AU2013227436B2 - Shuttering for concrete slab - Google Patents
Shuttering for concrete slab Download PDFInfo
- Publication number
- AU2013227436B2 AU2013227436B2 AU2013227436A AU2013227436A AU2013227436B2 AU 2013227436 B2 AU2013227436 B2 AU 2013227436B2 AU 2013227436 A AU2013227436 A AU 2013227436A AU 2013227436 A AU2013227436 A AU 2013227436A AU 2013227436 B2 AU2013227436 B2 AU 2013227436B2
- Authority
- AU
- Australia
- Prior art keywords
- slab
- shuttering
- casting
- slabs
- concrete slabs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/001—Paving elements formed in situ; Permanent shutterings therefor ; Inlays or reinforcements which divide the cast material in a great number of individual units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/10—Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
- E01C19/504—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes adapted to, or provided with, means to maintain reinforcing or load transfer elements in a required position
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/508—Devices or arrangements for forming individual paving elements in situ, e.g. by sectioning a freshly-laid slab
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/14—Puzzle-like connections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A method of laying concrete slabs comprising: • providing shuttering having a regular wave shape along a side of a first slab to be cast at which side a second slab will subsequently be cast; · casting the first slab; • removing the regular-wave-shape shuttering; • casting a second slab, whereby the slabs have inter-digitated protrusions of the regular wave shape along their adjoining sides.
Description
IP Gateway Patent and Trade Mark Attorneys Pty Ltd, PO Box 1321, SPRINGWOOD, QLD, 4127, AU (56) Related Art
GB 432809 A DE 3533077 A1 US 1505174 A (12) INTERNATIONAL APPLICATION PUBLISHED UNDER THE PATENT COOPERATION TREATY (PCT) (19) World Intellectual Property Organization
International Bureau (43) International Publication Date 6 September 2013 (06.09.2013)
WIPOIPCT (51) International Patent Classification:
E01C19/50 (2006.01) E01C 9/00 (2006.01) (21) International Application Number:
PCT/GB2013/000072 (22) International Filing Date:
February 2013 (22.02.2013) (25) Filing Language: English (26) Publication Language: English (30) Priority Data:
1203477.3 28 February 2012 (28.02.2012) GB (71) Applicant: PERMABAN LIMITED [GB/GB]; Mill Close, Lee Mill Industrial Estate, Ivyvridge, Devon PL21 9GL (GB).
(72) Inventor: KEEN, Andrew; Abbots Mead, Exeter Road, Ivybridge, Devon PL21 0BG (GB).
(74) Agent: NIGEL BROOKS CPA; Hill Hampton, East Meon, Petersfield, Hampshire GU32 1QN (GB).
(81) Designated States (unless otherwise indicated, for every kind of national protection available)·. AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DK, DM, DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IS, JP, KE, KG, KM, KN, KP, (10) International Publication Number
WO 2013/128152 A3
KR, KZ, LA, LC, LK, LR, LS, LT, LU, LY, MA, MD, ME, MG, MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW.
(84) Designated States (unless otherwise indicated, for every kind of regional protection available)·. ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, SZ, TZ, UG, ZM, ZW), Eurasian (AM, AZ, BY, KG, KZ, RU, TJ, TM), European (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, ΓΓ, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR), OAPI (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, ML, MR, NE, SN, TD, TG).
Declarations under Rule 4.17:
— of inventorship (Rule 4.17(iv))
Published:
— with international search report (Art. 21(3)) — before the expiration of the time limit for amending the claims and to be republished in the event of receipt of amendments (Rule 48.2(h)) (88) Date of publication of the international search report:
February 2014 (54) Title: SHUTTERING FOR CONCRETE SLAB
WO 2013/128152 A3
(57) Abstract: A method of laying concrete slabs comprising: · providing shuttering having a regular wave shape along a side of a first slab to be cast at which side a second slab will subsequently be cast; · casting the first slab; · removing the regular-wave-shape shuttering; · casting a second slab, whereby the slabs have inter-digitated protrusions of the regular wave shape along their adjoining sides.
2013227436 26 Mar 2018
CONCRETE SHUTTERING
FIELD
The present disclosure relates to shuttering and concrete laid with it.
DEFINITION
In the specification, the term “comprising” shall be understood to have a broad meaning similar to the term “including” and will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. This definition also applies to variations on the term “comprising” such as “comprise” and “comprises”.
BACKGROUND
Concrete is laid in shuttering, or formwork, which is often timber-work, which 15 is removed after the concrete has set to the green state. This is a state which is hard to touch, but is not yet cured to full strength. As is well known, concrete is strong in compression, but less strong in tension and shear.
Traditionally for concrete slabs laid at ground level timber shuttering has been 20 used. Once the shuttering has been removed when the laid concrete is has set to its green state, a neighbouring slab can be laid against a previously cast slab. There are limits to the sizes of slab that can be laid, largely because as concrete cures to full strength, it shrinks. Thus gaps develop between adjacent slaps. At these gaps sharp edges between the horizontal face of the slab and its vertical face are exposed. The sharp edges are known as arrises.
Application of vertical load to a horizontal slab face close to its free vertical face results in shear stress at the respective arris, which stress can be higher than the concrete can resist. The result is cracking of the arris, also known as spalling. We have produced a variety of so called “joints” which reinforce arrises, whilst at the same time allowing the concrete to shrink. Most joints include complementary arris protection members firmly connected into the concrete on their sides, with gaps arising between the complementary members.
2013227436 26 Mar 2018
Much of the stress in unprotected arrises arises due to vehicle wheels dropping slightly into the gaps between the slabs and impacting the arris towards which the wheel is rolling. The individual wheels drop little, but the cumulative fatigue stress can result in comparative rapid spalling, in particular where tyres are solid as opposed to pneumatic.
In our recently filed patent application No 1115940.7, we have proposed a free movement, arris protection, construction joint for dividing two concrete slabs to be poured on opposite side of it, the joint comprising:
· a pair of elongate fabrications one for each side of the joint, the fabrications being:
• both provided with features for anchoring them in the concrete slabs formed on opposite sides of the joint, • frangibly connected to each other, whereby as the concrete cures and the slabs move away from each other, with the fabrications remaining anchored to the slabs with connections breaking, • both provided with arris protection members one at each side of the joint, at least one of them being configured to act as a divider during the pouring of concrete on respective sides of the joint:
· the arris protection members being formed with a regular wave shape along the length of the joint, with each member regularly and oppositely extending across a mid-plane of the joint suit and • the regular wave shape extending throughout the depth of the arris protection members.
We proposed the regular wave shape to reduce the ability of a wheel to drop into the gap between the arris protection members. Without the drop, the wheel does not impact the members so severely, lowering their task in preserving the concrete from shear stress.
The reference to prior art in this specification is not and should not be taken as an acknowledgment or any form of suggestion that the referenced prior art forms part of the common general knowledge in Australia or in any other country.
2013227436 12 Jun2018
SUMMARY OF THE DISCLOSURE
Applicant believes that for certain applications, a regular wave shape gap between two arrises can restrict the shear stresses to levels such that arris protection members are not required.
According to one aspect of the disclosure there is provided a method of laying first and second concrete slabs, the method comprising:
• providing shuttering having a regular wave shape for extending along a wave side of a first slab to be cast, the regular wave shape being imparted over the full depth of the wave side;
• casting the first slab having a regular wave shape extending along the wave side imparted by the shuttering;
• removing the shuttering from the first slab once it has set;
• casting a second slab along the wave side of the first slab using shuttering having a regular wave shape, the second slab having a wave side imparted by the shuttering, • whereby adjoining wave sides of the first and second slab form inter-digitated protrusions extending over the full depth of the first and second slabs and the regular wave shape being visible at the surface of the cast concrete slabs.
The shuttering used for casting the first slab may be the same as the shuttering used for casting the second slab.
Accordingly, in another aspect of the disclosure, a method of laying concrete 25 slabs is provided comprising:
• providing shuttering having a regular wave shape, when viewed from above and throughout to the full depth of a slab to be lain, along a side of a first slab to be lain by casting at which side a second slab will subsequently be cast;
• casting the first slab;
· removing the regular-wave-shape shuttering;
• casting a second slab,
2013227436 12 Jun2018 whereby the slabs have inter-digitated protrusions of the regular wave shape to the full length of the slab along their adjoining sides imparted by the shuttering, with the regular wave shape being visible at the surface of the cast concrete slabs.
In use of the slabs by wheeled vehicles, load transfer from one slab to the next is progressive as opposed to step like. The shear stress at any one point in the concrete along the wave shaped arris is significantly lower than it would be if it was a straight arris.
We anticipate that a wide range of regular wave shapes will be effective, including wave shapes having straight portions, such as triangular, trapezium and square waves. We prefer that such wave shapes be given rounded corners to avoid stress concentration.
We can envisage the wave shape being tapered in its peak to peak extent with depth through the slabs.
According to another aspect of the disclosure there is provided concrete slab shuttering for use in the method of the first aspect, the shuttering having a regular wave shape along its length.
Whilst the disclosure provides that the shear stress at the arrises is restricted, the overall loading of the slabs remains the same and with it the tendency of one slab to be depressed whilst loaded and then the other as the load is passed to it. To restrict relative movement and transfer load from one slab to the next, it is known to provide dowels, both in rod and plate form, the dowels extending from the first slab, across a gap between the slabs to the second slab.
Such dowels can be provided for in the shuttering of the disclosure. A variety of manners for provision of this can be envisaged, in particular housings in the shuttering in which dowels are installed prior to casting of the first slab, with the shuttering being drawn horizontally away from the wave shaped slab face after curing to green state. Alternatively the shuttering can be provided with projections onto which plastics sleeves can be fitted prior to casting of the slab. On removal of the
2013227436 12 Jun2018 shuttering, the sleeves remain in place and dowels can be inserted into them, to have the second slab cast around their protruding portion. Where the shuttering cannot be withdrawn horizontally and vertical movement is required as well, the sleeve carrying projections can be removable from the shuttering in order to allow such withdrawal, leaving the sleeves in place.
Typically, corners of the slabs to be cast will be formed at intersections between different lengths of shuttering.
It is envisaged that at corners of the slabs to be cast, the shuttering may be provided with short median flats. Further for strength of the comers, the shuttering waves may be arranged for the first waves to be directed in the same clockwise or anti-clockwise direction with respect to the point of intersection of the short median flats.
Alternatively, it is envisaged that at corners of the slabs to be cast corner abutments may be provided between the lengths of shuttering, in abutment with respective comer ends of the lengths of shuttering. Typically, a corner abutment has a depth equal to or greater than the depth of the slabs and an extent between its outer edges and through its centre which is equal to or greater than the “peak to peak” height of the shuttering waves. A comer abutment with such an extent between its outer edges located at a corner of a slab to be cast will intersect the shuttering lengths at any point along the wave shape. This intersection permits the shuttering lengths to be cut to size without requiring short median flats at the comer ends.
It is envisaged that the corner abutments may be any shape, preferably a regular shape such as square or triangular and are ideally circularly cylindrical, with an outer diameter equal to or greater than the “peak to peak” height of the shuttering waves.
Typically comer abutments are provided between two or more shuttering lengths which are arranged to intersect to form corners of the slabs to be cast. Preferably corner abutments are provided at intersections of three or more shuttering lengths which are to form the comers of three or more slabs to be cast.
