[go: up one dir, main page]

CN105540436B - A locking device and a method for closing a fairing using the locking device - Google Patents

A locking device and a method for closing a fairing using the locking device Download PDF

Info

Publication number
CN105540436B
CN105540436B CN201610011004.9A CN201610011004A CN105540436B CN 105540436 B CN105540436 B CN 105540436B CN 201610011004 A CN201610011004 A CN 201610011004A CN 105540436 B CN105540436 B CN 105540436B
Authority
CN
China
Prior art keywords
half cover
hole
cover
upper half
adjusting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610011004.9A
Other languages
Chinese (zh)
Other versions
CN105540436A (en
Inventor
孟凡新
王国庆
吕晓敏
刘亮
马兴海
钱伟
张博轩
杜磊
周振辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Aerospace Changzheng Rocket Manufacturing Co Ltd
China Academy of Launch Vehicle Technology CALT
Original Assignee
Tianjin Aerospace Changzheng Rocket Manufacturing Co Ltd
China Academy of Launch Vehicle Technology CALT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Aerospace Changzheng Rocket Manufacturing Co Ltd, China Academy of Launch Vehicle Technology CALT filed Critical Tianjin Aerospace Changzheng Rocket Manufacturing Co Ltd
Priority to CN201610011004.9A priority Critical patent/CN105540436B/en
Publication of CN105540436A publication Critical patent/CN105540436A/en
Application granted granted Critical
Publication of CN105540436B publication Critical patent/CN105540436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64CAEROPLANES; HELICOPTERS
    • B64C7/00Structures or fairings not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Details Of Aerials (AREA)

Abstract

本发明提供了一种锁紧器及利用锁紧器的整流罩的合罩方法,其包括两个对称设立的控量组件;控量组件包括调整螺杆、调整螺套、销钉和紧固螺栓;调整螺杆中部开有贯穿孔,调整螺套套于该调整螺杆的外部并与其螺合,在调整螺杆尾部的侧壁螺纹上开有插接孔,销钉插于该插接孔内,调整螺杆的头部侧壁上开有与紧固螺栓配合的紧固孔,调整螺套的底部抵接有橡胶垫,该橡胶垫上开有与所述贯穿孔位置配合连通的第一配合孔。本发明的合罩方法操作简便,可避免产品磕伤危险,且操作人员可直接在外部进行外张量的调整;同时也解决了合罩时因调整量大而无法调整问题,进而大幅度降低合罩调整量,提高了对接过程的安全性。

The present invention provides a locking device and a fairing closing method using the locking device, which includes two symmetrically established volume control assemblies; the volume control assembly includes an adjusting screw, an adjusting screw sleeve, a pin and a fastening bolt; There is a through hole in the middle of the adjusting screw, and the adjusting screw sleeve is set on the outside of the adjusting screw and screwed with it. There is an insertion hole on the side wall thread at the tail of the adjusting screw, and the pin is inserted in the insertion hole. The head of the adjusting screw A fastening hole matched with the fastening bolt is opened on the side wall of the upper part, and a rubber pad is abutted against the bottom of the adjusting screw sleeve, and a first matching hole is opened on the rubber pad to communicate with the position of the through hole. The cover closing method of the present invention is easy to operate, can avoid the risk of product damage, and the operator can directly adjust the external tension outside; at the same time, it also solves the problem that the cover cannot be adjusted due to the large adjustment amount, thereby greatly reducing The adjustment of the closing cover improves the safety of the docking process.

Description

一种锁紧器及利用锁紧器的整流罩的合罩方法A locking device and a method for closing a fairing using the locking device

技术领域technical field

本发明属于航天制造领域,尤其是涉及一种锁紧器及利用锁紧器的整流罩的合罩方法。The invention belongs to the field of aerospace manufacturing, and in particular relates to a locking device and a method for closing a fairing using the locking device.

背景技术Background technique

目前,运载火箭整流罩均由柱段结构和锥段结构轴向串联而成,最大直径约5m,最大长度达20m,且整流罩上分布有通孔供产品起吊和运输使用。现役型号整流罩装配均是以卧式状态进行,完成半罩装配后,下半罩以自由状态放置在轨道托架上,通过吊运上半罩完成合罩工作。At present, the launch vehicle fairings are composed of a column structure and a cone structure in series axially, with a maximum diameter of about 5m and a maximum length of 20m, and through holes are distributed on the fairing for product lifting and transportation. The fairings of active models are assembled in a horizontal state. After the half-cover assembly is completed, the lower half-cover is placed on the track bracket in a free state, and the cover-closing work is completed by lifting the upper half-cover.

然而,大型整流罩卧式状态下合罩时,壳段被吊起后,上半罩受吊挂拉力后自身的壳体外张。而下半罩壳体处于仰壳状态,在产品自重作用下的不同位置和变形量均不一致,错位量很难控制。同时,受整流罩锥段曲线外形影响,对接情况更加复杂。两半罩间合罩装配时需同时调整两个半罩的变形量才能将吊运的上半罩完全刃入到下半罩的开口内。若强行装配将严重影响整流罩装配质量,导致壳体内部粘接结构受损。However, when the large fairing is closed in the horizontal state, after the shell section is hoisted, the upper half of the cowl is stretched outwards by the tension of the suspension. However, the lower half-cover shell is in an upside-down state, and the different positions and deformations under the action of the product's own weight are inconsistent, and the amount of misalignment is difficult to control. At the same time, due to the influence of the shape of the cone section of the fairing, the docking situation is more complicated. When assembling the cover between the two half covers, it is necessary to adjust the deformation of the two half covers at the same time to fully insert the lifted upper half cover into the opening of the lower half cover. Forcible assembly will seriously affect the assembly quality of the fairing, resulting in damage to the internal bonding structure of the shell.

但是现实情况却是:整流罩在合罩时变形严重,故而很难进行定位协调,且在整流罩内的工作人员无法专用操作平台,工作时易打滑,因此无法到达分离面高度进行作业。But the reality is that the fairing deforms severely when closing the cover, so it is difficult to coordinate positioning, and the staff inside the fairing cannot use a dedicated operating platform, which tends to slip during work, so they cannot reach the height of the separation surface for operation.

发明内容Contents of the invention

有鉴于此,本发明旨在提出一种锁紧器,以解决整流罩变形无法随时调整的问题。In view of this, the present invention aims to provide a locking device to solve the problem that the fairing deformation cannot be adjusted at any time.

为达到上述目的,本发明的技术方案是这样实现的:In order to achieve the above object, technical solution of the present invention is achieved in that way:

一种锁紧器,其包括两个对称设立的控量组件;A locking device, which includes two symmetrically set up volume control components;

所述控量组件包括调整螺杆、调整螺套、销钉和紧固螺栓;The volume control assembly includes an adjusting screw, an adjusting screw sleeve, a pin and a fastening bolt;

所述调整螺杆中部开有贯穿孔,所述调整螺套套于该调整螺杆的外部并与其螺合,在调整螺杆尾部的侧壁螺纹上开有插接孔,所述销钉插于该插接孔内,所述调整螺杆的头部侧壁上开有与紧固螺栓配合的紧固孔,所述调整螺套的底部抵接有橡胶垫,该橡胶垫上开有与所述贯穿孔位置配合连通的第一配合孔;There is a through hole in the middle of the adjusting screw, the adjusting screw sleeve is sleeved on the outside of the adjusting screw and screwed with it, and there is an insertion hole on the side wall thread at the tail of the adjusting screw, and the pin is inserted into the insertion hole Inside, the side wall of the head of the adjusting screw is provided with a fastening hole that cooperates with the fastening bolt, and the bottom of the adjusting screw sleeve is abutted against a rubber pad, and the rubber pad is provided with a hole that communicates with the position of the through hole. the first matching hole;

一绳子通过依次穿过一个控量组件的贯穿孔和第一配合孔以及另一个控量组件的第一配合孔和贯穿孔而将两个控量组件串接,且所述紧固螺栓与位于调整螺杆头部内的绳子抵接。A rope sequentially passes through the through hole and the first matching hole of one volume control component and the first matching hole and through hole of the other volume control component to connect the two volume control components in series, and the fastening bolt is connected to the Adjust the rope abutment inside the screw head.

进一步的,所述调整螺杆的外部还套有紧固螺母,所述紧固螺母抵接在所述调整螺套的顶部。Further, the outside of the adjusting screw rod is also sleeved with a fastening nut, and the fastening nut abuts against the top of the adjusting screw sleeve.

进一步的,所述调整螺套的底端外壁直径大于该调整螺套的其他部分的外壁直径。Further, the outer wall diameter of the bottom end of the adjusting screw sleeve is larger than the outer wall diameters of other parts of the adjusting screw sleeve.

进一步的,在所述调整螺套和橡胶垫之间还垫有铝垫圈,该铝垫圈上也开有与贯穿孔位置对应的第二配合孔,所述第一配合孔通过第二配合孔而与贯穿孔连通。Further, an aluminum washer is placed between the adjusting screw sleeve and the rubber pad, and the aluminum washer is also provided with a second matching hole corresponding to the position of the through hole, and the first matching hole passes through the second matching hole. communicate with the through hole.

