[go: up one dir, main page]

CN104333042A - Energy storage current transformer grid connection and grid disconnection seamless switching device and method - Google Patents

Energy storage current transformer grid connection and grid disconnection seamless switching device and method Download PDF

Info

Publication number
CN104333042A
CN104333042A CN201410654823.6A CN201410654823A CN104333042A CN 104333042 A CN104333042 A CN 104333042A CN 201410654823 A CN201410654823 A CN 201410654823A CN 104333042 A CN104333042 A CN 104333042A
Authority
CN
China
Prior art keywords
grid
energy storage
point switch
controller
storage converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410654823.6A
Other languages
Chinese (zh)
Inventor
柳劲松
曹智慧
李正力
张建兴
陈世峰
时珊珊
张宇
刘隽
刘舒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Xuji Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Xuji Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd, Xuji Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201410654823.6A priority Critical patent/CN104333042A/en
Publication of CN104333042A publication Critical patent/CN104333042A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an energy storage current transformer grid connection and grid disconnection seamless switching device and an energy storage current transformer grid connection and grid disconnection seamless switching method. The energy storage current transformer grid connection and disconnection seamless switching device is connected with a power grid monitoring system and a grid connection point switch, and comprises an energy storage current transformer, a controller, a battery management system, a battery pack and a first transformer, wherein the controller is connected with the power grid monitoring system, the energy storage current transformer and the battery management system, the battery pack is connected with the energy storage current transformer and the battery management system, the energy storage current transformer is connected with a first power grid bus through the first transformer, the controller is provided with a first interface connected with a voltage transformer, a second interface connected with the grid connection point switch and a third interface connected with a grid connection point switch position node, and the voltage transformer is arranged above the grid connection point switch. Compared with the prior art, the energy storage current transformer grid connection and grid disconnection seamless switching device and the energy storage current transformer grid connection and grid disconnection seamless switching method have the advantages of being capable of achieving high precision synchronism of grid disconnection to grid connection switching, achieving smooth grid connection to grid disconnection switching, being independent of a communication network and the like.

Description

一种储能变流器并离网无缝切换控制装置及方法A control device and method for seamless switching of energy storage converters on-grid and off-grid

技术领域technical field

本发明涉及微电网控制领域,尤其是涉及一种储能变流器并离网无缝切换控制装置及方法。The invention relates to the field of micro-grid control, in particular to an energy storage converter and an off-grid seamless switching control device and method.

背景技术Background technique

大规模储能技术属于科技前沿技术,目前只有中国、欧盟、美国等少数发达国家开展本项技术研究,并取得了一定研究成果,但是多项技术瓶颈尚未得到突破。国内有部分高校、科研院所及设备厂商也开始进行储能变流器并离网无缝切换的相关研究,并且技术路线各不相同,且技术在工程应用时尚不成熟,主要存在以下几个突出问题:Large-scale energy storage technology is a cutting-edge technology. At present, only a few developed countries such as China, the European Union, and the United States have carried out research on this technology and achieved certain research results. However, many technical bottlenecks have not yet been broken through. Some domestic universities, scientific research institutes and equipment manufacturers have also begun to carry out related research on energy storage converters and off-grid seamless switching, and the technical routes are different, and the technology is immature in engineering application, mainly in the following aspects Outstanding issue:

1)储能变流器并网转离网运行时,无法实现负载不失电及存在离网启动瞬间存在较大电压波动;1) When the energy storage converter is connected to the grid and switched to off-grid operation, it is impossible to realize the load without power loss and there is a large voltage fluctuation at the moment of off-grid startup;

2)储能变流器离网转并网运行时(尤其是转到弱电网运行时,如柴发),无法平滑切换冲击电网导致弱电网故障,及对储能变流器所带储能电池产生瞬间大电流冲击;2) When the energy storage converter is switched from off-grid to grid-connected operation (especially when it is switched to weak grid operation, such as diesel generators), it cannot smoothly switch to impact the grid, resulting in failure of the weak grid, and the energy storage converter carried by the energy storage converter The battery generates an instantaneous high current shock;

3)储能变流器自身无法完成自动同期功能,并离网切换严重依赖配置的并离网控制装置的检同期控制精度;3) The energy storage converter itself cannot complete the automatic synchronization function, and the off-grid switching is heavily dependent on the synchronous detection and control accuracy of the configured on-grid and off-grid control device;

4)当并网点开关不是高速电子开关时,由于开关每次动作时间不一致及开关位置结点返回时间长,因此无法准确预测开关合闸时间点,进而会造成离网转并网时冲击电网及储能变流器所带储能电池产生瞬间大电流冲击;4) When the grid-connection point switch is not a high-speed electronic switch, due to the inconsistency of each action time of the switch and the long return time of the switch position node, it is impossible to accurately predict the closing time point of the switch, which will cause impact on the grid and The energy storage battery attached to the energy storage converter produces an instantaneous high current impact;

5)储能变流器离网转并网同期过程中严重依赖通信网络传输并网点电网电压幅值相角等信息。5) The energy storage converter relies heavily on the communication network to transmit information such as the voltage amplitude and phase angle of the grid at the grid-connected point during the synchronization process of the energy storage converter from the grid to the grid.

目前储能变流器并离网切换还需要配置并离网切换装置来实现,现有的并离网切换装置主要存在以下缺点:At present, the on-grid and off-grid switching of energy storage converters still needs to be realized by configuring on-grid and off-grid switching devices. The existing on-grid and off-grid switching devices mainly have the following disadvantages:

1)并离网切换装置同期控制精度差,导致储能变流器无法离网转并网平滑切换冲击电网导致弱电网故障,及对储能变流器所带储能电池产生瞬间大电流冲击;1) The synchronous control accuracy of the off-grid switching device is poor, resulting in the inability of the energy storage converter to switch smoothly from off-grid to grid-connected, impacting the power grid, causing a weak grid failure, and causing an instantaneous high current impact on the energy storage battery of the energy storage converter ;

2)并离网切换装置在分合并网点开关后,判断开关位置时间延时较长,也会造成并离网切换存在冲击,以及无法实现无缝切换;2) After the on-grid and off-grid switching device separates and merges the outlet switch, the time delay in judging the switch position is long, which will also cause impact on the on-grid and off-grid switching, and seamless switching cannot be achieved;

3)并网点开关动作时间和位置结点返回时间一致性较差时,也会造成并离网切换过程存在冲击,以及无法实现无缝切换;3) When the consistency of the switch action time of the grid-connected point and the return time of the position node is poor, it will also cause impacts in the grid-connected and off-grid switching process, and seamless switching cannot be achieved;

4)并离网切换装置通过通信网络传输并网点电压幅值、频率等信息给储能变流器,当在并离网切换时由于通信实时性无法保证,也会造成并离网切换存在电流冲击,无法实现无缝切换;4) The on-grid and off-grid switching device transmits information such as the voltage amplitude and frequency of the on-grid point to the energy storage converter through the communication network. When switching on and off the grid, the real-time communication cannot be guaranteed, which will also cause currents in the on-grid and off-grid switching. Shock, unable to achieve seamless switching;

5)现有并离网切换是由并离网切换装置与储能变流器配合完成,控制实时性差,且成本高。5) The existing on-grid and off-grid switching is completed by the cooperation of the on-grid and off-grid switching device and the energy storage converter, and the real-time control is poor and the cost is high.

发明内容Contents of the invention

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种能实现离网转并网高精度同期、实现并离网平滑切换的储能变流器并离网无缝切换控制装置及方法。The purpose of the present invention is to overcome the above-mentioned defects in the prior art and provide an energy storage converter seamless switching control device for grid-connection and grid-connection, which can realize high-precision synchronism from off-grid to grid-connection, and realize smooth switching between grid-connection and grid-connection. method.

本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:

一种储能变流器并离网无缝切换控制装置,分别连接电网监控系统和并网点开关,该控制装置包括储能变流器、控制器、电池管理系统、电池组和第一变压器,所述的控制器分别连接电网监控系统、储能变流器、和电池管理系统,所述的电池组分别连接储能变流器和电池管理系统,所述的储能变流器通过第一变压器与第一电网母线连接,所述的控制器上设有用于连接电压互感器的第一接口、用于连接并网点开关的第二接口以及用于连接并网点开关位置结点的第三接口,所述的电压互感器设在并网点开关的上侧。An energy storage converter connected to and off-grid seamless switching control device, respectively connected to a grid monitoring system and a grid-connected point switch, the control device includes an energy storage converter, a controller, a battery management system, a battery pack and a first transformer, The controller is respectively connected to the grid monitoring system, the energy storage converter, and the battery management system, the battery pack is respectively connected to the energy storage converter and the battery management system, and the energy storage converter is connected to the first The transformer is connected to the first power grid bus, and the controller is provided with a first interface for connecting a voltage transformer, a second interface for connecting a grid-connection point switch, and a third interface for connecting a grid-connection point switch position node , the voltage transformer is arranged on the upper side of the grid-connected point switch.

所述的控制器通过局域网与电网监控系统连接。The controller is connected with the power grid monitoring system through a local area network.

所述的控制器内设有并网点上侧三相电压电流采样回路,该采样回路与电压互感器连接。The controller is provided with a three-phase voltage and current sampling loop on the upper side of the grid connection point, and the sampling loop is connected with a voltage transformer.

一种储能变流器并离网无缝切换控制方法,包括计划性并离网切换控制和非计划性并离网切换控制,其中,A control method for seamless on-off grid switching of energy storage converters, including planned on-grid switching control and unplanned on-grid switching control, wherein,

所述的计划性并离网切换控制具体为:控制器接收到电网监控系统下发的并网转离网指令后,控制器通过并网转离网控制逻辑完成对并网点开关的分闸操作,并使储能变流器进入离网运行模式;控制器接收到电网监控系统下发的离网转并网指令后,控制器通过离网转并网控制逻辑完成对并网点开关的合闸操作,并使储能变流器进入并网运行模式;The planned grid-connection and off-grid switching control is specifically: after the controller receives the grid-connection and off-grid instruction issued by the grid monitoring system, the controller completes the opening operation of the grid-connection point switch through the grid-connection and off-grid control logic , and make the energy storage converter enter the off-grid operation mode; after the controller receives the off-grid to grid-connected command issued by the grid monitoring system, the controller completes the closing of the grid-connected point switch through the off-grid to grid-connected control logic operation, and make the energy storage converter enter the grid-connected operation mode;

所述的非计划性并离网切换控制具体为:控制器通过设在并网点开关上侧的电压互感器检测到孤岛保护动作后,自动控制并网点开关分闸,并使储能变流器进入离网运行模式;控制器通过电压互感器检测到并网点开关上侧带电后,自动控制并网点开关合闸,并使储能变流器进入并网运行模式。The unplanned on-grid and off-grid switching control is specifically: after the controller detects the island protection action through the voltage transformer installed on the upper side of the grid-connected point switch, it automatically controls the switch-off of the grid-connected point switch, and makes the energy storage converter Enter the off-grid operation mode; after the controller detects that the upper side of the grid-connected point switch is live through the voltage transformer, it automatically controls the grid-connected point switch to close, and makes the energy storage converter enter the grid-connected operation mode.

计划性并离网切换控制中,所述的并网转离网控制逻辑具体为:控制器发送并网点开关分闸指令,在快速检出并网点开关分闸10ms内将储能变流器切换至离网运行模式;所述的离网转并网控制逻辑具体为:控制器发送并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器切换至并网运行模式。In the planned grid-connected and off-grid switching control, the grid-connected to off-grid control logic is specifically: the controller sends the grid-connected point switch opening command, and switches the energy storage converter within 10 ms of quickly detecting the grid-connected point switch opening to the off-grid operation mode; the off-grid to grid-connected control logic is specifically: the controller sends the grid-connected point switch closing command, and switches the energy storage converter to the grid-connected within 10ms after quickly detecting the grid-connected point switch closing run mode.

所述的非计划性并离网切换控制中,控制器检测到孤岛保护动作的同时,发出并网点开关分闸指令,并延时10ms将储能变流器切换至离网运行模式;控制器检测到并网点开关上侧带电后,发出并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器切换至并网运行模式。In the above-mentioned unplanned on-off grid switching control, when the controller detects the island protection action, it issues an opening command of the grid-connecting point switch, and switches the energy storage converter to the off-grid operation mode with a delay of 10 ms; the controller After detecting that the upper side of the grid-connected point switch is charged, a command to close the grid-connected point switch is issued, and the energy storage converter is switched to the grid-connected operation mode within 10ms of the rapid detection of the grid-connected point switch closing.

所述的快速检出并网点开关分闸或合闸的判据为判断并网点开关位置结点变位或并网点三相瞬时功率突变。The criterion for quickly detecting the opening or closing of the grid-connection point switch is judging the position node displacement of the grid-connection point switch or the sudden change of the three-phase instantaneous power of the grid-connection point.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1)在控制器内设置并网点开关上侧三相电压电流采样回路、并网点开关分合闸控制接口及开关位置结点接口,同时可检测并网点电压和电流,能够解决储能变流器无需并离网切换装置即能实现离网转并网高精度同期的问题;1) Set the three-phase voltage and current sampling circuit on the upper side of the grid-connected point switch, the opening and closing control interface of the grid-connected point switch, and the switch position node interface in the controller. At the same time, the voltage and current of the grid-connected point can be detected to solve the problem of energy storage converters. The problem of realizing high-precision synchronism from off-grid to grid-connected without the need for an off-grid switching device;

2)控制器内集成并离网无缝切换接口及逻辑控制功能,不依赖于并离网切换装置及通信网络完成并离网无缝切换;2) The controller integrates the on-off grid seamless switching interface and logic control function, and does not rely on the on-grid switching device and the communication network to complete the on-off grid seamless switching;

3)控制方法不依赖于并网点开关类型及动作时间,能够在并网点选用不同类型开关情况下,实现并离网平滑的无缝切换,进而保证在储能变流器并离网切换时,负载可靠稳定运行;3) The control method does not depend on the switch type and action time of the grid-connected point, and can realize smooth and seamless switching between grid-connected and off-grid when different types of switches are selected at the grid-connected point, thereby ensuring that when the energy storage converter is switched on and off the grid, Reliable and stable load operation;

4)控制方法在并离网切换时,对储能变流器及电网无冲击,因此也适用于短路容量小的电网;4) The control method has no impact on the energy storage converter and the grid when switching between on-grid and off-grid, so it is also suitable for grids with small short-circuit capacity;

5)控制方法支持多台储能变流器并联运行,因此易于系统扩容;5) The control method supports the parallel operation of multiple energy storage converters, so it is easy to expand the system;

6)在并离网切换过程中,控制器本身可自动完成并网同期功能;6) During the switching process of on-grid and off-grid, the controller itself can automatically complete the synchronous function of on-grid;

7)很好的解决了工程应用中储能变流器并离网无缝切换问题,对储能关键技术的发展具有极其重要的意义。7) It solves the problem of seamless switching between energy storage converters and off-grid in engineering applications, which is of great significance to the development of key energy storage technologies.

附图说明Description of drawings

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

如图1所示,一种储能变流器并离网无缝切换控制装置,分别连接电网监控系统1和并网点开关3,该控制装置包括储能变流器6、控制器4、电池管理系统5、电池组7和第一变压器9,控制器4通过局域网与电网监控系统1连接,并分别连接储能变流器6、和电池管理系统5,电池组7分别连接储能变流器6和电池管理系统5,储能变流器6通过第一变压器9与第一电网母线12连接。控制器4上设有用于连接电压互感器10的第一接口、用于连接并网点开关3的第二接口以及用于连接并网点开关位置结点11的第三接口,电压互感器10设在并网点开关3的上侧,并网点开关3通过第二变压器13与第二电网母线2连接,控制器4内设有并网点上侧三相电压电流采样回路,该采样回路与电压互感器10连接,控制器4可根据采集到的电压电流信号,获得并网点上侧三相功率。并网点上侧三相电压电流采样回路用作并网转离网及离网转并网的同期判断;控制器通过逻辑判断直接控制并网点开关分合闸,并实时通过与并网点开关位置结点11连接的第三接口检测并网点开关位置。控制器4除完成对储能变流器6的控制外,还承担接收电网监控系统1下发的并离网切换控制指令的传递,以实现储能变流器的并离网无缝切换。本实施例中,第一电网母线12为10kV电压等级电网,第二电网母线2为10kV及以上电压等级电网,第一电网母线12上连接有重要负荷8。As shown in Figure 1, a control device for seamless switching between grid-connected and off-grid energy storage converters is connected to the grid monitoring system 1 and the grid-connected point switch 3 respectively. The control device includes an energy storage converter 6, a controller 4, a battery The management system 5, the battery pack 7 and the first transformer 9, the controller 4 are connected to the power grid monitoring system 1 through a local area network, and are respectively connected to the energy storage converter 6 and the battery management system 5, and the battery pack 7 is respectively connected to the energy storage converter The energy storage converter 6 and the battery management system 5 are connected to the first grid bus 12 through the first transformer 9 . The controller 4 is provided with a first interface for connecting the voltage transformer 10, a second interface for connecting the grid connection point switch 3 and a third interface for connecting the grid connection point switch position node 11, and the voltage transformer 10 is located at On the upper side of the grid-connected point switch 3, the grid-connected point switch 3 is connected to the second grid bus 2 through the second transformer 13, and the controller 4 is provided with a three-phase voltage and current sampling circuit on the upper side of the grid-connected point, and the sampling circuit is connected to the voltage transformer 10 connected, the controller 4 can obtain the upper side three-phase power of the grid-connected point according to the collected voltage and current signals. The three-phase voltage and current sampling loop on the upper side of the grid-connected point is used for synchronous judgment of grid-connected to off-grid and off-grid to grid-connected; the controller directly controls the opening and closing of the grid-connected point switch through logical judgment, and real-time combination with the grid-connected point switch position The third interface connected to point 11 detects the position of the grid-connected point switch. In addition to completing the control of the energy storage converter 6, the controller 4 is also responsible for receiving the transmission of the on-grid switching control command issued by the grid monitoring system 1, so as to realize the seamless switching of the energy storage converter on the grid and off-grid. In this embodiment, the first grid bus 12 is a grid with a voltage level of 10kV, the second grid bus 2 is a grid with a voltage level of 10kV and above, and the first grid bus 12 is connected to an important load 8 .

上述储能变流器并离网无缝切换控制装置的控制方法,包括计划性并离网切换控制和非计划性并离网切换控制,其中,The above-mentioned control method for the seamless switching control device of the energy storage converter includes planned on-grid and off-grid switching control and unplanned on-grid switching control, wherein,

计划性并离网切换控制具体为:控制器4接收到电网监控系统1下发的并网转离网指令后,控制器4通过并网转离网控制逻辑完成对并网点开关3的分闸操作,并使储能变流器6进入离网运行模式;控制器4接收到电网监控系统1下发的离网转并网指令后,控制器4通过离网转并网控制逻辑完成对并网点开关3的合闸操作,并使储能变流器6进入并网运行模式;The planned on-grid and off-grid switching control is specifically: after the controller 4 receives the grid-connected to off-grid command issued by the grid monitoring system 1, the controller 4 completes the opening of the grid-connected point switch 3 through the grid-connected to off-grid control logic operation, and make the energy storage converter 6 enter the off-grid operation mode; after the controller 4 receives the off-grid to grid-connected instruction issued by the grid monitoring system 1, the controller 4 completes the parallelism through the off-grid to grid-connected control logic Closing operation of the outlet switch 3, and making the energy storage converter 6 enter the grid-connected operation mode;

非计划性并离网切换控制具体为:控制器4通过设在并网点开关3上侧的电压互感器10检测到孤岛保护动作后,自动控制并网点开关3分闸,并使储能变流器6进入离网运行模式;控制器4通过电压互感器10检测到并网点开关3上侧带电后,自动控制并网点开关3合闸,并使储能变流器6进入并网运行模式。The unplanned grid-connected and off-grid switching control is specifically: after the controller 4 detects the island protection action through the voltage transformer 10 arranged on the upper side of the grid-connected point switch 3, it automatically controls the grid-connected point switch 3 to open, and makes the energy storage converter The controller 6 enters the off-grid operation mode; after the controller 4 detects that the upper side of the grid-connection point switch 3 is charged through the voltage transformer 10, it automatically controls the grid-connection point switch 3 to close, and makes the energy storage converter 6 enter the grid-connection operation mode.

计划性并离网切换控制中,并网转离网控制逻辑具体为:控制器4发送并网点开关分闸指令,在快速检出并网点开关分闸10ms内将储能变流器6切换至离网运行模式,快速检出并网点开关分闸的判据为判断并网点开关位置结点变位或并网点三相瞬时功率突变,即并网点开关位置结点变位或并网点三相瞬时功率突变时,判断分闸成功;离网转并网控制逻辑具体为:控制器4发送并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器6切换至并网运行模式,快速检出并网点开关合闸的判据为判断并网点开关位置结点变位或并网点三相瞬时功率突变,即并网点开关位置结点变位或并网点三相瞬时功率突变时,判断合闸成功。In the planned on-grid switching control, the grid-connected to off-grid control logic is specifically: the controller 4 sends the grid-connected point switch opening command, and switches the energy storage converter 6 to In the off-grid operation mode, the criterion for quickly detecting the opening of the switch at the grid-connected point is to judge the position of the switch at the grid-connected point or the sudden change of the three-phase power at the grid-connected point, that is, the position of the switch at the grid-connected point or the three-phase instantaneous When the power changes suddenly, it is judged that the opening is successful; the off-grid to grid-connected control logic is specifically: the controller 4 sends the closing command of the grid-connecting point switch, and switches the energy storage converter 6 to In the grid-connected operation mode, the criterion for quickly detecting the closing of the grid-connected point switch is to judge the position of the grid-connected point switch or the sudden change of the three-phase power at the grid-connected point, that is, the position of the grid-connected point switch or the three-phase instantaneous power of the grid-connected point When the power changes suddenly, it is judged that the closing is successful.

非计划性并离网切换控制中,控制器4检测到孤岛保护动作的同时,发出并网点开关分闸指令,并延时10ms将储能变流器6切换至离网运行模式;控制器4检测到并网点开关3上侧带电后,发出并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器6切换至并网运行模式,快速检出并网点开关合闸的判据为判断并网点开关位置结点变位或并网点三相瞬时功率突变。In the unplanned on-off grid switching control, when the controller 4 detects the island protection action, it sends out the opening command of the grid-connecting point switch, and switches the energy storage converter 6 to the off-grid operation mode with a delay of 10ms; the controller 4 After detecting that the upper side of the grid-connection point switch 3 is electrified, a command to close the grid-connection point switch is issued, and the energy storage converter 6 is switched to the grid-connection operation mode within 10ms of fast detection of the grid-connection point switch closing, and the grid-connection point switch is quickly detected The criterion for closing is to judge the position of the switch at the grid-connected point and the node displacement or the sudden change of the three-phase instantaneous power at the grid-connected point.

Claims (7)

1.一种储能变流器并离网无缝切换控制装置,分别连接电网监控系统(1)和并网点开关(3),其特征在于,该控制装置包括储能变流器(6)、控制器(4)、电池管理系统(5)、电池组(7)和第一变压器(9),所述的控制器(4)分别连接电网监控系统(1)、储能变流器(6)、和电池管理系统(5),所述的电池组(7)分别连接储能变流器(6)和电池管理系统(5),所述的储能变流器(6)通过第一变压器(9)与第一电网母线(12)连接,所述的控制器(4)上设有用于连接电压互感器(10)的第一接口、用于连接并网点开关(3)的第二接口以及用于连接并网点开关位置结点(11)的第三接口,所述的电压互感器(10)设在并网点开关(3)的上侧。1. An energy storage converter connected to and off-grid seamless switching control device, which is respectively connected to a grid monitoring system (1) and a grid-connected point switch (3), characterized in that the control device includes an energy storage converter (6) , a controller (4), a battery management system (5), a battery pack (7) and a first transformer (9), and the controller (4) is respectively connected to the grid monitoring system (1), the energy storage converter ( 6), and the battery management system (5), the battery pack (7) is respectively connected to the energy storage converter (6) and the battery management system (5), and the energy storage converter (6) passes through the first A transformer (9) is connected to the first grid bus (12), and the controller (4) is provided with a first interface for connecting the voltage transformer (10) and a second interface for connecting the grid connection point switch (3). The second interface and the third interface for connecting the node (11) of the grid-connected point switch position, the voltage transformer (10) is arranged on the upper side of the grid-connected point switch (3). 2.根据权利要求1所述的一种储能变流器并离网无缝切换控制装置,其特征在于,所述的控制器(4)通过局域网与电网监控系统(1)连接。2. The energy storage converter according to claim 1, characterized in that the controller (4) is connected to the grid monitoring system (1) through a local area network. 3.根据权利要求1所述的一种储能变流器并离网无缝切换控制装置,其特征在于,所述的控制器(4)内设有并网点上侧三相电压电流采样回路,该采样回路与电压互感器(10)连接。3. An energy storage converter according to claim 1, characterized in that the controller (4) is equipped with a three-phase voltage and current sampling circuit on the upper side of the grid connection point. , the sampling loop is connected with the voltage transformer (10). 4.一种如权利要求1所述的储能变流器并离网无缝切换控制装置的控制方法,其特征在于,包括计划性并离网切换控制和非计划性并离网切换控制,其中,4. A control method for an energy storage converter as claimed in claim 1, characterized in that it includes planned on-grid and off-grid switching control and unplanned on-grid and off-grid switching control, in, 所述的计划性并离网切换控制具体为:控制器(4)接收到电网监控系统(1)下发的并网转离网指令后,控制器(4)通过并网转离网控制逻辑完成对并网点开关(3)的分闸操作,并使储能变流器(6)进入离网运行模式;控制器(4)接收到电网监控系统(1)下发的离网转并网指令后,控制器(4)通过离网转并网控制逻辑完成对并网点开关(3)的合闸操作,并使储能变流器(6)进入并网运行模式;The planned grid-connection and off-grid switching control specifically includes: after the controller (4) receives the grid-connection to off-grid instruction issued by the power grid monitoring system (1), the controller (4) passes the grid-connection to off-grid control logic Complete the opening operation of the grid-connected point switch (3), and enable the energy storage converter (6) to enter the off-grid operation mode; the controller (4) receives the off-grid transfer from the grid monitoring system (1) After the instruction, the controller (4) completes the closing operation of the grid-connection point switch (3) through the off-grid to grid-connection control logic, and enables the energy storage converter (6) to enter the grid-connection operation mode; 所述的非计划性并离网切换控制具体为:控制器(4)通过设在并网点开关(3)上侧的电压互感器(10)检测到孤岛保护动作后,自动控制并网点开关(3)分闸,并使储能变流器(6)进入离网运行模式;控制器(4)通过电压互感器(10)检测到并网点开关(3)上侧带电后,自动控制并网点开关(3)合闸,并使储能变流器(6)进入并网运行模式。The unplanned on-grid and off-grid switching control is specifically: the controller (4) automatically controls the grid-connected point switch ( 3) Open the switch, and make the energy storage converter (6) enter the off-grid operation mode; the controller (4) detects that the upper side of the grid-connection point switch (3) is charged through the voltage transformer (10), and automatically controls the grid-connection point The switch (3) is closed, and the energy storage converter (6) enters the grid-connected operation mode. 5.根据权利要求4所述的储能变流器并离网无缝切换控制方法,其特征在于,计划性并离网切换控制中,所述的并网转离网控制逻辑具体为:控制器(4)发送并网点开关分闸指令,在快速检出并网点开关分闸10ms内将储能变流器(6)切换至离网运行模式;所述的离网转并网控制逻辑具体为:控制器(4)发送并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器(6)切换至并网运行模式。5. The control method for seamless switching between grid-connected and off-grid converters according to claim 4, characterized in that, in the planned grid-connected and off-grid switching control, the control logic for grid-connected and off-grid transitions is specifically: control The converter (4) sends the opening command of the grid-connection point switch, and switches the energy storage converter (6) to the off-grid operation mode within 10 ms of quickly detecting the grid-connection point switch opening; the off-grid to grid-connection control logic is specific It is: the controller (4) sends a closing command of the grid-connecting point switch, and switches the energy storage converter (6) to the grid-connecting operation mode within 10 ms of quickly detecting the closing of the grid-connecting point switch. 6.根据权利要求4所述的储能变流器并离网无缝切换控制方法,其特征在于,所述的非计划性并离网切换控制中,控制器(4)检测到孤岛保护动作的同时,发出并网点开关分闸指令,并延时10ms将储能变流器(6)切换至离网运行模式;控制器(4)检测到并网点开关(3)上侧带电后,发出并网点开关合闸指令,在快速检出并网点开关合闸10ms内将储能变流器(6)切换至并网运行模式。6. The method for seamless switching control of energy storage converters according to claim 4, characterized in that, in the unplanned control of switching between grid and off-grid, the controller (4) detects an island protection action At the same time, it sends the opening command of the grid-connected point switch, and switches the energy storage converter (6) to the off-grid operation mode with a delay of 10ms; after the controller (4) detects that the upper side of the grid-connected point switch (3) is charged, it sends out The closing command of the grid-connecting point switch switches the energy storage converter (6) to the grid-connecting operation mode within 10 ms of fast detection of the closing of the grid-connecting point switch. 7.根据权利要求5或6所述的储能变流器并离网无缝切换控制方法,其特征在于,所述的快速检出并网点开关分闸或合闸的判据为判断并网点开关位置结点变位或并网点三相瞬时功率突变。7. The control method for grid-connected and off-grid seamless switching of energy storage converters according to claim 5 or 6, wherein the criterion for quickly detecting the opening or closing of the grid-connecting point switch is to judge the grid-connecting point Switch position node displacement or sudden change of three-phase instantaneous power at grid-connected point.
CN201410654823.6A 2014-11-17 2014-11-17 Energy storage current transformer grid connection and grid disconnection seamless switching device and method Pending CN104333042A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410654823.6A CN104333042A (en) 2014-11-17 2014-11-17 Energy storage current transformer grid connection and grid disconnection seamless switching device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410654823.6A CN104333042A (en) 2014-11-17 2014-11-17 Energy storage current transformer grid connection and grid disconnection seamless switching device and method

Publications (1)

Publication Number Publication Date
CN104333042A true CN104333042A (en) 2015-02-04

Family

ID=52407719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410654823.6A Pending CN104333042A (en) 2014-11-17 2014-11-17 Energy storage current transformer grid connection and grid disconnection seamless switching device and method

Country Status (1)

Country Link
CN (1) CN104333042A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821594A (en) * 2015-03-27 2015-08-05 国网上海市电力公司 Transformation and distribution station connected with energy storage system
CN106208367A (en) * 2015-05-26 2016-12-07 Aes有限公司 Modularity energy storage method and system
CN107612408A (en) * 2017-09-11 2018-01-19 广州智光电气股份有限公司 A kind of energy accumulation current converter and energy-storage system
CN108173286A (en) * 2018-01-22 2018-06-15 成都鼎智汇科技有限公司 A kind of intelligent battery energy-storage system
CN108847690A (en) * 2018-08-10 2018-11-20 国电南京自动化股份有限公司 A kind of micro-grid operation mode seamless switching control device and method
CN109256850A (en) * 2018-09-14 2019-01-22 浙江艾罗网络能源技术有限公司 Energy accumulation current converter and off-network switching device
CN109449968A (en) * 2018-10-19 2019-03-08 中国科学院电工研究所 A kind of electric power electric transformer and alternating current-direct current source net lotus multiple-variable flow integration of equipments method
CN112821435A (en) * 2020-12-31 2021-05-18 珠海格力电器股份有限公司 Grid-connected and off-grid scheduling method and device and energy storage and power supply system
CN113725901A (en) * 2021-08-24 2021-11-30 苏州中储普华电力科技有限公司 Energy storage converter grid-connected and off-grid switching control method
CN115776130A (en) * 2022-12-29 2023-03-10 北京索英电气技术股份有限公司 Grid-connected and off-grid switching method, energy storage converter, energy storage system and power system
CN116826795A (en) * 2023-06-01 2023-09-29 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685970A (en) * 2008-09-28 2010-03-31 上海市城市建设设计研究院 Multipurpose solar energy power generating system
CN102510089A (en) * 2011-11-25 2012-06-20 北京金风科创风电设备有限公司 Wind-solar storage micro-grid system
CN102638038A (en) * 2012-03-20 2012-08-15 华中科技大学 Parallel charging and discharging power conversion system
KR101181403B1 (en) * 2011-02-15 2012-09-19 ㈜코리아에너텍 Grid-Connected generating system with photovoltaic and wind power hybrid generation and generator thereof
CN202602306U (en) * 2012-05-29 2012-12-12 国电联合动力技术有限公司 Grid-connected offline micro-grid system
CN202616805U (en) * 2012-04-28 2012-12-19 北京索英电气技术有限公司 Switch control device for rapid grid connection and grid separation of micro gird and power grid
CN102856924A (en) * 2012-08-29 2013-01-02 中国能源建设集团广东省电力设计研究院 Microgrid smooth switch control method and strategy based on composite energy storage
CN102904278A (en) * 2012-09-20 2013-01-30 江苏万丰光伏有限公司 Distribution type grid connection photovoltaic system power supply
CN102916442A (en) * 2012-10-17 2013-02-06 北京科诺伟业科技有限公司 Building photovoltaic grid-connected system
CN103532214A (en) * 2013-09-17 2014-01-22 南京航空航天大学 Photovoltaic power generation system structure integrating energy storage and grid-connected and off-grid power supply functions and control method
CN103560538A (en) * 2013-11-08 2014-02-05 东南大学 Microgrid protection and switchover integrated control method based on storing energy at PCC
CN103683517A (en) * 2013-12-19 2014-03-26 合肥工业大学 Hybrid energy storage system applied to micro-grid
CN104052159A (en) * 2014-06-25 2014-09-17 中国东方电气集团有限公司 Energy management controller used for wind and light storage micro-grid system
CN204179680U (en) * 2014-11-17 2015-02-25 国网上海市电力公司 A kind of energy accumulation current converter from net seamless switching control device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685970A (en) * 2008-09-28 2010-03-31 上海市城市建设设计研究院 Multipurpose solar energy power generating system
KR101181403B1 (en) * 2011-02-15 2012-09-19 ㈜코리아에너텍 Grid-Connected generating system with photovoltaic and wind power hybrid generation and generator thereof
CN102510089A (en) * 2011-11-25 2012-06-20 北京金风科创风电设备有限公司 Wind-solar storage micro-grid system
CN102638038A (en) * 2012-03-20 2012-08-15 华中科技大学 Parallel charging and discharging power conversion system
CN202616805U (en) * 2012-04-28 2012-12-19 北京索英电气技术有限公司 Switch control device for rapid grid connection and grid separation of micro gird and power grid
CN202602306U (en) * 2012-05-29 2012-12-12 国电联合动力技术有限公司 Grid-connected offline micro-grid system
CN102856924A (en) * 2012-08-29 2013-01-02 中国能源建设集团广东省电力设计研究院 Microgrid smooth switch control method and strategy based on composite energy storage
CN102904278A (en) * 2012-09-20 2013-01-30 江苏万丰光伏有限公司 Distribution type grid connection photovoltaic system power supply
CN102916442A (en) * 2012-10-17 2013-02-06 北京科诺伟业科技有限公司 Building photovoltaic grid-connected system
CN103532214A (en) * 2013-09-17 2014-01-22 南京航空航天大学 Photovoltaic power generation system structure integrating energy storage and grid-connected and off-grid power supply functions and control method
CN103560538A (en) * 2013-11-08 2014-02-05 东南大学 Microgrid protection and switchover integrated control method based on storing energy at PCC
CN103683517A (en) * 2013-12-19 2014-03-26 合肥工业大学 Hybrid energy storage system applied to micro-grid
CN104052159A (en) * 2014-06-25 2014-09-17 中国东方电气集团有限公司 Energy management controller used for wind and light storage micro-grid system
CN204179680U (en) * 2014-11-17 2015-02-25 国网上海市电力公司 A kind of energy accumulation current converter from net seamless switching control device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104821594A (en) * 2015-03-27 2015-08-05 国网上海市电力公司 Transformation and distribution station connected with energy storage system
CN106208367B (en) * 2015-05-26 2021-11-02 Aes有限公司 Modular energy storage method and system
CN106208367A (en) * 2015-05-26 2016-12-07 Aes有限公司 Modularity energy storage method and system
CN107612408A (en) * 2017-09-11 2018-01-19 广州智光电气股份有限公司 A kind of energy accumulation current converter and energy-storage system
CN108173286A (en) * 2018-01-22 2018-06-15 成都鼎智汇科技有限公司 A kind of intelligent battery energy-storage system
CN108847690A (en) * 2018-08-10 2018-11-20 国电南京自动化股份有限公司 A kind of micro-grid operation mode seamless switching control device and method
CN109256850A (en) * 2018-09-14 2019-01-22 浙江艾罗网络能源技术有限公司 Energy accumulation current converter and off-network switching device
CN109449968A (en) * 2018-10-19 2019-03-08 中国科学院电工研究所 A kind of electric power electric transformer and alternating current-direct current source net lotus multiple-variable flow integration of equipments method
CN109449968B (en) * 2018-10-19 2021-12-07 中国科学院电工研究所 Power electronic transformer and AC/DC source network load multi-current equipment integration method
CN112821435A (en) * 2020-12-31 2021-05-18 珠海格力电器股份有限公司 Grid-connected and off-grid scheduling method and device and energy storage and power supply system
CN112821435B (en) * 2020-12-31 2024-03-22 珠海格力电器股份有限公司 Off-grid scheduling method and device and energy storage power supply system
US12261447B2 (en) 2020-12-31 2025-03-25 Gree Electric Appliances, Inc. Of Zhuhai On-grid/off-grid scheduling method and apparatus, and energy storage power supply system
CN113725901A (en) * 2021-08-24 2021-11-30 苏州中储普华电力科技有限公司 Energy storage converter grid-connected and off-grid switching control method
CN115776130A (en) * 2022-12-29 2023-03-10 北京索英电气技术股份有限公司 Grid-connected and off-grid switching method, energy storage converter, energy storage system and power system
CN115776130B (en) * 2022-12-29 2024-02-02 北京索英电气技术股份有限公司 Off-grid switching method, energy storage converter, energy storage system and power system
CN116826795A (en) * 2023-06-01 2023-09-29 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method
CN116826795B (en) * 2023-06-01 2024-03-15 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method

Similar Documents

Publication Publication Date Title
CN104333042A (en) Energy storage current transformer grid connection and grid disconnection seamless switching device and method
CN105281367B (en) A kind of multi-machine parallel connection and off-network seamless switch-over system
CN203398797U (en) Multi-machine parallel control system of dual-mode energy storing device
CN105762829B (en) Microgrid inverter based on phase angle estimation is from grid-connected seamless switching control method
GB2551596A (en) Method and apparatus for fault prediction of sub-module in flexible direct current transmission converter valve
CN104065104B (en) A kind of micro-capacitance sensor rapid combination method based on three-phase independent regulation
CN103490392B (en) Fault handling method of power distribution network comprising distributed power supplies and microgrids
CN204179680U (en) A kind of energy accumulation current converter from net seamless switching control device
CN103311906B (en) A kind of switch changed position islanding detect based on Wide-area Measurement Information and directly tripping operation formula island protect method
CN103983873A (en) Island detection method suitable for multi-inverter parallel operation and based on impedance measurement
CN109768571B (en) Grid-connected micro-grid control system and method
CN105845005A (en) Intelligent microgrid experiment system
CN106655099A (en) Inverter power current limiting method after short circuit fault of distribution network
CN106159985A (en) A kind of anti-isolated island method and apparatus of DC distribution net distributed power source
CN106058910A (en) Energy storage inverter dual-mode seamless intelligent switching system and switching method
CN108847690A (en) A kind of micro-grid operation mode seamless switching control device and method
CN204103589U (en) A kind of double-power supply switching device
CN105958518B (en) A kind of working method of low-voltage network circuit Real-time Balancing device
CN103607045B (en) Micro grid grid-connection to grid-off smooth switching intelligent control method based on GOOSE
CN104319815B (en) Grid connection/disconnection seamless switching method for micro-grid converter
CN103457249A (en) Smart distribution network distributed type pilot protection method and system
CN105024403B (en) A kind of micro-capacitance sensor isolated island and grid-connected whistle control system and method
CN106100117A (en) Distributed feeder-terminal-unit collocation method based on minimum distribution region
CN104393610B (en) A kind of pcs system and device
CN102497010A (en) Method and system for switching microgrid from grid-connected mode to island mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150204