CN104879167A - Method for rebuilding gas storage and layered injection and production system thereof - Google Patents
Method for rebuilding gas storage and layered injection and production system thereof Download PDFInfo
- Publication number
- CN104879167A CN104879167A CN201510205438.8A CN201510205438A CN104879167A CN 104879167 A CN104879167 A CN 104879167A CN 201510205438 A CN201510205438 A CN 201510205438A CN 104879167 A CN104879167 A CN 104879167A
- Authority
- CN
- China
- Prior art keywords
- gas
- injection
- oil
- production
- layered
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 75
- 238000003860 storage Methods 0.000 title claims abstract description 53
- 238000002347 injection Methods 0.000 title claims abstract description 40
- 239000007924 injection Substances 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000012360 testing method Methods 0.000 claims abstract description 49
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 23
- 230000035699 permeability Effects 0.000 claims description 8
- 230000005484 gravity Effects 0.000 claims description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 32
- 239000007789 gas Substances 0.000 description 140
- 239000010410 layer Substances 0.000 description 54
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 20
- 238000005755 formation reaction Methods 0.000 description 18
- 239000003345 natural gas Substances 0.000 description 10
- 238000011161 development Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 238000009826 distribution Methods 0.000 description 2
- 239000011229 interlayer Substances 0.000 description 2
- 230000014759 maintenance of location Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
本发明公开了一种改建储气库的方法及分层注采系统,所述改建储气库的方法包括:获取油气藏地层参数;在所述油气藏上分别设置注采气井和观察井;在所述观察井中下入分层排水管柱,并根据所述油气藏地层参数,在所述分层排水管柱上分段射孔,以形成射孔段;在所述注采气井中下入注采气管柱,进行注气;在所述观察井中进行小层测试,获取小层测试结果;根据所述小层测试结果,确定产气层位,并将其关闭。本发明所述改建储气库的方法及分层注采系统,能够有效降低油气藏内剩余水含量,增加储气库的库容。
The invention discloses a method for rebuilding a gas storage and a layered injection-production system. The method for rebuilding a gas storage includes: obtaining formation parameters of oil and gas reservoirs; respectively setting gas injection and production wells and observation wells on the oil and gas reservoirs; Run a layered drainage pipe string in the observation well, and perforate in sections on the layered drainage pipe string according to the formation parameters of the oil and gas reservoir to form a perforation section; Injecting the gas injection and production string for gas injection; performing sub-layer testing in the observation well to obtain sub-layer test results; determining the gas-producing layer according to the sub-layer test results and closing it. The method for rebuilding the gas storage and the layered injection-production system described in the invention can effectively reduce the remaining water content in the oil and gas reservoir and increase the storage capacity of the gas storage.
Description
技术领域technical field
本发明涉及油气藏改建储气库开发领域,特别涉及一种改建储气库的方法及分层注采系统。The invention relates to the field of oil and gas reservoir reconstruction and development of a gas storage, in particular to a method for rebuilding a gas storage and a layered injection-production system.
背景技术Background technique
地下储气库是储存天然气的一种方式。一般地下储气库是在较深的地下,找到一个完全封闭的构造体,在地面用泵送的办法把天然气注入到这个构造中储存起来。当需要时,又通过生产井把天然气采出到地面输送到用户。地下储气库具有储气量大;安全系数高,不易引发火灾及爆炸;经济效益好,与金属气罐相比储气成本低等优点。此外,地下储气库能够协调供求关系与调峰,实施战略储备,保证供气的可靠性和连续性,且能有助于优化生产系统和输气管网的运行,对于国家安全与区域天然气使用具有极其重要的作用。现有的改建储气库领域中,常见的一种方式为将废弃的油气藏改建为储气库。Underground gas storage is a way to store natural gas. Generally, the underground gas storage is to find a completely closed structure in the deep underground, and pump the natural gas into the structure on the ground for storage. When needed, the natural gas is extracted to the ground through production wells and delivered to users. Underground gas storage has the advantages of large gas storage capacity; high safety factor, not easy to cause fire and explosion; good economic benefits, and low gas storage cost compared with metal gas tanks. In addition, underground gas storage can coordinate the relationship between supply and demand and peak shaving, implement strategic reserves, ensure the reliability and continuity of gas supply, and help optimize the operation of production systems and gas pipeline networks. Use is extremely important. In the existing field of rebuilding gas storages, a common way is to transform abandoned oil and gas reservoirs into gas storages.
一般的,地层发育往往是不均匀的,废弃的油气藏纵向储层上渗透率、孔隙度等参数差异较大,通常废弃的油气藏纵向储层上存在含水层,例如比较典型的为边底水油藏等。针对此类含水层的油气藏,现有的改建方式主要是在地层中靠近油层顶界布置多口注采气井,地层边部布置观察井,通过顶部注气,边部排水,期望通过把气注入水层,用天然气把水挤到边缘,使天然气占据储层空间,以实现改建地下储气库的扩容需求。Generally, the development of formations is often uneven, and the parameters such as permeability and porosity in the vertical reservoirs of abandoned oil and gas reservoirs are quite different. Usually, there are aquifers in the vertical reservoirs of abandoned oil and gas reservoirs, such as the typical edge-bottom water reservoir, etc. For oil and gas reservoirs in such aquifers, the existing reconstruction methods are mainly to arrange multiple gas injection and production wells in the formation near the top boundary of the oil layer, arrange observation wells at the edge of the formation, inject gas through the top, and drain the edge. Inject the water into the water layer, squeeze the water to the edge with natural gas, and make the natural gas occupy the reservoir space, so as to realize the expansion demand of the reconstruction of the underground gas storage.
但是由于地层发育的不均匀性,特别是气体在油层中的流动往往是向着渗透率较好的位置运动,当向在注采气井中注入天然气时,很可能大部分有效气量进入地层中含水层以下,造成气体锥进,从而不仅浪费了天然气,而且不能够将地层中部的水向边部驱赶,不能达到预期设定库容。而相应地,在边部观察井排水过程中,观察井往往出现气、水同产现象,甚至只产气不产水的现象,最终导致注采气井持续高压不能有效注入,边部观察井只产气不产水不能实现有效扩容的目的。However, due to the inhomogeneity of formation development, especially the flow of gas in the oil layer tends to move toward the position with better permeability, when injecting natural gas into the injection-production gas well, it is likely that most of the effective gas will enter the aquifer in the formation Below, gas coning is caused, thereby not only wasting natural gas, and the water in the middle of the formation cannot be driven to the edge, and the expected set storage capacity cannot be achieved. Correspondingly, during the drainage process of the observation wells at the edge, the phenomenon of gas and water co-production often occurs in the observation wells, or even only gas is produced but not water, which eventually leads to the continuous high pressure of the gas injection and production wells that cannot be effectively injected, and the observation wells at the edge only produce gas and water. Gas production without water production cannot achieve the purpose of effective capacity expansion.
发明内容Contents of the invention
本发明的目的是提供一种改建储气库的方法及分层注采系统,能够有效降低油气藏内剩余水含量,增加储气库的库容。The object of the present invention is to provide a method for rebuilding a gas storage and a layered injection-production system, which can effectively reduce the remaining water content in the oil and gas reservoir and increase the storage capacity of the gas storage.
本发明的上述目的可采用下列技术方案来实现:Above-mentioned purpose of the present invention can adopt following technical scheme to realize:
一种改建储气库的方法,其包括:A method for rebuilding a gas storage, comprising:
获取油气藏地层参数;Obtain formation parameters of oil and gas reservoirs;
在所述油气藏上分别设置注采气井和观察井;Setting injection-production gas wells and observation wells on the oil and gas reservoirs;
在所述观察井中下入分层排水管柱,并根据所述油气藏地层参数,在所述分层排水管柱上分段射孔,以形成射孔段;Running a layered drainage string into the observation well, and perforating the layered drainage string in sections according to the formation parameters of the oil and gas reservoir to form a perforation section;
在所述注采气井中下入注采气管柱,进行注气;Lowering the gas injection and production string into the gas injection and production well for gas injection;
在所述观察井中进行小层测试,获取小层测试结果;Carrying out sub-layer testing in the observation well to obtain sub-layer testing results;
根据所述小层测试结果,确定产气层位,并将其关闭。According to the test results of the sub-layers, the gas-producing layers are determined and closed.
在优选的实施方式中,所述注采气井设置在油气藏的中部;所述观察井设置在油气藏的边部,位于所述注采气井周围。In a preferred embodiment, the gas injection and production well is arranged in the middle of the oil and gas reservoir; the observation well is arranged at the edge of the oil and gas reservoir, and is located around the gas injection and production well.
在优选的实施方式中,所述注采气井为水平井,其沿着重力方向,根据所述油气藏地层参数间隔分布。In a preferred embodiment, the gas injection and production wells are horizontal wells, which are distributed at intervals along the gravity direction according to the formation parameters of the oil and gas reservoir.
在优选的实施方式中,所述分层排水管柱的射孔段与满足预定渗透率和孔隙度的小层相连通。In a preferred embodiment, the perforated section of the layered drainage pipe string communicates with a small layer satisfying predetermined permeability and porosity.
在优选的实施方式中,所述小层测试方法包括:In a preferred embodiment, the sublayer testing method includes:
分段开启所述射孔段,使所述分层排水管柱与预定小层相连通;Opening the perforation section in sections, so that the layered drainage pipe string is connected with the predetermined small layer;
获取所述分层排水管柱内分层流入的样品;Obtaining a sample of stratified inflow in the stratified drainage column;
根据所述样品的性质,获取小层测试结果,以确定关闭或开启对应的小层。According to the properties of the sample, the test results of the sub-layers are obtained to determine whether to close or open the corresponding sub-layers.
一种用于改建储气库的方法的分层注采系统,其包括用于注气、采气的注采气管柱和用于观测、排水的分层排水管柱,A layered injection-production system for the method of rebuilding a gas storage, which includes an injection-production gas string for gas injection and gas production and a layered drainage string for observation and drainage,
所述注采气管柱设置在注采气井内,其包括直井段和水平段,所述直井段内设置有第一套管,设置在所述第一套管内的第一油管,以及依次设置在所述第一油管上的井下安全阀、滑套、封隔器、堵塞器坐落短接、测试坐落短接,所述堵塞器坐落短接与所述测试坐落短接之间的第一油管上设置有多个通孔;The gas injection and production string is arranged in the gas injection and production well, which includes a vertical well section and a horizontal section, the first casing is arranged in the vertical well section, the first oil pipe arranged in the first casing, and the The downhole safety valve, sliding sleeve, packer, and plug on the first tubing are located on the short circuit and the test site short circuit, and the plug is located on the first oil pipe between the short circuit site and the test site short circuit a plurality of through holes are provided;
所述分层排水管柱设置在观察井内,其包括第二套管,设置在所述第二套管内的第二油管,以及依次设置在所述第二油管上的井下安全阀、至少一个滑套、至少一个封隔器、堵塞器坐落短接、测试坐落短接,所述第二套管上设置有射孔段,所述射孔段的位置与预定小层相连通。The layered drainage pipe string is set in the observation well, which includes a second casing, a second oil pipe arranged in the second casing, and a downhole safety valve and at least one sliding pipe arranged in sequence on the second oil pipe. The casing, at least one packer, the stopper is short-circuited, and the test is short-circuited. The second casing is provided with a perforation section, and the position of the perforation section is connected to a predetermined small layer.
在优选的实施方式中,所述井下安全阀的两端设置有流动短接,所述流动短接为变直径接头,其直径较大的一端与油管连接,直径较小的一端与所述井下安全阀连接。In a preferred embodiment, both ends of the downhole safety valve are provided with flow shorts, and the flow shorts are variable diameter joints, one end with a larger diameter is connected to the tubing, and the end with a smaller diameter is connected to the downhole Safety valve connection.
在优选的实施方式中,所述油气藏分两层以上,所述分层排水管柱上的封隔器、滑套的数量与油气藏层数一致。In a preferred embodiment, the oil and gas reservoir is divided into more than two layers, and the number of packers and sliding sleeves on the layered drainage string is consistent with the number of layers of the oil and gas reservoir.
在优选的实施方式中,相邻两个所述封隔器之间的第二油管上设置有所述滑套,通过打开所述滑套,能使所述分层排水管柱与预定小层相连通。In a preferred embodiment, the second oil pipe between two adjacent packers is provided with the sliding sleeve, and by opening the sliding sleeve, the layered drainage string can be connected to a predetermined small layer. connected.
在优选的实施方式中,所述第一油管靠近水平段的下端设置有喇叭口。In a preferred embodiment, a bell mouth is provided at the lower end of the first oil pipe near the horizontal section.
本发明的特点和优点是:本发明提供一种改建储气库的方法及分层注采系统,所述改建储气库的方法通过结合油气藏地层参数,在所述观察井中下入分层排水管柱,并根据所述油气藏地层参数,在所述分层排水管柱上分段射孔,以形成射孔段;并在所述观察井中进行小层测试,获取小层测试结果;根据所述小层测试结果,确定产气层位,并将其关闭。所述方法能够针对性地降低油藏内剩余水含量,有效增加储气库的库容,且通过小层测试,能提高注采气井内注入的天然气的利用率,从而在有限油藏储层空间内实现最大限度降低建库成本的目的,特别适用于边底水油藏、高含水油藏等含水层油藏。The characteristics and advantages of the present invention are: the present invention provides a method for rebuilding a gas storage and a layered injection-production system. The method for rebuilding a gas storage combines the stratum parameters of the oil and gas reservoir to lower the layers into the observation well. Drainage string, and according to the stratum parameters of the oil and gas reservoir, perforate in sections on the layered drainage string to form a perforation section; and perform a sublayer test in the observation well to obtain a sublayer test result; According to the test results of the sub-layers, the gas-producing layers are determined and closed. The method can specifically reduce the remaining water content in the oil reservoir, effectively increase the storage capacity of the gas storage, and through the small-layer test, can improve the utilization rate of the injected natural gas in the injection-production gas well, so that in the limited reservoir space It is especially suitable for aquifer reservoirs such as edge-bottom water reservoirs and high water-cut reservoirs.
附图说明Description of drawings
图1是本发明实施例中一种改建储气库的方法的流程图;Fig. 1 is a flow chart of a method for rebuilding a gas storage in an embodiment of the present invention;
图2是本发明实施例中一种改建储气库井网分布示意图;Fig. 2 is a schematic diagram of well pattern distribution of a rebuilt gas storage in an embodiment of the present invention;
图3是本发明实施例中一种改建储气库的方法中小层测试的流程图;Fig. 3 is a flow chart of small-layer testing in a method for rebuilding a gas storage in an embodiment of the present invention;
图4是本发明实施例中一种注采气井内注采气管柱的结构示意图;Fig. 4 is a structural schematic diagram of a gas injection and production string in a gas injection and production well in an embodiment of the present invention;
图5是本发明实施例中一种观察井内分层排水管柱的结构示意图。Fig. 5 is a schematic structural view of a layered drainage pipe column in an observation well in an embodiment of the present invention.
具体实施方式Detailed ways
下面将结合附图和具体实施例,对本发明的技术方案作详细说明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落入本申请所附权利要求所限定的范围内。The technical solution of the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. After reading the present invention, those skilled in the art Modifications to various equivalent forms of the present invention fall within the scope defined by the appended claims of the present application.
本发明的目的是提供一种改建储气库的方法及分层注采系统,能够有效降低油气藏内剩余水含量,增加储气库的库容。The object of the present invention is to provide a method for rebuilding a gas storage and a layered injection-production system, which can effectively reduce the remaining water content in the oil and gas reservoir and increase the storage capacity of the gas storage.
请参阅图1,为本发明实施例中一种改建储气库的方法的流程图。本发明所述改建储气库的方法包括:Please refer to FIG. 1 , which is a flowchart of a method for rebuilding a gas storage in an embodiment of the present invention. The method for rebuilding the gas storage according to the present invention comprises:
S1:获取油气藏地层参数;S1: Obtain formation parameters of oil and gas reservoirs;
S2:在所述油气藏上分别设置注采气井和观察井;S2: setting injection-production gas wells and observation wells on the oil and gas reservoirs;
S3:在所述观察井中下入分层排水管柱,并根据所述油气藏地层参数,在所述分层排水管柱上分段射孔;S3: Running a layered drainage pipe string into the observation well, and perforating the layered drainage pipe string in sections according to the formation parameters of the oil and gas reservoir;
S4:在所述注采气井中下入注采气管柱,进行注气;S4: Running a gas injection and production string into the gas injection and production well to perform gas injection;
S5:在所述观察井中进行小层测试,获取小层测试结果;S5: Perform sublayer testing in the observation well, and obtain sublayer test results;
S6:根据所述小层测试结果,确定产气层位,并将其关闭。S6: According to the test results of the sub-layer, determine the gas-producing layer and close it.
由于地层发育往往是不均匀的,废弃的油气藏纵向储层上渗透率、孔隙度等参数差异较大,通常废弃的油气藏纵向储层上存在含水层,因此在改造之前,需要对获取所改造的废弃油气藏的地层参数。所述地层参数包括油气藏的埋深、厚度、孔隙度、渗透率、温度、压力系统、油藏类型等。Since the formation development is often uneven, the vertical reservoirs of abandoned oil and gas reservoirs have large differences in parameters such as permeability and porosity. Usually, there are aquifers in the vertical reservoirs of abandoned oil and gas reservoirs. Therefore, before the transformation, it is necessary to obtain all Formation parameters of stimulated abandoned oil and gas reservoirs. The formation parameters include buried depth, thickness, porosity, permeability, temperature, pressure system, reservoir type, etc. of oil and gas reservoirs.
请参阅图2,为本发明实施例中一种改建储气库井网分布示意图。所述注采气井1设置在油气藏的中部,所述观察井2设置在油气藏的边部,位于所述注采气井1周围。所述注采气井1的个数通常为多个。所述注采气井1为水平井,其沿着重力方向,根据所述油气藏地层参数间隔分布。例如根据油藏的埋深和厚度等参数,将注采气井1的水平段分布在预定的深度。Please refer to FIG. 2 , which is a schematic diagram of well pattern distribution of a modified gas storage in an embodiment of the present invention. The gas injection and production well 1 is arranged in the middle of the oil and gas reservoir, and the observation well 2 is arranged at the edge of the oil and gas reservoir, and is located around the gas injection and production well 1 . The number of the gas injection and production wells 1 is generally multiple. The gas injection and production wells 1 are horizontal wells, which are distributed at intervals along the direction of gravity according to the formation parameters of the oil and gas reservoir. For example, according to parameters such as buried depth and thickness of the reservoir, the horizontal sections of the injection-production gas well 1 are distributed at predetermined depths.
所述注采气井1采用水平井相对现有的直井来说,更适用于油气藏本身为边底水油藏、高含水油藏等含水型油藏。以边底水油藏为例,利用直井进行开发时,初期产量较高,但是由于水锥现象比较严重,而且后期含水上升快,边底水油藏边底水活跃,地层能力多,压降小,从而导致油藏的采收率大大降低。而当利用水平井进行开发时,由于水平井通过扩大油层泄油面积来提高油井产量,可以大幅度提高单井产量,实现少井高产并可提高油藏最终采收率,增加可采储量。特别的,应用水平井技术开采边底水油藏的过程中,其可以有效控制边底水,以达到高效开采这类油藏的目的。Compared with existing vertical wells, horizontal wells for the injection and production gas wells 1 are more suitable for water-bearing reservoirs such as edge-bottom water reservoirs and high water-cut reservoirs. Taking edge-bottom water reservoirs as an example, when vertical wells are used for development, the initial production is relatively high. However, due to the severe water cone phenomenon and the rapid rise of water cut in the later stage, edge-bottom water reservoirs are active in edge-bottom water reservoirs, with high formation capacity and pressure drop. small, resulting in a significant reduction in oil recovery. When using horizontal wells for development, because horizontal wells can increase the production of oil wells by expanding the drainage area of oil layers, single well production can be greatly increased, high production with fewer wells can be achieved, and ultimate recovery of oil reservoirs can be improved, increasing recoverable reserves. In particular, in the process of exploiting edge-bottom water reservoirs using horizontal well technology, it can effectively control edge-bottom water to achieve efficient exploitation of such reservoirs.
所述分层排水管柱的射孔段位于满足预定渗透率和孔隙度的小层上,使得所述分层排水管柱的射孔能与满足预定渗透率和孔隙度的小层相连通。The perforation section of the layered drainage pipe string is located on the sublayer satisfying the predetermined permeability and porosity, so that the perforation of the layered drainage pipe string can be connected with the small layer satisfying the predetermined permeability and porosity.
通过已知的油藏地层参数,确定分层排水管柱射孔的具体位置。具体的,由于油藏本身不可能完全发育,各油层之间可能存在不连通的隔夹层,可按照隔夹层分段进行射孔。The specific location of the perforation of the layered drainage string is determined by the known formation parameters of the reservoir. Specifically, since the reservoir itself cannot be fully developed, there may be disconnected interlayers between oil layers, and perforation can be carried out in sections according to the interlayers.
所述观察井2与其内部的分层排水管柱之间通过设置封隔器将所述射孔段封隔。相应地,在所述分层排水管柱上与所述射孔段对应的位置,设置有可将所述分层排水管柱与所述观察井的油套环空相连通的开关。所述开关通常为连接于油管上的滑套。所述滑套可实现反复开启和关闭油套环空。The perforated section is isolated by setting a packer between the observation well 2 and the layered drainage pipe string inside. Correspondingly, at the position corresponding to the perforation section on the layered drainage string, there is provided a switch that can communicate the layered drainage string with the oil casing annulus of the observation well. The switch is usually a sliding sleeve connected to the oil pipe. The sliding sleeve can repeatedly open and close the oil sleeve annulus.
在所述观察井2中进行小层测试,获取小层测试结果。具体的,请参阅图3,本发明实施例中一种改建储气库的方法中小层测试的流程图。所述小层测试方法包括:A sublayer test is performed in the observation well 2 to obtain a sublayer test result. Specifically, please refer to FIG. 3 , which is a flow chart of small-layer testing in a method for rebuilding a gas storage in an embodiment of the present invention. Described small layer test method comprises:
S51:分段开启所述射孔段,使所述分层排水管柱与预定小层相连通;S51: Open the perforation section in sections, so that the layered drainage pipe string is connected to a predetermined sublayer;
S52:获取所述分层排水管柱内分层流入的样品;S52: Obtain a sample of stratified inflow in the stratified drainage column;
S53:根据所述样品的性质,获取小层测试结果,以确定关闭或开启对应的小层。S53: According to the properties of the sample, obtain the test results of the sub-layers, so as to determine whether to close or open the corresponding sub-layers.
若所述样品主要为水时,使所述分层排水管柱与所述预定小层保持连通状态,以利于将油藏中的水从所述观察井中排出,以利于有效扩大储气库的库容。当所述样品主要为气时,关闭滑套,使所述分层排水管柱与预定小层相封隔,从而使节约从注采气井注入的天然气,提高其利用率。If the sample is mainly water, keep the layered drainage pipe column in communication with the predetermined small layer, so as to facilitate the water in the oil reservoir to be discharged from the observation well, so as to effectively expand the capacity of the gas storage Storage capacity. When the sample is mainly gas, the sliding sleeve is closed to isolate the layered drainage string from the predetermined sublayer, thereby saving the natural gas injected from the injection-production gas well and improving its utilization rate.
本发明还对应的提出一种用于所述的改建储气库的方法的分层注采系统,其包括用于注气、采气的注采气管柱和用于观测、排水的分层排水管柱。The present invention also correspondingly proposes a layered injection-production system used in the method for rebuilding a gas storage, which includes an injection-production gas string for gas injection and gas production and layered drainage for observation and drainage pipe string.
请参阅图4,为本发明实施例中一种注采气井内注采气管柱的结构示意图。所述注采气管柱是保证为储气库进行正常注气、采气而设计的井下管柱。Please refer to FIG. 4 , which is a schematic structural diagram of a gas injection and production string in a gas injection and production well in an embodiment of the present invention. The gas injection and production string is a downhole string designed to ensure normal gas injection and gas production for the gas storage.
所述注采气管柱设置在注采气井1内其包括直井段10和水平段101,所述直井段10内设置有第一套管1A,设置在所述第一套管1A内的第一油管1B,以及依次设置在所述第一油管1B上的流动短接11、井下安全阀12、滑套13、封隔器14、堵塞器坐落短接15、测试坐落短接17,所述堵塞器坐落短接15与所述测试坐落短接17之间的第一油管1B上设置有多个通孔16。The injection-production gas string is set in the injection-production gas well 1, which includes a vertical well section 10 and a horizontal section 101. The first casing 1A is arranged in the vertical well section 10, and the first casing 1A is arranged in the first casing 1A. The oil pipe 1B, and the flow short 11, downhole safety valve 12, sliding sleeve 13, packer 14, plugger seat short 15, and test seat short 17 arranged on the first oil pipe 1B in sequence. A plurality of through-holes 16 are provided on the first oil pipe 1B between the tester short-circuit 15 and the test short-circuit 17 .
所述流动短接11具体可为变直径接头。其可设置在所述井下安全阀12的两端,分别的一端与油管连接,另一端与所述井下安全阀12连接。与所述井下安全阀12连接的一端相对所述与第一油管1B连接的一端内径小,其能够防止所述井下安全阀12在缩径作用下被冲蚀,从而能够保护所述井下安全阀12,延长其使用寿命。The flow short 11 can specifically be a variable diameter joint. It can be arranged at both ends of the downhole safety valve 12 , with one end connected to the oil pipe and the other end connected to the downhole safety valve 12 . The end connected to the downhole safety valve 12 has a smaller inner diameter than the end connected to the first oil pipe 1B, which can prevent the downhole safety valve 12 from being eroded under the action of diameter reduction, thereby protecting the downhole safety valve. 12. Extend its service life.
所述井下安全阀12,为由液控管线120控制的一种自动井下关井装置,其能够在气井采气出现异常压力需要关井时实现自动关井。The downhole safety valve 12 is an automatic downhole shut-in device controlled by the hydraulic control pipeline 120, which can realize automatic well shut-in when the gas well produces abnormal pressure and needs to be shut down.
所述滑套13,用于打开第一套管1A与所述第一油管1B形成的油套环空,以便于在所述油套环空内进行下入的工具;或在所述油套环空内循环替入套管保护液;或在后期需要更换上部管柱进行压井循环作业。所述滑套13可为循环滑套,可反复开启或关闭所述油套环空。The sliding sleeve 13 is a tool for opening the oil jacket annulus formed by the first casing 1A and the first oil pipe 1B, so as to facilitate running in the oil jacket annulus; The inner circulation of the annulus is replaced by the casing protection fluid; or the upper string needs to be replaced in the later stage to carry out the killing circulation operation. The sliding sleeve 13 can be a circulating sliding sleeve, which can repeatedly open or close the annulus of the oil sleeve.
所述封隔器14,为避免封隔器14之上油套环空承受高压的井下工具。具体的,所述封隔器14为可取封隔器。The packer 14 is a downhole tool for preventing the oil casing annulus above the packer 14 from being subjected to high pressure. Specifically, the packer 14 is an optional packer.
所述堵塞器坐落短接15,为辅助封隔器14进行打压坐封时的一个井下工具。具体的,其为具有内台阶面的井下工具,所述台阶面用于和堵塞器相匹配。打压坐封时,将堵塞器投至所述堵塞器坐落短接15上,以封闭油管进行打压作业。The plug is located on the short-circuit 15, which is a downhole tool for the auxiliary packer 14 to pressurize and set. Specifically, it is a downhole tool with an inner stepped surface for matching with a plug. When pressing and setting the seal, the plug is thrown onto the short connection 15 of the plug to close the oil pipe for pressing.
所述测试坐落短接17,用于在井下安置测试工具。具体的,其为具有内台阶面的井下工具,所述台阶面用于和测试工具相匹配。The test sits short 17 for placing test tools downhole. Specifically, it is a downhole tool with an inner stepped surface, and the stepped surface is used to match with the testing tool.
在进行生产测试时,需要在所述测试坐落短接17上长期投入井下压力测试工具,为了不影响正常生产,在所述堵塞器坐落短接15与所述测试坐落短接17之间的第一油管1B上设置有多个通孔16,作为备用生产通道。When carrying out production testing, it is necessary to put downhole pressure testing tools on the test set short-circuit 17 for a long time. An oil pipe 1B is provided with a plurality of through holes 16 as backup production channels.
所述第一油管1B靠近水平段101的下端设置有喇叭口18。所述喇叭口18,沿着重力方向直径逐渐变大,当通过所述第一油管1B向下注气时,其与下部的水具有较大的接触面积,从而有利于更好地将水沿着水平段101向观察井2推进。The lower end of the first oil pipe 1B near the horizontal section 101 is provided with a bell mouth 18 . The diameter of the bell mouth 18 gradually becomes larger along the direction of gravity. When the gas is injected downward through the first oil pipe 1B, it has a larger contact area with the water in the lower part, which is beneficial to better transport the water along the direction of gravity. The horizontal section 101 advances toward the observation well 2.
请参阅图5,为本发明实施例中一种观察井内分层排水管柱的结构示意图。所述观察井2布置于储气库边界,在所述观察井2内设置分层排水管柱,不仅能够用于监测压力并进行后期排水扩容,同时还具有注采气井的部分功能。Please refer to FIG. 5 , which is a schematic structural diagram of a layered drainage pipe column in an observation well in an embodiment of the present invention. The observation well 2 is arranged at the boundary of the gas storage, and the layered drainage pipe string is set in the observation well 2, which can not only be used for monitoring pressure and performing drainage and capacity expansion in the later stage, but also has some functions of gas injection and production wells.
所述分层排水管柱设置在观察井2内,其包括第二套管2A,设置在所述第二套管2A内的第二油管2B,以及依次设置在所述第二油管2B上的流动短接11、井下安全阀12、至少一个滑套13、至少一个封隔器14、堵塞器坐落短接15、测试坐落短接17,所述第二套管2A上设置有射孔段,所述射孔段的位置与预定小层相连通。The layered drainage string is set in the observation well 2, which includes a second casing 2A, a second oil pipe 2B arranged in the second casing 2A, and a second oil pipe 2B arranged in turn on the second oil pipe 2B. Flow short 11, downhole safety valve 12, at least one sliding sleeve 13, at least one packer 14, plugging short 15, testing short 17, the second casing 2A is provided with a perforation section, The position of the perforation section communicates with a predetermined sublayer.
所述第二油管2B上的流动短接11、井下安全阀12、滑套13、封隔器14、堵塞器坐落短接15、测试坐落短接17其结构和作用与所述第一油管1B上的相同。The flow short 11, downhole safety valve 12, sliding sleeve 13, packer 14, stopper short 15, and test short 17 on the second oil pipe 2B have the same structure and function as the first oil pipe 1B. same as above.
所述压力计托筒19能在后期测试、生产时用于监测后期测试、生产时井筒内压力和温度。The pressure gauge holder 19 can be used to monitor the pressure and temperature in the wellbore during later testing and production.
一般的,所述油气藏分两层以上,所述分层排水管柱上的封隔器、滑套的数量与油气藏层数一致。如图5所述,当所述油气藏分两层,即所述预定小层3包括:第一油气层31和第二油气层32。相应地,所述滑套13包括第一滑套131和第二滑套132;所述封隔器14包括:上下布置的第一封隔器141和第二封隔器142。相邻两个所述封隔器14之间的第二油管2B上设置有所述第二滑套132,通过打开所述第二滑套132,能使所述分层排水管柱与预定小层3相连通。Generally, the oil and gas reservoir is divided into more than two layers, and the number of packers and sliding sleeves on the layered drainage string is consistent with the number of layers of the oil and gas reservoir. As shown in FIG. 5 , when the oil and gas reservoir is divided into two layers, that is, the predetermined small layer 3 includes: a first oil and gas layer 31 and a second oil and gas layer 32 . Correspondingly, the sliding sleeve 13 includes a first sliding sleeve 131 and a second sliding sleeve 132; the packer 14 includes: a first packer 141 and a second packer 142 arranged up and down. The second oil pipe 2B between two adjacent packers 14 is provided with the second sliding sleeve 132. By opening the second sliding sleeve 132, the layered drainage string can be aligned with a predetermined small Layer 3 is connected.
进行扩容时,在所述注采气井1中进行注气;在所述观察井2中进行小层测试,获取小层测试结果,根据所述小层测试结果,确定产气层位,并将其关闭。具体的,先使所述第二油气层32在所述分层排水管柱保持连通,并对所述对流入所述分层排水管柱内的物质进行取样分析。若所取得的样品为水,则保持所述第二油气层32与所述分层排水管柱保持连通;若所取得的样品主要为气体,可通过投入堵塞器关闭下层,使所述第二油气层32与所述分层排水管柱之间不连通。When expanding capacity, perform gas injection in the injection-production gas well 1; perform sub-layer testing in the observation well 2 to obtain sub-layer test results, determine the gas-producing layer according to the sub-layer test results, and place its off. Specifically, the second oil and gas layer 32 is kept connected in the layered drainage column, and the substances flowing into the layered drainage column are sampled and analyzed. If the obtained sample is water, then keep the second oil and gas layer 32 in communication with the layered drainage column; if the obtained sample is mainly gas, the lower layer can be closed by dropping a plug so that the second There is no communication between the oil and gas layer 32 and the layered drainage pipe string.
若所述第二油气层32内产出为水,则在所述分层排水管柱内投入堵塞器,使其坐落在所述堵塞器坐落短接15上,以使所述分层排水管柱不与所述第二油气层32相连通。If water is produced in the second oil and gas layer 32, a plug is put into the layered drainage column so that it sits on the short-circuit 15 of the plug so that the layered drainage pipe The column does not communicate with the second oil and gas layer 32 .
打开所述第二滑套132使所述分层排水管柱与第一油气层31相连通,获取所述分层排水管柱内分层流入的样品;并对所述对流入所述分层排水管柱内的样品进行取样分析,若所取得的样品为水,则保持所述第一油气层31与所述分层排水管柱保持连通;若所取得的样品主要为气体,则关闭所述第二滑套132,使所述第以油气层32与所述分层排水管柱之间不连通。Open the second sliding sleeve 132 to make the layered drainage pipe column communicate with the first oil and gas layer 31, and obtain the sample of stratified inflow in the layered drainage pipe column; Samples in the drainage column are sampled and analyzed, if the obtained sample is water, then keep the first oil and gas layer 31 in communication with the layered drainage column; if the obtained sample is mainly gas, then close the The second sliding sleeve 132 is used to prevent communication between the second oil and gas layer 32 and the layered drainage pipe column.
本发明提供一种改建储气库的方法及分层注采系统,所述改建储气库的方法通过结合油气藏地层参数,在所述观察井中下入分层排水管柱,并根据所述油气藏地层参数,在所述分层排水管柱上分段射孔,以形成射孔段;并在所述观察井中进行小层测试,获取小层测试结果;根据所述小层测试结果,确定产气层位,并将其关闭。所述方法能够针对性地降低油藏内剩余水含量,有效增加储气库的库容,且通过小层测试,能提高注采气井内注入的天然气的利用率,从而在有限油藏储层空间内实现最大限度降低建库成本的目的,特别适用于边底水油藏、高含水油藏等含水层油藏。The invention provides a method for rebuilding a gas storage and a layered injection-production system. The method for rebuilding a gas storage combines the stratum parameters of oil and gas reservoirs, and runs a layered drainage string in the observation well, and according to the Formation parameters of oil and gas reservoirs, perforating in sections on the layered drainage pipe string to form perforation sections; and performing sub-layer testing in the observation well to obtain sub-layer test results; according to the sub-layer test results, Identify gas-producing horizons and close them. The method can specifically reduce the remaining water content in the oil reservoir, effectively increase the storage capacity of the gas storage, and through the small-layer test, can improve the utilization rate of the injected natural gas in the injection-production gas well, so that in the limited reservoir space It is especially suitable for aquifer reservoirs such as edge-bottom water reservoirs and high water-cut reservoirs.
以上所述仅为本发明的几个实施例,虽然本发明所揭露的实施方式如上,但所述内容只是为了便于理解本发明而采用的实施方式,并非用于限定本发明。任何本发明所属技术领域的技术人员,在不脱离本发明所揭露的精神和范围的前提下,可以在实施方式的形式上及细节上作任何的修改与变化,但本发明的专利保护范围,仍须以所附权利要求书所界定的范围为准。The above descriptions are only a few embodiments of the present invention. Although the disclosed embodiments of the present invention are as above, the content described above is only for the convenience of understanding the present invention, and is not intended to limit the present invention. Any person skilled in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention is Still, the scope defined by the appended claims shall prevail.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510205438.8A CN104879167B (en) | 2015-04-27 | 2015-04-27 | Method for rebuilding gas storage and layered injection and production system thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510205438.8A CN104879167B (en) | 2015-04-27 | 2015-04-27 | Method for rebuilding gas storage and layered injection and production system thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104879167A true CN104879167A (en) | 2015-09-02 |
| CN104879167B CN104879167B (en) | 2017-02-01 |
Family
ID=53946818
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510205438.8A Active CN104879167B (en) | 2015-04-27 | 2015-04-27 | Method for rebuilding gas storage and layered injection and production system thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104879167B (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106894796A (en) * | 2017-01-09 | 2017-06-27 | 神华集团有限责任公司 | Inject a gas into method and device, the equipment on stratum |
| CN107313760A (en) * | 2016-04-26 | 2017-11-03 | 中国石油化工股份有限公司 | The method that layer steam injection improves development result of heavy oil reservoirs |
| CN111140202A (en) * | 2020-01-13 | 2020-05-12 | 中国石油天然气股份有限公司 | Deep well and ultra-deep well integrated production completion pipe string and operation method thereof |
| CN111878168A (en) * | 2020-07-09 | 2020-11-03 | 中国地质大学(武汉) | A method and system for storing natural gas and heating by utilizing abandoned mines |
| CN115110927A (en) * | 2021-03-23 | 2022-09-27 | 中国石油天然气股份有限公司 | Shaft cluster type underground gas storage method and device suitable for gas injection development mode and using method of device |
| CN115199263A (en) * | 2021-04-13 | 2022-10-18 | 中石化石油工程技术服务有限公司 | A method for determining the injection-production layer of a single well in an underground gas storage |
| CN115977584A (en) * | 2023-01-04 | 2023-04-18 | 常州大学 | Method and device for revamping heavy oil reservoir gas storage after fire flooding |
| CN116220571A (en) * | 2021-12-06 | 2023-06-06 | 中国石油天然气股份有限公司 | Injection-production integrated device and method for gas storage |
| CN119163477A (en) * | 2024-09-13 | 2024-12-20 | 长江大学 | A construction method for converting abandoned oil and gas wells through karst caves into gas storage |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202900175U (en) * | 2012-07-26 | 2013-04-24 | 中国石油天然气股份有限公司 | Pressure measuring well completion pipe string for suspension pressure gauge of gas storage |
| CN103089306A (en) * | 2011-11-03 | 2013-05-08 | 大港油田集团有限责任公司 | Method for constructing underground gas storage by depleted oil-gas reservoir |
| CN203959096U (en) * | 2014-06-30 | 2014-11-26 | 中国石油天然气股份有限公司 | Well completion pipe string for observation well of gas storage reservoir |
-
2015
- 2015-04-27 CN CN201510205438.8A patent/CN104879167B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103089306A (en) * | 2011-11-03 | 2013-05-08 | 大港油田集团有限责任公司 | Method for constructing underground gas storage by depleted oil-gas reservoir |
| CN202900175U (en) * | 2012-07-26 | 2013-04-24 | 中国石油天然气股份有限公司 | Pressure measuring well completion pipe string for suspension pressure gauge of gas storage |
| CN203959096U (en) * | 2014-06-30 | 2014-11-26 | 中国石油天然气股份有限公司 | Well completion pipe string for observation well of gas storage reservoir |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107313760A (en) * | 2016-04-26 | 2017-11-03 | 中国石油化工股份有限公司 | The method that layer steam injection improves development result of heavy oil reservoirs |
| CN107313760B (en) * | 2016-04-26 | 2019-09-24 | 中国石油化工股份有限公司 | The method of layer steam injection improvement development result of heavy oil reservoirs |
| CN106894796A (en) * | 2017-01-09 | 2017-06-27 | 神华集团有限责任公司 | Inject a gas into method and device, the equipment on stratum |
| CN106894796B (en) * | 2017-01-09 | 2019-11-15 | 神华集团有限责任公司 | Method, device and equipment for injecting gas into formation |
| CN111140202A (en) * | 2020-01-13 | 2020-05-12 | 中国石油天然气股份有限公司 | Deep well and ultra-deep well integrated production completion pipe string and operation method thereof |
| CN111878168B (en) * | 2020-07-09 | 2021-11-30 | 中国地质大学(武汉) | Method and system for storing natural gas and supplying heat by using abandoned mine |
| CN111878168A (en) * | 2020-07-09 | 2020-11-03 | 中国地质大学(武汉) | A method and system for storing natural gas and heating by utilizing abandoned mines |
| CN115110927A (en) * | 2021-03-23 | 2022-09-27 | 中国石油天然气股份有限公司 | Shaft cluster type underground gas storage method and device suitable for gas injection development mode and using method of device |
| CN115110927B (en) * | 2021-03-23 | 2024-03-26 | 中国石油天然气股份有限公司 | Shaft cluster type underground gas storage method and device suitable for gas injection development mode and use method of device |
| CN115199263A (en) * | 2021-04-13 | 2022-10-18 | 中石化石油工程技术服务有限公司 | A method for determining the injection-production layer of a single well in an underground gas storage |
| CN116220571A (en) * | 2021-12-06 | 2023-06-06 | 中国石油天然气股份有限公司 | Injection-production integrated device and method for gas storage |
| CN115977584A (en) * | 2023-01-04 | 2023-04-18 | 常州大学 | Method and device for revamping heavy oil reservoir gas storage after fire flooding |
| CN119163477A (en) * | 2024-09-13 | 2024-12-20 | 长江大学 | A construction method for converting abandoned oil and gas wells through karst caves into gas storage |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104879167B (en) | 2017-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104879167B (en) | Method for rebuilding gas storage and layered injection and production system thereof | |
| CA2757950C (en) | Ported packer | |
| RU2365747C2 (en) | Method for gas production from underground formation (versions) | |
| CN106354983B (en) | A kind of determining CO2The method for burying risk of leakage monitoring point | |
| RU2548291C2 (en) | Method of reservoir hydraulic fracturing with selective flow injection | |
| Checkai et al. | Towards a frequency distribution of effective permeabilities of leaky wellbores | |
| CN110924899A (en) | Coal bed gas yield increasing transformation method and development method | |
| Sheng | Cyclic steam stimulation | |
| RU2473790C1 (en) | System of well operation using submersible electric pump by means of packers with cable entry | |
| Rodrigues et al. | Horizontal well completion and stimulation techniques—A review with emphasis on low-permeability carbonates | |
| CN109681138B (en) | Method for lifting and discharging halogen pipes | |
| US9957787B2 (en) | Method of enhanced oil recovery from lateral wellbores | |
| CA2902591C (en) | Axially segmented depletion operations in horizontal wells | |
| CN105257288A (en) | Method for determining tight reservoir original reservoir pressure based on injection pressure decline well testing technology | |
| CN104271878A (en) | Steam anti-coning/cresting technology (SACT) remediation process | |
| Young et al. | Alaskan Heavy Oil: First CHOPS at a vast, untapped arctic resource | |
| Qin et al. | Water problems and control techniques in heavy oils with bottom Aquifers | |
| RU2626500C1 (en) | Method of development of bituminous oil reservoir from horizontal well | |
| RU2601707C1 (en) | Method of development of oil and gas condensate deposit | |
| Anthony et al. | Inverted ESP Changing the Game in Water Coning Control in Water Drive Reservoirs-North Kuwait Case Study | |
| RU2570178C1 (en) | Method of production string sealing | |
| CA2815410A1 (en) | Steam anti-coning/cresting technology (sact) remediation process | |
| Aglyamov et al. | Advanced Control of Coiled Tubing Downhole Tools Addresses Extreme Permeability Contrast of Carbonate Water Injectors and Leads to Unprecedented Reservoir Sweep Efficiency | |
| Muradji et al. | Combining cyclic steam stimulation and solvent injection for increasing heat efficiency | |
| Bybee | Alaskan Heavy Oil: First CHOPS at an Untapped Arctic Resource |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| EXSB | Decision made by sipo to initiate substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |