[go: up one dir, main page]

CL2008003560A1 - Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock. - Google Patents

Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.

Info

Publication number
CL2008003560A1
CL2008003560A1 CL2008003560A CL2008003560A CL2008003560A1 CL 2008003560 A1 CL2008003560 A1 CL 2008003560A1 CL 2008003560 A CL2008003560 A CL 2008003560A CL 2008003560 A CL2008003560 A CL 2008003560A CL 2008003560 A1 CL2008003560 A1 CL 2008003560A1
Authority
CL
Chile
Prior art keywords
exploitation
extraction
galleries
points
mineral
Prior art date
Application number
CL2008003560A
Other languages
Spanish (es)
Inventor
Geister Fernando
Baez Fidel
Arancibia Ernesto
Henriquez Jaime
Moyano Alejandro
Cerrutti Carlo
Original Assignee
Corporacion Nac Del Cobre De Chile
Inst De Innovacion En Mineria Y Metalurgia S A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Corporacion Nac Del Cobre De Chile, Inst De Innovacion En Mineria Y Metalurgia S A filed Critical Corporacion Nac Del Cobre De Chile
Priority to CL2008003560A priority Critical patent/CL2008003560A1/en
Publication of CL2008003560A1 publication Critical patent/CL2008003560A1/en
Priority to RU2015126488A priority patent/RU2702494C2/en
Priority to EP09806186.4A priority patent/EP2370673B1/en
Priority to CA2745066A priority patent/CA2745066C/en
Priority to MX2011005722A priority patent/MX2011005722A/en
Priority to US13/132,180 priority patent/US20120181844A1/en
Priority to AU2009321259A priority patent/AU2009321259A1/en
Priority to PL09806186T priority patent/PL2370673T3/en
Priority to CN2009801530835A priority patent/CN102264998A/en
Priority to RU2011124898/03A priority patent/RU2011124898A/en
Priority to AP2011005750A priority patent/AP3679A/en
Priority to PE2011001116A priority patent/PE20120378A1/en
Priority to PCT/IB2009/007556 priority patent/WO2010061274A1/en
Priority to AU2016222451A priority patent/AU2016222451A1/en
Priority to AU2018202700A priority patent/AU2018202700A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/04Transport of mined material in gravity inclines; in staple or inclined shafts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • E21F13/066Scraper chain conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Extraction Or Liquid Replacement (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Disintegrating Or Milling (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

METODO PARA EXTRACCION CONTINUA DE MINERAL EN FAENAS SUBTERRANEAS, DESTINADO A LA PRODUCCION PERMANENTE DE EXTRACCION  DESDE LOS PUNTOS O ZANJAS DE EXPLOTACION CARACTERIZADO PORQUE COMPRENDE CONSTRUIR GALERIAS DE EXPLOCION DE TAMAÑO REDUCIDO, EN QUE POR EL CENTRO DEFINIDO POR UN GRUPO DE GALERIAS ATRAVIESA UNA CALLE DESTINADA AL TRANSPORTE DE MINERAL, DICHA CALLE ATRAVESANDO SUCESIVAMENTE TODOS LOS GRUPOS DE GALERIAS DEFINIDOS EN EL FRENTE DE EXPLOTACION, DICHOS PUNTOS DE EXTRACCION  SE DISPONEN DE MODO DE CONFIGURAR UNA MALLA REGULAR A DISTANCIAS DETERMINADAS COMPATIBLES CON UN FLUJO GRAVITACIONAL INTERACTIVO; UNA VEZ QUE DICHAS GALERIAS, ZANJAS Y DICHA CALLE DE TRANSPORTE SE ENCUENTRAN CONSTRUIDAS, SE PROCEDE A EFECTUAR LAS SIGUIENTES ETAPAS:<br /> A. PREACONDICIONAMIENTO, EL CUAL CONSISTE EN MODIFICAR LA ROCA IN SITU, POR MEDIO DE LA INTENSIFICACION DE SU GRADO DE FRACTURAMIENTO HASTA ALCANZAR NIVELES QUE LA DEJEN CON CARACTERISTICAS DE UN MACIZO SECUNDARIO; B. HUNDIMIENTO, EL CUAL CONSISTE EN HUNDIR EL MACIZO POR LA SOCAVACION DE SU BASE, MEDIANTE PROCEDIMIENTOS CONVENCIONALES EN AMBIENTES DE ROCA BIEN FRAGMENTADA, Y; <br /> C. EXTRACCION, QUE CONSISTE EN LA OPERACIÓN SIMULTANEA DESDE MULTIPLES PUNTOS DE EXTRACCION DEFINIDOS DURANTE LA ETAPA DE LA CONSTRUCCION DE DICHA GALERIA DE EXPLOTACION.METHOD FOR CONTINUOUS EXTRACTION OF MINERAL IN UNDERGROUND FAULES, INTENDED FOR PERMANENT PRODUCTION OF EXTRACTION FROM THE POINTS OR CHARACTERIZED EXPLOITATION DIVES BECAUSE IT UNDERSTANDS BUILD GALLERIES OF EXPLOITATION OF REDUCED SIZE, IN WHICH A CENTER ISSUED BY A CENTER ON THE TRANSPORTATION OF MINERAL, SUCH STREET SHALL THROUGH ALL THE GALLERY DEFINED GROUPS FRONT OF THE EXPLOITATION FRONT, THESE EXTRACTION POINTS ARE PROVIDED TO CONFIGURE A REGULAR MESH TO DETERMINED DISTANCES COMPATIBLE WITH A FLUXABLE DISTANCES; ONCE THAT SUCH GALLERIES, TANKS AND SUCH TRANSPORT STREET ARE FOUND, THE FOLLOWING STAGES ARE PROCESSED: <br /> A. PRE-CONDITIONING, WHICH IS TO MODIFY THE ROCK IN SITU, THROUGH THE GRADING OF FRACTURING UNTIL REACHING LEVELS THAT LEAVE IT WITH CHARACTERISTICS OF A SECONDARY MACIZO; B. SINK, WHICH CONSISTS OF SUNKING THE DEATH DUE TO THE SOCAVATION OF ITS BASE, BY CONVENTIONAL PROCEDURES IN ROAD ENVIRONMENTS WELL FRAGMENTED, AND; <br /> C. EXTRACTION, WHICH CONSISTS IN THE SIMULTANEOUS OPERATION FROM MULTIPLE POINTS OF EXTRACTION DEFINED DURING THE CONSTRUCTION STAGE OF SUCH EXPLOITATION GALLERY.

CL2008003560A 2008-11-28 2008-11-28 Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock. CL2008003560A1 (en)

Priority Applications (15)

Application Number Priority Date Filing Date Title
CL2008003560A CL2008003560A1 (en) 2008-11-28 2008-11-28 Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.
PCT/IB2009/007556 WO2010061274A1 (en) 2008-11-28 2009-11-25 Continuous mining
AU2009321259A AU2009321259A1 (en) 2008-11-28 2009-11-25 Continuous mining
CN2009801530835A CN102264998A (en) 2008-11-28 2009-11-25 continuous mining method
CA2745066A CA2745066C (en) 2008-11-28 2009-11-25 Continuous mining
MX2011005722A MX2011005722A (en) 2008-11-28 2009-11-25 Continuous mining.
US13/132,180 US20120181844A1 (en) 2008-11-28 2009-11-25 Continuous mining
RU2015126488A RU2702494C2 (en) 2008-11-28 2009-11-25 Continuous groove
PL09806186T PL2370673T3 (en) 2008-11-28 2009-11-25 Pre-conditioning for cave mining by fracturing
EP09806186.4A EP2370673B1 (en) 2008-11-28 2009-11-25 Pre-conditioning for cave mining by fracturing
RU2011124898/03A RU2011124898A (en) 2008-11-28 2009-11-25 CONTINUOUS DRAWING
AP2011005750A AP3679A (en) 2008-11-28 2009-11-25 Continuous mining
PE2011001116A PE20120378A1 (en) 2008-11-28 2009-11-25 METHOD FOR THE CONTINUOUS EXTRACTION OF MINERAL IN UNDERGROUND MILLS
AU2016222451A AU2016222451A1 (en) 2008-11-28 2016-09-01 Continuous mining
AU2018202700A AU2018202700A1 (en) 2008-11-28 2018-04-18 Continuous mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CL2008003560A CL2008003560A1 (en) 2008-11-28 2008-11-28 Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.

Publications (1)

Publication Number Publication Date
CL2008003560A1 true CL2008003560A1 (en) 2009-05-04

Family

ID=42077378

Family Applications (1)

Application Number Title Priority Date Filing Date
CL2008003560A CL2008003560A1 (en) 2008-11-28 2008-11-28 Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.

Country Status (12)

Country Link
US (1) US20120181844A1 (en)
EP (1) EP2370673B1 (en)
CN (1) CN102264998A (en)
AP (1) AP3679A (en)
AU (3) AU2009321259A1 (en)
CA (1) CA2745066C (en)
CL (1) CL2008003560A1 (en)
MX (1) MX2011005722A (en)
PE (1) PE20120378A1 (en)
PL (1) PL2370673T3 (en)
RU (2) RU2011124898A (en)
WO (1) WO2010061274A1 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102278114B (en) * 2011-09-01 2013-01-23 长沙矿山研究院 Stereo partition mass ore caving mining method
AU2014256811A1 (en) * 2014-02-26 2015-09-10 Guillermo BASUALTO LIRA Back and forth extractor/feeder placed into the drawpoints in underground caving mining
EP3090968A1 (en) 2015-05-07 2016-11-09 Caterpillar Global Mining Europe GmbH Material handling system and method of operating the same
CN105545307A (en) * 2015-12-11 2016-05-04 大同煤矿集团有限责任公司 Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
CN109458180B (en) * 2018-09-17 2020-07-14 东北大学秦皇岛分校 A mining method and ventilation and cooling system combined with the construction of an underground warehouse
RU2712848C1 (en) * 2019-05-08 2020-01-31 Федеральное государственное унитарное предприятие "Российский Федеральный ядерный центр - Всероссийский научно-исследовательский институт экспериментальной физики" (ФГУП "РФЯЦ-ВНИИЭФ") Underground mining method of mineral deposits
CN112253111B (en) * 2020-09-18 2025-04-15 中国恩菲工程技术有限公司 Block caving
CN112031771B (en) * 2020-09-18 2023-06-06 玉溪矿业有限公司 Cutting groove pulling method with safe construction
CN112414237B (en) * 2020-10-28 2022-09-16 云南迪庆有色金属有限责任公司 A kind of natural caving Faraday over-hard surrounding rock treatment method
CN113431581B (en) * 2021-07-26 2022-02-22 中南大学 Non-blasting mechanical intelligent mining method for deep hard rock ore body
CN114233258A (en) * 2021-12-08 2022-03-25 核工业二三O研究所 A Fracturing Method for Refractory Reservoir of Difficult-to-Leach Sandstone Uranium Ore
CN115680761B (en) * 2023-01-05 2023-04-07 山西冶金岩土工程勘察有限公司 Multi-layer goaf subsection grouting treatment construction process
CN118220741B (en) * 2024-05-22 2024-07-19 鄂尔多斯市神传矿用设备制造有限公司 Coal conveying equipment for coal mining

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1967115A (en) * 1932-06-13 1934-07-17 Louis F Gerdetz Method of mining coal
US2298599A (en) * 1941-03-15 1942-10-13 Mark A Smith Block cave mining method and plant
US2536869A (en) * 1946-06-22 1951-01-02 Philip B Bucky Mining method
US3707307A (en) * 1970-12-11 1972-12-26 Harry Kristoffersson Methods in mining by sublevel caving
SE364339B (en) * 1972-06-28 1974-02-18 Luossavaara Kiirunavaara Ab
SE404620B (en) * 1974-08-20 1978-10-16 Janelid Erik Ingvar PROCEDURE FOR BREAKING ROCK OR ORE ACCORDING TO THE BLOCKRAS PRINCIPLE IN MASSFUL BODIES
US4017121A (en) * 1974-11-25 1977-04-12 Allied Chemical Corporation Longwall mining of trona with prefracturing to prevent slabbing
US4279444A (en) * 1980-01-07 1981-07-21 Occidental Oil Shale, Inc. Jetting out weak areas for forming an in situ oil shale retort
SU883421A1 (en) * 1980-03-06 1981-11-23 Научно-Исследовательский Горнорудный Институт Method of explosion-breaking of ore
SE449122B (en) * 1980-05-06 1987-04-06 Vos Ni Gornorudny I SET AND DEVICE FOR UNDERGRADUATE
US4938536A (en) * 1989-11-22 1990-07-03 Lee Raymond C Conic mass caving structure and method
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
RU2114306C1 (en) * 1997-06-06 1998-06-27 Институт горного дела СО РАН Method for mining steep ore deposits by induced level caving with longwall stoping
CN1089399C (en) * 1997-12-23 2002-08-21 杨学政 gas fracturing method
AUPP209498A0 (en) * 1998-03-02 1998-03-26 Commonwealth Scientific And Industrial Research Organisation Hydraulic fracturing of ore bodies
RU2163968C2 (en) * 1999-06-01 2001-03-10 Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) Method of cover caving
RU2247607C2 (en) * 2003-05-12 2005-03-10 Акционерная компания "АЛРОСА" (ЗАО) Complex of dry concentration of diamond-containing kimberlite ore
AU2004251183B2 (en) * 2003-06-23 2008-03-06 Caterpillar Global Mining Europe Gmbh Method and device for extracting extraction products in underground mining
RU2261329C1 (en) * 2004-06-23 2005-09-27 Институт горного дела Сибирского отделения Российской академии наук Method for coal excavation from thick steeply beds
RU2283430C1 (en) * 2005-05-05 2006-09-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет)" Method for thick steep seams mining
DE102005043236B4 (en) * 2005-09-09 2016-08-04 Caterpillar Global Mining Europe Gmbh Arrangement for mining of mining products in underground mining operations in quarry construction
CN100497886C (en) * 2006-05-31 2009-06-10 段连权 Coal mining process including prop type mining and prop recovery

Also Published As

Publication number Publication date
AP2011005750A0 (en) 2011-06-30
CA2745066A1 (en) 2010-06-03
PL2370673T3 (en) 2019-12-31
EP2370673A1 (en) 2011-10-05
CN102264998A (en) 2011-11-30
MX2011005722A (en) 2012-06-01
RU2702494C2 (en) 2019-10-08
CA2745066C (en) 2018-10-23
US20120181844A1 (en) 2012-07-19
RU2015126488A (en) 2018-12-24
PE20120378A1 (en) 2012-04-26
AU2009321259A1 (en) 2011-06-30
AP3679A (en) 2016-04-17
AU2016222451A1 (en) 2016-09-29
EP2370673B1 (en) 2019-02-27
RU2011124898A (en) 2013-01-10
WO2010061274A1 (en) 2010-06-03
RU2015126488A3 (en) 2019-02-12
AU2018202700A1 (en) 2018-05-10

Similar Documents

Publication Publication Date Title
CL2008003560A1 (en) Method for the continuous extraction of mineral in underground works, destined for the permanent production of extraction from the points of exploitation, includes building exploitation galleries, in which the center defined by a group of galleries crosses a street to transport ore, and preconditioning of rock.
CL2012002324A1 (en) Block sinking mining method comprising, digging undercut tunnels, drilling undercut blast holes through the undercut tunnel roofs and placing and detonating explosive charges in those holes to fly rocks over the undercut tunnels, digging Tunnels at the extraction level at an extraction level below the undercut level.
AR090762A1 (en) SYSTEMS AND METHODS TO TREAT SUBSUPERFICIAL FORMATIONS CONTAINING FRACTURES
PE20120386A1 (en) A METHOD TO EXPLODE MINES
GEP20207062B (en) Tunnel construction method using pre-support and post-support
AR071495A1 (en) ROCK MODIFICATION EFFORT TECHNIQUE
FR3010192B1 (en) METHOD FOR OPERATING A UNDERGROUND STORAGE COMPRISING AT LEAST ONE GEOLOGICAL DISCHARGE USING PHOTOGRAMMETRY
CL2009000781A1 (en) Refuge chamber for miners in a mine, comprising: a platform and a tent arranged therein, in an undeployed state which is expandable to a deployed state and which extends from the platform to provide a protected atmosphere; method to provide a refuge chamber for miners.
BRPI1013925A2 (en) rare earth recovery process from a solid mixture containing at least one halophosphate and at least one compound from one or more rare earths.
EP2449213A4 (en) UNDERGROUND MINING
PE20150175A1 (en) METHOD OF EXPLOITATION OF POTASSIUM SALTS FROM AN UNDERGROUND DEPOSIT
BRPI0811595A2 (en) SYSTEM FOR DRILLING A WELL HOLE IN A GROUND FORMATION.
AR101134A1 (en) METHOD FOR PROVIDING A CEMENT AGGREGATE IN A UNDERGROUND FORMATION, CEMENT AGGREGATE AND SYSTEM USED
EA201592187A1 (en) PRODUCTION LINE OF ORE MINING, DOUBLE-INCLINED ROADS AND METHOD OF INSTALLATION OF OIL FIXTURE
BR112014018673A8 (en) DOWNLOAD TRANSPORT FACILITY TO BE LAUNCHED ON A SLOPE OF AN OPEN CAST MINING BOREHOLE, TRANSPORT CASCADE AND SYSTEM COMPRISING A DOWNLOAD TRANSPORT FACILITY
CL2011000312A1 (en) Method of exploitation of ore in a pit of a mine, which includes drilling and thundering the ore in a bank of the pit, collection of the threshed ore and delivery of the collected in at least one mobile crusher in the pit and transport of the crushed ore out of the pit on a ladder conveyor; And a mine.
AR097027A1 (en) COMPOSITIONS FOR WELL SERVICE AND METHODS FOR THEIR DEVELOPMENT AND USE
BRPI0716894A2 (en) UNDERGROUND HOUSING FOR INSTALLATION IN AN APPROPRIATE LAND EXCAVATED PLACE.
CN103362514B (en) Speedy tunneling method for gas drainage roadway
CN202338356U (en) Underground exit passageway system of coal mine
FI20085837A0 (en) Rock drilling rig, method of moving boom of mining vehicle, and mine vehicle
PE20190884A1 (en) AUTONOMOUS DRILLING MACHINE FOR CONSTRUCTION OF SERVICE CHIMNEYS AND FREE FACE
Sas et al. Debris flows as agents of landscape evolution in quartzite terrains of the central Appalachians, Virginia
AR125433A1 (en) DREDGING SYSTEM FOR ACCUMULATED SEDIMENTS IN WATER RESERVOIRS
RU2007144639A (en) METHOD FOR REDUCING ANTHROPOGENIC IMPACT ON THE ENVIRONMENT WHEN OPERATING GAS DEPOSITS AND UNDERGROUND GAS STORAGES