进一步的,所述销钉顶端端面到调整螺杆中心线的距离小于或者等于所述调整螺杆的外螺纹半径。Further, the distance from the top end surface of the pin to the centerline of the adjusting screw is less than or equal to the radius of the external thread of the adjusting screw.

进一步的,所述绳子选用尼龙绳。Further, the rope is nylon rope.

相对于现有技术,本发明所述的一种锁紧器具有以下优势:Compared with the prior art, a locking device described in the present invention has the following advantages:

(1)本发明所述的控量组件的结构包括调整螺杆、调整螺套、销钉和紧固螺栓,且两个控量组件通过绳子串接,这样的整体结构设计可以快速简捷的调整两个控量组件之间的间距,即为两者之间绳子的长度;(1) The structure of the volume control assembly according to the present invention includes an adjustment screw, an adjustment screw sleeve, a pin and a fastening bolt, and the two volume control assemblies are connected in series by a rope. Such an overall structural design can quickly and simply adjust the two The distance between the control components is the length of the rope between them;

故而在使用本锁紧器的时候能调高整个操作效率,同时因为是利用调整螺杆和调整螺套之间的螺纹配合的原理而实现,所以整体制造成本低,且不会发生过多的意外。Therefore, when using this locking device, the overall operating efficiency can be adjusted. At the same time, because it is realized by utilizing the principle of thread cooperation between the adjusting screw rod and the adjusting screw sleeve, the overall manufacturing cost is low and there will be no excessive accidents. .

(2)本发明所述的销钉的设立可以进一步提高锁紧器的使用安全度,即销钉相当于限位件,当调整螺套和调整螺杆相互作用到此位置时即刻停止,以此防止调整螺杆脱离调整螺套的情况发生。(2) The establishment of the pin described in the present invention can further improve the use safety of the lock, that is, the pin is equivalent to a limiter, and when the adjustment screw sleeve and the adjustment screw interact with each other to this position, they stop immediately, thereby preventing adjustment The situation where the screw rod breaks away from the adjusting screw sleeve occurs.

本发明的另一目的在于提出一种利用上述锁紧器的整流罩的合罩方法,以解决快速合罩的同时保证两个半罩之间配合度高的要求。Another object of the present invention is to provide a fairing closing method using the above-mentioned locking device, so as to solve the requirement of fast closing while ensuring a high degree of cooperation between the two half-covers.

为达到上述目的,本发明的技术方案是这样实现的:In order to achieve the above object, technical solution of the present invention is achieved in that way:

一种利用上述锁紧器的整流罩的合罩方法,其具体步骤包括:A method for closing a fairing utilizing the above-mentioned locking device, the specific steps of which include:

整流罩包括上半罩和下半罩;The fairing includes an upper half cover and a lower half cover;

步骤一,下半罩以仰壳状态置于托架上,上半罩以扣壳状态置于地面上;Step 1, the lower half cover is placed on the bracket with the shell upside down, and the upper half cover is placed on the ground with the shell buckled;

步骤二,选取上半罩和下半罩上几组通孔位置作为调整点;Step 2, select several groups of through hole positions on the upper half cover and the lower half cover as adjustment points;

步骤三,初检上半罩和下半罩上调整点的外张量并将锁紧器中控量组件分别安装在对应的通孔内;Step 3: Initially check the external tension of the adjustment points on the upper half cover and the lower half cover, and install the central control components of the locking device in the corresponding through holes;

步骤四,上半罩安装吊挂并起吊离地;Step 4, install and hang the upper half cover and lift it off the ground;

步骤五,再次测量并比对两个半罩的外张量数值,调整锁紧器至两半罩外张量一致;Step 5, measure and compare the outer tensor values of the two half-covers again, and adjust the locking device until the outer tensors of the two half-covers are consistent;

步骤六,继续起吊上半罩;Step 6, continue to lift the upper half cover;

步骤七,将上半罩的后端首先缓降直至与下半罩扣合为止,再将上半罩的前端缓降直至与下半罩扣合为止。Step 7: Slowly lower the rear end of the upper half cover until it is fastened with the lower half cover, and then slowly lower the front end of the upper half cover until it is buckled with the lower half cover.

进一步的,上半罩作为吊点位置附近的通孔选为调整点。Further, the through hole near the position of the upper half cover as the lifting point is selected as the adjustment point.

进一步的,在起吊上半罩的时候就需要将该上半罩的位置与下半罩的位置对应好。Further, when lifting the upper half cover, it is necessary to correspond the position of the upper half cover with the position of the lower half cover.

进一步的,上半罩和下半罩上分别选取3-5组通孔作为调整点。Further, 3-5 groups of through holes are respectively selected on the upper half cover and the lower half cover as adjustment points.

进一步的,在上半罩和下半罩合并后组成的整流罩,将该整流罩的前端与一前定位环架连接固定,整流罩的后端与一后端定位环架连接固定。Further, the front end of the fairing is connected and fixed with a front positioning ring frame, and the rear end of the fairing is connected and fixed with a rear end positioning ring frame for the fairing formed after the upper half cover and the lower half cover are combined.

进一步的,所述上半罩安装的吊挂至少包括两个吊挂,且吊挂对称分布在上半罩上。Further, the hangers installed on the upper half cover include at least two hangers, and the hangers are symmetrically distributed on the upper half cover.

进一步的,锁紧器安装在通孔内的方法为:Further, the method for installing the locker in the through hole is as follows:

a.一控量组件中的调整螺杆旋入对应的调整螺套,将绳子从调整螺杆穿入,随后拧入紧固螺栓并锁紧绳子;a. The adjustment screw in the volume control component is screwed into the corresponding adjustment screw sleeve, the rope is passed through the adjustment screw, and then the fastening bolt is screwed in and the rope is locked;

b.连接铝垫圈与橡胶垫,绳子从半罩的一侧通孔穿入,再从对应的另一侧通孔穿出,同时再连接另一个控量组件中的橡胶垫与铝垫圈,此时绳子的穿出端穿过另一控量组件的调整螺杆;b. Connect the aluminum washer and the rubber pad, the rope is passed through the hole on one side of the half cover, and then passed through the corresponding hole on the other side, and at the same time connect the rubber pad and the aluminum washer in another volume control component. When the threaded end of the rope passes through the adjusting screw of another volume control component;

c.调整绳子在半罩内的长度,随后使用该控量组件上的紧固螺栓锁紧绳子;c. Adjust the length of the rope in the half cover, and then use the fastening bolt on the volume control assembly to lock the rope;

d.紧固螺母拧至与调整螺套抵接。d. Tighten the fastening nut until it abuts against the adjusting screw sleeve.

相对于现有技术,本发明所述的一种利用上述锁紧器的整流罩的合罩方法具有以下优势:Compared with the prior art, a method for closing the fairing using the above-mentioned locking device according to the present invention has the following advantages:

(1)本发明所述合罩方法操作简便,可避免产品磕伤危险,且操作人员可直接在外部进行外张量的调整;(1) The cover closing method of the present invention is easy to operate, can avoid the risk of product damage, and the operator can directly adjust the external tension outside;

同时也解决了合罩时因调整量大而无法调整问题,进而大幅度降低合罩调整量,提高了对接过程的安全性。At the same time, it also solves the problem that the adjustment cannot be adjusted due to the large adjustment amount when closing the cover, thereby greatly reducing the adjustment amount of the cover closing, and improving the safety of the docking process.

(2)本发明所述的上半罩上对称设立吊挂的方式,可以实现上半罩的前后端在升降时可根据实际情况进行调整,解决了单横梁人字型起吊时姿态难调整的问题。(2) The method of hanging symmetrically on the upper half cover according to the present invention can realize that the front and rear ends of the upper half cover can be adjusted according to the actual situation when lifting, and solve the problem that the posture is difficult to adjust when the single beam is hoisted in a herringbone shape question.

附图说明Description of drawings

构成本发明的一部分的附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention. In the attached picture:

图1为本发明实施例所述的锁紧器的整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the locking device described in the embodiment of the present invention;

图2为本发明实施例所述的上半罩吊挂设立位置示意图;Fig. 2 is a schematic diagram of the hanging establishment position of the upper half cover described in the embodiment of the present invention;

图3为本发明实施例所述的上半罩与下半罩合并后的结构示意图;Fig. 3 is a schematic structural view of the combination of the upper half cover and the lower half cover described in the embodiment of the present invention;

图4为本发明实施例所述的上半罩与下半罩配合过程示意图;Fig. 4 is a schematic diagram of the cooperation process of the upper half cover and the lower half cover described in the embodiment of the present invention;

图5为本发明实施例所述的上半罩与下半罩配合侧面示意图;Fig. 5 is a schematic side view of the cooperation between the upper half cover and the lower half cover according to the embodiment of the present invention;

图6为本发明实施例所述的上半罩与下半罩合并后的侧面示意图。Fig. 6 is a schematic side view of the combination of the upper half cover and the lower half cover according to the embodiment of the present invention.

附图标记说明:Explanation of reference signs:

1-调整螺杆;2-紧固螺栓;3-紧固螺母;4-调整螺套;5-销钉;6-铝垫圈;7-橡胶圈;8-绳子;9-下半罩;10-上半罩;101-吊挂;11-通孔;12-起吊衡量;13-起吊绳;14-前定位环架;15-后定位环架。1-adjusting screw; 2-fastening bolt; 3-fastening nut; 4-adjusting screw sleeve; 5-pin; 6-aluminum washer; 7-rubber ring; 8-rope; Half cover; 101-hanging; 11-through hole; 12-lifting measure; 13-lifting rope; 14-front positioning ring frame; 15-back positioning ring frame.

具体实施方式detailed description

需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and Simplified descriptions, rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and thus should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second", etc. may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it may be mechanically connected or electrically connected; it may be directly connected or indirectly connected through an intermediary, and it may be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention based on specific situations.

下面将参考附图并结合实施例来详细说明本发明。The present invention will be described in detail below with reference to the accompanying drawings and examples.

如图1所示,一种锁紧器,其包括两个对称设立的控量组件;As shown in Figure 1, a locking device includes two symmetrically set up volume control components;

所述控量组件包括调整螺杆1、调整螺套4、销钉5和紧固螺栓2;The volume control assembly includes an adjusting screw 1, an adjusting screw sleeve 4, a pin 5 and a fastening bolt 2;

所述调整螺杆1中部开有贯穿孔,所述调整螺套4套于该调整螺杆1的外部并与其螺合,在调整螺杆1尾部的侧壁螺纹上开有插接孔,所述销钉5插于该插接孔内,且所述销钉5顶端端面到调整螺杆1中心线的距离小于或者等于所述调整螺杆1的外螺纹半径;There is a through hole in the middle of the adjusting screw 1, the adjusting screw sleeve 4 is set on the outside of the adjusting screw 1 and screwed with it, and an insertion hole is opened on the side wall thread at the tail of the adjusting screw 1, and the pin 5 It is inserted into the insertion hole, and the distance from the top end surface of the pin 5 to the centerline of the adjusting screw 1 is less than or equal to the radius of the external thread of the adjusting screw 1;

所述调整螺杆1的头部侧壁上开有与紧固螺栓2配合的紧固孔,所述调整螺套4的底端外壁直径大于该调整螺套4的其他部分的外壁直径,所述调整螺套4的底部依次抵接有铝垫圈6和橡胶垫7,该铝垫圈6上开有与贯穿孔位置对应的第二配合孔,该橡胶垫7上开有与所述贯穿孔位置配合连通的第一配合孔,所述第一配合孔通过第二配合孔而与贯穿孔连通。The side wall of the head of the adjusting screw 1 is provided with a fastening hole to cooperate with the fastening bolt 2, and the outer wall diameter of the bottom end of the adjusting screw sleeve 4 is larger than the outer wall diameter of other parts of the adjusting screw sleeve 4. The bottom of the adjusting screw sleeve 4 is sequentially abutted with an aluminum washer 6 and a rubber pad 7. The aluminum washer 6 is provided with a second fitting hole corresponding to the position of the through hole, and the rubber pad 7 is provided with a hole matching the position of the through hole. The first matching hole communicates with the through hole through the second matching hole.

一绳子8通过依次穿过一个控量组件的贯穿孔和第一配合孔以及另一个控量组件的第一配合孔和贯穿孔而将两个控量组件串接,且所述紧固螺栓2与位于调整螺杆1头部内的绳子8抵接,这里面说到的绳子为较为结实且没有弹性的,可选用为尼龙绳。A rope 8 connects the two volume control assemblies in series by passing through the through hole and the first matching hole of one volume control assembly and the first cooperation hole and the through hole of the other volume control assembly in sequence, and the fastening bolt 2 Abut against the rope 8 located in the head of the adjusting screw 1, the rope mentioned here is relatively strong and inelastic, and can be selected as a nylon rope.

所述调整螺杆1的外部还套有紧固螺母3,所述紧固螺母3抵接在所述调整螺套4的顶部,设有紧固螺母3也是进一步的对调整螺杆1进行一个限位,防止在使用的过程中调整螺杆1与调整螺套4发生相对滑动。The outside of the adjusting screw 1 is also covered with a tightening nut 3, and the tightening nut 3 abuts against the top of the adjusting screw sleeve 4, and the setting of the tightening nut 3 is also to further limit the adjusting screw 1. , to prevent relative sliding between the adjusting screw 1 and the adjusting screw sleeve 4 during use.

