FROM SURFACE; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL; MULTI-STEP PROCESSES FOR SURFACE TREATMENT OF METALLIC MATERIAL INVOLVING AT LEAST ONE PROCESS PROVIDED FOR IN CLASS C23 AND AT LEAST ONE PROCESS COVERED BY SUBCLASS C21D OR C22F OR CLASS C25
    • C23F2201/00Type of materials to be protected by cathodic protection
    • C23F2201/02Concrete, e.g. reinforced
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23FNON-MECHANICAL REMOVAL OF METALLIC MATERIAL FROM SURFACE; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL; MULTI-STEP PROCESSES FOR SURFACE TREATMENT OF METALLIC MATERIAL INVOLVING AT LEAST ONE PROCESS PROVIDED FOR IN CLASS C23 AND AT LEAST ONE PROCESS COVERED BY SUBCLASS C21D OR C22F OR CLASS C25
    • C23F2213/00Aspects of inhibiting corrosion of metals by anodic or cathodic protection
    • C23F2213/20Constructional parts or assemblies of the anodic or cathodic protection apparatus
    • C23F2213/22Constructional parts or assemblies of the anodic or cathodic protection apparatus characterized by the ionic conductor, e.g. humectant, hydratant or backfill

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
  • Electron Sources, Ion Sources (AREA)

Abstract

The invention discloses a kind of method for moving dechlorination to reinforced concrete structure uniformity electricity, its step includes:A, prepare electricity and move dechlorination device, it includes protective cover (1) and power supply, and the chamber of protective cover (1) is divided into the square chamber (3) in center and the annular compartment (4) of surrounding;B, the side that protective cover (1) is fitted in reinforced concrete structure; the annular compartment (4) of protective cover (1) surrounding is just to the position for having reinforcing bar (7) or stirrup on the side, and the square chamber (3) in center opposite the side no-reinforcing-bar (7) or the part without stirrup;C, while open two switch and continue for some time;D, closing first switch, continue to open second switch continuation a period of time.The method can move dechlorination to reinforced concrete structure uniformity electricity.

Description

The method that dechlorination is moved to reinforced concrete structure uniformity electricity
Technical field
It is especially a kind of electric to reinforced concrete structure uniformity the present invention relates to the durable reparation field of armored concrete The method for moving dechlorination.
Background technology
Coastal reinforced concrete structure is in the severe corrosive environments such as seawater and marine climate, is existed a large amount of to reinforcing bar Mordant chlorion, can reduce the engineering life-span of reinforced concrete structure.To ensure the engineering longevity of reinforced concrete structure Life reaches desired a century when people design and requires, it is necessary to carrying out electricity to it moves dechlorination process.
The method that the electricity of prior art moves dechlorination is that a protective cover is fixed on into concrete surface, is provided with protective cover One piece of stainless steel plate, is perfused with electrolyte solution in protective cover, connected with stainless steel plate with a positive source, power cathode with Reinforcing bar connection in reinforced concrete structure.So, electrical potential difference is produced between stainless steel plate and reinforcing bar so that armored concrete knot Electronegative chlorion is moved to positive pole in the concrete of structure, and the electrolyte solution of protective cover cavity is entered into from concrete Interior, the device can effectively remove the chlorion in reinforced concrete structure, it is to avoid the reinforcing bar in reinforced concrete structure is corroded.
But, the electricity of prior art moves dechlorination method in the presence of a larger limitation, is convenient statement, with reference to Fig. 1 from bowing Apparent direction illustrates above mentioned problem, from the point of view of the overlook direction of reinforced concrete structure, is leaned on the horizontal section of concrete column There are two reinforcing bars 101 position of a nearly side, and the side is fitted with protective cover 102, protective cover 102 and is provided with a monoblock not Rust steel plate 103, because reinforcing bar 101 is negative pole, the stainless steel plate 103 of whole plane is positive pole, from the point of view of space layout, from Every axis of reinforcing bar 101 does a vertical line to stainless steel plate 103, near the route of the chloride ion transport of the region A of vertical line it is short, move The speed of shifting is fast, and slow compared with the speed of the path length of the chloride ion transport of far region, migration apart from this vertical line;So, often Resulted in that chloride ion transport is uneven, the chlorion near the region A of vertical line is migrated, and away from vertical line region chlorine from Son still in, or even region B chlorine ion concentration of some regions such as in the middle of two vertical lines be even more taller in the past than dechlorination, therefore Dechlorination effect is undesirable.And, the premise of the reinforced concrete structure durability appraisal procedure based on Fick second laws is exactly Inside concrete chlorion is uniformly distributed, and the limitation that the electricity of prior art moves dechlorination technology causes electricity and moves after dechlorination in concrete Portion's chlorion non-uniform Distribution, so that electricity cannot carry out accurate durability evaluating after moving dechlorination.
The content of the invention
The invention solves the problems that a technical problem be to provide one kind can prevent electricity from moving process is uneven, cause chlorion The aliquant method that dechlorination is moved to reinforced concrete structure uniformity electricity.
A kind of technical solution of the invention is to provide a kind of side that dechlorination is moved to reinforced concrete structure uniformity electricity Method, its step includes:
A, the electricity for preparing following structure move dechlorination device, and it includes protective cover and power supply, the base plate side of being provided with of protective cover The chamber of protective cover is separated into frame-type side dividing plate, frame type side dividing plate the square chamber in center and the annular compartment of surrounding, side Stainless steel square plate is provided with shape chamber, stainless steel square ring flat-plate, the negative pole and armored concrete of power supply are provided with annular compartment The bar connecting of structure, the positive pole of power supply is connected through the first wire with stainless steel square ring flat-plate, and the first wire is provided with first switch, The positive pole of power supply is connected through the second wire with stainless steel square plate, and the second wire is provided with second switch;
B, the side that protective cover is fitted in reinforced concrete structure, the annular compartment of protective cover surrounding is just to the side There is the position of reinforcing bar or stirrup on face, and part of the square chamber in center against the side no-reinforcing-bar or without stirrup;
C, while open two switch, electricity is carried out to reinforced concrete structure and moves dechlorination, and continued for some time;
D, first switch is closed, continue to open second switch, to reinforced concrete structure no-reinforcing-bar or the region without stirrup Proceed electricity and move dechlorination a period of time.
The present invention dechlorination is moved to reinforced concrete structure uniformity electricity method compared with prior art, with following excellent Point:
The operation principle of the method is that the stainless steel plate of original positive pole divide into two pieces of regions, first, first rank Section is powered to central area and peripheral regions indifference, and unification carries out the process that globality electricity moves dechlorination, in this stage, is located at The chlorion of reinforcing bar and stirrup near zone is because migratory route is short, electrical potential difference is big, migration velocity has been migrated out steel first soon Tendon concrete structure, but centre away from reinforcing bar or stirrup region chlorion still, even with the chlorion in other region Migrate and to become concentration bigger, proceed by second stage this when, that is, the stainless steel square ring flat-plate of neighboring area is broken Electricity, but continue to power the stainless steel square plate of middle section, increase the dechlorination time of middle section, specifically designed for getting rid of for property Away from the chlorion that reinforcing bar or stirrup region are piled up, it is ensured that electricity moves the uniformity except chlorine process, optimization electricity is moved except chlorine process Effect.Moreover, the above method can guarantee that inside concrete chlorion naturally except the chlorion in clean reinforced concrete structure Uniformly, so as to ensure that electricity can carry out accurate durability evaluating after moving dechlorination.
Brief description of the drawings
Fig. 1 is the vertical view cross section structure diagram of the device for implementing the method that prior art electricity moves dechlorination.
Fig. 2 is the configuration schematic diagram of the protective cover of the device for implementing the method that electricity of the present invention moves dechlorination.
Fig. 3 is the vertical view cross section structure diagram of the device for implementing the method that electricity of the present invention moves dechlorination.
Fig. 4 is the positive structure diagram of the device for implementing the method that electricity of the present invention moves dechlorination.
Shown in figure
The parts 101, reinforcing bar of prior art dechlorination device, 102, protective cover, 103, stainless steel plate, A, near vertical line Region, the region in the middle of B, two vertical lines;
The parts 1, protective cover of dechlorination device of the present invention, 2, frame type side dividing plate, 3, square chamber, 4, annular compartment, 5th, stainless steel square plate, 6, stainless steel square ring flat-plate, 7, reinforcing bar, the 8, second wire, the 9, first wire, 10, stirrup, A, near vertical line Region, the region in the middle of B, two vertical lines.
Specific embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 2, Figure 3, Figure 4, the method that the present invention moves dechlorination to reinforced concrete structure uniformity electricity, its step is such as Under.
A, the electricity for preparing following structure move dechlorination device, and it includes protective cover 1 and power supply, and the base plate of protective cover 1 is provided with The chamber of protective cover 1 is separated into frame type side dividing plate 2, frame type side dividing plate 2 the square chamber 3 in center and the annular chamber of surrounding Room 4, is provided with square chamber 3 and stainless steel square ring flat-plate 6 is provided with stainless steel square plate 5, annular compartment 4, the negative pole of power supply with The reinforcing bar 7 of reinforced concrete structure is connected, and the positive pole of power supply is connected through the first wire 9 with stainless steel square ring flat-plate 6, the first wire 9 First switch is provided with, the positive pole of power supply is connected through the second wire 8 with stainless steel square plate 5, and the second wire 8 is provided with second and opens Close.
B, the side that protective cover 1 is fitted in reinforced concrete structure, by taking reinforced concrete square columns as an example, square column bag Include four vertical reinforcements 7 and multiple-layer horizontal to stirrup 10.For the square column complete to, each side can be from lower past The upper multiple protective covers 1 of laminating, the position of the annular compartment 4 of each surrounding of protective cover 1 just to having reinforcing bar 7 or stirrup 10 on the side Put, and part of the square chamber 3 in center against the side no-reinforcing-bar 7 or without stirrup 10, specifically, the two of annular compartment 4 Individual vertical chamber is directed at two vertical reinforcements 7 of the side of reinforced concrete square columns and two horizontal chambers are directed at armored concrete The two-layer stirrup 10 of the side of square column.
C, while open two switch, electricity is carried out to reinforced concrete structure and moves dechlorination, and continue for some time such as 7~10 My god.
D, first switch is closed, continue to open second switch, to reinforced concrete structure no-reinforcing-bar 7 or the area without stirrup 10 Domain proceeds electricity and moves dechlorination a period of time such as 7~10 days.
In other words, from terms of overlook direction, by step c after, the chlorion near the region A of vertical line has been migrated , and away from vertical line region chlorion still in or even region B chlorine ion concentration of some regions such as in the middle of two vertical lines It is even more taller than before dechlorination, so step d targetedly carries out dechlorination process to the region B in the middle of two vertical lines.

Claims (1)

1. a kind of method that dechlorination is moved to reinforced concrete structure uniformity electricity, it is characterised in that:Its step includes:
A, the electricity for preparing following structure move dechlorination device, and it includes protective cover (1) and power supply, and the base plate of protective cover (1) is provided with The chamber of protective cover (1) is separated into the square chamber (3) and surrounding in center for frame type side dividing plate (2), frame type side dividing plate (2) Annular compartment (4), is provided with square chamber (3) in stainless steel square plate (5), annular compartment (4) and is provided with stainless steel square ring Plate (6), the negative pole of power supply is connected with the reinforcing bar (7) of reinforced concrete structure, and the positive pole of power supply is through the first wire (9) and stainless steel Square ring flat-plate (6) connection, the first wire (9) is provided with first switch, and the positive pole of power supply is through the second wire (8) and stainless steel square plate (5) connect, the second wire (8) is provided with second switch;
B, the side that protective cover (1) is fitted in reinforced concrete structure, the annular compartment (4) of protective cover (1) surrounding is just To the position for having reinforcing bar (7) or stirrup (10) on the side, and the square chamber (3) in center against the side no-reinforcing-bar (7) or Part without stirrup (10);
C, while open two switch, electricity is carried out to reinforced concrete structure and moves dechlorination, and continued for some time;
D, first switch is closed, continue to open second switch, to reinforced concrete structure no-reinforcing-bar (7) or the area without stirrup (10) Domain proceeds electricity and moves dechlorination a period of time.
CN201710005769.6A 2017-01-05 2017-01-05 The method that dechlorination is moved to reinforced concrete structure uniformity electricity Active CN106757053B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710005769.6A CN106757053B (en) 2017-01-05 2017-01-05 The method that dechlorination is moved to reinforced concrete structure uniformity electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710005769.6A CN106757053B (en) 2017-01-05 2017-01-05 The method that dechlorination is moved to reinforced concrete structure uniformity electricity

Publications (2)

Publication Number Publication Date
CN106757053A true CN106757053A (en) 2017-05-31
CN106757053B CN106757053B (en) 2019-04-23

Family

ID=58950929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710005769.6A Active CN106757053B (en) 2017-01-05 2017-01-05 The method that dechlorination is moved to reinforced concrete structure uniformity electricity

Country Status (1)

Country Link
CN (1) CN106757053B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974684A (en) * 2017-11-07 2018-05-01 浙江大学宁波理工学院 A kind of sunpender to arched bridge pre-stressed boom carries out the device that electricity moves dechlorination
CN108004552A (en) * 2017-11-07 2018-05-08 浙江大学宁波理工学院 The electric device for moving dechlorination is carried out to the sunpender of arched bridge pre-stressed boom

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3794574A (en) * 1972-04-27 1974-02-26 Us Interior Device for cathodically protecting metal conduit system
CN102926349A (en) * 2012-11-09 2013-02-13 中交四航工程研究院有限公司 Method for repairing and reinforcing harbour engineering concrete structure based on electrochemical desalting
CN203782238U (en) * 2014-04-29 2014-08-20 浙江大学宁波理工学院 Electro-migrating dechlorinating corrosion inhibiting device of planar reinforced concrete structure
CN205313669U (en) * 2016-01-29 2016-06-15 浙江大学宁波理工学院 Carry out electricity to concrete aggregate and move equipment except that chlorine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3794574A (en) * 1972-04-27 1974-02-26 Us Interior Device for cathodically protecting metal conduit system
CN102926349A (en) * 2012-11-09 2013-02-13 中交四航工程研究院有限公司 Method for repairing and reinforcing harbour engineering concrete structure based on electrochemical desalting
CN203782238U (en) * 2014-04-29 2014-08-20 浙江大学宁波理工学院 Electro-migrating dechlorinating corrosion inhibiting device of planar reinforced concrete structure
CN205313669U (en) * 2016-01-29 2016-06-15 浙江大学宁波理工学院 Carry out electricity to concrete aggregate and move equipment except that chlorine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974684A (en) * 2017-11-07 2018-05-01 浙江大学宁波理工学院 A kind of sunpender to arched bridge pre-stressed boom carries out the device that electricity moves dechlorination
CN108004552A (en) * 2017-11-07 2018-05-08 浙江大学宁波理工学院 The electric device for moving dechlorination is carried out to the sunpender of arched bridge pre-stressed boom
CN107974684B (en) * 2017-11-07 2019-06-18 浙江大学宁波理工学院 The sunpender of a kind of pair of arched bridge pre-stressed boom carries out the device that electricity moves dechlorination
CN108004552B (en) * 2017-11-07 2019-08-09 浙江大学宁波理工学院 The device that electricity moves dechlorination is carried out to the sunpender of arched bridge pre-stressed boom

Also Published As

Publication number Publication date
CN106757053B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
WO2008113841A3 (en) Electrochemical cell and method for operating the same
CN106757053A (en) The method that dechlorination is moved to reinforced concrete structure uniformity electricity
DK1540041T3 (en) Structure of an electrode for use in an electrolysis cell
EP3787092A4 (en) SOLID ELECTROLYTIC MEMBRANE, ITS MANUFACTURING PROCESS AND FULLY SOLID BATTERY INCLUDING IT
Adamatzky et al. Adaptive fungal architectures
CN204311141U (en) A kind of electrolysis cells of water electrolysis hydrogen producing
GB1240908A (en) Electrochemical surface treatment of metallic articles
DK339486A (en) ELECTROLYTIC MANUFACTURING A METAL
CN105088298A (en) Composite electroplating bath for electroplating of cold rolling thin strip steel surface and electroplating section of composite electroplating bath
MA52007A (en) PROCESSES FOR IMPROVING CELL VIABILITY IN A PRODUCTION BIOREACTOR
ATE40720T1 (en) ELECTROLYSIS PROCESS.
CN109678252B (en) A system and method for eutrophication ecological restoration of reservoir water body
León‐Fernandez et al. Modelling of a bioelectrochemical system for metal‐polluted wastewater treatment and sequential metal recovery
GB1168715A (en) Cathode Structure for Electrolytic Cell.
NO20022575D0 (en) Electrochemical cell for single element electrolyzer
JPH09310190A (en) Floating electrode for electrochemical reaction and electrolytic cell using the same electrode
US1486546A (en) Electrolytic separation
Blum et al. Theory of the Metal–Electrolyte Interface
US10480086B2 (en) Multipurpose electrolytic device (MPED) for forced or spontaneous electrolytic processes, with independent electrolytes
Ferrolho Scheduling and control of flexible manufacturing cells usinggenetic algorithms.
CN203440459U (en) Device for electrolytic nickel or electrolytic cobalt
Bhandari et al. Parametric optimization of electrochemical machining process by particle swarm optimization technique
Bozzini et al. Numerical modelling of the growth of electrodeposited chromium on corner-shaped cathodes
CL2019000591A1 (en) Improvements in suspension bars.
CN208270662U (en) A kind of water treatment of power plant material lifetime automatic detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant