[go: up one dir, main page]

CN105003266A - Exploration and mining combination method of ore body exploration entry - Google Patents

Exploration and mining combination method of ore body exploration entry Download PDF

Info

Publication number
CN105003266A
CN105003266A CN201510314804.3A CN201510314804A CN105003266A CN 105003266 A CN105003266 A CN 105003266A CN 201510314804 A CN201510314804 A CN 201510314804A CN 105003266 A CN105003266 A CN 105003266A
Authority
CN
China
Prior art keywords
exploration
ore body
ore
entry
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510314804.3A
Other languages
Chinese (zh)
Inventor
田宏海
程国华
孙海军
刘明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201510314804.3A priority Critical patent/CN105003266A/en
Publication of CN105003266A publication Critical patent/CN105003266A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an exploration and mining combination method of an ore body exploration entry. The method includes the steps that firstly, a developing entry is pre-distributed according to known ore body data; secondly, the exploration entry is designed on the inevitable way of the developing entry; thirdly, an exploration access is distributed perpendicular to an ore body and penetrates through the ore body, and the boundary of the ore body inclining to ore rock and the thickness of the ore body are determined; fourthly, the exploration entry is distributed in the middle of the ore body along the ore body, and the boundary of the ore rock is found in the direction; fifthly, a short exploration entry perpendicular to the direction of the ore body is distributed along the tunneling of the exploration entry in the direction of the ore body, and accordingly ore control precision of the entry in the direction is guaranteed. The method has the beneficial effects that a traditional exploration method achieved by finding the ore rock boundary is replaced, and the exploration and mining combination method is closely combined with the mining method, so that entry engineering amount is reduced, exploration and mining are combined, and the aim of reducing mining cost, the dilution rate and the loss rate is achieved.

Description

The prospecting in mining method in ore body mine locating lane
Technical field
The invention belongs to mining technique field, relate to the prospecting in mining method in mine locating lane.
Background technology
Sublevel caving method without sill pillar is applicable to inclined thick gulf, and domestic iron ore mine of adopting substantially all adopts the method to dig up mine.But for some number mines, the occurrence patterns of ore body and irregularity, exploitation form undesirable be long and narrow narrow ore body.Also having some mines also to there is ore body major part is thick large high-dipping, but remainder, particularly ore limits part is irregular, still has certain the blind area of control, needs to carry out production mine locating in real time, increases control accuracy.For the long and narrow narrow ore body in down-hole and thick large high-dipping ore block irregularity boundary part with traditional capwise gallery (as shown in Figure 1,4-prospect tunnel, 5-intend arranging tunnel, 6-boundary line of ore bed and rock, 7-lane along the pulse), Dai Yan then can be caused many, and rock mixing in rock intersection ore deposit, ore deposit causes unnecessary dilution, loss; Roadway engineering amount is bigger than normal, and cost is high, the problem that the rate of dilution of ore extraction is large, loss late is large, cost is high.
Summary of the invention
The present invention, for solving above technical problem, proposes a kind of prospecting in mining method of lane of prospecting.To reach the object reducing mining cost, the rate of dilution, loss late.
Technical scheme: the prospecting in mining method in ore body mine locating lane, step is as follows: a. is according to the development heading of known underground mining layer data pre-arranged; B. mine locating lane must be designed in development heading on path; C. vertical orebody trend arranges that a mine locating route penetrates ore body, determines rock border, orebody strike ore deposit and orebody thickness; D. in the mine locating lane of ore body intermediate arrangement one along orebody trend, push away and look for Kuang Yan border, across pitch ore deposit; E. along with the short lane of the mine locating of vertical orebody trend is arranged in the propelling in the mine locating lane of orebody trend, to guarantee the control ore deposit accuracy in tunnel, across pitch direction.
Beneficial effect: 1, traditional perpendicular to orebody trend, gallery mode is arranged to arrange that along orebody trend mode gallery substitutes for the long and narrow narrow ore body in down-hole and thick large high-dipping ore block irregularity boundary part;
2, prospect tunnel is arranged in the middle of ore body, in the middle of ore body, push away the rock border, ore deposit looked for along orebody trend direction.
3, according to engineering geological conditions and back production parameter, a mine locating route perpendicular to trend is arranged every 2 of development heading or multiple drift interval, to reach the object controlling rock border, orebody strike ore deposit;
4, instead of the survey methods on traditional rock border, searching ore deposit and combine closely with mining methods, roadway engineering amount being reduced, accomplishes prospecting in mining, to reach the object reducing mining cost, the rate of dilution, loss late.
Accompanying drawing explanation
Fig. 1 is traditional capwise gallery schematic diagram;
Fig. 2 is this method roadway layout schematic diagram;
Fig. 3 is this method embody rule example schematic.
Detailed description of the invention
As figure, according to the development heading of known underground mining layer data pre-arranged; Mine locating lane must be designed on path in development heading; Vertical orebody trend arranges that a mine locating route 1 penetrates ore body, determines rock border, orebody strike ore deposit and orebody thickness; In the mine locating lane 2 of ore body intermediate arrangement one along orebody trend, push away and look for Kuang Yan border, across pitch ore deposit; According to engineering geological conditions, arrange a short lane 3 of mine locating perpendicular to trend, to push away the rock border, ore deposit (see Fig. 2, arrow is explorating direction) looking for orebody strike direction every 2 of development heading or multiple drift interval.Guarantee the control ore deposit accuracy in tunnel, across pitch direction.The section of prospect tunnel is identical with the section of development heading, with the Mining entrance used as follow-up mining and ore removal loop.
Experiment embodiment, to the west of certain ore deposit ore body 3 exploration line, part ore body end is anxious receives pinching, is the long and narrow narrow Feature of The Orebody of big thick ore body irregularity boundary.Within the scope of the maximum haul distance of electric LHD, to arrange that along orebody trend mine locating direction, lane replaces vertical orebody trend arrangement, roadway engineering amount saves nearly half, and unnecessary country rock will be avoided in exploitation process to be mixed into will improve rate of extraction (see figure 3) further.

Claims (1)

1. the prospecting in mining method in ore body mine locating lane, it is characterized in that, step is as follows: a. is according to the development heading of known underground mining layer data pre-arranged; B. mine locating lane must be designed in development heading on path; C. vertical orebody trend arranges that a mine locating route penetrates ore body, determines rock border, orebody strike ore deposit and orebody thickness; D. in the mine locating lane of ore body intermediate arrangement one along orebody trend, push away and look for Kuang Yan border, across pitch ore deposit; E. along with the short lane of the mine locating of vertical orebody trend is arranged in the propelling in the mine locating lane of orebody trend, to guarantee the control ore deposit accuracy in tunnel, across pitch direction.
CN201510314804.3A 2015-06-10 2015-06-10 Exploration and mining combination method of ore body exploration entry Pending CN105003266A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510314804.3A CN105003266A (en) 2015-06-10 2015-06-10 Exploration and mining combination method of ore body exploration entry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510314804.3A CN105003266A (en) 2015-06-10 2015-06-10 Exploration and mining combination method of ore body exploration entry

Publications (1)

Publication Number Publication Date
CN105003266A true CN105003266A (en) 2015-10-28

Family

ID=54376097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510314804.3A Pending CN105003266A (en) 2015-06-10 2015-06-10 Exploration and mining combination method of ore body exploration entry

Country Status (1)

Country Link
CN (1) CN105003266A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706331A (en) * 2020-07-07 2020-09-25 酒泉钢铁(集团)有限责任公司 A kind of construction method of underground mine road along the outer vein
CN115343777A (en) * 2022-07-08 2022-11-15 铜陵有色金属集团股份有限公司 Method for surveying shape complex copper ore body

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066906A (en) * 1992-06-13 1992-12-09 盐城市矿务局 Nature coking coal mining method in magma invaded region
CN104314567A (en) * 2014-09-25 2015-01-28 白银有色集团股份有限公司 Medium-thick ore body mining method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066906A (en) * 1992-06-13 1992-12-09 盐城市矿务局 Nature coking coal mining method in magma invaded region
CN104314567A (en) * 2014-09-25 2015-01-28 白银有色集团股份有限公司 Medium-thick ore body mining method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
翁哲伟: "浅谈探采结合在浅孔留矿法中的生产实践", 《采矿技术》 *
胡家峪铜矿技术科: "在矿区开发中实行探采结合", 《地质与勘探》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706331A (en) * 2020-07-07 2020-09-25 酒泉钢铁(集团)有限责任公司 A kind of construction method of underground mine road along the outer vein
CN111706331B (en) * 2020-07-07 2022-03-15 酒泉钢铁(集团)有限责任公司 A kind of construction method of underground mine road along the outer vein
CN115343777A (en) * 2022-07-08 2022-11-15 铜陵有色金属集团股份有限公司 Method for surveying shape complex copper ore body

Similar Documents

Publication Publication Date Title
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
CN106121648B (en) A mining method of segmented empty-stop mining chassis approach with ore drawing followed by filling
CN101424186B (en) Method for recovering disc ore on incline ore block
CN112177613B (en) Fan-shaped medium-diameter deep hole mining technology for steeply inclined medium-thick orebodies
US20130106165A1 (en) Underground mining
CN107559008B (en) A method for combined re-mining of extra-thick coal seam to stop mining line coal pillars
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN115387791B (en) Coordinated, collaborative, and staggered mining methods for coal and associated minerals
CN109252860A (en) A kind of girdle continuous milling machine high mechanization recovery method
CN107905816A (en) A kind of three-soft seam high-seam working face, which is faced upward, adopted more than 5m major fault methods
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN108952725B (en) A low-dilution mining method suitable for gently inclined thin ore bodies
CN105003266A (en) Exploration and mining combination method of ore body exploration entry
CN106593447B (en) A kind of underground mining gently inclined medium thick orebody mining methods
Shnorhokian et al. Mechanisms and Measurements of Destressing in Underground Mines: A State-of-the-Art Review
CN114233295B (en) One-lane multi-purpose mining method
CN110284884A (en) Mining method of gentle dip-dip medium-thickness ore body
Youzhen et al. Application and development of advanced drilling technology for coal mine roadway heading
CN115387844B (en) Method for preventing outbursts in advance in the initial mining area of the outburst coal seam working face
CN104533422A (en) Noble metal mine pillar recovery method and timbering framework
CN108086978A (en) A kind of coal-mining method suitable for deep-well super high seam
US20220195858A1 (en) Method including downhole flow control in solution mining
CN116575973B (en) Method for controlling stope gas of working face under surrounding rock gas outburst condition
Kaplunov et al. Particularities of solving the problem of sustainable development of chromite underground mining at deep horizons by means of combined geotechnology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151028