2013227436 26 Mar 2018
BRIEF DESCRIPTION OF THE DRAWINGS
To help understanding of the disclosure, a specific embodiment thereof will now be described by way of example and with reference to the accompanying drawings, in which:
Figure 1 is a perspective view of shuttering set out casting a first slab in working of the disclosure;
Figure 2 is a plan view of wave shape shuttering in accordance with the disclosure;
Figure 3 is an end view of the shuttering of the disclosure set up on a sub10 base;
Figure 4 is a cross-sectional side view through portions of slabs cast in accordance with the disclosure;
Figure 5 is a diagrammatic plan view of the shuttering of Figure 1;
Figure 6 is a view similar to Figure 5, with the shuttering moved on after 15 casting of a first slab for casting of a second, adjoining slab;
Figure 7 is a similar view of shuttering set up for a third slab;
Figure 8 is a plan view of four slabs cast in accordance with the disclosure; and
Figure 9 is an alternative arrangement of slab comers cast in accordance with 20 the disclosure.
DETAILED DESCRIPTION
Referring to the drawings, a sub-base 1 is prepared for a concrete slab 2 to be laid on, with straight shuttering 3, 4 on two adjoining sides and shuttering 5, 6 of the disclosure on the other two sides, beyond which further slabs will the laid.
The shuttering of the disclosure comprises casting face member 11, which is of rounded-corner-trapezium, regular-wave shape when viewed from above. The “peak to peak height” of the wave is 300mm, with flats 12 at the peak being nominally 150mm in length along the shuttering with a 25mm radius between them and the angled flats 14 between the peaks extending at 45° to the length of the joint. The shape of the wave is stabilised by upper and lower pieces 15, 16 of concrete reinforcing bar (rebar) welded along the length of the shuttering on an outer surface
2013227436 26 Mar 2018 of the member. At lm centres, tubes 18 are welded to the outer surface in outer troughs 19. The tubes are stabilised by pieces 20 of rebar connecting the outer end of the tubes to neighbouring outer peaks 21. The tubes are cross drilled 22 for pins 23 locating removable supports 24 for sleeves 25 to extend into the concrete when cast.
The pins and supports are chained 26 against loss. Triangulated jacks 27 are provided along the length of the shuttering. The jacks have vertically arranged screws threads carrying supports 28 engaging the upper rebar 15. The jacks abut the lower rebar and hold the shuttering upright. Adjustment of the jacks allows the shuttering to be adjusted and regularly supported level.
With the shuttering set up and sleeves 25 fitted to the supports, the slab 2 is pour and tamped. It is allowed to cure to its green state.
The pins are removed and the supports withdrawn, leaving the sleeves in the slab. The shuttering is lifted away from the slab and set up again one slabs length from its first position. Dowels 32 are inserted in the sleeves.
The exposed face of the slab is left with protrusions 33 having the regular trapezium wave shape of the shuttering. The protrusions extend through the full depth of the slab. When the next slab 34 is cast, complementary protrusions 35 will form in the troughs of the protrusions 33. They interdigitate. The dowels have their one ends in the sleeves of the first slab and their other ends cast into the second slab, whereby they can transfer vertical load from one slab to the next.
In Figures 5 to 7, the slabs and shuttering are shown diagrammatically in that a few wave peaks and troughs and a few protrusions only are shown. In practice many more individual peaks, troughs and protrusions are included per slab as shown in Figure 1. Figure 5 shows the abutment of the individual pieces of shuttering. Each has a 45° chamfer. At the plain corner between the straight shuttering 3, 4 the chamfers 41, 42 are provided on end flanges 43, 44 extending down from longitudinal edge flanges 45 provided for stiffening the straight shuttering. Opposite their opposite ends are provided with transverse flanges 46, 47 from which angled flanges extend.
2013227436 26 Mar 2018
The wave shaped shuttering lengths have 60° trapezium waves 51 through out most of their length. At their ends they have one pitch 52 of 45° trapezium waves. These provide 45° flanges 53, 54 for abutment at the corner opposite from the plain comer. At the comers where the wave shuttering meets the plain shuttering, the flats 55 of the 45° wave abut the transverse flanges 46, 47. The end 45° flanges 56 abut the angle flanges 48. In this way, the four pieces of shuttering mate together to contain the concrete poured for the slab 2.
Referring to Figure 6, the straight shuttering 3 is moved along one slab pitch and with it the two wave shuttering lengths. These abut in the same way. The end pitch of the length 6 fits the last angled face of the slab 2, whereby the second slab 34 can be poured. As shown in Figure 7, the shuttering lengths 4, 6 can be used for a side slab 61. However, for abutment with the first protrusion 62 along the side of the slab 34, a shortened piece of wave shuttering 63 is used, have a transverse flange 64 and an angled flange 65 similar to those at the end of the straight shuttering.
On final shrinkage of the slabs, a gap will open up between them following the wave shape, since the slabs will bond to each other only weakly and such bonds will break in preference to cracks developing in the body of the slabs.
The process of laying slabs will have been continued with wave shaped shuttering of the disclosure having been used wherever one slab extends on from another. Figure 8 shows slabs 71, 72 laid subsequently to slabs 2, 34.
In use, when the slabs have cured to full strength, a wheel rolling over the gaps between neighbouring slabs will progressively increase their area of contact with the next slab as they decrease the contact with the previous slab. Even non-pneumatic tyres can be expected to apply a reasonably uniform pressure across their tyre contact area to whatever is supporting them. Thus the load applied to one slab will be progressively transferred to the next slab, added to which the dowels hold the slabs level with each other. The result is the arrises at the gaps do not receive a shock
2013227436 26 Mar 2018 loading - or at least such a large shock loading as would be the case in the absence of the interdigitation. The arrises are expected not to suffer serious spalling.
The disclosure is not intended to be restricted to the details of the above described embodiment. For instance, the wave shape shuttering can be provided with flanges in addition to the rebar for enhanced stiffening.
As shown in Figure 9, the comers of the slabs can be cast differently with the wave shuttering provided with short median flats 101. For strength of the comers the shuttering waves are arranged for the first waves to be directed in the same clockwise or anti clockwise direction with respect to the point of intersection of the short median flats.
Alternatively, as shown in Figure 10, the shuttering may be provided with at least one corner abutment for comers of the slabs to be cast to be cast against. Corner abutments may be provided between two or more shuttering lengths which are to intersect to form a corner of a slab to be cast. The corner abutments may have any cross-sectional shape such as circular, triangular or square and have a depth equal to or greater than the shuttering lengths. Typically the abutments have a radial extent between their outer edges equal to or greater than the “peak to peak” height of the regular wave shape of the shuttering. Ideally the radial extent is greater than double the “peak to peak” height.
Referring to Figure 10, corner abutments 110 are hollow, circularly cylindrical steel tubes, typically the same height as the shuttering and with an outer diameter 111 of 900mm.
The abutments 110 are positioned at the intersections between lengths of shuttering 115, 116. The shuttering 115, 116 is cut to size for abutment against the comer abutment 110 at their respective intersecting ends 117, 118. The position of the cut at ends 117, 118 is independent of the wave shape of the shuttering, and is at the flat at the peak at 117 for shuttering 115 and at an angled flat at 118 for shuttering
116. The outer diameter 111 of the abutment 110 is larger than the “peak to peak”
2013227436 26 Mar 2018 height of the shuttering and so the abutment will be in abutment with the shuttering at any point along the wave shape.
In use, corner abutments 110 may remain in place throughout casting of each 5 of the slabs with which they are in abutment. Once the slabs have been cast, each abutment 110 can be removed and further slabs cast in their place. Alternatively, an abutment 110 may be removed before casting of a final slab, such that a comer of the final slab is cast against the edges of the slabs which had been cast against the abutment 110.
2013227436 12 Jun2018
Claims (9)
- CLAIMS:1. A method of laying concrete slabs, the method comprising:• providing shuttering having a regular wave shape, when viewed from above5 and throughout the full depth of a slab to be lain, along a side of a first slab to be lain by casting at which side a second slab will subsequently be cast;• casting the first slab;• removing the regular-wave-shape shuttering;• casting a second slab,10 whereby the slabs have inter-digitated protrusions of the regular wave shape to the full depth of the slab along their adjoining sides imparted by the shuttering, with the regular wave shape being visible at the surface of the cast concrete slabs.
- 2. A method of laying concrete slabs as claimed in claim 1, wherein the regular wave shape of the shuttering has straight portions.15 3. A method of laying concrete slabs as claimed in claim 2, wherein the regular wave shape has portions which are one of a triangular shape, a trapezium shape or a square shape.4. A method of laying concrete slabs as claimed in claim 2 or claim 3, wherein the regular wave shape has rounded corners.20 5. A method of laying concrete slabs as claimed in any one of claims 1 to 4, wherein the regular wave shape is tapered in its peak to peak extent with depth through the slabs.6. A method of laying concrete slabs as claimed in any one of claims 1 to 5, wherein the shuttering is provided with dowels, the dowels extending from the first25 slab, across a gap between the slabs to the second slab.7. A method of laying concrete slabs as claimed in claim 6, wherein:• the shuttering is provided with housings;• prior to casting the first slab, dowels are installed in the housings; and • on removal of the shuttering from the first slab, the shuttering is drawn horizontally away from the wave shaped slab face.2013227436 12 Jun20188. A method of laying concrete slabs as claimed in claim 6, wherein:• the shuttering is provided with projections;• prior to casting the first slab, plastic sleeves are fitted to the projections;• after casting the first slab and on removal of the shuttering, the plastic5 sleeves remain in place in the first slab;• after removal of the shuttering from the first slab and prior to casting the second slab, dowels are installed in the plastic sleeves, a portion of the dowels protruding from the plastic sleeves; and • on casting the second slab, the second slab is cast around the portions of10 the dowels protruding from the first slab.9. A method of laying concrete slabs as claimed in claim 8, wherein the sleeve carrying projections are removable from the shuttering, such that one of either of the shuttering or the projections may be removed from the first slab prior to removal of other one.15 10. A method of laying concrete slabs as claimed in any one of claims 1 to 9, wherein the shuttering is provided with at least one comer abutment.11. A method of laying concrete slabs as claimed in claim 10, wherein corner abutments are provided between ends of two or more shuttering lengths, which are to intersect to form corners of the slabs to be cast.20 12. A method of laying concrete slabs as claimed in claim 10 or claim 11, wherein prior to casting the second slab, the comer abutment is removed.13. A method of laying concrete slabs as claimed in claim 11 or claim 12, wherein after the casting of the second slab the comer abutment is removed.14. Concrete slab shuttering for use in the method in any one of claims 1 to 13,25 wherein the shuttering has a regular wave shape along its length.15. A method of laying first and second concrete slabs, the method comprising:• providing shuttering having a regular wave shape for extending along a wave side of a first slab to be cast, the regular wave shape being imparted over the full depth of the wave side;2013227436 12 Jun2018 • casting the first slab having a regular wave shape extending along the wave side imparted by the shuttering;• removing the shuttering from the first slab once it has set;• casting a second slab along the wave side of the first slab using shuttering5 having a regular wave shape, the second slab having a wave side imparted by the shuttering, whereby adjoining wave sides of the first and second slab form inter-digitated protrusions extending over the full depth of the first and second slabs and the regular wave shape being visible at the surface of the cast concrete slabs.10 16. A method of laying first and second concrete slabs according to claim 15, wherein the shuttering used for casting the first slab is the same as the shuttering used for casting the second slab.WO 2013/128152PCT/GB2013/0000721/9Figure 1SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/0000722/9Figure 2SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 3/9Figure 3Figure 4SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 4/9Figure 5SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 5/9SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 6/9Figure 7SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 7/9Figure 8SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 8/9Figure 9SUBSTITUTE SHEET (RULE 26)WO 2013/128152PCT/GB2013/000072
- 9/9Figure 10SUBSTITUTE SHEET (RULE 26)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GBGB1203477.3A GB201203477D0 (en) | 2012-02-28 | 2012-02-28 | Concrete shuttering |
| GB1203477.3 | 2012-02-28 | ||
| PCT/GB2013/000072 WO2013128152A2 (en) | 2012-02-28 | 2013-02-22 | Concrete shuttering |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| AU2013227436A1 AU2013227436A1 (en) | 2014-11-13 |
| AU2013227436B2 true AU2013227436B2 (en) | 2018-07-12 |
Family
ID=45991882
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2013227436A Ceased AU2013227436B2 (en) | 2012-02-28 | 2013-02-22 | Shuttering for concrete slab |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20150048543A1 (en) |
| EP (1) | EP2820190A2 (en) |
| AU (1) | AU2013227436B2 (en) |
| GB (1) | GB201203477D0 (en) |
| MX (1) | MX2014010305A (en) |
| NZ (1) | NZ628259A (en) |
| WO (1) | WO2013128152A2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113833127A (en) * | 2021-10-28 | 2021-12-24 | 中国十七冶集团有限公司 | Lossless demolding construction method for cast-in-place concrete of lifting plate |
| NL2033438B1 (en) * | 2021-11-03 | 2023-06-02 | Abs Infradvies Bv | Setting stone assembly |
| USD1050873S1 (en) | 2022-09-30 | 2024-11-12 | Illinois Tool Works Inc. | Joint former connector |
| USD1063119S1 (en) | 2022-09-30 | 2025-02-18 | Illinois Tool Works Inc. | Joint former |
| USD1081343S1 (en) | 2022-09-30 | 2025-07-01 | Illinois Tool Works Inc. | Joint former intersection |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1505174A (en) * | 1922-02-09 | 1924-08-19 | Edward K Triol | Concrete-pavement construction |
| GB432809A (en) * | 1934-02-02 | 1935-08-02 | Joah Haigh Walker | Improvements in or relating to structures formed of concrete or like mouldable material |
| DE3533077A1 (en) * | 1985-09-17 | 1987-03-19 | Alfred Cremer | Wave joints in concrete surfaces |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3186676A (en) * | 1963-03-04 | 1965-06-01 | Acme Highway Prod | Keyway-forming member for use on highway forms |
| US5787666A (en) * | 1994-12-23 | 1998-08-04 | Sherry; Edward B. | Thin masonry veneer panel system and the fabrication thereof |
| US6145262A (en) * | 1998-11-12 | 2000-11-14 | Expando-Lok, Inc. | Dowel bar sleeve system and method |
| NL1028441C2 (en) * | 2005-02-16 | 2006-11-01 | Jakob Gerrit Hendrik Pannekoek | Roadside protection. |
| US20070134063A1 (en) * | 2005-12-14 | 2007-06-14 | Shaw And Sons, Inc. | Dowel device with closed end speed cover |
| PT2027340E (en) * | 2006-06-12 | 2015-07-09 | Hengelhoef Concrete Joints Mfg Nv | Floor provided with structural joint |
-
2012
- 2012-02-28 GB GBGB1203477.3A patent/GB201203477D0/en not_active Ceased
-
2013
- 2013-02-22 WO PCT/GB2013/000072 patent/WO2013128152A2/en not_active Ceased
- 2013-02-22 AU AU2013227436A patent/AU2013227436B2/en not_active Ceased
- 2013-02-22 MX MX2014010305A patent/MX2014010305A/en unknown
- 2013-02-22 US US14/381,493 patent/US20150048543A1/en not_active Abandoned
- 2013-02-22 EP EP13710513.6A patent/EP2820190A2/en not_active Ceased
- 2013-02-22 NZ NZ628259A patent/NZ628259A/en not_active IP Right Cessation
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1505174A (en) * | 1922-02-09 | 1924-08-19 | Edward K Triol | Concrete-pavement construction |
| GB432809A (en) * | 1934-02-02 | 1935-08-02 | Joah Haigh Walker | Improvements in or relating to structures formed of concrete or like mouldable material |
| DE3533077A1 (en) * | 1985-09-17 | 1987-03-19 | Alfred Cremer | Wave joints in concrete surfaces |
Also Published As
| Publication number | Publication date |
|---|---|
| GB201203477D0 (en) | 2012-04-11 |
| EP2820190A2 (en) | 2015-01-07 |
| NZ628259A (en) | 2016-11-25 |
| WO2013128152A3 (en) | 2014-02-20 |
| MX2014010305A (en) | 2014-10-13 |
| WO2013128152A2 (en) | 2013-09-06 |
| US20150048543A1 (en) | 2015-02-19 |
| AU2013227436A1 (en) | 2014-11-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2023285787B2 (en) | Load transfer plate pocket and method of employing same | |
| AU2013227436B2 (en) | Shuttering for concrete slab | |
| WO2014031365A1 (en) | Method and apparatus for lifting and leveling a concrete panel | |
| US8465222B1 (en) | Load transfer apparatus for cast-in-place concrete slabs | |
| Matsumoto et al. | of a precast concrete bent-cap system | |
| CN103485281B (en) | A kind of construction method of assembled external transverse prestress hollow slab bridge | |
| CN104480846A (en) | Spliced girder bridge and construction method thereof | |
| CN102943431B (en) | Cast-in-place reinforced concrete plate and fabricated reinforced concrete plate splicing bridge and method | |
| CN105568963B (en) | A kind of concrete-pile and preparation method thereof | |
| CN210262769U (en) | A kind of hollow slab bridge reinforcement and widening structure | |
| CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
| US20080145144A1 (en) | Precast Curb System and Method of Installation thereof | |
| JPH108429A (en) | Structure and construction method of concrete protection fence | |
| CN113882274B (en) | Construction method for paving longitudinal prestressed concrete bridge deck | |
| KR102386348B1 (en) | Girder installed strengthen and space cap device | |
| JP7782226B2 (en) | Bridge replacement method | |
| KR101379384B1 (en) | Repair method for concrete pavement | |
| CN210262550U (en) | Asphalt pavement structure based on cement pavement | |
| JP6522222B1 (en) | Foundation structure of the building | |
| US9499945B2 (en) | Methods for the construction and repair of concrete pavements | |
| CN113981829B (en) | Construction method of prestressed concrete tongue-and-groove joint | |
| AT526888B1 (en) | CONCRETE GUARD ELEMENT FOR A VEHICLE RESTRAINT SYSTEM | |
| JP2017020176A (en) | Abutment reinforcement structure and reinforcement method | |
| JP2016003434A (en) | Seismic reinforcement structure for earth structure and seismic reinforcement method for earth structure | |
| JPH11280008A (en) | Precast pavement slab and method of manufacturing the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| NB | Applications allowed - extensions of time section 223(2) |
Free format text: THE TIME IN WHICH TO ENTER THE NATIONAL PHASE HAS BEEN EXTENDED TO 28 OCT 2014 . |
|
| MK1 | Application lapsed section 142(2)(a) - no request for examination in relevant period | ||
| NA | Applications received for extensions of time, section 223 |
Free format text: AN APPLICATION TO EXTEND THE TIME FROM 24 JUL 2016 TO 24 NOV 2016 IN WHICH TO REQUEST EXAMINATION HAS BEEN FILED |
|
| NB | Applications allowed - extensions of time section 223(2) |
Free format text: THE TIME IN WHICH TO REQUEST EXAMINATION HAS BEEN EXTENDED TO 24 NOV 2016 |
|
| HB | Alteration of name in register |
Owner name: RCR FLOORING PRODUCTS LIMITED Free format text: FORMER NAME(S): PERMABAN LIMITED |
|
| FGA | Letters patent sealed or granted (standard patent) | ||
| MK14 | Patent ceased section 143(a) (annual fees not paid) or expired |