BE1020475A3 - TANDEM ROLLING SYSTEM OUTPUT AND OUTPUT METHOD WITH COUPLED WINDING CARROUSEL WITH ONLINE INSPECTION (II). - Google Patents
TANDEM ROLLING SYSTEM OUTPUT AND OUTPUT METHOD WITH COUPLED WINDING CARROUSEL WITH ONLINE INSPECTION (II). Download PDFInfo
- Publication number
- BE1020475A3 BE1020475A3 BE2012/0327A BE201200327A BE1020475A3 BE 1020475 A3 BE1020475 A3 BE 1020475A3 BE 2012/0327 A BE2012/0327 A BE 2012/0327A BE 201200327 A BE201200327 A BE 201200327A BE 1020475 A3 BE1020475 A3 BE 1020475A3
- Authority
- BE
- Belgium
- Prior art keywords
- winding
- inspection
- sample
- line
- shear
- Prior art date
Links
- 238000004804 winding Methods 0.000 title claims description 69
- 238000007689 inspection Methods 0.000 title claims description 56
- 238000005096 rolling process Methods 0.000 title claims description 17
- 238000000034 method Methods 0.000 title claims description 9
- 238000009434 installation Methods 0.000 claims description 15
- 239000002184 metal Substances 0.000 claims description 10
- 230000007547 defect Effects 0.000 claims description 6
- 239000002699 waste material Substances 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 239000010813 municipal solid waste Substances 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000005097 cold rolling Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 241001061132 Eutaeniophorus sp. 033-Miya Species 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 230000037452 priming Effects 0.000 description 2
- 239000000470 constituent Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000005098 hot rolling Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000011179 visual inspection Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Winding, Rewinding, Material Storage Devices (AREA)
Description
INSTALLATION ET PROCEDE DE SORTIE DE LAMINOIR TANDEM AVEC CARROUSEL DE BOBINAGE COUPLEE AVEC UNE INSPECTION EN LIGNEINSTALLATION AND METHOD OF TANDEM ROLLER OUTPUT WITH COUPLED WINDING CARROUSEL WITH INSPECTION ONLINE
(II)(II)
Objet de l'inventionObject of the invention
[0001] La présente invention concerne une installation et un procédé industriels se rapportant au domaine technique des laminoirs de bandes métalliques, en particulier de type tandem avec station de bobinage continu, présentant en fin de laminage une table d'inspection du produit laminé et en cours de bobinage.The present invention relates to an industrial plant and process relating to the technical field of metal strip rolling mills, in particular tandem type with continuous winding station, having at the end of rolling an inspection table of the rolled product and in winding course.
Arrière-plan technologique et état de la techniqueTechnological background and state of the art
[0002] Le bobinage de bande par bobines, de tension à carrousel, que nous appellerons plus simplement bobinage à carrousel, est bien connu en guise de système de bobinage final en laminage continu, tant au laminoir à froid qu'au laminoir à chaud.The coil winding of coils, of carousel tension, which we shall call more simply carousel winding, is well known as a final winding system in continuous rolling, both at the cold rolling mill and hot rolling mill.
[0003] La séquence de bobinage est la suivante : - le carrousel est en position de réception avec l'enrouleur à courroie relevé autour du mandrin N°1 en position inférieure, le mandrin N°2 libre étant en position supérieure à 180°; - une fois l'amorçage de la bande effectué, l'enrouleur à courroie se rétracte et le bobinage de la bobine N°1 se poursuit ; - alors que le bobinage se poursuit, tout le carrousel tourne de 180° dans le sens des aiguilles d'une montre si la bande vient de gauche (sinon dans le sens contraire) , ce qui place la bobine N°1 en cours de bobinage en position d'évacuation et le mandrin libre en position de réception pour l'extrémité avant de la prochaine bande à bobiner ; - à la fin du bobinage de la bobine N°l, la puissance est transférée au mandrin N°2. La bobine N°1 est évacuée et le prochain cycle de bobinage commence.The winding sequence is as follows: the carousel is in the receiving position with the belt winder raised around the mandrel No. 1 in the lower position, the free mandrel No. 2 being in the upper position at 180 °; - Once the tape is primed, the belt retractor retracts and the winding of the reel No. 1 continues; - while the winding continues, the entire carousel rotates 180 ° in the direction of clockwise if the band comes from the left (if not in the opposite direction), which places the coil No. 1 during winding in the evacuation position and the free mandrel in the receiving position for the front end of the next web to be wound; - At the end of the winding of the coil No. 1, the power is transferred to the mandrel No. 2. Coil No. 1 is evacuated and the next winding cycle begins.
[0004] Les détails de réalisation des moyens constitutifs du carrousel de bobinage tels que l'enrouleur à courroie, la position des mandrins, le dispositif de support et d'évacuation des mandrins, etc. sont bien connus de l'homme de métier.The embodiment details of the constituent means of the winding carousel such as the belt winder, the position of the mandrels, the device for supporting and evacuating the mandrels, etc. are well known to those skilled in the art.
[0005] Un problème qui se pose est de détecter le plus tôt possible dans le procédé de fabrication les défauts qui peuvent être rédhibitoires pour la bande laminée, comme par exemple des défauts de surface, de géométrie, d'épaisseur, de planéité, etc. Une inspection séparée de la ligne n'est pas envisageable car elle est désavantageuse du point de vue de la perte de temps et donc du point de vue économique.A problem that arises is to detect as early as possible in the manufacturing process defects that can be unacceptable for the rolled strip, such as surface defects, geometry, thickness, flatness, etc. . A separate inspection of the line is not possible because it is disadvantageous from the point of view of the loss of time and therefore from the economic point of view.
[0006] Le document JP 2000 254725 divulgue une installation de laminage à froid comprenant, montés dans cet ordre sur la ligne, un laminoir à froid, une cisaille mobile qui sectionne la bande d'acier produite en continu par le laminoir, un appareil de bobinage de tension à double mandrin, de type enrouleur à carrousel, qui bobine la bande d'acier en continu. Le bobineur à carrousel est positionné en aval et en dessous de la ligne de passe du laminoir à froid et un appareil d'inspection de surface qui inspecte la surface de la bande d'acier, est situé en aval sur une extension de la ligne de passe qui passe au-dessus du bobineur à carrousel. L'installation est pourvue de moyens d'aiguillage pour diriger la bande vers l'enrouleur à carrousel ou alternativement vers l'appareil d'inspection de surface, positionnés à l'extérieur de la cisaille mobile.[0006] JP 2000 254725 discloses a cold rolling plant comprising, mounted in this order on the line, a cold rolling mill, a movable shear which cuts the steel strip produced continuously by the rolling mill, an apparatus for double mandrel tension winding, of the carrousel winder type, which continuously coils the steel strip. The carousel winder is positioned downstream and below the cold rolling line and a surface inspection apparatus which inspects the surface of the steel strip, is located downstream on an extension of the line of pass that passes over the carousel coiler. The installation is provided with switching means for directing the strip towards the carousel reel or alternatively to the surface inspection apparatus, positioned outside the moving shear.
[0007] Le document EP 1 581 355' divulgue un procédé pour le laminage et le bobinage successifs d'une bande métallique, en particulier une bande d'acier, sur un mandrin de bobinage entraîné en rotation et susceptible d'être écarté, dans lequel la bande métallique est inspectée en portions longitudinales par rapport à des anomalies de laminage. Les échantillons de bande sont produits par une cisaille à tambour se trouvant après la dernière cage de laminage, guidés et arrêtés « en ligne » à l'intérieur de la ligne de laminage au-dessus d'une station de bobinage située en contrebas de la ligne de laminage, sur une table d'inspection, pour une inspection visuelle libre.[0007] EP 1 581 355 discloses a method for rolling and winding a metal strip, in particular a steel strip, on a winding mandrel which is rotated and can be removed, which the metal strip is inspected in longitudinal portions with respect to rolling anomalies. The strip samples are produced by a drum shear located after the last rolling stand, guided and stopped "in line" inside the rolling line above a winding station located below the rolling line. rolling line, on an inspection table, for a free visual inspection.
[0008] La station de bobinage est donc située sous le plan de la table d'inspection, cette dernière étant disposée « en ligne » avec la ligne de laminage. Ici également, la bande d'acier qui émerge de la dernière cage de laminage peut être guidée de telle sorte qu'une unité déflectrice, aménagée à l'entrée de la station de bobinage, peut dévier la bande métallique vers un mandrin de bobinage.The winding station is located under the plane of the inspection table, the latter being arranged "in line" with the rolling line. Here again, the steel strip emerging from the last rolling stand can be guided so that a baffle unit, arranged at the entrance of the winding station, can deflect the metal strip towards a winding mandrel.
[0009] Généralement, la table d'inspection est munie de moyens de préhension qui permettent de retourner les échantillons de bande afin d'inspecter également l'autre face.[0009] Generally, the inspection table is provided with gripping means which make it possible to return the strip samples in order to also inspect the other face.
[0010] De plus, après l'inspection sur la table d'inspection, les échantillons de bande sont acheminés vers une cisaille qui les réduit en morceaux avant collecte par gravité dans un bac ou wagon à déchets.In addition, after the inspection on the inspection table, the tape samples are routed to a shear which reduces them to pieces before collection by gravity in a bin or waste car.
[0011] Les solutions telles que décrites ci-dessus présentent des avantages sur 1'inspection séparée hors ligne : temps d'accès court et inspection rapide, utilisation seulement d'un échantillon de la bande et donc pas de nécessité de retirer une bobine entière du flux de matières. Elles présentent cependant le désavantage d'utiliser un système à aiguillage ou déflecteur.[0011] The solutions as described above have advantages over the separate off-line inspection: short access time and fast inspection, use only of a sample of the tape and therefore no need to remove a whole reel material flow. However, they have the disadvantage of using a switching system or deflector.
Buts de 11 inventionGoals of 11 invention
[0012] La présente invention a pour but de permettre la réalisation d'une inspection rapide et peu coûteuse de bandes métalliques laminées dans une installation de laminage fonctionnant en continu, en ce compris la station de bobinage.The present invention aims to enable the realization of a quick and inexpensive inspection of rolled metal strips in a rolling plant operating continuously, including the winding station.
[0013] L'invention vise aussi à réaliser une installation simple et fiable pour effectuer cette inspection.The invention also aims to achieve a simple and reliable installation to perform this inspection.
[0014] L' invention a encore pour but de fournir une installation qui puisse s'insérer dans une ligne existante, où l'on dispose de très peu de place en longueur.The invention also aims to provide an installation that can fit into an existing line, where there is very little room in length.
Principaux éléments caractéristiques de 11 inventionMain features of invention
[0015] Un premier aspect de la présente invention se rapporte à un procédé de bobinage et d'inspection en ligne d'une bande métallique laminée en continu, comprenant une étape de bobinage en continu sur au moins un mandrin d'une station de bobinage, de préférence à carrousel, caractérisé par au moins les étapes suivantes : - la bande est sectionnée par une cisaille se trouvant avant le bobinage, avance sur une certaine longueur sur une table d'introduction de manière à couvrir au moins partiellement celle-ci et est sectionnée une deuxième fois par la cisaille afin d'obtenir un échantillon ; - le bobinage de la bobine réalisée sur le mandrin est terminé et la bobine est évacuée de la station de bobinage ; - parallèlement, la table d'introduction portant l'échantillon est déplacée parallèlement à la ligne de laminage-bobinage jusqu'à se trouver dans le prolongement d'une ligne d'inspection comportant une table d'inspection ; - l'échantillon est inspecté sur la table d'inspection en vue de déceler des défauts ; - une fois que l'échantillon a quitté la table d'introduction, celle-ci est replacée dans la ligne de laminage-bobinage, pour permettre le bobinage d'une nouvelle bobine.A first aspect of the present invention relates to a winding process and online inspection of a continuous rolled metal strip, comprising a step of continuous winding on at least one mandrel of a winding station , preferably carousel, characterized by at least the following steps: - the band is cut by a shear before winding, advance over a certain length on an introduction table so as to cover at least partially this and is cut a second time by the shears to obtain a sample; - The winding of the coil made on the mandrel is completed and the coil is removed from the winding station; in parallel, the introduction table carrying the sample is moved parallel to the rolling-winding line until it is in the extension of an inspection line comprising an inspection table; - the sample is inspected on the inspection table for defects; - Once the sample has left the introduction table, it is placed in the rolling-winding line, to allow the winding of a new coil.
[0016] Selon des formes d'exécution préférées de l'invention, le procédé comporte une ou une combinaison appropriée des étapes suivantes : - au niveau de la table d'inspection, l'échantillon de bande est inspecté sur une première face, puis retourné et inspecté sur sa seconde face ; - après inspection, l'échantillon est acheminé de la table d'inspection vers une table d'évacuation, à l'extrémité de laquelle se trouve une deuxième cisaille qui découpe l'échantillon en morceaux qui sont ensuite dirigés vers un bac à déchets ou similaire.According to preferred embodiments of the invention, the method comprises one or a suitable combination of the following steps: at the level of the inspection table, the strip sample is inspected on a first face, then returned and inspected on his second face; - after inspection, the sample is routed from the inspection table to an evacuation table, at the end of which is a second shear which cuts the sample into pieces which are then directed to a waste container or similar.
[0017] Un second aspect de la présente invention concerne une installation de bobinage et d'inspection en ligne d'une bande métallique laminée en continu, comprenant, en aval de la dernière cage de laminage, une première cisaille, une station de bobinage sur au moins un mandrin et une table d'inspection pour déceler des défauts sur au moins une face d'un échantillon de la bande, caractérisée en ce que la table d'inspection fait partie d'une ligne séparée dite d'inspection, parallèle à la ligne de laminage-bobinage et en ce que l'installation comporte en outre une table d'introduction, située initialement entre la cisaille et la station de bobinage dans la ligne de laminage-bobinage et pouvant être déplacée de cette ligne vers la ligne d'inspection au moyen d'un convoyeur, la table d'introduction permettant de transporter vers la table d'inspection un échantillon de bande obtenue en queue de bande au moyen de ladite cisaille par deux sectionnements successifs de la bande pour obtenir une longueur d'échantillon déterminée correspondant au moins partiellement à la longueur de la table d'introduction.A second aspect of the present invention relates to a winding installation and online inspection of a continuous rolled metal strip, comprising, downstream of the last roll stand, a first shear, a winding station on at least one mandrel and an inspection table for detecting defects on at least one side of a sample of the strip, characterized in that the inspection table is part of a separate inspection line, parallel to the winding-winding line and in that the installation further comprises an infeed table, initially situated between the shear and the winding station in the winding-winding line and which can be moved from this line to the line d inspection by means of a conveyor, the introduction table for conveying to the inspection table a band sample obtained at the tail end by means of said shear by two successive sectioning of the nde to obtain a determined sample length corresponding at least partially to the length of the introduction table.
[0018] Avantageusement, la station de bobinage est une station à carrousel.[0018] Advantageously, the winding station is a carousel station.
[0019] Toujours avantageusement, l'installation comporte, au niveau de la table d'inspection, des moyens de préhension à pinces qui permettent de retourner l'échantillon, pour en inspecter l'autre face.Still advantageously, the installation comprises, at the inspection table, clamping means for gripping the sample, to inspect the other side.
[0020] Encore avantageusement, dans la ligne d'inspection, la table d'inspection est prolongée par une table d'évacuation, à l'extrémité de laquelle se trouve une deuxième cisaille pour découper l'échantillon en morceaux, ainsi qu'un bac à déchets ou similaire.Still advantageously, in the inspection line, the inspection table is extended by a discharge table, at the end of which is a second shear to cut the sample into pieces, and a waste bin or the like.
Brève description des figuresBrief description of the figures
[0021] La figure 1 représente une vue en plan de la station de bobinage à carrousel couplée avec une table d'inspection selon une forme d'exécution préférée de la présente invention.Figure 1 shows a plan view of the carousel winding station coupled with an inspection table according to a preferred embodiment of the present invention.
[0022] La figure 2 représente deux vues longitudinales en coupe, AA et BB respectivement, de la station de bobinage à carrousel selon la figure 1.FIG. 2 represents two longitudinal sectional views, AA and BB respectively, of the carousel winding station according to FIG. 1.
Description d'une forme d1 exécution préférée de 11 inventionDescription of a preferred embodiment of the invention
[0023] Un mode d'exécution préféré de l'installation selon l'invention est représenté sur les figures 1 et 2.A preferred embodiment of the installation according to the invention is shown in Figures 1 and 2.
[0024] L' installation comporte successivement, à la sortie de la dernière cage du laminoir tandem, dans le sens de déplacement de la bande métallique (ligne de passe 100) : - une première cisaille 4 permettant de réaliser un échantillon de bande ; - une table d'introduction 6 ; - un convoyeur 15 permettant de déplacer la table d'introduction 6 parallèlement à elle-même, en dehors de la ligne de laminage-bobinage en continu ; - dans une direction parallèle à la ligne de laminage-bobinage en continu, successivement, une table d'inspection 8 et - des moyens de pinçage 8', 8'' de l'échantillon de bande, en vue de retourner celui-ci ; - une table d'évacuation 12 ; - une deuxième cisaille 13 ; - un bac à déchets 14 ; - dans la ligne de laminage-bobinage en continu, un carrousel 3 équipé d'un premier mandrin supérieur droit 10 pour la confection d'une bobine 1, 1', 1'', etc., muni d'un support nez-mandrin 9, d'un second mandrin inférieur gauche 20 pour la confection d'une bobine 2, 2', 2'', etc., muni d'un support nez-mandrin 11 et d'un enrouleur à courroie 5 pour l'amorçage de l'enroulement sur le mandrin 20 ; -. des moyens d'évacuation 16 des bobines terminées 1, 1', 1'', etc.The installation comprises, successively, at the outlet of the last cage of the tandem mill, in the direction of movement of the metal strip (line 100): - a first shear 4 for making a strip sample; an introduction table 6; a conveyor 15 making it possible to move the insertion table 6 parallel to itself, outside the rolling-winding line continuously; in a direction parallel to the continuous rolling-rolling line, successively, an inspection table 8 and clamping means 8 ', 8' 'of the strip sample, in order to turn it over; an evacuation table 12; a second shear 13; a waste bin 14; in the continuous rolling-winding line, a carousel 3 equipped with a first right upper mandrel 10 for the manufacture of a spool 1, 1 ', 1' ', etc., provided with a nose-mandrel support 9, a second lower left mandrel 20 for the manufacture of a coil 2, 2 ', 2' ', etc., provided with a nose-mandrel support 11 and a belt reel 5 for priming winding on the mandrel 20; -. evacuation means 16 of the completed coils 1, 1 ', 1' ', etc.
[0025] La séquence d'opérations effectuées sur cette installation est décrite ci-après. L'ordre dans lequel les opérations sont décrites ci-après n' est pas nécessairement (toujours) chronologique. Certaines opérations peuvent se dérouler en parallèle et être simultanées.The sequence of operations performed on this installation is described below. The order in which the operations are described below is not necessarily (always) chronological. Some operations can run in parallel and be simultaneous.
Etape 1Step 1
[0026] Tout d'abord, la vitesse de défilement de la bande et la vitesse de rotation du mandrin de droite et supérieur 10 sont diminuées.First, the speed of travel of the band and the speed of rotation of the mandrel of the right and upper 10 are decreased.
[0027] La bande de la bobine dite « N°1 » 1 (sur le mandrin de droite et supérieur 10) est coupée une première fois à la première cisaille 4, ce qui génère une queue de bande de la bobine 1 qui va être bobinée.The strip of the coil called "No. 1" 1 (on the chuck right and upper 10) is cut a first time to the first shear 4, which generates a tape tail of the coil 1 which is going to be wound.
[0028] La bande avance encore de Y mètres sur la table d'introduction 6 avant d'être à nouveau coupée par la cisaille 4, afin d'obtenir un échantillon qui .couvre tout ou partie de la longueur de la table d'introduction 6.The tape is still Y meters on the introduction table 6 before being cut again by the shears 4, to obtain a sample that covers all or part of the length of the introductory table 6.
[0029] Le convoyeur 15 déplace la table d'introduction 6 avec l'échantillon parallèlement à elle-même et à la ligne de laminage-bobinage, jusqu'à ce qu'elle soit positionnée selon la ligne d'inspection, en vis-à-vis de la table d'inspection 8. A ce moment le défilement de la bande est arrêté complètement. Pendant ce temps, la bobine 1 est enroulée complètement.The conveyor 15 moves the introduction table 6 with the sample parallel to itself and to the rolling-winding line, until it is positioned along the inspection line, facing the to the inspection table 8. At this time the tape scrolling is stopped completely. During this time, the coil 1 is wound up completely.
[0030] Le support nez-mandrin 9, supportant le mandrin de droite 10, est évacué. La bobine « N°1 » 1 est alors retirée du mandrin de droite 10 et évacuée avec des moyens d'évacuation 16.The nose-mandrel support 9, supporting the right mandrel 10, is evacuated. The "No. 1" coil 1 is then removed from the right mandrel 10 and discharged with discharge means 16.
[0031] L' échantillon coupé avance sur la table d'inspection 8 et l'échantillon est inspecté sur une première face. Les extrémités de l'échantillon sont pincées par des moyens de pinçage 8', 8'' et l'échantillon est retourné (non représenté). L'autre face de l'échantillon est inspectée. Les extrémités de l'échantillon sont « dépincées ». L'échantillon avance sur la table d'évacuation 12, au bout de laquelle une cisaille 13 découpe l'échantillon en morceaux, qui seront dirigés ensuite vers un bac ou un wagonnet à déchets 14The cut sample advances on the inspection table 8 and the sample is inspected on a first face. The ends of the sample are pinched by pinching means 8 ', 8' 'and the sample is returned (not shown). The other side of the sample is inspected. The ends of the sample are "peeled off". The sample advances on the discharge table 12, at the end of which a shear 13 cuts the sample into pieces, which will then be directed to a bin or a waste car.
Etape 22nd step
[0032] Une fois que l'échantillon est passé sur la table d'inspection 8 et que la table d'introduction 6 est libérée, cette dernière est renvoyée dans l'autre sens par le convoyeur 15, jusqu'à ce qu'elle reprenne sa place dans la ligne de laminage-bobinage.Once the sample is passed on the inspection table 8 and the introduction table 6 is released, the latter is returned in the other direction by the conveyor 15, until it resumes its place in the rolling-winding line.
[0033] La tête de bande suivante avance sur la table d'introduction 6 jusqu'au carrousel de bobinage 3 et la bobine dite « N°2 » 2 commence à être bobinée sur le mandrin de gauche et inférieur 20. Une fois que quelques spires sont bobinées, l'enrouleur à courroie 5 utilisé pour l'amorçage de l'enroulement de la bande est évacué. La vitesse de bobinage augmente.The next tape head advances on the introduction table 6 to the carousel winding 3 and the coil called "No. 2" 2 begins to be wound on the chuck left and lower 20. Once a few turns are wound, the belt winder 5 used for priming the winding of the band is evacuated. The winding speed increases.
[0034] Le support nez-mandrin 11, supportant le mandrin de gauche 20, est évacué et le bobinage poursuivi. Au cours de celui-ci, le carrousel 3 tourne de 180° dans le sens des aiguilles d'une montre.The nose-mandrel support 11, supporting the left mandrel 20, is evacuated and the winding continued. During this one, the carousel 3 rotates 180 ° in the direction of clockwise.
[0035] Une fois la rotation du carrousel 3 terminée, le support nez-mandrin 9 se met en position pour supporter le nouveau mandrin de droite et supérieur 10. Le bobinage de la nouvelle bobine « N°2 » 1' se poursuit donc sur le nouveau mandrin de droite et supérieur 10.Once the rotation of the carousel 3 is completed, the nose-mandrel support 9 is placed in position to support the new mandrel right and upper 10. The winding of the new coil "No. 2" 1 'continues so on the new right and upper chuck 10.
[0036] Le support nez-mandrin 11 se met en position pour supporter le nouveau mandrin de gauche et inférieur 20. L'enrouleur à courroie 5 utilisé pour l'amorçage de l'enroulement de la bande est mis en position de fonctionnement.The nose-mandrel support 11 is placed in position to support the new mandrel left and lower 20. The belt winder 5 used for the initiation of the winding of the strip is put in the operating position.
Etape 3Step 3
[0037] La vitesse de défilement de la bande et la vitesse de rotation du mandrin de droite et supérieur 10 sont diminuées.The tape speed and the speed of rotation of the mandrel of the right and upper 10 are decreased.
[0038] La bande de la bobine « N°2 » 1' est une première fois coupée à la cisaille 4, ce qui génère une queue de bande de la bobine 1' qui va être bobinée. La bande avance encore de Y mètres sur la table d'introduction 6 avant d'être à nouveau coupée par la cisaille 4, afin d'obtenir un échantillon qui couvre toute la longueur de la table d'introduction 6. L'inspection se fait alors comme ci-dessus. Le bobinage de la bobine « N°2 » est terminé et la bobine évacuée. Une fois, la table d'introduction de retour en ligne de laminage-bobinage, une bobine « N°3 » 2' va pouvoir être bobinée sur le mandrin de gauche et inférieur 10. Une fois que quelques spires sont bobinées, l'enrouleur à courroie 5 est évacué. La vitesse de bobinage augmente et ainsi de suite.The tape of the coil "No. 2" 1 'is a first time cut to the shear 4, which generates a tape tail of the coil 1' which will be wound. The tape is further advanced Y meters on the introduction table 6 before being cut again by the shears 4, to obtain a sample that covers the entire length of the introduction table 6. The inspection is done then as above. The winding of the "No. 2" spool is completed and the spool evacuated. Once, the roll-winding return line introduction table, a "No. 3" coil 2 'will be able to be wound on the mandrel left and lower 10. Once a few turns are wound, the winder belt 5 is evacuated. The winding speed increases and so on.
Claims (7)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261595403P | 2012-02-06 | 2012-02-06 | |
| US201261595403 | 2012-02-06 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BE1020475A3 true BE1020475A3 (en) | 2013-11-05 |
Family
ID=46633923
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BE2012/0327A BE1020475A3 (en) | 2012-02-06 | 2012-05-16 | TANDEM ROLLING SYSTEM OUTPUT AND OUTPUT METHOD WITH COUPLED WINDING CARROUSEL WITH ONLINE INSPECTION (II). |
Country Status (1)
| Country | Link |
|---|---|
| BE (1) | BE1020475A3 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000254725A (en) * | 1999-03-05 | 2000-09-19 | Hitachi Ltd | Cold rolling equipment |
| WO2004060589A1 (en) * | 2003-01-06 | 2004-07-22 | Sms Demag Aktiengesellschaft | Method and plant for rolling and subsequent reeling of metal strip in particular steel strip |
| WO2006051239A1 (en) * | 2004-11-10 | 2006-05-18 | Siemens Vai Metals Technologies Sas | Method and device for the inspection of a rolled strip |
| WO2009047395A1 (en) * | 2007-10-08 | 2009-04-16 | Siemens Vai Metals Technologies Sas | Device for inspecting a metal strip |
-
2012
- 2012-05-16 BE BE2012/0327A patent/BE1020475A3/en active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000254725A (en) * | 1999-03-05 | 2000-09-19 | Hitachi Ltd | Cold rolling equipment |
| WO2004060589A1 (en) * | 2003-01-06 | 2004-07-22 | Sms Demag Aktiengesellschaft | Method and plant for rolling and subsequent reeling of metal strip in particular steel strip |
| WO2006051239A1 (en) * | 2004-11-10 | 2006-05-18 | Siemens Vai Metals Technologies Sas | Method and device for the inspection of a rolled strip |
| WO2009047395A1 (en) * | 2007-10-08 | 2009-04-16 | Siemens Vai Metals Technologies Sas | Device for inspecting a metal strip |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2205369B1 (en) | Device for inspecting a metal strip | |
| EP1824619B1 (en) | Method and device for the inspection of a rolled strip | |
| US8117733B2 (en) | Apparatus and method for removing a film of a package of objects | |
| CH649516A5 (en) | Automatic process to place rolls on a support. | |
| CA2508958C (en) | Method and apparatus for rolling and winding into coils (reeling) metal strip, especially steel strip | |
| EP2812132B1 (en) | Installation and output method of tandem mill with winding carousel coupled with in-line inspection | |
| EP2013125B1 (en) | Method and installation for inspecting a wound strip | |
| EP2279049A1 (en) | Device and method for winding sheared waste from steel band edges | |
| EP2664390B1 (en) | Installation and output method of tandem mill with winding carousel coupled with in-line inspection | |
| EP1917113B1 (en) | Inspection method | |
| JP2000254725A (en) | Cold rolling equipment | |
| BE1020475A3 (en) | TANDEM ROLLING SYSTEM OUTPUT AND OUTPUT METHOD WITH COUPLED WINDING CARROUSEL WITH ONLINE INSPECTION (II). | |
| BE1021536B1 (en) | INSTALLATION AND METHOD OF TANDEM ROLLER OUTPUT WITH COUPLED WINDING CARROUSEL WITH ONLINE INSPECTION (I) | |
| EP2664391A1 (en) | Installation and output method of tandem mill with winding carousel coupled with in-line inspection | |
| FR2770503A1 (en) | CONTINUOUS SHEET PRODUCT WINDING MACHINE FOR FORMING COILS | |
| CN104169016B (en) | Tandem mill output intent and the equipment with the winding conveyer belt coupled with online verifying attachment | |
| CN104169017B (en) | Winding for tandem rolling sheet metal strip and the method and apparatus at X-ray inspection X | |
| WO2009034248A1 (en) | Method for rolling metal strips | |
| EP1161875A1 (en) | Machine for rolling bacon slices |