如图2-6所示,一种利用锁紧器的整流罩的合罩方法,其具体步骤包括:As shown in Figure 2-6, a method for closing a fairing using a locker, the specific steps include:

整流罩包括上半罩10和下半罩9;The fairing includes an upper half cover 10 and a lower half cover 9;

步骤一,下半罩9以仰壳状态置于托架上,上半罩10以扣壳状态置于地面上;Step 1, the lower half-cover 9 is placed on the bracket in the state of facing up, and the upper half-cover 10 is placed on the ground in the state of buckling the shell;

步骤二,上半罩10和下半罩9上分别选取3-5组通孔11作为调整点,且在下面提到的安装吊挂101处的吊点位置附近的通孔11选为调整点;Step 2, select 3-5 groups of through holes 11 on the upper half cover 10 and the lower half cover 9 respectively as adjustment points, and select the through holes 11 near the hanging point position of the installation hanging 101 mentioned below as adjustment points ;

步骤三,初检上半罩10和下半罩9上调整点的外张量并将锁紧器中控量组件分别安装在对应的通孔11内;Step 3: Preliminarily check the external tension of the adjustment points on the upper half cover 10 and the lower half cover 9 and install the control components of the locking device in the corresponding through holes 11;

步骤四,上半罩10安装吊挂101并起吊离地,同时在起吊上半罩的时候就需要将该上半罩的位置与下半罩的位置对应好;Step 4, install the hanger 101 on the upper half cover 10 and lift it off the ground. At the same time, when lifting the upper half cover, it is necessary to correspond the position of the upper half cover with the position of the lower half cover;

而所述上半罩10安装的吊挂101至少包括两个吊挂101,且吊挂101对称分布在上半罩10上;The hangers 101 installed on the upper half cover 10 include at least two hangers 101, and the hangers 101 are symmetrically distributed on the upper half cover 10;

步骤五,再次测量并比对两个半罩的外张量数值,调整锁紧器至两半罩外张量一致;即为调整绳子在半罩内的长度,具体调整为:通过扳手调整调整螺套4与调整螺杆1的螺纹配合长度进行调整的,紧固螺母3起固定调整螺套4位置的作用;Step 5: Measure and compare the outer tensor values of the two half covers again, and adjust the locking device until the outer tensors of the two half covers are the same; that is, to adjust the length of the rope in the half cover, the specific adjustment is: adjust and adjust with a wrench When the screw sleeve 4 is adjusted with the length of the screw thread of the adjustment screw 1, the fastening nut 3 plays the role of fixing the position of the adjustment screw sleeve 4;

步骤六,继续起吊上半罩10;Step 6, continue to lift the upper half cover 10;

步骤七,将上半罩10的后端首先缓降直至与下半罩9扣合为止,再将上半罩10的前端缓降直至与下半罩9扣合为止;Step 7, the rear end of the upper half cover 10 is first slowly lowered until it is fastened with the lower half cover 9, and then the front end of the upper half cover 10 is slowly lowered until it is buckled with the lower half cover 9;

步骤八,在上半罩10和下半罩9合并后组成的整流罩,将该整流罩的前端与一前定位环架14连接固定,整流罩的后端与一后端定位环架15连接固定。Step 8: For the fairing formed after the upper half cover 10 and the lower half cover 9 are merged, the front end of the fairing is connected and fixed with a front positioning ring frame 14, and the rear end of the fairing is connected with a rear end positioning ring frame 15 fixed.

步骤九,分解吊挂、锁紧器;Step 9, disassemble the hanger and locker;

步骤十,进行后续工作。Step ten, follow-up work.

所述锁紧器安装在通孔11内的方法为:The method for installing the locking device in the through hole 11 is as follows:

a.一控量组件中的调整螺杆1旋入对应的调整螺套4,将绳子8从调整螺杆1穿入,随后拧入紧固螺栓2并锁紧绳子8;a. The adjustment screw 1 in the volume control assembly is screwed into the corresponding adjustment screw sleeve 4, the rope 8 is passed through the adjustment screw 1, and then the fastening bolt 2 is screwed in and the rope 8 is locked;

b.连接铝垫圈6与橡胶垫7,绳子8从半罩的一侧通孔11穿入,再从对应的另一侧通孔11穿出,同时再连接另一个控量组件中的橡胶垫7与铝垫圈6,此时绳子8的穿出端穿过另一控量组件的调整螺杆1;b. Connect the aluminum washer 6 and the rubber pad 7, the rope 8 passes through the through hole 11 on one side of the half cover, and then passes through the corresponding through hole 11 on the other side, and at the same time connects the rubber pad in another volume control component 7 and the aluminum washer 6, the threaded end of the rope 8 passed through the adjusting screw 1 of another volume control assembly;

c.调整绳子8在半罩内的长度,随后使用该控量组件上的紧固螺栓2锁紧绳子8;c. Adjust the length of the rope 8 in the half cover, and then use the fastening bolt 2 on the volume control assembly to lock the rope 8;

d.紧固螺母3拧至与调整螺套4抵接。d. The fastening nut 3 is screwed until it abuts against the adjusting screw sleeve 4 .

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of the present invention. within the scope of protection.

Claims (10)

1. a kind of locker, it is characterised in that:Including two control symmetrically set up amount components;
The control amount component includes adjusting bolt (1), adjustment swivel nut (4), pin (5) and fastening bolt (2);
Be provided with through hole in the middle part of the adjusting bolt (1), the adjustment swivel nut (4) be placed on the outside of the adjusting bolt (1) and with It is screwed togather, and spliced eye is provided with the sidewall thread of adjusting bolt (1) afterbody, the pin (5) is inserted in the spliced eye, described The fastener hole coordinated with fastening bolt (2) is provided with the head side wall of adjusting bolt (1), the bottom of the adjustment swivel nut (4) is supported Rubber blanket (7) is connected to, is provided with the rubber blanket (7) and first mating holes connected through hole site cooperation;
One rope (8) is by sequentially passing through the through hole and the first mating holes and another control amount component of control amount component First mating holes and through hole and two control amount components are concatenated, and the fastening bolt (2) with positioned at adjusting bolt (1) head Interior rope (8) is abutted.
2. a kind of locker according to claim 1, it is characterised in that:The outside of the adjusting bolt (1) is also cased with tightly Gu nut (3), the clamp nut (3) is connected to the top of the adjustment swivel nut (4).
3. a kind of locker according to claim 1, it is characterised in that:It is described adjustment swivel nut (4) and rubber blanket (7) it Between be also lined with aluminium packing ring (6), be also provided with the aluminium packing ring (6) and through corresponding second mating holes in hole site, described first matches somebody with somebody Hole is closed to connect with through hole by the second mating holes.
4. a kind of locker according to claim 1, it is characterised in that:Pin (5) the top end face is to adjusting bolt (1) distance of center line is less than or equal to the external screw thread radius of the adjusting bolt (1).
5. a kind of conjunction cover method of the radome fairing of the locker described in utilization claim 1, it is characterised in that:Specific steps bag Include:
Radome fairing includes upper half cover (10) and lower half cover (9);
Step one, lower half cover (9) is placed on bracket with state on one's back, and upper half cover (10) is placed on ground with buckleing shelly state;
Step 2, chooses upper half cover (10) and upper several groups of through holes (11) position of lower half cover (9) as adjustment point;
The outer tensor of step 3, initial survey upper half cover (10) and lower half cover (9) up-regulation integral point simultaneously distinguishes control amount component in locker In corresponding through hole (11);
Step 4, upper half cover (10) installs hanging (101) and lifts by crane liftoff;
Step 5, measures and compares tensor outside the outer tensor numerical value of two and half covers, adjustment locker to two halves cover consistent again;
Step 6, continues to lift by crane upper half cover (10);
Step 7, drop is delayed into the rear end of upper half cover (10) first until with lower half cover (9) fastening untill, then by upper half cover (10) The slow drop in front end with lower half cover (9) untill fastening.
6. a kind of conjunction cover method of the radome fairing of utilization locker according to claim 5, it is characterised in that:Upper half cover (10) adjustment point is elected as the through hole (11) near hoisting point position.
7. a kind of conjunction cover method of the radome fairing of utilization locker according to claim 5, it is characterised in that:Upper half cover (10) 3-5 groups through hole (11) and on lower half cover (9) is chosen respectively as adjustment point.
8. a kind of conjunction cover method of the radome fairing of utilization locker according to claim 5, it is characterised in that:In upper half cover (10) radome fairing and after lower half cover (9) merging constituted, the front end of the radome fairing is connected with a prelocalization ring stand (14), The rear end of radome fairing is connected with a rear alignment ring stand (15).
9. a kind of conjunction cover method of the radome fairing of utilization locker according to claim 5, it is characterised in that:The upper half Covering the hanging (101) (10) installed at least includes two hangings (101), and hanging (101) is symmetrically distributed on upper half cover (10).
10. a kind of conjunction cover method of the radome fairing of utilization locker according to claim 5, it is characterised in that:The lock Tightly method of the device in through hole (11) is:
A. the adjusting bolt (1) in a control amount component screws in corresponding adjustment swivel nut (4), and rope (8) is worn from adjusting bolt (1) Enter, be then screwed into fastening bolt (2) and lock rope (8);
B. connection aluminium packing ring (6) and rubber blanket (7), a side through hole (11) for rope (8) from half cover are penetrated, then from corresponding another Side through hole (11) is passed, while reconnect rubber blanket (7) in another control amount component and aluminium packing ring (6), now rope (8) Traversing through end passes through the adjusting bolt (1) of another control amount component;
C. length of the adjustment rope (8) in half cover, then locks rope (8) using the fastening bolt (2) on the control amount component;
D. clamp nut (3) is screwed onto abuts with adjustment swivel nut (4).
CN201610011004.9A 2016-01-06 2016-01-06 A locking device and a method for closing a fairing using the locking device Active CN105540436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610011004.9A CN105540436B (en) 2016-01-06 2016-01-06 A locking device and a method for closing a fairing using the locking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610011004.9A CN105540436B (en) 2016-01-06 2016-01-06 A locking device and a method for closing a fairing using the locking device

Publications (2)

Publication Number Publication Date
CN105540436A CN105540436A (en) 2016-05-04
CN105540436B true CN105540436B (en) 2017-08-01

Family

ID=55820075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610011004.9A Active CN105540436B (en) 2016-01-06 2016-01-06 A locking device and a method for closing a fairing using the locking device

Country Status (1)

Country Link
CN (1) CN105540436B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107554801B (en) * 2016-07-01 2020-08-11 陕西飞机工业(集团)有限公司 Vibration reduction connecting structure of propeller hub fairing
CN106695319B (en) * 2016-11-25 2018-11-30 北京强度环境研究所 A kind of conjunction cover method of radome fairing in vibration tower
CN109343189A (en) * 2018-11-21 2019-02-15 北京遥感设备研究所 A conformal optical head cover bonding device and assembling method
CN116462095B (en) * 2023-04-19 2025-08-01 天津爱思达航天科技股份有限公司 Cowling lifting appliance and assembling method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4747738A (en) * 1986-10-03 1988-05-31 Avilbank Mfg., Inc. Captive panel fastener assembly
US4828442A (en) * 1987-12-23 1989-05-09 Avibank Mfg Inc Spring form captive panel fastener assembly
CN101797688B (en) * 2009-12-07 2012-06-13 东华大学 Device and method for positioning, clamping and installing any curved sheet piece in plane
ES2399262B1 (en) * 2010-12-31 2014-04-29 Airbus Operations, S.L. ADJUSTABLE HARDWARE FOR THE INSTALLATION AND ADJUSTMENT OF MEATS IN AIRCRAFT.
CN102555215B (en) * 2011-12-12 2016-08-17 上海航天设备制造总厂 Trousers cover body docking purlin interface frame, mating frame adhering method
CN202623305U (en) * 2011-12-27 2012-12-26 上海航天设备制造总厂 Bonding device of butt girder and butt frame of satellite fairing body
CN203638954U (en) * 2013-11-04 2014-06-11 北京航天发射技术研究所 Hanger for vertically hoisting fairing
CN205367503U (en) * 2016-01-06 2016-07-06 天津航天长征火箭制造有限公司 a locker

Also Published As

Publication number Publication date
CN105540436A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105540436B (en) A locking device and a method for closing a fairing using the locking device
CN103201507B (en) Wind turbine blade structure, lifting assembly and method of handling blades
US8128026B2 (en) Removable cargo pod with lifting mechanism and open top
CN104691769B (en) Novel unmanned aerial vehicle airborne pod hanging frame
CN103030061A (en) Circular ring lifting tool based on satellite bearing cylinder lifting
CN205367503U (en) a locker
CN201834215U (en) aircraft tail brace
CN107381382A (en) A kind of collapsible falling-resistant crane boom
CN104163250A (en) Reliability test device for aircraft landing gear cabin door lock system
CN105836318A (en) Sealing device for transportation of aviation product and sling of sealing device
CN205634610U (en) Self -balancing crane beam
CN208363575U (en) Elevating scaffold wall-attached supporting seat
CN105621225A (en) Automatic-disassembling lifting appliance for lifting forklift lifting system assembly
CN107176537B (en) A kind of hanging device and its hanging method
CN105784585A (en) Variable-load regulating and controlling device for explosive drop impact test
CN106544957B (en) Length adjustment device, stiffening girder of suspension bridge mounting system and method
CN105667823B (en) A kind of Airstairs of airplane
CN112158357A (en) Device and method for measuring deviation between thrust line and gravity center of unmanned aerial vehicle booster rocket
CN206783106U (en) A kind of single hook for large-tonnage lifting is without eye plate lifting beam device
CN205442374U (en) A can dismantle hoist automatically that is used for fork truck jack -up system assembly to hoist
CN103587689A (en) Aerospace vehicle landing approach flight test hanging rack
CN115000876A (en) Cable is maintained and is used safety seat
CN208762095U (en) A kind of capacitor replacement platform
RU2362724C2 (en) Cross bar for docking of large space vehicle with carrier rocket equipped with supercaliber payload fairing
CN206839560U (en) A kind of tightening machine locking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant