[go: up one dir, main page]

CN104282148B - A kind of method obtaining the intersection Dai Hang district traffic capacity - Google Patents

A kind of method obtaining the intersection Dai Hang district traffic capacity Download PDF

Info

Publication number
CN104282148B
CN104282148B CN201410502566.4A CN201410502566A CN104282148B CN 104282148 B CN104282148 B CN 104282148B CN 201410502566 A CN201410502566 A CN 201410502566A CN 104282148 B CN104282148 B CN 104282148B
Authority
CN
China
Prior art keywords
waiting area
capacity
traffic
seconds
intersection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410502566.4A
Other languages
Chinese (zh)
Other versions
CN104282148A (en
Inventor
白玉
杨晓光
朱晓波
吴明敏
陆艳
郝妍熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201410502566.4A priority Critical patent/CN104282148B/en
Publication of CN104282148A publication Critical patent/CN104282148A/en
Application granted granted Critical
Publication of CN104282148B publication Critical patent/CN104282148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0125Traffic data processing
    • G08G1/0133Traffic data processing for classifying traffic situation

Landscapes

  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)

Abstract

The present invention relates to a kind of method obtaining the intersection Dai Hang district traffic capacity, comprise the following steps: 1) gather crossing's Dai Hang district type, treat row section length and Traffic Signal Timing information;2) according to treating that row section length calculates corresponding Dai Hang district capacity;3) according to the startup lost time that Dai Hang district type is corresponding with Dai Hang district calculation of capacity;4) according to starting lost time, Dai Hang district capacity and the Traffic Signal Timing information calculating Dai Hang district traffic capacity.Compared with prior art, the present invention has convenience of calculation, degree of accuracy advantages of higher.

Description

一种获取道路交叉口待行区通行能力的方法A Method for Acquiring Traffic Capacity of Waiting Area at Road Intersection

技术领域technical field

本发明涉及交通控制领域,尤其是涉及一种获取道路交叉口待行区通行能力的方法。The invention relates to the field of traffic control, in particular to a method for acquiring the traffic capacity of a waiting area at a road intersection.

背景技术Background technique

现如今,大部分路口都设置了待行区,待行区用途是为了不影响交通情况下多释放交叉口内部空间增加进口道容量,以便缓解下交通压力,提高通行效率。国内虽也有许多类似的与待行区通行能力相关的研究与探索,但是尚未有针对国内交通特征的统一的通行能力计算标准,在交通设计与评价中,这就难免会增大计算结果与实际情况不相符合的程度。Nowadays, most intersections are equipped with waiting areas. The purpose of the waiting area is to release more internal space at the intersection and increase the capacity of the entrance road without affecting the traffic, so as to relieve the traffic pressure and improve the traffic efficiency. Although there are many similar studies and explorations related to the traffic capacity of waiting areas in China, there is no unified traffic capacity calculation standard for domestic traffic characteristics. In traffic design and evaluation, this will inevitably increase the difference between calculation results and actual conditions. The extent to which the situation does not match.

因此,一套专门针对待行区通行能力计算方法对于交通设计、评价、规划,更好地管理城市道路、促进城市发展,都有着一定的积极意义与作用。Therefore, a set of calculation methods specifically for the capacity of the waiting area has a certain positive significance and effect on traffic design, evaluation, planning, better management of urban roads, and promotion of urban development.

发明内容Contents of the invention

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种精确度高的获取道路交叉口待行区通行能力的方法。The object of the present invention is to provide a method for obtaining the traffic capacity of a waiting area at a road intersection with high accuracy in order to overcome the above-mentioned defects in the prior art.

本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:

一种获取道路交叉口待行区通行能力的方法,包括以下步骤:A method for obtaining traffic capacity of a waiting area at a road intersection, comprising the following steps:

1)采集交叉口处待行区类型、待行区长度以及交通信号配时信息;1) Collect information on the type of waiting area at the intersection, the length of the waiting area, and the timing of traffic signals;

2)根据待行区长度计算对应的待行区容量;2) Calculate the corresponding capacity of the waiting area according to the length of the waiting area;

3)根据待行区类型和待行区容量计算对应的启动损失时间;3) Calculate the corresponding start-up loss time according to the type of waiting area and the capacity of the waiting area;

4)根据启动损失时间、待行区容量和交通信号配时信息计算待行区通行能力。4) Calculate the traffic capacity of the waiting area according to the start-up loss time, the capacity of the waiting area and the timing information of traffic signals.

所述的待行区类型包括左转待行区或直行待行区;The types of holding areas mentioned include left-turn holding areas or straight-going holding areas;

所述的左转待行区的启动损失时间计算公式为:The formula for calculating the start-up loss time of the left-turn waiting area is:

Tcl=0.93nl+0.92T cl =0.93n l +0.92

其中,nl为左转待行区对应的待行区容量;Among them, n l is the capacity of the waiting area corresponding to the left-turn waiting area;

所述的直行待行区的启动损失时间计算公式为:The formula for calculating the start-up loss time of the straight-going waiting area is:

Tcs=0.95ns+1.32T cs =0.95ns +1.32

其中,ns为直行待行区对应的待行区容量。Among them, n s is the capacity of the waiting area corresponding to the straight waiting area.

所述的交通信号配时信息包括绿灯时间和控制周期。The traffic signal timing information includes green light time and control cycle.

所述的待行区通行能力的计算公式为:The formula for calculating the capacity of the waiting area is:

CC == (( nno ++ GG -- TT CC -- TT SS hh )) ·&Center Dot; 36003600 TT

其中,n为待行区容量;T为控制周期,单位秒;G为绿灯时间,单位秒;TC为启动损失时间,单位秒;TS为绿末或黄灯损失时间,单位秒;h为饱和车头时距,单位秒。Among them, n is the capacity of the waiting area; T is the control period, in seconds; G is the green light time, in seconds; T C is the start-up loss time, in seconds; T S is the green or yellow light loss time, in seconds; h is the saturated headway, in seconds.

所述的待行区容量的计算公式为:The formula for calculating the capacity of the waiting area is:

nno == LL Waitwait LL vv ++ LL CC

其中,LWait为待行区长度,Lv为标准车辆长度,LC为停车时的安全车车间距,单位均为米;Among them, L Wait is the length of the waiting area, L v is the length of the standard vehicle, and L C is the safety car-to-vehicle distance when parking, and the unit is meter;

当n的计算结果为小数时,向小取整数。When the calculation result of n is a decimal, the integer is rounded to the smallest.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1、交叉口的交通信号配时信息会影响待行区的通行能力,本发明考虑了此项影响因素,分析全面,计算精确度高;1. The traffic signal timing information at the intersection will affect the traffic capacity of the waiting area. The present invention takes this influencing factor into consideration, with comprehensive analysis and high calculation accuracy;

2、本发明计算方便,使用者能够直接用本发明算出相应的通行能力;2. The present invention is convenient for calculation, and the user can directly use the present invention to calculate the corresponding traffic capacity;

3、通过实地调查,对比计算值与实际值,二者平均绝对误差在3%~10%范围内,说明本发明方法具有较高的准确度。3. By comparing the calculated value with the actual value through on-the-spot investigation, the average absolute error of the two is within the range of 3% to 10%, which shows that the method of the present invention has higher accuracy.

附图说明Description of drawings

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

具体实施方式detailed description

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

如图1所示,本发明实施例提供的获取道路交叉口待行区通行能力的方法包括以下步骤:As shown in Figure 1, the method for obtaining the traffic capacity of the waiting area at a road intersection provided by the embodiment of the present invention includes the following steps:

1)采集交叉口处待行区类型、待行区长度以及交通信号配时信息,交通信号配时信息包括绿灯时间和控制周期等。1) Collect the type of waiting area at the intersection, the length of the waiting area, and the timing information of traffic signals. The timing information of traffic signals includes green light time and control cycle.

进行数据采集时,分析研究了各类待行区通行能力的影响因素,确认了相应的影响因子及相关的数理回归方法,为后期分析研究做数据准备。During the data collection, the influencing factors of the traffic capacity of various waiting areas were analyzed and studied, and the corresponding influencing factors and related mathematical regression methods were confirmed to prepare data for later analysis and research.

2)根据待行区长度计算对应的待行区容量:2) Calculate the corresponding capacity of the waiting area according to the length of the waiting area:

nno == LL Waitwait LL vv ++ LL CC -- -- -- (( 11 ))

其中,LWait为待行区长度,Lv为标准车辆长度,LC为停车时的安全车车间距,单位均为米;当n的计算结果为小数时,向小取整数。Among them, L Wait is the length of the waiting area, L v is the length of the standard vehicle, and L C is the safety car-to-vehicle distance when parking, and the unit is meter; when the calculation result of n is a decimal, round to the smallest integer.

3)根据待行区类型和待行区容量计算对应的启动损失时间。待行区类型包括左转待行区或直行待行区,其中,左转待行区的启动损失时间计算公式为:3) Calculate the corresponding start-up loss time according to the type of waiting area and the capacity of the waiting area. The types of waiting areas include left-turn waiting areas or straight-going waiting areas. The formula for calculating the start-up loss time of left-turn waiting areas is:

Tcl=0.93nl+0.92 (2)T cl =0.93n l +0.92 (2)

其中,nl为左转待行区对应的待行区容量。Among them, n l is the capacity of the waiting area corresponding to the left-turn waiting area.

直行待行区的启动损失时间计算公式为:The formula for calculating the start-up lost time in the straight-going waiting area is:

Tcs=0.95ns+1.32 (3)T cs =0.95ns +1.32 (3)

其中,ns为直行待行区对应的待行区容量。Among them, n s is the capacity of the waiting area corresponding to the straight waiting area.

4)根据启动损失时间、待行区容量和交通信号配时信息计算待行区通行能力,计算公式为:4) Calculate the traffic capacity of the waiting area according to the start-up loss time, the capacity of the waiting area and the timing information of traffic signals. The calculation formula is:

CC == (( nno ++ GG -- TT CC -- TT SS hh )) ·&Center Dot; 36003600 TT -- -- -- (( 44 ))

其中,n为待行区容量;T为控制周期,单位秒;G为绿灯时间,单位秒;TC为启动损失时间,单位秒;TS为绿末或黄灯损失时间,单位秒;h为饱和车头时距,单位秒。Among them, n is the capacity of the waiting area; T is the control period, in seconds; G is the green light time, in seconds; T C is the start-up loss time, in seconds; T S is the green or yellow light loss time, in seconds; h is the saturated headway, in seconds.

以上海市河南北路海宁路交叉口为例进行说明,具体使用步骤参考如下。Take the intersection of Henan North Road and Haining Road in Shanghai as an example. The specific steps are as follows.

第一步,通过调查,了解交叉口的类型、待行区长度、待行区类型及信号配时方案。在本例中,以上海市河南北路海宁路交叉口最内侧南进口道作为目标交叉口,通过计算其待行区容量为4,待行区类型为左转待行区,为四相位信号控制交叉口,周期时间为206秒,目标进口道绿灯相位为38秒;The first step is to understand the type of intersection, the length of the waiting area, the type of the waiting area and the signal timing scheme through investigation. In this example, taking the innermost south entrance road at the intersection of Henan North Road and Haining Road in Shanghai as the target intersection, the capacity of the waiting area is calculated to be 4, the type of the waiting area is a left-turn waiting area, and it is a four-phase signal To control the intersection, the cycle time is 206 seconds, and the green light phase of the target entrance is 38 seconds;

第二步,通过左转待行区启动损失时间取值公式得到该进口道的启动损失时间为4.64秒;In the second step, the start-up loss time of the entrance is obtained as 4.64 seconds through the formula for calculating the start-up loss time in the left-turn waiting area;

第三步,借助于第二步求得的启动损失时间,可由待行区通行能力计算公式算得该进口道的计算通行能力为308pcu/h。对比实际结果325pcu/h,可发现本发明具有较好的准确度与参考价值。In the third step, with the help of the start-up loss time obtained in the second step, the calculation capacity of the entrance can be calculated as 308pcu/h by the calculation formula of the capacity of the waiting area. Compared with the actual result of 325pcu/h, it can be found that the present invention has better accuracy and reference value.

Claims (4)

1.一种获取道路交叉口待行区通行能力的方法,其特征在于,包括以下步骤:1. A method for obtaining traffic capacity of a road intersection waiting area, characterized in that, comprising the following steps: 1)采集交叉口处待行区类型、待行区长度以及交通信号配时信息;1) Collect information on the type of waiting area at the intersection, the length of the waiting area, and the timing of traffic signals; 2)根据待行区长度计算对应的待行区容量;2) Calculate the corresponding capacity of the waiting area according to the length of the waiting area; 3)根据待行区类型和待行区容量计算对应的启动损失时间;3) Calculate the corresponding start-up loss time according to the type of waiting area and the capacity of the waiting area; 4)根据启动损失时间、待行区容量和交通信号配时信息计算待行区通行能力;4) Calculate the traffic capacity of the waiting area according to the start-up loss time, the capacity of the waiting area and the timing information of traffic signals; 所述的待行区类型包括左转待行区或直行待行区;The types of holding areas mentioned include left-turn holding areas or straight-going holding areas; 所述的左转待行区的启动损失时间计算公式为:The formula for calculating the start-up loss time of the left-turn waiting area is: Tcl=0.93nl+0.92T cl =0.93n l +0.92 其中,nl为左转待行区对应的待行区容量;Among them, n l is the capacity of the waiting area corresponding to the left-turn waiting area; 所述的直行待行区的启动损失时间计算公式为:The formula for calculating the start-up loss time of the straight-going waiting area is: Tcs=0.95ns+1.32T cs =0.95ns +1.32 其中,ns为直行待行区对应的待行区容量。Among them, n s is the capacity of the waiting area corresponding to the straight waiting area. 2.根据权利要求1所述的一种获取道路交叉口待行区通行能力的方法,其特征在于,所述的交通信号配时信息包括绿灯时间和控制周期。2. A method for obtaining traffic capacity of a waiting area at an intersection according to claim 1, wherein the traffic signal timing information includes green light time and control cycle. 3.根据权利要求2所述的一种获取道路交叉口待行区通行能力的方法,其特征在于,所述的待行区通行能力的计算公式为:3. A kind of method for obtaining the traffic capacity of the waiting area at a road intersection according to claim 2, characterized in that, the calculation formula of the traffic capacity of the waiting area is: CC == (( nno ++ GG -- TT CC -- TT SS hh )) ·· 36003600 TT 其中,n为待行区容量;T为控制周期,单位秒;G为绿灯时间,单位秒;TC为启动损失时间,单位秒;TS为绿末或黄灯损失时间,单位秒;h为饱和车头时距,单位秒。Among them, n is the capacity of the waiting area; T is the control period, in seconds; G is the green light time, in seconds; T C is the start-up loss time, in seconds; T S is the green or yellow light loss time, in seconds; h is the saturated headway, in seconds. 4.根据权利要求1或2或3所述的一种获取道路交叉口待行区通行能力的方法,其特征在于,所述的待行区容量的计算公式为:4. A method for obtaining traffic capacity of a waiting area at a road intersection according to claim 1, 2 or 3, wherein the formula for calculating the capacity of the waiting area is: nno == LL WW aa ii tt LL vv ++ LL CC 其中,LWait为待行区长度,Lv为标准车辆长度,LC为停车时的安全车车间距,单位均为米;Among them, L Wait is the length of the waiting area, L v is the length of the standard vehicle, and L C is the safety car-to-vehicle distance when parking, and the unit is meter; 当n的计算结果为小数时,向小取整数。When the calculation result of n is a decimal, the integer is rounded to the smallest.
CN201410502566.4A 2014-09-26 2014-09-26 A kind of method obtaining the intersection Dai Hang district traffic capacity Active CN104282148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410502566.4A CN104282148B (en) 2014-09-26 2014-09-26 A kind of method obtaining the intersection Dai Hang district traffic capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410502566.4A CN104282148B (en) 2014-09-26 2014-09-26 A kind of method obtaining the intersection Dai Hang district traffic capacity

Publications (2)

Publication Number Publication Date
CN104282148A CN104282148A (en) 2015-01-14
CN104282148B true CN104282148B (en) 2016-08-17

Family

ID=52256990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410502566.4A Active CN104282148B (en) 2014-09-26 2014-09-26 A kind of method obtaining the intersection Dai Hang district traffic capacity

Country Status (1)

Country Link
CN (1) CN104282148B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107578620B (en) * 2017-08-07 2020-08-18 广东方纬科技有限公司 Method, system and device for calculating road traffic capacity based on lane level system
CN111243300B (en) * 2018-11-28 2023-04-28 阿里巴巴集团控股有限公司 Method and device for acquiring lost time length
CN110111587B (en) * 2019-05-17 2020-09-01 哈尔滨工业大学 An optimization method for signal timing of intersections with straight-through waiting areas
CN111339590B (en) * 2020-02-25 2020-10-20 四川警察学院 Intersection straight-going waiting area setting method considering environmental influence
CN113362622B (en) * 2021-06-04 2022-03-01 哈尔滨工业大学 Method and system for left-turn non-motor vehicle hook-turn crossing at parallel-flow intersection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4809321B2 (en) * 2007-12-07 2011-11-09 住友電気工業株式会社 Traffic information calculation device, traffic information calculation program, and traffic information calculation method
CN101251953A (en) * 2008-04-03 2008-08-27 同济大学 An Asymmetric Spatiotemporal Optimal Control Method for Roundabouts
JP5374067B2 (en) * 2008-04-21 2013-12-25 株式会社豊田中央研究所 Traffic condition simulation apparatus and program
CN101763735B (en) * 2010-02-01 2015-02-25 王茜 Method for controlling dynamic signal control system capable of having negative system loss time
CN102842237A (en) * 2011-06-21 2012-12-26 王培绿 Traffic control method and device of waiting area

Also Published As

Publication number Publication date
CN104282148A (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN104282148B (en) A kind of method obtaining the intersection Dai Hang district traffic capacity
CN104200042B (en) A Tracking Method of Location Data Trajectory
CN103218618B (en) Highway route automatic extraction method based on remote-sensing digital image
CN103871239B (en) Based on public transport operation condition discrimination method and the application system of taxi and public transport gps data
PH12019501156A1 (en) Blockchain-based data processing method and device
CN104408917B (en) Based on smart mobile phone acceleration transducer real-time traffic method of estimation
CN105489004B (en) The bayonet and floating car data fusion method calculated towards road real-time speed
CN103632540B (en) Based on the major urban arterial highway traffic circulation information processing method of floating car data
CN104111073B (en) The method and apparatus in inaccurate section in a kind of identification map datum
CN104008644B (en) A kind of traffic noise on urban roads measuring method based on Gradient Descent
CN104751631A (en) Method of judging mode of transportation of train chain based on GPS (Global Positioning System) positioning and fuzzy theory
CN104866670A (en) GPS spatial-temporal trajectory-based road network topological change automatic detection method and system
CN104732765A (en) Real-time urban road saturability monitoring method based on checkpoint data
CN104063467A (en) Intra-domain traffic flow pattern discovery method based on improved similarity search technology
CN103218915B (en) Experience route generation method based on probe vehicle data
CN104750830B (en) The cycle method for digging of time series data
CN109409008B (en) A construction method for typical speed-time driving conditions of urban rail vehicle lines
CN105067050A (en) Method for improving accuracy of natural gas measurement
CN104095630A (en) Fatigue detection method based on electro-cerebral phase synchronization
CN102708269B (en) Based on SVM prediction cytosolic phospholipase A2The method of the inhibition concentration of alpha inhibitor
CN104182456A (en) Spatial entity increment extraction method based on MRS-MM (Multi-Rules Supported Matching Model) target matching model
CN204116955U (en) Based on the magnetic navigation intelligent vehicle locating device of magnetic field symmetry
CN107331160A (en) The method and apparatus that car speed is measured based on single geomagnetic sensor
CN108961132A (en) Private accounts for the detection method and device of shared bicycle behavior
CN102722661B (en) Forecasting method of micro-pressure waves at tunnel exit when high-speed train passes through long tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant